CN110016531A - A kind of large blast furnace taphole mud sleeve integral production method - Google Patents

A kind of large blast furnace taphole mud sleeve integral production method Download PDF

Info

Publication number
CN110016531A
CN110016531A CN201910248429.5A CN201910248429A CN110016531A CN 110016531 A CN110016531 A CN 110016531A CN 201910248429 A CN201910248429 A CN 201910248429A CN 110016531 A CN110016531 A CN 110016531A
Authority
CN
China
Prior art keywords
taphole
castable
frame
blast furnace
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910248429.5A
Other languages
Chinese (zh)
Inventor
李瑞杰
曲云玉
王永忠
石钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN201910248429.5A priority Critical patent/CN110016531A/en
Publication of CN110016531A publication Critical patent/CN110016531A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/12Opening or sealing the tap holes
    • C21B7/125Refractory plugging mass

Abstract

The invention discloses a kind of large blast furnace taphole mud sleeve integral production methods, include the following steps: S1, castable old in taphole frame frame all disintegrates before taphole mud sleeve is integrated poured, Hydraulic clay gun is operated to iron mouth region, big gun head lower edge is put in into 7-15mm in taphole frame frame, it is sealed in big gun head surrounding with steel form, edge opens up material filling mouth on steel form;It is S2, with blender that siccative is 2-4 minutes dry-mixed, the water of siccative weight 4%-6% is then added, is sufficiently stirred 3-5 minutes, obtains castable;S3, it is poured into taphole frame frame from material filling mouth by castable, until filling;S4, after filling castable, keep castable full with vibrating head slight vibration, by Hydraulic clay gun return after health 18-30 hours, it is covered 18-30 hours with small fire baking mud, being toasted 18-30 hours with high fire again can be used, it will not be pressed when method stifled iron notch of the invention and collapse mud set, long service life, and iron mouth is easy to maintain.

Description

A kind of large blast furnace taphole mud sleeve integral production method
Technical field
The present invention relates to a kind of large blast furnace taphole mud sleeve integral production methods.
Background technique
Currently, existing processing method is compacting mud set again that old mud set part is disintegrated, but due in mud set and iron Castable cannot form an entirety inside mouth region, there are problems that the service life is low, difficult maintenance so as to cause it.
The taphole mud sleeve pouring procedure that No. 7 blast furnace opening initials of Baogang use is after old mud set to be plucked out to certain space with pouring Material feeding casting, this mud set production method blast furnace intensity is low, low output in the case where, production is still maintained, as blast furnace is strong Degree, output increased this mud set, which bear not live high temperature and pressure, to be influenced breakage often and causes to block up to run mud, and it is qualified to influence iron mouth depth Rate.And service life is short to cause to switch that iron mouth is frequent, and stokehold labor intensity increases, it is difficult to meet large blast furnace production needs. So the quality of mud set and service life are significant to blast fumance.
Summary of the invention
In order to solve the above-mentioned technical problem, the object of the present invention is to provide a kind of large blast furnace taphole mud sleeve integral manufacturing sides Method.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of large blast furnace taphole mud sleeve integral production method, includes the following steps:
S1, castable old in taphole frame frame all disintegrated before taphole mud sleeve is integrated poured, by Hydraulic clay gun operation to iron Big gun head lower edge is put in 7-15mm in taphole frame frame by mouth region, is sealed in big gun head surrounding with steel form, and edge opens up filling on steel form Material mouth;
It is S2, with blender that siccative is 2-4 minutes dry-mixed, the water of siccative weight 4%-6% is then added, 3-5 is sufficiently stirred Minute, obtain castable;
S3, it is poured into taphole frame frame from material filling mouth by castable, until filling;
S4, after filling castable, keep castable full with vibrating head slight vibration, by Hydraulic clay gun after health 18-30 hours Return is covered 18-30 hours with small fire baking mud, then is toasted 18-30 hours with high fire and be can be used.
Further, Hydraulic clay gun is operated to iron mouth region and big gun head lower edge is put in into 10mm in taphole frame frame.
Further, with blender by siccative dry-mixed 3 minutes, then plus water 5%.
Further, health 24 hours are covered 24 hours with small fire baking mud, are toasted 24 hours with high fire.
Further, include the steps that purge in taphole frame frame after disintegrating clean.
Further, Hydraulic clay gun is operated to iron mouth region and big gun head lower edge is put in into 8mm or 12mm in taphole frame frame.
Further, with blender by siccative dry-mixed 2 minutes, then plus water 4%.
Compared with prior art, advantageous effects of the invention:
Method of the invention can successfully inhibit iron mouth region domain coal gas excessive after implementing, and keep taphole mud sleeve formation one solid Integrally, it will not be pressed when stifled iron notch and collapse mud set, long service life improves whole ditch system iron and reaches 250,000 tons, and iron is switched in reduction Mouth number, iron mouth is easy to maintain, effectively prevents the generation of all kinds of accidents.
Detailed description of the invention
Fig. 1 is old to pour preparation method effect diagram;
Fig. 2 is the effect diagram of method of the invention.
Specific embodiment
A kind of large blast furnace taphole mud sleeve integral production method will be old in taphole frame frame before taphole mud sleeve is integrated poured Castable is all disintegrated, and will purge completely in taphole frame frame after disintegration, Hydraulic clay gun is operated to iron mouth region and puts in big gun head lower edge 10mm in taphole frame frame is sealed in big gun head surrounding with steel form, and material filling mouth is opened on edge on steel form, with blender that siccative is dry-mixed Then plus water 4%-5% it 2-3 minutes, is sufficiently stirred 3-5 minutes, is poured into taphole frame frame from material filling mouth by castable, directly Until filling.After filling castable, keep castable full with vibrating head slight vibration, then returns Hydraulic clay gun within health 24 hours Position is covered 24 hours with small fire baking mud, then is toasted 24 hours with high fire and be can be used.
Health and large and small fire in the present invention control the conventional technical means being well known to the skilled person, This is not repeated specifically, if be those skilled in the art can make according to actual needs adjustment, be ensured of health after It can be achieved the goal with small fire and high fire baking respectively.
In October, 2017 in No. 1 iron mouth practical application of No. 7 blast furnaces, in January, 2018 in 7,8 blast furnace institutes after success of the test There are the popularization and application of iron mouth, so far 7,8 blast furnace taphole good application effect.
As shown in Fig. 2, its using effect is good., then see Fig. 1, it is old pour the new and old material of preparation method and combine cause gas leak tight Weight.
Embodiment described above is only that preferred embodiment of the invention is described, and is not carried out to the scope of the present invention It limits, without departing from the spirit of the design of the present invention, those of ordinary skill in the art make technical solution of the present invention Various changes and improvements, should all fall into claims of the present invention determine protection scope in.

Claims (7)

1. a kind of large blast furnace taphole mud sleeve integral production method, which comprises the steps of:
S1, castable old in taphole frame frame all disintegrated before taphole mud sleeve is integrated poured, by Hydraulic clay gun operation to iron mouth region Big gun head lower edge is put in into 7-15mm in taphole frame frame, is sealed in big gun head surrounding with steel form, edge opens up material filling mouth on steel form;
It is S2, with blender that siccative is 2-4 minutes dry-mixed, the water of siccative weight 4%-6% is then added, is sufficiently stirred 3-5 minutes, Obtain castable;
S3, it is poured into taphole frame frame from material filling mouth by castable, until filling;
S4, after filling castable, keep castable full with vibrating head slight vibration, by Hydraulic clay gun return after health 18-30 hours, It is covered 18-30 hours with small fire baking mud, then is toasted 18-30 hours with high fire and be can be used.
2. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that operate Hydraulic clay gun Big gun head lower edge is put in into 10mm in taphole frame frame to iron mouth region.
3. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that will be done with blender Then plus water 5% expect dry-mixed 3 minutes,.
4. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that health 24 hours, It is covered 24 hours with small fire baking mud, is toasted 24 hours with high fire.
5. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that after further including disintegration Clean step will be purged in taphole frame frame.
6. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that operate Hydraulic clay gun Big gun head lower edge is put in into 8mm or 12mm in taphole frame frame to iron mouth region.
7. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that will be done with blender Then plus water 4% expect dry-mixed 2 minutes,.
CN201910248429.5A 2019-03-29 2019-03-29 A kind of large blast furnace taphole mud sleeve integral production method Pending CN110016531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910248429.5A CN110016531A (en) 2019-03-29 2019-03-29 A kind of large blast furnace taphole mud sleeve integral production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910248429.5A CN110016531A (en) 2019-03-29 2019-03-29 A kind of large blast furnace taphole mud sleeve integral production method

Publications (1)

Publication Number Publication Date
CN110016531A true CN110016531A (en) 2019-07-16

Family

ID=67190211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910248429.5A Pending CN110016531A (en) 2019-03-29 2019-03-29 A kind of large blast furnace taphole mud sleeve integral production method

Country Status (1)

Country Link
CN (1) CN110016531A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607410A (en) * 2019-10-16 2019-12-24 首钢京唐钢铁联合有限责任公司 Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve
CN111216216A (en) * 2019-11-22 2020-06-02 安阳钢铁股份有限公司 Plastic pouring process for blast furnace taphole channel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020048161A (en) * 2000-12-16 2002-06-22 이구택 Making apparatus of protective wall for tapping hole
CN101781693A (en) * 2009-12-24 2010-07-21 马鞍山钢铁股份有限公司 Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof
CN103114159A (en) * 2013-03-04 2013-05-22 攀钢集团攀枝花钢钒有限公司 Method for manufacturing or mending taphole mud sleeve of blast furnace
CN104291844A (en) * 2014-09-29 2015-01-21 吴雪健 Method for preparing long-service-life taphole mud sleeve for blast furnace
CN208087653U (en) * 2018-04-20 2018-11-13 攀钢集团攀枝花钢钒有限公司 Taphole mud sleeve casting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020048161A (en) * 2000-12-16 2002-06-22 이구택 Making apparatus of protective wall for tapping hole
CN101781693A (en) * 2009-12-24 2010-07-21 马鞍山钢铁股份有限公司 Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof
CN103114159A (en) * 2013-03-04 2013-05-22 攀钢集团攀枝花钢钒有限公司 Method for manufacturing or mending taphole mud sleeve of blast furnace
CN104291844A (en) * 2014-09-29 2015-01-21 吴雪健 Method for preparing long-service-life taphole mud sleeve for blast furnace
CN208087653U (en) * 2018-04-20 2018-11-13 攀钢集团攀枝花钢钒有限公司 Taphole mud sleeve casting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张永忠: "宝钢3号高炉铁口整体修复技术", 《炼铁》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607410A (en) * 2019-10-16 2019-12-24 首钢京唐钢铁联合有限责任公司 Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve
CN110607410B (en) * 2019-10-16 2021-12-21 首钢京唐钢铁联合有限责任公司 Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve
CN111216216A (en) * 2019-11-22 2020-06-02 安阳钢铁股份有限公司 Plastic pouring process for blast furnace taphole channel

Similar Documents

Publication Publication Date Title
CN110016531A (en) A kind of large blast furnace taphole mud sleeve integral production method
CN101497930A (en) Single taphole blast furnace tapping channel iron storing type improving technology
CN110243185A (en) A kind of stifled eye material for high-silicon alloy mineral hot furnace
CN102554201A (en) Large steel ladle and manufacturing method for same
CN112501369B (en) Method for reducing tapping frequency of blast furnace
CN110527759A (en) A method of prevent blast furnace taphole from leaking coal gas
CN103114159A (en) Method for manufacturing or mending taphole mud sleeve of blast furnace
CN101781693B (en) Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof
JP2009062601A (en) Molten pig iron tapping hole structure in melting furnace, and repairing method therefor
CN205188326U (en) Can prevent iron notch of blast furnace structure of gas leakage
CN104451008B (en) A kind of blast furnace gravity flow fire-resistant castable construction method
CN105195723A (en) Repairing method for steel ladle wall permanent layer
CN108971471B (en) Construction process for carbon-free steel ladle composite ladle bottom
CN87101798A (en) The flashboard of fire-resistant moulded parts, especially sliding gate
CN108842018A (en) A kind of blast-furnace tuyere blocks up mud device and its installation and method for dismounting
CN210561599U (en) Slag bituminous mixture's even agitating unit
CN208594308U (en) Waste material clears up system in a kind of large blast furnace overhaul furnace
CN1180902C (en) Draining ageng made of chromium
CN107022662A (en) A kind of fixing means of blast furnace hot edge brick when cylinder iron cooling wall is cast
CN206008803U (en) One kind of multiple class debris melting plants
CN201367433Y (en) Single iron notch blast furnace iron storage type iron runner
CN109539796A (en) A kind of sub- furnace deslagging method of metal casting
CN103542725A (en) Method for prolonging service life of guide chute of sintering machine
CN205747979U (en) A kind of casting smelting furnace threshold
CN209602576U (en) A kind of blast furnace casting mouth structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190716