CN110016531A - A kind of large blast furnace taphole mud sleeve integral production method - Google Patents
A kind of large blast furnace taphole mud sleeve integral production method Download PDFInfo
- Publication number
- CN110016531A CN110016531A CN201910248429.5A CN201910248429A CN110016531A CN 110016531 A CN110016531 A CN 110016531A CN 201910248429 A CN201910248429 A CN 201910248429A CN 110016531 A CN110016531 A CN 110016531A
- Authority
- CN
- China
- Prior art keywords
- taphole
- castable
- frame
- blast furnace
- hours
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/12—Opening or sealing the tap holes
- C21B7/125—Refractory plugging mass
Abstract
The invention discloses a kind of large blast furnace taphole mud sleeve integral production methods, include the following steps: S1, castable old in taphole frame frame all disintegrates before taphole mud sleeve is integrated poured, Hydraulic clay gun is operated to iron mouth region, big gun head lower edge is put in into 7-15mm in taphole frame frame, it is sealed in big gun head surrounding with steel form, edge opens up material filling mouth on steel form;It is S2, with blender that siccative is 2-4 minutes dry-mixed, the water of siccative weight 4%-6% is then added, is sufficiently stirred 3-5 minutes, obtains castable;S3, it is poured into taphole frame frame from material filling mouth by castable, until filling;S4, after filling castable, keep castable full with vibrating head slight vibration, by Hydraulic clay gun return after health 18-30 hours, it is covered 18-30 hours with small fire baking mud, being toasted 18-30 hours with high fire again can be used, it will not be pressed when method stifled iron notch of the invention and collapse mud set, long service life, and iron mouth is easy to maintain.
Description
Technical field
The present invention relates to a kind of large blast furnace taphole mud sleeve integral production methods.
Background technique
Currently, existing processing method is compacting mud set again that old mud set part is disintegrated, but due in mud set and iron
Castable cannot form an entirety inside mouth region, there are problems that the service life is low, difficult maintenance so as to cause it.
The taphole mud sleeve pouring procedure that No. 7 blast furnace opening initials of Baogang use is after old mud set to be plucked out to certain space with pouring
Material feeding casting, this mud set production method blast furnace intensity is low, low output in the case where, production is still maintained, as blast furnace is strong
Degree, output increased this mud set, which bear not live high temperature and pressure, to be influenced breakage often and causes to block up to run mud, and it is qualified to influence iron mouth depth
Rate.And service life is short to cause to switch that iron mouth is frequent, and stokehold labor intensity increases, it is difficult to meet large blast furnace production needs.
So the quality of mud set and service life are significant to blast fumance.
Summary of the invention
In order to solve the above-mentioned technical problem, the object of the present invention is to provide a kind of large blast furnace taphole mud sleeve integral manufacturing sides
Method.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of large blast furnace taphole mud sleeve integral production method, includes the following steps:
S1, castable old in taphole frame frame all disintegrated before taphole mud sleeve is integrated poured, by Hydraulic clay gun operation to iron
Big gun head lower edge is put in 7-15mm in taphole frame frame by mouth region, is sealed in big gun head surrounding with steel form, and edge opens up filling on steel form
Material mouth;
It is S2, with blender that siccative is 2-4 minutes dry-mixed, the water of siccative weight 4%-6% is then added, 3-5 is sufficiently stirred
Minute, obtain castable;
S3, it is poured into taphole frame frame from material filling mouth by castable, until filling;
S4, after filling castable, keep castable full with vibrating head slight vibration, by Hydraulic clay gun after health 18-30 hours
Return is covered 18-30 hours with small fire baking mud, then is toasted 18-30 hours with high fire and be can be used.
Further, Hydraulic clay gun is operated to iron mouth region and big gun head lower edge is put in into 10mm in taphole frame frame.
Further, with blender by siccative dry-mixed 3 minutes, then plus water 5%.
Further, health 24 hours are covered 24 hours with small fire baking mud, are toasted 24 hours with high fire.
Further, include the steps that purge in taphole frame frame after disintegrating clean.
Further, Hydraulic clay gun is operated to iron mouth region and big gun head lower edge is put in into 8mm or 12mm in taphole frame frame.
Further, with blender by siccative dry-mixed 2 minutes, then plus water 4%.
Compared with prior art, advantageous effects of the invention:
Method of the invention can successfully inhibit iron mouth region domain coal gas excessive after implementing, and keep taphole mud sleeve formation one solid
Integrally, it will not be pressed when stifled iron notch and collapse mud set, long service life improves whole ditch system iron and reaches 250,000 tons, and iron is switched in reduction
Mouth number, iron mouth is easy to maintain, effectively prevents the generation of all kinds of accidents.
Detailed description of the invention
Fig. 1 is old to pour preparation method effect diagram;
Fig. 2 is the effect diagram of method of the invention.
Specific embodiment
A kind of large blast furnace taphole mud sleeve integral production method will be old in taphole frame frame before taphole mud sleeve is integrated poured
Castable is all disintegrated, and will purge completely in taphole frame frame after disintegration, Hydraulic clay gun is operated to iron mouth region and puts in big gun head lower edge
10mm in taphole frame frame is sealed in big gun head surrounding with steel form, and material filling mouth is opened on edge on steel form, with blender that siccative is dry-mixed
Then plus water 4%-5% it 2-3 minutes, is sufficiently stirred 3-5 minutes, is poured into taphole frame frame from material filling mouth by castable, directly
Until filling.After filling castable, keep castable full with vibrating head slight vibration, then returns Hydraulic clay gun within health 24 hours
Position is covered 24 hours with small fire baking mud, then is toasted 24 hours with high fire and be can be used.
Health and large and small fire in the present invention control the conventional technical means being well known to the skilled person,
This is not repeated specifically, if be those skilled in the art can make according to actual needs adjustment, be ensured of health after
It can be achieved the goal with small fire and high fire baking respectively.
In October, 2017 in No. 1 iron mouth practical application of No. 7 blast furnaces, in January, 2018 in 7,8 blast furnace institutes after success of the test
There are the popularization and application of iron mouth, so far 7,8 blast furnace taphole good application effect.
As shown in Fig. 2, its using effect is good., then see Fig. 1, it is old pour the new and old material of preparation method and combine cause gas leak tight
Weight.
Embodiment described above is only that preferred embodiment of the invention is described, and is not carried out to the scope of the present invention
It limits, without departing from the spirit of the design of the present invention, those of ordinary skill in the art make technical solution of the present invention
Various changes and improvements, should all fall into claims of the present invention determine protection scope in.
Claims (7)
1. a kind of large blast furnace taphole mud sleeve integral production method, which comprises the steps of:
S1, castable old in taphole frame frame all disintegrated before taphole mud sleeve is integrated poured, by Hydraulic clay gun operation to iron mouth region
Big gun head lower edge is put in into 7-15mm in taphole frame frame, is sealed in big gun head surrounding with steel form, edge opens up material filling mouth on steel form;
It is S2, with blender that siccative is 2-4 minutes dry-mixed, the water of siccative weight 4%-6% is then added, is sufficiently stirred 3-5 minutes,
Obtain castable;
S3, it is poured into taphole frame frame from material filling mouth by castable, until filling;
S4, after filling castable, keep castable full with vibrating head slight vibration, by Hydraulic clay gun return after health 18-30 hours,
It is covered 18-30 hours with small fire baking mud, then is toasted 18-30 hours with high fire and be can be used.
2. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that operate Hydraulic clay gun
Big gun head lower edge is put in into 10mm in taphole frame frame to iron mouth region.
3. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that will be done with blender
Then plus water 5% expect dry-mixed 3 minutes,.
4. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that health 24 hours,
It is covered 24 hours with small fire baking mud, is toasted 24 hours with high fire.
5. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that after further including disintegration
Clean step will be purged in taphole frame frame.
6. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that operate Hydraulic clay gun
Big gun head lower edge is put in into 8mm or 12mm in taphole frame frame to iron mouth region.
7. large blast furnace taphole mud sleeve integral production method according to claim 1, which is characterized in that will be done with blender
Then plus water 4% expect dry-mixed 2 minutes,.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910248429.5A CN110016531A (en) | 2019-03-29 | 2019-03-29 | A kind of large blast furnace taphole mud sleeve integral production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910248429.5A CN110016531A (en) | 2019-03-29 | 2019-03-29 | A kind of large blast furnace taphole mud sleeve integral production method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110016531A true CN110016531A (en) | 2019-07-16 |
Family
ID=67190211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910248429.5A Pending CN110016531A (en) | 2019-03-29 | 2019-03-29 | A kind of large blast furnace taphole mud sleeve integral production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110016531A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110607410A (en) * | 2019-10-16 | 2019-12-24 | 首钢京唐钢铁联合有限责任公司 | Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve |
CN111216216A (en) * | 2019-11-22 | 2020-06-02 | 安阳钢铁股份有限公司 | Plastic pouring process for blast furnace taphole channel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020048161A (en) * | 2000-12-16 | 2002-06-22 | 이구택 | Making apparatus of protective wall for tapping hole |
CN101781693A (en) * | 2009-12-24 | 2010-07-21 | 马鞍山钢铁股份有限公司 | Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof |
CN103114159A (en) * | 2013-03-04 | 2013-05-22 | 攀钢集团攀枝花钢钒有限公司 | Method for manufacturing or mending taphole mud sleeve of blast furnace |
CN104291844A (en) * | 2014-09-29 | 2015-01-21 | 吴雪健 | Method for preparing long-service-life taphole mud sleeve for blast furnace |
CN208087653U (en) * | 2018-04-20 | 2018-11-13 | 攀钢集团攀枝花钢钒有限公司 | Taphole mud sleeve casting device |
-
2019
- 2019-03-29 CN CN201910248429.5A patent/CN110016531A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020048161A (en) * | 2000-12-16 | 2002-06-22 | 이구택 | Making apparatus of protective wall for tapping hole |
CN101781693A (en) * | 2009-12-24 | 2010-07-21 | 马鞍山钢铁股份有限公司 | Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof |
CN103114159A (en) * | 2013-03-04 | 2013-05-22 | 攀钢集团攀枝花钢钒有限公司 | Method for manufacturing or mending taphole mud sleeve of blast furnace |
CN104291844A (en) * | 2014-09-29 | 2015-01-21 | 吴雪健 | Method for preparing long-service-life taphole mud sleeve for blast furnace |
CN208087653U (en) * | 2018-04-20 | 2018-11-13 | 攀钢集团攀枝花钢钒有限公司 | Taphole mud sleeve casting device |
Non-Patent Citations (1)
Title |
---|
张永忠: "宝钢3号高炉铁口整体修复技术", 《炼铁》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110607410A (en) * | 2019-10-16 | 2019-12-24 | 首钢京唐钢铁联合有限责任公司 | Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve |
CN110607410B (en) * | 2019-10-16 | 2021-12-21 | 首钢京唐钢铁联合有限责任公司 | Manufacturing method of blast furnace taphole mud sleeve and manufactured mud sleeve |
CN111216216A (en) * | 2019-11-22 | 2020-06-02 | 安阳钢铁股份有限公司 | Plastic pouring process for blast furnace taphole channel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110016531A (en) | A kind of large blast furnace taphole mud sleeve integral production method | |
CN101497930A (en) | Single taphole blast furnace tapping channel iron storing type improving technology | |
CN110243185A (en) | A kind of stifled eye material for high-silicon alloy mineral hot furnace | |
CN102554201A (en) | Large steel ladle and manufacturing method for same | |
CN112501369B (en) | Method for reducing tapping frequency of blast furnace | |
CN110527759A (en) | A method of prevent blast furnace taphole from leaking coal gas | |
CN103114159A (en) | Method for manufacturing or mending taphole mud sleeve of blast furnace | |
CN101781693B (en) | Tap hole integral pouring mud sleeve for blast furnace and manufacturing method thereof | |
JP2009062601A (en) | Molten pig iron tapping hole structure in melting furnace, and repairing method therefor | |
CN205188326U (en) | Can prevent iron notch of blast furnace structure of gas leakage | |
CN104451008B (en) | A kind of blast furnace gravity flow fire-resistant castable construction method | |
CN105195723A (en) | Repairing method for steel ladle wall permanent layer | |
CN108971471B (en) | Construction process for carbon-free steel ladle composite ladle bottom | |
CN87101798A (en) | The flashboard of fire-resistant moulded parts, especially sliding gate | |
CN108842018A (en) | A kind of blast-furnace tuyere blocks up mud device and its installation and method for dismounting | |
CN210561599U (en) | Slag bituminous mixture's even agitating unit | |
CN208594308U (en) | Waste material clears up system in a kind of large blast furnace overhaul furnace | |
CN1180902C (en) | Draining ageng made of chromium | |
CN107022662A (en) | A kind of fixing means of blast furnace hot edge brick when cylinder iron cooling wall is cast | |
CN206008803U (en) | One kind of multiple class debris melting plants | |
CN201367433Y (en) | Single iron notch blast furnace iron storage type iron runner | |
CN109539796A (en) | A kind of sub- furnace deslagging method of metal casting | |
CN103542725A (en) | Method for prolonging service life of guide chute of sintering machine | |
CN205747979U (en) | A kind of casting smelting furnace threshold | |
CN209602576U (en) | A kind of blast furnace casting mouth structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190716 |