CN110014019A - A kind of device and method of construction waste recycling - Google Patents

A kind of device and method of construction waste recycling Download PDF

Info

Publication number
CN110014019A
CN110014019A CN201910280000.4A CN201910280000A CN110014019A CN 110014019 A CN110014019 A CN 110014019A CN 201910280000 A CN201910280000 A CN 201910280000A CN 110014019 A CN110014019 A CN 110014019A
Authority
CN
China
Prior art keywords
conveyer belt
hopper
electromagnet
batch mixer
waste recycling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910280000.4A
Other languages
Chinese (zh)
Other versions
CN110014019B (en
Inventor
张理飞
徐晓慧
林周银
应显国
陈聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Lucheng First Construction Engineering Co Ltd
Original Assignee
Wenzhou Lucheng First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Lucheng First Construction Engineering Co Ltd filed Critical Wenzhou Lucheng First Construction Engineering Co Ltd
Priority to CN201910280000.4A priority Critical patent/CN110014019B/en
Publication of CN110014019A publication Critical patent/CN110014019A/en
Application granted granted Critical
Publication of CN110014019B publication Critical patent/CN110014019B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B18/00Use of agglomerated or waste materials or refuse as fillers for mortars, concrete or artificial stone; Treatment of agglomerated or waste materials or refuse, specially adapted to enhance their filling properties in mortars, concrete or artificial stone
    • C04B18/04Waste materials; Refuse
    • C04B18/16Waste materials; Refuse from building or ceramic industry
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/78Recycling of wood or furniture waste
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

By building waste sifting sort and building waste recycling can be prepared to the device and method of building mortar the invention discloses a kind of, its key points of the technical solution are that: this building waste recycling prepares the device of building mortar, including Material Sorting component and prepare component, the Material Sorting component includes the first hopper, second hopper, second electromagnet, electromagnetism smelting furnace, first conveyer belt, second conveyer belt, third conveyer belt and the 4th conveyer belt, first hopper and the second hopper are separately positioned on above the first conveyer belt and third conveyer belt, and first hopper and the second hopper discharge port be respectively toward to the first conveyer belt and third conveyer belt, first conveyer belt, second conveyer belt, third conveyer belt and the 4th conveyer belt are all from beginning to end, the two sides of second conveyer belt are equipped with second electromagnet, third conveyer belt is equipped with outer end It is cased with electromagnetism smelting furnace, second hopper is located at electromagnetism smelting furnace front end.

Description

A kind of device and method of construction waste recycling
Technical field
The present invention relates to building recycling field, more particularly to a kind of device and method of construction waste recycling.
Background technique
It generally requires to use many building mortars in architectural process, and containing a large amount of in a large amount of building waste Recyclable resource, such as metal, timber, plastics and cement slurry, these resources are usually treated as garbage disposal, too unrestrained Take, and these resources are thrown away as rubbish can also expend that many manpower and material resources, processing difficulty are big and expense is also high, and will build The device that building refuse recycling is prepared into building mortar does not also occur in the market.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide one kind can by building waste sifting sort and Building waste recycling can be prepared to the device and method of building mortar.
To achieve the above object, the present invention provides the following technical scheme that
The device of a kind of construction waste recycling, including Material Sorting component and prepare component, the Material Sorting component include the One hopper, the second hopper, the second electromagnet, electromagnetism smelting furnace, the first conveyer belt, the second conveyer belt, third conveyer belt and the 4th Conveyer belt, first hopper and the second hopper are separately positioned on above the first conveyer belt and third conveyer belt, and the first hopper The first conveyer belt and third conveyer belt, first conveyer belt, the second conveyer belt, third are respectively toward to the second hopper discharge port Conveyer belt and the 4th conveyer belt are all from beginning to end, and the two sides of second conveyer belt are equipped with second electromagnet, third transmission Band is equipped with outer end and is cased with electromagnetism smelting furnace, and second hopper is located at electromagnetism smelting furnace front end.
Further, the component for preparing includes the first batch mixer, filtering ponds, liquid storage tank and the second batch mixer, and described the One conveyer belt lower end connecting tube, the conduit under shed are connected with the first batch mixer, and first batch mixer is equipped with water inlet Mouthful, first batch mixer is connected to filtering ponds by conduit, and the filtering bottom of pond portion is equipped with mesh screen, and the filtering ponds pass through conduit It is connected to the second batch mixer, electromagnetism smelting furnace bottom is connected to by conduit with liquid storage tank, and liquid storage tank is mixed by conduit and second The conducting of material machine, second batch mixer are equipped with first charging aperture and second charging aperture.
Further, material mixing component is equipped in first hopper, the material mixing component includes shaft, material mixing piece, motor And fixed link, the shaft are mounted below motor, the side wall of the shaft is equipped with several material mixing pieces, the motor and fixation Bar is fixed, and the first hopper inner wall below the material mixing component fixes several the first electromagnet, first hopper and first The plate conveyor for transporting iron class material is equipped between conveyer belt, the plate conveyor is slidably connected with the first hopper.
Further, the rear and front end of second conveyer belt is fixed with sliding rail, and second electromagnet is erected at sliding rail On, the both ends junction of second electromagnet and sliding rail is equipped with the fixing piece for fixing the second electromagnet, and the both ends are sliding Rail is equipped with touching switch, and the touching switch is electrically connected with the second electromagnet.
Further, first conveyer belt uses mesh belt, and the sizing grid of the mesh belt is 4mm, The third conveyer belt uses high temperature resistant mesh belt.
Further, first hopper and the second hopper all pass through connecting rod and the mounting plate of conveyer belt is fixed.
Further, first conveyer belt, the second conveyer belt, third conveyer belt and the 4th conveyer belt all set there are two pass Driving wheel, the driving wheel are connect with the motor with speed reducer.
Further, roller, the mounting plate of the roller and conveyer belt are equipped between the opposite conveyer belt of the every two It is flexibly connected.
Further, it is equipped with the inclined-plane for water conservancy diversion in the electromagnetism smelting furnace, the surface bottom is against conduit.
A kind of method of construction waste recycling, comprising the following steps:
Category filter: building waste being ground into after fines and pours into the first hopper, is being fallen on the first conveyer belt, and fines is by The separation of one conveyer belt, is conducted surplus material to the second conveyer belt by the movement of the first conveyer belt, the second conveyor belt two sides The second electromagnet be powered the metal in material be sucked out, surplus material enters third conveyer belt, ring is added in the second hopper Oxygen resin enters electromagnetism smelting furnace together with material, and electromagnetism smelting furnace is 100 DEG C~120 DEG C, plastics and asphalt mixtures modified by epoxy resin in material Rouge melts, and timber is spread out of by the 4th conveyer belt;
Extract basic feed liquid: the fines that the first conveyer belt isolates less than 4mm falls the fines in the first batch mixer, then by into The mouth of a river is that 1:55 adds water according to solid-to-liquid ratio, is entered in filtering ponds after high-speed stirred 15min by conduit, the net through filtering ponds bottom Filtered liquid is sieved as basic feed liquid;
Extract resin mixture liquor: epoxy resin and recycled plastic while heating and melting obtain resin mixture liquor, store up in liquid storage tank It deposits;
Synthesize building mortar: basic feed liquid enters the second batch mixer by conduit, and cement is added in first charging aperture, opens second Batch mixer obtains mixed liquor A after mixing, then the resin mixture liquor in liquid storage tank is added in mixed liquor A, high-speed stirring It mixes 5~10min, then adhesive, diethyl phthalate, colorant, sagging inhibitor and fire-retardant is added by second charging aperture Agent is further continued for 5~10min of mixing to get mixed liquid B, then silicate powder is added by second charging aperture and stirs 30s~1min 20~25min is stood afterwards, adds curing agent, 10~20min of stirred under pressure is to get building mortar.
Beneficial effects of the present invention:
1, building material will be isolated on the first conveyer belt and be less than by the first hopper by initial gross separation ferrous metal material Iron substance is kept completely separate by the building fines of 4mm by second electromagnet at both ends, the electromagnetic welding of third conveyer belt outer end Furnace melts plastic substance, and remaining wood materials are spread out of by the 4th conveyer belt, and building material is pressed metal, plastics and wood The screening of material three classes is opened.
2, by the combined use of the first batch mixer, the second batch mixer and liquid storage tank, fines and building plastic will be built again The additives such as cement, which are added, makes it become building mortar again, is recycled.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of the first hopper in the present invention;
Fig. 3 is the attachment structure schematic diagram of sliding rail and the second electromagnet in the present invention.
Appended drawing reference: 1, the first conveyer belt;10, the first hopper;100, fixed link;101, shaft;102, material mixing piece;103, First electromagnet;104, motor;11, connecting rod;12, roller;2, the second conveyer belt;20, the second electromagnet;21, sliding rail;22, Mounting plate;23, touching switch;24, Object storing drum;3, third conveyer belt;30, the second hopper;31, electromagnetism smelting furnace;310, inclined-plane; 4, the 4th conveyer belt;5, the first batch mixer;50, water inlet;6, liquid storage tank;7, filtering ponds;70, mesh screen;8, the second batch mixer; 81, first charging aperture;82, second charging aperture.
Specific embodiment
With reference to the accompanying drawings and examples, the present invention is described in more detail.Wherein identical components are with identical Appended drawing reference indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "up" and "down" Refer to that the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and "outside" are referred respectively to towards or away from particular elements The direction of geometric center.
Shown in 2, the working principle of the present embodiment: building material pours into the first hopper 10 and passes through material mixing component Agitation by draw part ferrous metal inhale on the first electromagnet 103, rest materials can be fallen on the first conveyer belt 1, When needing to take out the ferrous metal of the first electromagnet 103 onto, plate conveyor is shifted to the lower section of 10 discharge port of the first hopper, the first electricity The power-off ferrous metal of magnet 103 falls in plate conveyor and transports, and the first conveyer belt 1 is less than the building fines of 4mm by isolating, and second passes Band 2 is sent to separate iron substance by second electromagnet 20 at both ends, in the electromagnetism smelting furnace 31 for passing through 3 outer end of third conveyer belt Plastic substance is melted, remaining wood materials are spread out of by the 4th conveyer belt 4, and building fines passes through water inlet 50 plus water again, High-speed stirred is entered in filtering ponds 7 by conduit, and the filtered liquid of mesh screen 70 through 7 bottom of filtering ponds is basic feed liquid, Epoxy resin and recycled plastic on third conveyer belt 3 are obtained resin mixture liquor, are being stored up by 31 heating and melting of electromagnetism smelting furnace It is stored in liquid pool 6, basic feed liquid enters the second batch mixer 8 by conduit, and cement is added in first charging aperture 81, it is mixed to open second Material machine 8 obtains mixed liquor A after mixing, then the resin mixture liquor in liquid storage tank 6 is added in mixed liquor A, high-speed stirring Mix again by second charging aperture 82 be added adhesive, diethyl phthalate, colorant, sagging inhibitor and fire retardant to get Mixed liquid B, then stood after silicate powder stirring is added by second charging aperture 82, add curing agent, stirred under pressure to obtain the final product Building mortar.
This building waste recycling prepares the device of building mortar, including Material Sorting component divides with component, material is prepared Picking component includes the first hopper 10,30 second electromagnet of the second hopper, 20 second electromagnet 20,20 second electromagnetism of the second electromagnet 20 second electromagnet 20 of iron, 31 second electromagnet of electromagnetism smelting furnace, 20 second electromagnet 20,1 second electromagnet of the first conveyer belt 20,2 second electromagnet 20 of the second conveyer belt, 3 second electromagnet 20 of third conveyer belt and the 4th conveyer belt 4, the first hopper 10 Two electromagnet, 20 second electromagnet 20 and 30 second electromagnet of the second hopper, 20 second electromagnet 20 are separately positioned on the first transmission 20 top of 1 second electromagnet 20 of band and 3 second electromagnet of third conveyer belt, and 10 second electromagnet of the first hopper, 20 second electromagnetism Iron 20 and 30 second 20 second electromagnet of electromagnet of the second hopper, 20 discharge port are respectively toward to 1 second electromagnet 20 of the first conveyer belt With 3 second electromagnet 20 of third conveyer belt, 1 second electromagnet 20 of the first conveyer belt, 2 second electromagnet 20 of the second conveyer belt, Three conveyer belts, 3 second electromagnet 20 and the 4th conveyer belt 4 are all from beginning to end, and the two sides of 2 second electromagnet 20 of the second conveyer belt are set There is 20 second electromagnet of the second electromagnet, 20 second electromagnet 20,3 second electromagnet 20 of third conveyer belt is equipped with outer end and is cased with electricity 31 second electromagnet of magnetic smelting furnace, 20 second electromagnet 20,30 second electromagnet of the second hopper, 20 second electromagnet 20 are located at electromagnetism 31 second 20 second electromagnet of electromagnet of smelting furnace, 20 front end.
First conveyer belt 1 may separate out the fines for being less than 4mm in construction material, the second electromagnetism of two sides of the second conveyer belt 2 The energization of iron 20 can siphon away iron substance, and third conveyer belt 3 can be by plastic melt and timber does not burn, and timber passes through the 4th biography again Band 4 is sent to spread out of, the temperature of electromagnetism smelting furnace 31 is 100 DEG C~120 DEG C, this temperature can just dissolve plastic material and due to wood The temperature of block spontaneous combustion is 400 DEG C therefore natural phenomena will not occur in electromagnetism smelting furnace 31 for module.
As a kind of improved specific embodiment, preparing component includes the first batch mixer 5, filtering ponds 7,6 and of liquid storage tank Second batch mixer 8,1 lower end connecting tube of the first conveyer belt, conduit under shed and the first batch mixer 5 are connected, on the first batch mixer 5 Equipped with water inlet 50, the first batch mixer 5 is connected to filtering ponds 7 by conduit, and 7 bottom of filtering ponds is equipped with mesh screen 70, and filtering ponds 7 pass through Conduit is connected to the second batch mixer 8, and 31 bottom of electromagnetism smelting furnace is connected to by conduit with liquid storage tank 6, and liquid storage tank 6 passes through conduit and the The conducting of two batch mixers 8, the second batch mixer 8 are equipped with first charging aperture 81 and second charging aperture 82.
The exit of liquid storage tank 6 and filtering ponds 7 is equipped with electromagnetic flow switch, is used for accurate flow control.
As a kind of improved specific embodiment, it is equipped with material mixing component in the first hopper 10, material mixing component includes shaft 101, material mixing piece 102, motor 104 and fixed link 100, shaft 101 is mounted on 104 lower section of motor, if the side wall of shaft 101 is equipped with A dry material mixing piece 102, motor 104 and fixed link 100 are fixed, 10 inner wall of the first hopper below material mixing component fix several the One electromagnet 103, is equipped with plate conveyor for transporting iron class material between the first hopper 10 and the first conveyer belt 1, plate conveyor with First hopper 10 is slidably connected.
First electromagnet 103 pours into building material in the first hopper 10 after passing through, and motor 104 drives shaft 101 and stirs Tablet 102 rotates, and material is all fallen from the side wall of the first hopper 10, and the first electromagnet 103 draws the range of ferrous metal more Greatly, absorption is more, and rest materials are spread out of by the discharge port of the first hopper 10, and plate conveyor is pushed into discharge port and corresponds to lower end, First electromagnet 103 is powered off, the first electromagnet 103 loses magnetism, and ferrous metal falls in plate conveyor and transports, and carries out preliminary Ferrous metal separation.
As a kind of improved specific embodiment, the rear and front end of the second conveyer belt 2 is fixed with sliding rail 21, the second electromagnetism Iron 20 is erected on sliding rail 21, and the both ends junction of the second electromagnet 20 and sliding rail 21 is equipped with for fixing the second electromagnet 20 Fixing piece, both ends sliding rail 21 are equipped with touching switch 23, and touching switch 23 is electrically connected with the second electromagnet 20.
When the second electromagnet 20 is pushed away by touching switch 23 from outside to inside, the second electromagnet 20 is powered, in the second electromagnetism When iron 20 is pushed away by touching switch 23 from inside to outside, the power-off of the second electromagnet 20 is fixed by fixing piece, makes be attracted iron class It when substance, will not be driven by mutual attraction, the Object storing drum 24 for collecting storage metal is equipped with below the second conveyer belt 2, Object storing drum 24 can raise support by supporting table.
As a kind of improved specific embodiment, the first conveyer belt 1 uses mesh belt, the grid of mesh belt Size is 4mm, and third conveyer belt 3 uses high temperature resistant mesh belt.
Website size is that 4mm can screen the fines less than 4mm, and third conveyer belt 3 uses the netted biography of high temperature resistant Band is sent, can prevent from being burnt out by electromagnetism smelting furnace 31 can also be dripped the plastics of dissolution by grid.
As a kind of improved specific embodiment, the first hopper 10 and the second hopper 30 all pass through connecting rod 11 and transmission The mounting plate 22 of band is fixed.
As a kind of improved specific embodiment, the first conveyer belt 1, the second conveyer belt 2, third conveyer belt 3 and the 4th Conveyer belt 4 is all set there are two driving wheel, and driving wheel is connect with the motor 104 with speed reducer.
As a kind of improved specific embodiment, be equipped with roller 12 between the opposite conveyer belt of every two, roller 12 with The mounting plate 22 of conveyer belt is flexibly connected.
Material is seamlessly transitted can between conveyer belt equipped with roller 12.
As a kind of improved specific embodiment, the inclined-plane 310 for water conservancy diversion, inclined-plane are equipped in electromagnetism smelting furnace 31 310 bottom ends are against conduit.
It is dripped after plastics are dissolved by grid, on falling in inclined-plane 310, since gravity can be voluntarily toward inclined-plane The conduit of 310 lower sections is mobile.
A kind of method of construction waste recycling, comprising the following steps:
Category filter: building waste being ground into after fines and pours into the first hopper 10, is being fallen on the first conveyer belt 1, fines It is separated by the first conveyer belt 1, is conducted surplus material to the second conveyer belt 2 by the movement of the first conveyer belt 1, the second transmission The second electromagnet 20 with 2 two sides is powered, and the metal in material is sucked out, and surplus material enters third conveyer belt 3, in the second material Epoxy resin is added in bucket 30 and enters electromagnetism smelting furnace 31 together with material, electromagnetism smelting furnace 31 is 100 DEG C~120 DEG C, material In plastics and epoxy resin melt, timber by the 4th conveyer belt 4 outflow;
Extract basic feed liquid: the first conveyer belt 1 isolates the fines less than 4mm and falls the fines in the first batch mixer 5, then passes through Water inlet 50 is that 1:55 adds water according to solid-to-liquid ratio, is entered in filtering ponds 7 after high-speed stirred 15min by conduit, through 7 bottom of filtering ponds The filtered liquid of mesh screen 70 in portion is basic feed liquid;
Extract resin mixture liquor: epoxy resin and recycled plastic while heating and melting obtain resin mixture liquor, in liquid storage tank 6 Storage;
Synthesize building mortar: basic feed liquid enters the second batch mixer 8 by conduit, and cement is added in first charging aperture 81, opens Second batch mixer 8 obtains mixed liquor A after mixing, and then the resin mixture liquor in liquid storage tank 6 is added in mixed liquor A, 5~10min of high-speed stirred, then adhesive, diethyl phthalate, colorant, anti-settling are added by second charging aperture 82 Agent and fire retardant are further continued for 5~10min of mixing to get mixed liquid B, then silicate powder is added by second charging aperture 82 and stirs 20~25min is stood after mixing 30s~1min, adds curing agent, 10~20min of stirred under pressure is to get building mortar.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of device of construction waste recycling, including Material Sorting component and prepare component, it is characterised in that: the material point Picking component includes the first hopper (10), the second hopper (30), the second electromagnet (20), electromagnetism smelting furnace (31), the first conveyer belt (1), the second conveyer belt (2), third conveyer belt (3) and the 4th conveyer belt (4), first hopper (10) and the second hopper (30) It is separately positioned on above the first conveyer belt (1) and third conveyer belt (3), and the first hopper (10) and the second hopper (30) discharge port It is respectively toward to the first conveyer belt (1) and third conveyer belt (3), first conveyer belt (1), the second conveyer belt (2), third transmission Band (3) and the 4th conveyer belt (4) are all from beginning to end, and the two sides of second conveyer belt (2) are equipped with second electromagnet (20), Third conveyer belt (3) is equipped with outer end and is cased with electromagnetism smelting furnace (31), before second hopper (30) is located at electromagnetism smelting furnace (31) End.
2. a kind of device of construction waste recycling according to claim 1, it is characterised in that: the component for preparing includes the One batch mixer (5), filtering ponds (7), liquid storage tank (6) and the second batch mixer (8), the first conveyer belt (1) lower end connecting tube, The conduit under shed and the first batch mixer (5) are connected, and first batch mixer (5) is equipped with water inlet (50), and described first Batch mixer (5) is connected to filtering ponds (7) by conduit, and filtering ponds (7) bottom is equipped with mesh screen (70), and the filtering ponds (7) are logical Conduit connection the second batch mixer (8) is crossed, electromagnetism smelting furnace (31) bottom is connected to by conduit with liquid storage tank (6), liquid storage tank (6) be connected by conduit and the second batch mixer (8), second batch mixer (8) equipped with first charging aperture (81) and second into Material mouth (82).
3. a kind of device of construction waste recycling according to claim 1, it is characterised in that: in first hopper (10) Equipped with material mixing component, the material mixing component includes shaft (101), material mixing piece (102), motor (104) and fixed link (100), institute It states shaft (101) to be mounted below motor (104), the side wall of the shaft (101) is equipped with several material mixing pieces (102), described Motor (104) and fixed link (100) are fixed, and the first hopper (10) inner wall below the material mixing component fixes several the first electricity Magnet (103) is equipped with the plate conveyor for transporting iron class material, institute between first hopper (10) and the first conveyer belt (1) Plate conveyor is stated to be slidably connected with the first hopper (10).
4. a kind of device of construction waste recycling according to claim 1, it is characterised in that: second conveyer belt (2) Rear and front end be fixed with sliding rail (21), second electromagnet (20) is erected on sliding rail (21), second electromagnet (20) fixing piece for fixing the second electromagnet (20), the both ends sliding rail (21) are equipped with the both ends junction of sliding rail (21) Equipped with touching switch (23), the touching switch (23) is electrically connected with the second electromagnet (20).
5. a kind of device of construction waste recycling according to claim 1, it is characterised in that: first conveyer belt (1) Using mesh belt, the sizing grid of the mesh belt is 4mm, and the third conveyer belt (3) is netted using high temperature resistant Conveyer belt.
6. a kind of device of construction waste recycling according to claim 1, it is characterised in that: first hopper (10) and Second hopper (30) is fixed by the mounting plate (22) of connecting rod (11) and conveyer belt.
7. a kind of device of construction waste recycling according to claim 1, it is characterised in that: first conveyer belt (1), Second conveyer belt (2), third conveyer belt (3) and the 4th conveyer belt (4) are all set there are two driving wheel, and the driving wheel subtracts with having The motor (104) of fast machine connects.
8. a kind of device of construction waste recycling according to claim 1, it is characterised in that: the opposite biography of the every two It send and is equipped with roller (12) between band, the roller (12) is flexibly connected with the mounting plate (22) of conveyer belt.
9. a kind of device of construction waste recycling according to claim 2, it is characterised in that: the electromagnetism smelting furnace (31) The interior inclined-plane (310) being equipped with for water conservancy diversion, inclined-plane (310) bottom end is against conduit.
10. a kind of method of construction waste recycling, which comprises the following steps:
Category filter: building waste being ground into after fines and pours into the first hopper (10), is being fallen on the first conveyer belt (1), Fines is separated by the first conveyer belt (1), is conducted surplus material to the second conveyer belt (2) by the movement of the first conveyer belt (1) On, second electromagnet (20) of the second conveyer belt (2) two sides is powered, and the metal in material is sucked out, and surplus material enters third biography Band (3) is sent, epoxy resin is added in the second hopper (30) and enters electromagnetism smelting furnace (31), electromagnetism smelting furnace together with material It (31) is 100 DEG C~120 DEG C, the plastics and epoxy resin in material melt, and timber is spread out of by the 4th conveyer belt (4);
Extract basic feed liquid: the first conveyer belt (1), which is isolated, to be fallen less than the fines of 4mm in the first batch mixer (5) interior fines, then Add water according to solid-to-liquid ratio by water inlet (50) for 1:55, is entered in filtering ponds (7) after high-speed stirred 15min by conduit, warp Mesh screen (70) the filtered liquid of filtering ponds (7) bottom is basic feed liquid;
Extract resin mixture liquor: epoxy resin and recycled plastic while heating and melting obtain resin mixture liquor, in liquid storage tank (6) Middle storage;
Synthesize building mortar: basic feed liquid enters the second batch mixer (8) by conduit, and cement is added in first charging aperture (81), The second batch mixer (8) are opened, after mixing, obtain mixed liquor A, are then added to the resin mixture liquor in liquid storage tank (6) mixed It closes in liquid A, 5~10min of high-speed stirred, then adhesive, diethyl phthalate, coloring is added by second charging aperture (82) Agent, sagging inhibitor and fire retardant are further continued for 5~10min of mixing to get mixed liquid B, then silicon is added by second charging aperture (82) Hydrochlorate powder stands 20~25min after stirring 30s~1min, adds curing agent, 10~20min of stirred under pressure is to get building Mortar.
CN201910280000.4A 2019-04-09 2019-04-09 Device and method for recycling construction waste Active CN110014019B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910280000.4A CN110014019B (en) 2019-04-09 2019-04-09 Device and method for recycling construction waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910280000.4A CN110014019B (en) 2019-04-09 2019-04-09 Device and method for recycling construction waste

Publications (2)

Publication Number Publication Date
CN110014019A true CN110014019A (en) 2019-07-16
CN110014019B CN110014019B (en) 2021-02-26

Family

ID=67190801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910280000.4A Active CN110014019B (en) 2019-04-09 2019-04-09 Device and method for recycling construction waste

Country Status (1)

Country Link
CN (1) CN110014019B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111014258A (en) * 2020-01-07 2020-04-17 龙游卡伊环保科技有限公司 Building timber burning iron material recovery plant
CN112246423A (en) * 2020-09-23 2021-01-22 重庆工程职业技术学院 Building rubbish intelligent classification device
CN113546977A (en) * 2021-06-07 2021-10-26 安徽省国润换热管路有限公司 Environment-friendly heat exchange pipeline extrusion molding equipment capable of automatically treating solid waste

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04176375A (en) * 1990-11-08 1992-06-24 Mutsuo Sugawara Partitioning equipment for building wrecking waste
CN1911542A (en) * 2006-08-31 2007-02-14 王鸣高 Comprehensive treatment method for architectural garbage
CN107129216A (en) * 2017-06-27 2017-09-05 六安三创建筑材料有限公司 A kind of method that application building waste prepares building mortar
CN107214184A (en) * 2017-08-02 2017-09-29 贵州精正检测有限公司 Building waste sorting equipment and building waste processing system
CN107597383A (en) * 2017-09-27 2018-01-19 禹州金科再生资源有限公司 A kind of building waste processing equipment
CN107838174A (en) * 2017-11-15 2018-03-27 江苏欧油品科技有限公司 A kind of building waste retracting device
CN207591953U (en) * 2017-11-20 2018-07-10 李文静 A kind of civil construction waste recovery agitating device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04176375A (en) * 1990-11-08 1992-06-24 Mutsuo Sugawara Partitioning equipment for building wrecking waste
CN1911542A (en) * 2006-08-31 2007-02-14 王鸣高 Comprehensive treatment method for architectural garbage
CN107129216A (en) * 2017-06-27 2017-09-05 六安三创建筑材料有限公司 A kind of method that application building waste prepares building mortar
CN107214184A (en) * 2017-08-02 2017-09-29 贵州精正检测有限公司 Building waste sorting equipment and building waste processing system
CN107597383A (en) * 2017-09-27 2018-01-19 禹州金科再生资源有限公司 A kind of building waste processing equipment
CN107838174A (en) * 2017-11-15 2018-03-27 江苏欧油品科技有限公司 A kind of building waste retracting device
CN207591953U (en) * 2017-11-20 2018-07-10 李文静 A kind of civil construction waste recovery agitating device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111014258A (en) * 2020-01-07 2020-04-17 龙游卡伊环保科技有限公司 Building timber burning iron material recovery plant
CN112246423A (en) * 2020-09-23 2021-01-22 重庆工程职业技术学院 Building rubbish intelligent classification device
CN113546977A (en) * 2021-06-07 2021-10-26 安徽省国润换热管路有限公司 Environment-friendly heat exchange pipeline extrusion molding equipment capable of automatically treating solid waste

Also Published As

Publication number Publication date
CN110014019B (en) 2021-02-26

Similar Documents

Publication Publication Date Title
CN110014019A (en) A kind of device and method of construction waste recycling
CN104788033B (en) A kind of building waste recovery and reusing and recycling method
CN106045393B (en) A kind of production equipment of eco-concrete
CN205774140U (en) A kind of production equipment of eco-concrete
CN104860561A (en) Construction waste recycling brick manufacturing system
CN110756325A (en) Preparation device and method for waste concrete coarse aggregate
CN212241583U (en) Concrete mixing device with comminuted structure
CN105381953B (en) Glass particle screening machine
CN209453909U (en) A kind of quotient's concrete concrete mixing plant
CN203091402U (en) Household garbage integrated treatment carbon rod producing system
CN107983473B (en) A kind of concrete for construction engineering recycling sand-gravel separation device
KR100696614B1 (en) The manufacturing method of high quality aggregate form construction waste by heating
CN207533338U (en) A kind of concrete for construction engineering recycles sand-gravel separation device
CN213797283U (en) Feeding device for mixing recycled concrete
CN206799455U (en) Machine-made Sand WATER-WASHING METHOD bugduster apparatus
CN109127683A (en) A kind of aging process for treating garbage as resource
CN206103765U (en) Fertilizer electronic batching device
CN204509124U (en) A kind of building waste recycling reutilization system
CN207745947U (en) Concrete cycle crushes aggregate device for separating powder
CN112892879B (en) Ore dressing medicament adds processing apparatus
CN205997172U (en) High pressure spray type concrete mixing device and concrete preparation transport vehicle
CN212292831U (en) Powdery nitratine continuous halogen making system
CN210332815U (en) Breaker for concrete
CN212193672U (en) Dosing unit is used in concrete processing
CN217703998U (en) Recycled concrete goods preparation facilities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant