CN110014002A CN201910430273.2A CN201910430273A CN110014002A CN 110014002 A CN110014002 A CN 110014002A CN 201910430273 A CN201910430273 A CN 201910430273A CN 110014002 A CN110014002 A CN 110014002A
Authority
CN
China
Prior art keywords
pilot hose
pilot
hose
valve
dredger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910430273.2A
Other languages
Chinese (zh)
Other versions
CN110014002B (en
Inventor
周伟
陈耘杰
邹科
胡怡东
邱启盛
唐元军
赵博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Guangzhou Metro Group Co Ltd
Original Assignee
Central South University
Guangzhou Metro Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, Guangzhou Metro Group Co Ltd filed Critical Central South University
Priority to CN201910430273.2A priority Critical patent/CN110014002B/en
Publication of CN110014002A publication Critical patent/CN110014002A/en
Application granted granted Critical
Publication of CN110014002B publication Critical patent/CN110014002B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • B08B9/0328Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid by purging the pipe with a gas or a mixture of gas and liquid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

The invention discloses the dredgers and method of a kind of small-bore pressure measurement pilot hose of parallel multiplex, pilot hose includes the first pilot hose and the second pilot hose, one end of first pilot hose is equipped with pressure sensing hole, the other end of first pilot hose is connect with the second pilot hose, the other end of second pilot hose connects a collector, dredger includes a triple valve, first pilot hose and the second pilot hose are connected by triple valve, the one dredging pipeline of third interface connection of triple valve, the other end for dredging pipeline connects a micro-positive pressure generating device, dredging pipe road is additionally provided with a check valve, first pilot hose is equipped with a valve.The dredger structure is simple, effectively dredges the second pilot hose when can block in the second pilot hose.

Description

A kind of dredger and method of the small-bore pressure measurement pilot hose of parallel multiplex
Technical field
The present invention relates to rail traffic wind speed measurement equipment technical fields, in particular to a kind of parallel multiplex osculum The dredger and method of diameter pressure measurement pilot hose.
Background technique
The small-bore pilot hose of parallel multiplex is very widely used in detection device and sensor field, is such as applied to track In the wind speed measurement of vehicular traffic.It is applied in harsh environment when by it, such as the environment of sand and dust, dust or haze molecule When middle, pilot hose is easy to be blocked, and causes measurement result inaccurate, influences the normal work of equipment, or even safety occurs and asks Topic.
Therefore, the dredging method of small-bore pilot hose in parallel is extremely important to the normal operation of installations and facilities.However, small Bore pilot hose is difficult to be dredged using mechanical dredging method, and then needs sealing ring using vapour-pressure type dredging method Border.
Summary of the invention
The main purpose of the present invention is to provide a kind of dredgers of the small-bore pressure measurement pilot hose of parallel multiplex And method, it is asked with solve to be difficult to dredge when the small-bore pressure measurement pilot hose of parallel multiplex blocks in the prior art Topic.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of small-bore pressure of parallel multiplex is surveyed Measure pilot hose dredger, pilot hose include the first pilot hose and the second pilot hose, the one of the first pilot hose End is equipped with pressure sensing hole, and the other end of the first pilot hose is connect with the second pilot hose, the other end connection of the second pilot hose One collector, dredger include a triple valve, and the first pilot hose and the second pilot hose are connected by triple valve, threeway The one dredging pipeline of third interface connection of valve, the other end for dredging pipeline connect a micro-positive pressure generating device, dredging pipe road It is additionally provided with a check valve, the first pilot hose is equipped with a valve.
Further, dredger further includes controller, and valve, collector and micro-positive pressure generating device connect with controller It connects.
Further, controller is also connected with a timing module.
Further, the first pilot hose, the second pilot hose and dredging pipeline are more, every first pilot hose Pass through a triple valve and a second pilot hose and a dredging piping connection, the other end of more second pilot hoses It being connect respectively with collector, the other end of more dredging pipelines is connect with micro-positive pressure generating device respectively by a multiway valve, Every dredging pipe road is equipped with check valve, is equipped with valve on every first pilot hose.
According to another aspect of the present invention, a kind of dredging of small-bore pressure measurement pilot hose of parallel multiplex is additionally provided Method is dredged using above-mentioned dredger, which includes: to adopt when blocking in the second pilot hose Pressure signal in the collected second pilot hose of storage obviously weakens, and closes the valve on corresponding first pilot hose at this time Door generates air pressure by micro-positive pressure generating device, and air pressure flows into the second pilot hose through dredging pipeline and triple valve to second Pilot hose is dredged.
It applies the technical scheme of the present invention, by the way that triple valve is arranged between the first pilot hose and the second pilot hose, The one dredging pipeline of another interface connection of triple valve, the other end of the dredging pipeline connect a micro-positive pressure generating device, and the Valve is set on one pilot hose;When blocking in the second pilot hose, the collected pressure signal of collector obviously subtracts It is weak, valve is closed at this time, makes to dredge pipeline and the second pilot hose is connected to the environment to form opposing seal, open micro-positive pressure Device generates air pressure, can dredge to the second pilot hose;By the way that check valve is arranged on dredging pipe road, avoid in pressure When measuring device works, air-flow enters the normal work dredged pipeline and influence device for pressure measurement from the first pilot hose.It should Dredger structure is simple, effectively dredges the second pilot hose when can block in the second pilot hose.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present invention, and of the invention shows Examples and descriptions thereof are used to explain the present invention for meaning property, does not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structure schematic diagram of the dredger of the embodiment of the present invention.
Wherein, the above drawings include the following reference numerals:
10, the first pilot hose;20, pressure sensing hole;30, triple valve;40, valve;50, the second pilot hose;60, it acquires Device;70, pipeline is dredged;80, micro-positive pressure generating device;90, check valve;100, controller;110, multiway valve.
Specific embodiment
To facilitate the understanding of the present invention, the present invention is made below in conjunction with Figure of description and preferred embodiment more complete Face meticulously describes, but the protection scope of the present invention is not limited to the following specific embodiments.It should be noted that not rushing In the case where prominent, the feature in embodiment and embodiment in the present invention be can be combined with each other.
Unless otherwise defined, all technical terms used hereinafter and the normally understood meaning of those skilled in the art It is identical." first ", " second " used in present patent application specification and claims and similar word are simultaneously Any sequence, quantity or importance are not indicated, and are intended merely to facilitate and corresponding components are distinguished.Equally, " one It is a " or the similar word such as " one " do not indicate that quantity limits, but indicate that there are at least one.The classes such as " connection " or " connected " As word be not limited to physics or mechanical connection, but may include electrical connection, either it is direct also It is indirect."upper", "lower", "left", "right" etc. are only used for indicating relative positional relationship, when the absolute position for being described object changes After change, then the relative positional relationship also correspondingly changes.
Referring to Fig. 1, a kind of dredger of the small-bore pressure measurement pilot hose of the parallel multiplex of the embodiment of the present invention is led Pressing hose includes the first pilot hose 10 and the second pilot hose 50, and one end of the first pilot hose 10 is provided with pressure sensing hole 20, The other end of first pilot hose 10 is connect with the second pilot hose 50, and the other end of the second pilot hose 50 connects an acquisition Device 60;Dredger includes a triple valve 30, and the first pilot hose 10 and the second pilot hose 50 pass through 30 phase of triple valve Connection, the third interface of triple valve 30 connect a dredging pipeline 70, and the other end connection one of the dredging pipeline 70 is micro- just Pressure generating apparatus 80 is dredged on pipeline 70 and is additionally provided with a check valve 90, a valve is provided on the first pilot hose 10 40。
Above-mentioned dredger, by the way that triple valve 30 is arranged between the first pilot hose 10 and the second pilot hose 50, The one dredging pipeline 70 of another interface connection of triple valve 30, the other end of the dredging pipeline 70 connect a micro-positive pressure generating device 80, and valve 40 is set on the first pilot hose 10;When blocking in the second pilot hose 50, collector 60 is collected Pressure signal obviously weaken, at this time close valve 40, make dredge pipeline 70 be connected to the second pilot hose 50 formation it is relatively close The environment of envelope opens micro-positive pressure generating device 80 and generates air pressure, can dredge to the second pilot hose 50;By dredging Check valve 90 is set on pipeline 70, is avoided when device for pressure measurement works, air-flow enters dredging pipe from the first pilot hose 10 Road 70 and the normal work for influencing device for pressure measurement.The dredger structure is simple, can send out in the second pilot hose 50 The second pilot hose 50 is effectively dredged when raw blocking.
In the present embodiment, the first pilot hose 10 should be arranged shorter as far as possible, in this way, being unlikely to lead to sand and dust, powder The molecules such as dirt or haze block in the first pilot hose 10.
In order to realize that the purge operation to the second pilot hose 50 carries out automatically controlling, referring to Fig. 1, in the present embodiment, Dredger further includes a controller 100, valve 40, collector 60 and micro-positive pressure generating device 80 with the controller 100 Connection.When blocking in the second pilot hose 50, the pressure signal that collector 60 acquires obviously weakens, at this time by controller 100 control valves 40 are closed, and control the unlatching of micro-positive pressure generating device 80, are generated air pressure and are dredged to the second pilot hose 50 It is logical, realize the automatic control to the purge operation of the second pilot hose 50.
Further, in the present embodiment, controller 100 is also connected with a timing module (not shown).Pass through The interval time dredged to the second pilot hose 50 is arranged in the timing module, is when the dredging time for reaching setting, by controlling Device 100 processed controls micro-positive pressure generating device 80 and dredges to the second pilot hose 50.So set, realizing to the second pilot The regular automatic removing obstruction of hose 50, reduces the maintenance times of device for pressure measurement, extends maintenance period.
Referring to Fig. 1, in the present embodiment, the first pilot hose 10, the second pilot hose 50 and dredging pipeline 70 are more Root, every first pilot hose 10 are connected by a triple valve 30 and a second pilot hose 50 and a dredging pipeline 70 It connects, the other end of more second pilot hoses 50 is connect with collector 60 respectively, and the other end of more dredging pipelines 70 passes through one A multiway valve 110 is connect with micro-positive pressure generating device 80 respectively, is provided with a check valve 90 on every dredging pipeline 70, A valve 40 is provided on every first pilot hose 10.In this way, more in the device for pressure measurement of multi-channel parallel Two pilot hoses 50 can be dredged by a micro-positive pressure generating device 80.
The application method of the dredger of the small-bore pressure measurement pilot hose of parallel multiplex of the invention is as follows:
When the molecules such as sand and dust, dust or haze enter the second pilot hose 50 in, cause the second pilot hose 50 send out When raw blocking, the pressure signal in the collected second pilot hose 50 of collector 60 obviously weakens, close at this time with this second The valve 40 on the first pilot hose 10 that pilot hose 50 is connected generates air pressure, air pressure by micro-positive pressure generating device 80 It is flowed into the second pilot hose 50 through dredging pipeline 70 and triple valve 30 and second pilot hose 50 is dredged;It is automatic periodically Under dredging mode, when reaching the dredging time of timing module setting, 100 automatic-closing valve 40 of controller opens micro-positive pressure Generating device 80 dredges the second pilot hose 50.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of dredger of the small-bore pressure measurement pilot hose of parallel multiplex, the pilot hose includes that the first pilot is soft (10) and the second pilot hose (50) are managed, one end of the first pilot hose (10) is equipped with pressure sensing hole (20), and described first leads The other end of pressure hose (10) is connect with the second pilot hose (50), the other end connection of the second pilot hose (50) One collector (60), which is characterized in that the dredger includes a triple valve (30), the first pilot hose (10) and institute It states the second pilot hose (50) to be connected by the triple valve (30), the third interface connection one of the triple valve (30) is dredged The other end on siphunculus road (70), dredging pipeline (70) connects a micro-positive pressure generating device (80), the dredging pipeline (70) On be additionally provided with a check valve (90), the first pilot hose (10) be equipped with a valve (40).
2. the dredger of the small-bore pressure measurement pilot hose of parallel multiplex according to claim 1, which is characterized in that The dredger further includes controller (100), the valve (40), the collector (60) and the micro-positive pressure generating device (80) it is connect with the controller (100).
3. the dredger of the small-bore pressure measurement pilot hose of parallel multiplex according to claim 2, which is characterized in that The controller (100) is also connected with a timing module.
4. the dredger of the small-bore pressure measurement pilot hose of parallel multiplex according to claim 1, which is characterized in that The first pilot hose (10), the second pilot hose (50) and the dredging pipeline (70) are more, described in every First pilot hose (10) is by described in a triple valve (30) and the second pilot hose (50) and one Pipeline (70) connection is dredged, the other end of the more second pilot hoses (50) is connect with the collector (60) respectively, more The other end that pipeline (70) are dredged described in root is connected with the micro-positive pressure generating device (80) respectively by a multiway valve (110) It connects, is equipped with the check valve (90) on the every dredging pipeline (70), is all provided on the every first pilot hose (10) There are the valve (40).
5. a kind of dredging method of the small-bore pressure measurement pilot hose of parallel multiplex, which is characterized in that using such as claim Dredger described in any one of 1-4 is dredged, and the dredging method includes:
Pressure when being blocked in the second pilot hose (50), in the collected second pilot hose (50) of collector (60) Signal obviously weakens, and closes the valve (40) on corresponding first pilot hose (10) at this time, passes through micro-positive pressure generating device (80) air pressure is generated, air pressure flows into soft to the second pilot in the second pilot hose (50) through dredging pipeline (70) and triple valve (30) Pipe (50) is dredged.
CN201910430273.2A 2019-05-22 2019-05-22 Dredging device and method for parallel multi-path small-caliber pressure measurement pressure guide hose Active CN110014002B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910430273.2A CN110014002B (en) 2019-05-22 2019-05-22 Dredging device and method for parallel multi-path small-caliber pressure measurement pressure guide hose

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910430273.2A CN110014002B (en) 2019-05-22 2019-05-22 Dredging device and method for parallel multi-path small-caliber pressure measurement pressure guide hose

Publications (2)

Publication Number Publication Date
CN110014002A true CN110014002A (en) 2019-07-16
CN110014002B CN110014002B (en) 2021-09-28

Family

ID=67194278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910430273.2A Active CN110014002B (en) 2019-05-22 2019-05-22 Dredging device and method for parallel multi-path small-caliber pressure measurement pressure guide hose

Country Status (1)

Country Link
CN (1) CN110014002B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200982904Y (en) * 2006-11-27 2007-11-28 肖立新 Automatic blockage prevention and reverse blow device for pressure measurement
CN101884989A (en) * 2010-06-24 2010-11-17 瓮福(集团)有限责任公司 Method for dredging pressure guiding system by using high-pressure nitrogen backblowing
CN206934975U (en) * 2017-05-26 2018-01-30 黄石市粮丰机械有限公司 Deduster energy-saving anti-blocking control pressurer system
CN207394372U (en) * 2017-10-20 2018-05-22 中海浙江宁波液化天然气有限公司 The nitrogen blowback sweeping device of BOG compressors
CN109357809A (en) * 2018-11-09 2019-02-19 中冶焦耐自动化有限公司 A kind of coke oven bridge tube raw coke oven gas pressure-measuring system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200982904Y (en) * 2006-11-27 2007-11-28 肖立新 Automatic blockage prevention and reverse blow device for pressure measurement
CN101884989A (en) * 2010-06-24 2010-11-17 瓮福(集团)有限责任公司 Method for dredging pressure guiding system by using high-pressure nitrogen backblowing
CN206934975U (en) * 2017-05-26 2018-01-30 黄石市粮丰机械有限公司 Deduster energy-saving anti-blocking control pressurer system
CN207394372U (en) * 2017-10-20 2018-05-22 中海浙江宁波液化天然气有限公司 The nitrogen blowback sweeping device of BOG compressors
CN109357809A (en) * 2018-11-09 2019-02-19 中冶焦耐自动化有限公司 A kind of coke oven bridge tube raw coke oven gas pressure-measuring system and method

Also Published As

Publication number Publication date
CN110014002B (en) 2021-09-28

Similar Documents

Publication Publication Date Title
US20200165887A1 (en) Graded pressure drop type multi stage water injection device and method based on fracture observation
US20200165915A1 (en) Graded pressure drop type detection system and detection method of borehole cracks
CN202381795U (en) Intelligent flow throttling control system
CN102853876A (en) Anti-blocking air blowing liquid level meter applicable to polyester reactor
CN110014002A (en) A kind of dredger and method of the small-bore pressure measurement pilot hose of parallel multiplex
CN208476876U (en) Gas detecting system and its calibrating installation
CN206161457U (en) Steel pylons member surface receives testing system of sand blown by wind environment erosion
CN207386088U (en) A kind of furnace of calcium carbide furnace pressure pipeline automatic back blow device
CN102124183A (en) Hydrocarbon production system, method for performing clean-up and method for controlling flow
CN208845460U (en) Drill jumbo parking differential lock integrated control valve block
CN102980851B (en) Cable-stayed bridge cable beam anchorage zone technical condition monitoring windows and observation method
CN204613764U (en) A kind of portable filling flow automatic control box
CN208793004U (en) A kind of shield machine air automatic pressure-maintaining testing stand
CN201269883Y (en) Flow speed measurement apparatus in fume emission
CN206756375U (en) Pressure sensor field test device
CN110274987A (en) A kind of gas detecting system and its calibrating installation
CN208902204U (en) A kind of differential pressure type gas flowmeter automatic blowout device
CN208763642U (en) A kind of oil gas sand separation metering skid complexes for oil and gas extraction wellhead equipment
CN208476291U (en) Back flushing type measuring device
CN209069381U (en) A kind of closed pressure vessel measuring device
CN102840891A (en) Net fume flow automatic blowing device and method
CN104019361A (en) Online unclogging device for small-size valves
CN114033399B (en) Intelligent monitoring system for synchronous grouting of subway tunnel shield
CN204690904U (en) Blow-off pipe manhole
CN205504483U (en) Laboratory pipeline slurry is less than critical flow velocity operating duration survey device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant