CN110011215A CN201910110265.XA CN201910110265A CN110011215A CN 110011215 A CN110011215 A CN 110011215A CN 201910110265 A CN201910110265 A CN 201910110265A CN 110011215 A CN110011215 A CN 110011215A
Authority
CN
China
Prior art keywords
suspension string
electrician
pedestal
shaft tower
ground potential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910110265.XA
Other languages
Chinese (zh)
Inventor
尹洪
程绳
董晓虎
姚京松
杜勇
闫旭东
王国满
孙忠慧
龙飞
吴军
姚俊
孙继雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI CHAONENG ELECTRIC POWER CO Ltd
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Original Assignee
HUBEI CHAONENG ELECTRIC POWER CO Ltd
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI CHAONENG ELECTRIC POWER CO Ltd, State Grid Corp of China SGCC, Maintenance Branch of State Grid Hubei Electric Power Co Ltd filed Critical HUBEI CHAONENG ELECTRIC POWER CO Ltd
Priority to CN201910110265.XA priority Critical patent/CN110011215A/en
Publication of CN110011215A publication Critical patent/CN110011215A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a kind of combination tools for replacing direct current grounding pole route suspension string, including fixture main body, pedestal and connecting screw;The pedestal is the type structure that can be installed between two suspension string hanging point angle steel, the pedestal is mounted on the bottom surface of the fixture main body by the connecting screw, the connecting screw lower end is through the pedestal and extends downwardly, the compressible clamping plate on the bottom surface of described two suspension string hanging point angle steel is set on the lower end extended segment of the connecting screw, the position that the clamping plate bottom surface is corresponded on the connecting screw is equipped with clamp nut, the both ends of the fixture main body are fitted with an anti-torsion wire bar respectively, an insulated pull rod is respectively connected on each anti-torsion wire bar, the conducting wire that one can hook suspension string side of wire is respectively connected in the every insulated pull rod mentions line suspension hook;The replacement of direct current grounding pole route suspension string can be realized using said combination tool.Suitable for line maintenance.

Description

Replace the combination tool and method of direct current grounding pole route suspension string
Technical field
The present invention relates to high voltage direct current field, in particular to a kind of combination tool for replacing direct current grounding pole route suspension string And method.
Background technique
D.C. high voltage transmission has its unique in terms of remote, high-power conveying electric energy relative to ac transmission mode Advantage, therefore be widely used in the point-to-point power Transmission of large capacity, overlength distance, Jiangsu, Shanghai are sent in such as western water power east Etc. ground take the mode of D.C. high voltage transmission extensively.And the livewire work of DC transmission system is concentrated mainly on high direct voltage at present Route and converter station lack direct current grounding pole route and further investigate, therefore DC earthing line live-line work had both lacked reason By basis, also lack practical experience.When ground electrode circuit needs replacing suspension string, power failure operation can only be generally used, at this time The operation of direct current system can be produced bigger effect, directly reduce power supply reliability.
Moreover, direct current grounding pole route current potential is ground potential when hvdc transmission line is under bipolar mode of operation, and in list Ground electrode circuit then has a high voltage under the operational mode of pole, be generally considered as ground electrode circuit voltage class in actual job ± 50kV.Direct current grounding pole route is because voltage class is lower, and insulation configuration is similar to distribution line, and its current-carrying capacity Much larger than distribution line, conducting wire is again dramatically different with distribution line.Therefore, when replacing suspension string, direct current grounding pole route band The Work tool of electric operation can not simply continue to use the Work tool and method of distribution line or hot line maintenance.
Summary of the invention
The purpose of the invention is to overcome the shortcomings of above-mentioned background technique, it is outstanding to provide a kind of replacement direct current grounding pole route The combination tool and method of vertical string.
In order to achieve the goal above, a kind of combination tool for replacing direct current grounding pole route suspension string provided by the invention, Including fixture main body, pedestal and connecting screw;The pedestal is the type structure that can be installed between two suspension string hanging point angle steel, The pedestal is mounted on the bottom surface of the fixture main body by the connecting screw, and the bottom is run through in the connecting screw lower end Seat simultaneously extends downwardly, and is set on the lower end extended segment of the connecting screw compressible in described two suspension string hanging point angle steel Clamping plate on bottom surface, the position that the clamping plate bottom surface is corresponded on the connecting screw are equipped with clamp nut, the fixture main body Both ends are fitted with an anti-torsion wire bar respectively, and an insulated pull rod is respectively connected on each anti-torsion wire bar, and every described exhausted The conducting wire that one can hook suspension string side of wire is respectively connected on edge pull rod mentions line suspension hook.
Fixture main body is fixed on suspension string shaft tower side by clamping plate and pedestal, and line suspension hook will be mentioned and hooked in suspension string conducting wire On the conducting wire of side, the tension on suspension string can be transferred to fixture main body, anti-torsion wire bar, insulated pull rod in this way and mention line suspension hook On, so as to realize the replacement of suspension string;Meanwhile by the way that fixture main body and pedestal are designed to two components so that it is convenient to The transport of this combination tool, also reduces production cost.
In the above scheme, the bottom surface of the fixture main body is equipped with the fixture bottom surface spiral shell for installing the connecting screw Hole, the interior pedestal screw hole being equipped with through the pedestal of the pedestal, the pedestal is run through in the connecting screw upper end from bottom to up Screw hole is simultaneously inserted into the tool bottom surface screw hole to be fixed on the pedestal on the bottom surface of the fixture main body.By screw thread side Formula connects fixture main body and pedestal, simple and convenient in this way and at low cost.
In the above scheme, corresponded on the side wall of the fixture main body connecting screw upper end position be equipped with it is described The fixture side wall screw hole of fixture bottom surface screw hole connection, is equipped with for fixing the connecting screw in the fixture side wall screw hole Screw rod tightening pin.The screw rod tightening pin added can be effectively prevented connecting screw and get loose.
In the above scheme, the position that the connecting screw upper end corresponds to the screw rod tightening pin is equipped with tight with the screw rod The screw rod tightening slot that rationed marketing matches.The screw rod tightening slot added can prevent from connecting in this way with screw rod tightening pin-shaped at detent Screw rod is deviate from out of fixture bottom surface screw hole.
In the above scheme, the height h in the clamping portion of the pedestal is less than the height H of the suspension string hanging point angle steel, institute The space D stated between the width d in the clamping portion of pedestal and described two suspension string hanging point angle steel matches.By by the card of pedestal The height h in dress portion is designed to the height H less than suspension string hanging point angle steel, in this way, pedestal and clamping plate can tightly be clamped in two At the upper and lower ends of suspension string hanging point angle steel;Meanwhile by the way that the width d in the clamping portion of pedestal is designed to hang with two suspension strings Space D between point angle steel matches, and pedestal can be prevented to be subjected to displacement in this way.
In the above scheme, the length L of the clamping plate is greater than the space D between described two suspension string hanging point angle steel.It is logical It crosses and the length L of clamping plate is designed to the space D being greater than between two suspension string hanging point angle steel so that it is convenient to clamping for clamping plate.
In the above scheme, lock washer is equipped between the clamping plate and the clamp nut.The lock washer energy added Clamp nut is effectively prevented to get loose.
The present invention also provides a kind of methods for replacing direct current grounding pole route suspension string, comprising the following steps:
1) ground potential electrician climbs to the ground potential electric work position of shaft tower, and ground potential electrician installs shaft tower on shaft tower to be slided surely It takes turns and puts on shaft tower side transmission rope on shaft tower fixed pulley;
2) the first ground electrician is determined insulating bar with the conducting wire for putting on side of wire transmission rope by shaft tower side transmission rope Pulley passes to ground potential electrician, and conducting wire fixed pulley is articulated on conducting wire by ground potential electrician by insulating bar corresponds to old hang The position for string conductor wire end of hanging down;
3) the second ground electrician fastens insulated flexible ladder end using side of wire transmission rope, and will be exhausted using side of wire transmission rope Edge rope ladder is mounted on the conducting wire at equipotential electrician's working position;
4) it after equipotential electrician puts on screening clothing and confirms that screening clothing connection is good, is climbed by insulated flexible ladder to away from conducting wire Greater than potential transfer is carried out at 0.2m, into equipotential, equipotential electrician working position is reached;
5) the first ground electrician is by the fixture main body, the pedestal, the connecting screw, the clamping plate, the compression After nut, the anti-torsion wire bar and the insulated pull rod assemble, the first ground electrician will be assembled by shaft tower side transmission rope The fixture main body, the pedestal, the connecting screw, the clamping plate, the clamp nut, the anti-torsion wire bar and described Insulated pull rod passes to ground potential electrician, and the second ground electrician passes through side of wire transmission rope and the line suspension hook that mentions is passed to equal electricity Position electrician;
6) after ground potential electrician first successively removes the clamp nut and the clamping plate, then by the card of the pedestal Dress portion is installed between two suspension string hanging point angle steel, then the clamping plate is pressed on described two hang by the clamp nut It hangs down on the bottom surface of string hanging point angle steel, then equipotential electrician cooperates with ground potential electrician and mentions the insulated pull rod with described Line suspension hook is connected, and last equipotential electrician catches on two conducting wires for line suspension hook is mentioned described in two respectively;
7) ground potential electrician tightens the anti-torsion wire bar, and the tension on old suspension string is transferred to the fixture main body, institute It states anti-torsion wire bar, the insulated pull rod and described mentions on line suspension hook;
8) after checking that bearing tool stress is normal, equipotential electrician takes out the locking pin of old suspension string conductor wire end, ground potential Electrician continues to tighten the anti-torsion wire bar, until equipotential electrician disengages the connection of old suspension string conductor wire end;
9) ground potential electrician fastens shaft tower side transmission rope one end on old suspension string shaft tower end, and the first ground electrician is by bar The tower side transmission rope other end is fastened on new suspension string shaft tower end;
10) ground potential electrician takes out the locking pin at old suspension string shaft tower end, and the first ground electrician operates shaft tower side transmission rope Cooperation ground potential electrician disengages the connection at old suspension string shaft tower end;
11) the first ground electrician and ground potential electrician, which cooperate, reaches ground potential electric work position for new suspension string, this When old suspension string just fall to the ground automatically, the first ground electrician and ground potential electrician cooperate and restore new suspension string shaft tower The connection at end, and reset the locking pin at new suspension string shaft tower end;
12) ground potential electrician cooperates equipotential electrician to restore the connection of new suspension string conductor wire end, and installs new suspension string and lead The locking pin of line end, so far, the replacement of suspension string are completed.
Fixture main body is fixed on suspension string shaft tower side by clamping plate and pedestal, and line suspension hook will be mentioned and hooked in suspension string conducting wire On the conducting wire of side, the tension on suspension string can be transferred to fixture main body, anti-torsion wire bar, insulated pull rod in this way and mention line suspension hook On, so as to realize the replacement of suspension string;Meanwhile by the way that fixture main body and pedestal are designed to two components so that it is convenient to The transport of this combination tool, also reduces production cost.
Technical solution provided by the invention has the benefit that
1, fixture main body is fixed on by suspension string shaft tower side by clamping plate and pedestal, and line suspension hook hook will be mentioned and led in suspension string On the conducting wire of line side, the tension on suspension string can be transferred to fixture main body, anti-torsion wire bar, insulated pull rod in this way and mention line suspension hook On, so as to realize the replacement of suspension string;
2, by the way that fixture main body and pedestal be designed to two components so that it is convenient to which the transport of this combination tool, also drops Low production cost;
3, fixture main body and pedestal are threadedly connected, it is simple and convenient in this way and at low cost;
4, the screw rod tightening pin added can be effectively prevented connecting screw and get loose;
5, the screw rod tightening slot added can prevent connecting screw from fixture bottom surface in this way with screw rod tightening pin-shaped at detent Abjection in screw hole;
6, by the way that the height h in the clamping portion of pedestal to be designed to the height H less than suspension string hanging point angle steel, in this way, pedestal It can be tightly clamped in clamping plate at the upper and lower ends of two suspension string hanging point angle steel;
7, matched by the space D being designed to the width d in the clamping portion of pedestal between two suspension string hanging point angle steel It closes, pedestal can be prevented to be subjected to displacement in this way;
8, by the way that the length L of clamping plate is designed to the space D being greater than between two suspension string hanging point angle steel so that it is convenient to Clamping plate clamps;
9, the lock washer added can be effectively prevented clamp nut and get loose.
Detailed description of the invention
Fig. 1 is the using state structure diagram of this combination tool;
Fig. 2 is the enlarged structure schematic diagram that the portion A removes after suspension string in Fig. 1;
Fig. 3 is the structural schematic diagram of the positional relationship of fixture main body and pedestal;
Fig. 4 is another viewing angle constructions schematic diagram of Fig. 3.
In figure, fixture main body 1, fixture bottom surface screw hole 1a, fixture side wall screw hole 1b, pedestal 2, pedestal screw hole 2a, connection spiral shell Bar 3, screw rod tightening slot 3a, clamping plate 4, clamp nut 5, anti-torsion wire bar 6, insulated pull rod 7 mention line suspension hook 8, and screw rod tightening pin 9 is prevented Loose washer 10, suspension string hanging point angle steel a, conducting wire b.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
Embodiment 1:
A kind of combination tool of replacement direct current grounding pole route suspension string as shown in Figure 1, including fixture main body 1, pedestal 2 With connecting screw 3;The pedestal 2 is the T-type structure that can be installed between two suspension string hanging point angle steel a, and the pedestal 2 passes through The connecting screw 3 is mounted on the bottom surface of the fixture main body 1, and 3 lower end of connecting screw is simultaneously downward through the pedestal 2 Extend, is set on the lower end extended segment of the connecting screw 3 compressible on the bottom surface of described two suspension string hanging point angle steel a Clamping plate 4, the position that 4 bottom surface of clamping plate is corresponded on the connecting screw 3 is equipped with clamp nut 5, the two of the fixture main body 1 End is fitted with an anti-torsion wire bar 6 respectively, and an insulated pull rod 7 is respectively connected on each anti-torsion wire bar 6, and every described exhausted The conducting wire b that one can hook suspension string side of wire is respectively connected on edge pull rod 7 mentions line suspension hook 8.It will by clamping plate 4 and pedestal 2 Fixture main body 1 is fixed on suspension string shaft tower side, and will mention line suspension hook 8 and hook on the conducting wire b of suspension string side of wire, can will hang in this way The tension to hang down on string is transferred to fixture main body 1, anti-torsion wire bar 6, insulated pull rod 7 and mentions on line suspension hook 8, so as to realize pendency The replacement of string;Meanwhile by the way that fixture main body 1 and pedestal 2 be designed to two components so that it is convenient to the fortune of this combination tool It is defeated, also reduce production cost.
The bottom surface of above-mentioned fixture main body 1 is equipped with the fixture bottom surface screw hole 1a for installing the connecting screw 3, the bottom The pedestal screw hole 2a through the pedestal 2 is equipped in seat 2, the pedestal screw hole is run through in 3 upper end of connecting screw from bottom to up 2a is simultaneously inserted into the tool bottom surface screw hole 1a to be fixed on the pedestal 2 on the bottom surface of the fixture main body 1.Pass through screw thread Mode connects fixture main body 1 and pedestal 2, simple and convenient in this way and at low cost.Described in being corresponded on the side wall of the fixture main body 1 The position of 3 upper end of connecting screw is equipped with the fixture side wall screw hole 1b being connected to the fixture bottom surface screw hole 1a, the fixture side wall Screw rod tightening pin 9 for fixing the connecting screw 3 is installed in screw hole 1b.The screw rod tightening pin 9 added can effectively be prevented Only connecting screw 3 is got loose.The position that 3 upper end of connecting screw corresponds to the screw rod tightening pin 9 is equipped with and the screw rod The screw rod tightening slot 3a that tightening pin 9 matches.The screw rod tightening slot 3a added can form detent, such energy with screw rod tightening pin 9 Prevent connecting screw 3 from deviating from out of fixture bottom surface screw hole 1a.
The height h in the clamping portion of above-mentioned pedestal 2 is less than the height H of the suspension string hanging point angle steel a, the card of the pedestal 2 Space D between the width d in dress portion and described two suspension string hanging point angle steel a matches.By by the height in the clamping portion of pedestal 2 Degree h is designed to the height H less than suspension string hanging point angle steel a, in this way, pedestal 2 and clamping plate 4 can tightly be clamped in two suspension strings At the upper and lower ends of hanging point angle steel a;Meanwhile by the way that the width d in the clamping portion of pedestal 2 is designed to and two suspension string hanging point angles Space D between steel a matches, and pedestal 2 can be prevented to be subjected to displacement in this way.The length L of the clamping plate 4 is greater than described two pendencys Space D between string hanging point angle steel a.By the way that the length L of clamping plate 4 is designed to be greater than between two suspension string hanging point angle steel a Space D is so that it is convenient to the clamping of clamping plate 4.
Lock washer 10 is equipped between above-mentioned clamping plate 4 and the clamp nut 5.The lock washer 10 added can effectively be prevented Only clamp nut 5 is got loose.
Fixture main body 1 is fixed on suspension string shaft tower side by clamping plate 4 and pedestal 2 by the present embodiment, and will be mentioned line suspension hook 8 and be hooked On the conducting wire b of suspension string side of wire, the tension on suspension string can be transferred to fixture main body 1, anti-torsion wire bar 6, insulation in this way It pull rod 7 and mentions on line suspension hook 8, so as to realize the replacement of suspension string;By the way that fixture main body 1 and pedestal 2 are designed to two Component also reduces production cost so that it is convenient to the transport of this combination tool.
Meanwhile the present embodiment threadedly connects fixture main body 1 and pedestal 2, it is simple and convenient in this way and at low cost; The screw rod tightening pin 9 added can be effectively prevented connecting screw 3 and get loose;The screw rod tightening slot 3a added can be with screw rod tightening Pin 9 forms detent, can prevent connecting screw 3 from deviating from out of fixture bottom surface screw hole 1a in this way.
Moreover, the height h in the clamping portion of pedestal 2 by being designed to the height less than suspension string hanging point angle steel a by the present embodiment H is spent, in this way, pedestal 2 and clamping plate 4 can be tightly clamped at the upper and lower ends of two suspension string hanging point angle steel a;By by pedestal The width d in 2 clamping portion is designed to that the space D between two suspension string hanging point angle steel a matches, and can prevent pedestal 2 in this way It is subjected to displacement.
Finally, the present embodiment is by the way that the length L of clamping plate 4 to be designed between being greater than between two suspension string hanging point angle steel a Away from D so that it is convenient to the clamping of clamping plate 4;The lock washer 10 added can be effectively prevented clamp nut 5 and get loose.
Embodiment 2:
The application method of the combination tool of above-mentioned replacement direct current grounding pole route suspension string, comprising the following steps:
1) ground potential electrician climbs to the ground potential electric work position of shaft tower, and ground potential electrician installs shaft tower on shaft tower to be slided surely It takes turns and puts on shaft tower side transmission rope on shaft tower fixed pulley;
2) the first ground electrician is determined insulating bar with the conducting wire for putting on side of wire transmission rope by shaft tower side transmission rope Pulley passes to ground potential electrician, and conducting wire fixed pulley is articulated on conducting wire by ground potential electrician by insulating bar corresponds to old hang The position for string conductor wire end of hanging down;
3) the second ground electrician fastens insulated flexible ladder end using side of wire transmission rope, and will be exhausted using side of wire transmission rope Edge rope ladder is mounted on the conducting wire at equipotential electrician's working position;
4) it after equipotential electrician puts on screening clothing and confirms that screening clothing connection is good, is climbed by insulated flexible ladder to away from conducting wire Greater than potential transfer is carried out at 0.2m, into equipotential, equipotential electrician working position is reached;
5) the first ground electrician is by the fixture main body 1, pedestal 2, the connecting screw 3, the clamping plate 4, described After clamp nut 5, the anti-torsion wire bar 6 and the insulated pull rod 7 assemble, the first ground electrician will by shaft tower side transmission rope It is the assembled fixture main body 1, the pedestal 2, the connecting screw 3, the clamping plate 4, the clamp nut 5, described anti- Torsion wire bar 6 and the insulated pull rod 7 pass to ground potential electrician, and the second ground electrician mentions line for described by side of wire transmission rope Suspension hook 8 passes to equipotential electrician;
6) after ground potential electrician first successively removes the clamp nut 5 and the clamping plate 4, then by the pedestal 2 Clamping portion be installed between two suspension string hanging point angle steel a, then the clamping plate 4 is pressed on by institute by the clamp nut 5 On the bottom surface for stating two suspension string hanging point angle steel a, then equipotential electrician and ground potential electrician, which cooperate, draws the insulation Bar 7 is connected with the line suspension hook 8 that mentions, and last equipotential electrician catches on two conducting wire b for line suspension hook 8 is mentioned described in two respectively;
7) ground potential electrician tightens the anti-torsion wire bar 6, by the tension on old suspension string be transferred to the fixture main body 1, It the anti-torsion wire bar 6, the insulated pull rod 7 and described mentions on line suspension hook 8;
8) after checking that bearing tool stress is normal, equipotential electrician takes out the locking pin of old suspension string conductor wire end, ground potential Electrician continues to tighten the anti-torsion wire bar 6, until equipotential electrician disengages the connection of old suspension string conductor wire end;
9) ground potential electrician fastens shaft tower side transmission rope one end on old suspension string shaft tower end, and the first ground electrician is by bar The tower side transmission rope other end is fastened on new suspension string shaft tower end;
10) ground potential electrician takes out the locking pin at old suspension string shaft tower end, and the first ground electrician operates shaft tower side transmission rope Cooperation ground potential electrician disengages the connection at old suspension string shaft tower end;
11) the first ground electrician and ground potential electrician, which cooperate, reaches ground potential electric work position for new suspension string, this When old suspension string just fall to the ground automatically, the first ground electrician and ground potential electrician cooperate and restore new suspension string shaft tower The connection at end, and reset the locking pin at new suspension string shaft tower end;
12) ground potential electrician cooperates equipotential electrician to restore the connection of new suspension string conductor wire end, and installs new suspension string and lead The locking pin of line end, so far, the replacement of suspension string are completed.
Fixture main body 1 is fixed on suspension string shaft tower side by clamping plate 4 and pedestal 2, and line suspension hook 8 will be mentioned and hooked in suspension string On the conducting wire b of side of wire, the tension on suspension string can be transferred to fixture main body 1, anti-torsion wire bar 6, insulated pull rod 7 in this way and mentioned On line suspension hook 8, so as to realize the replacement of suspension string;Meanwhile by the way that fixture main body 1 and pedestal 2 are designed to two components, The transport for facilitating this combination tool in this way, also reduces production cost.
Said combination tool includes fixture main body 1, pedestal 2 and connecting screw 3;The pedestal 2 is that can be installed on two to hang T-type structure between vertical string hanging point angle steel a, the pedestal 2 are mounted on the bottom of the fixture main body 1 by the connecting screw 3 On face, 3 lower end of connecting screw is through the pedestal 2 and extends downwardly, and is set on the lower end extended segment of the connecting screw 3 There is the compressible clamping plate 4 on the bottom surface of described two suspension string hanging point angle steel a, corresponds to the clamping plate 4 on the connecting screw 3 The position of bottom surface is equipped with clamp nut 5, and the both ends of the fixture main body 1 are fitted with an anti-torsion wire bar 6 respectively, each described anti- It is respectively connected with an insulated pull rod 7 on torsion wire bar 6, is respectively connected with one in the every insulated pull rod 7 and can hook suspension string and lead The conducting wire b's of line side mentions line suspension hook 8.Fixture main body 1 is fixed on suspension string shaft tower side by clamping plate 4 and pedestal 2, and line will be mentioned Suspension hook 8 hooks on the conducting wire b of suspension string side of wire, and the tension on suspension string can be transferred to fixture main body 1, anti-torsion wire bar in this way 6, it insulated pull rod 7 and mentions on line suspension hook 8, so as to realize the replacement of suspension string;Meanwhile by by fixture main body 1 and pedestal 2 Two components are designed to so that it is convenient to which the transport of this combination tool, also reduces production cost.
The bottom surface of above-mentioned fixture main body 1 is equipped with the fixture bottom surface screw hole 1a for installing the connecting screw 3, the bottom The pedestal screw hole 2a through the pedestal 2 is equipped in seat 2, the pedestal screw hole is run through in 3 upper end of connecting screw from bottom to up 2a is simultaneously inserted into the tool bottom surface screw hole 1a to be fixed on the pedestal 2 on the bottom surface of the fixture main body 1.Pass through screw thread Mode connects fixture main body 1 and pedestal 2, simple and convenient in this way and at low cost.Described in being corresponded on the side wall of the fixture main body 1 The position of 3 upper end of connecting screw is equipped with the fixture side wall screw hole 1b being connected to the fixture bottom surface screw hole 1a, the fixture side wall Screw rod tightening pin 9 for fixing the connecting screw 3 is installed in screw hole 1b.The screw rod tightening pin 9 added can effectively be prevented Only connecting screw 3 is got loose.The position that 3 upper end of connecting screw corresponds to the screw rod tightening pin 9 is equipped with and the screw rod The screw rod tightening slot 3a that tightening pin 9 matches.The screw rod tightening slot 3a added can form detent, such energy with screw rod tightening pin 9 Prevent connecting screw 3 from deviating from out of fixture bottom surface screw hole 1a.
The height h in the clamping portion of above-mentioned pedestal 2 is less than the height H of the suspension string hanging point angle steel a, the card of the pedestal 2 Space D between the width d in dress portion and described two suspension string hanging point angle steel a matches.By by the height in the clamping portion of pedestal 2 Degree h is designed to the height H less than suspension string hanging point angle steel a, in this way, pedestal 2 and clamping plate 4 can tightly be clamped in two suspension strings At the upper and lower ends of hanging point angle steel a;Meanwhile by the way that the width d in the clamping portion of pedestal 2 is designed to and two suspension string hanging point angles Space D between steel a matches, and pedestal 2 can be prevented to be subjected to displacement in this way.The length L of the clamping plate 4 is greater than described two pendencys Space D between string hanging point angle steel a.By the way that the length L of clamping plate 4 is designed to be greater than between two suspension string hanging point angle steel a Space D is so that it is convenient to the clamping of clamping plate 4.
Lock washer 10 is equipped between above-mentioned clamping plate 4 and the clamp nut 5.The lock washer 10 added can effectively be prevented Only clamp nut 5 is got loose.
Fixture main body 1 is fixed on suspension string shaft tower side by clamping plate 4 and pedestal 2 by the present embodiment, and will be mentioned line suspension hook 8 and be hooked On the conducting wire b of suspension string side of wire, the tension on suspension string can be transferred to fixture main body 1, anti-torsion wire bar 6, insulation in this way It pull rod 7 and mentions on line suspension hook 8, so as to realize the replacement of suspension string;By the way that fixture main body 1 and pedestal 2 are designed to two Component also reduces production cost so that it is convenient to the transport of this combination tool.
Meanwhile the present embodiment threadedly connects fixture main body 1 and pedestal 2, it is simple and convenient in this way and at low cost; The screw rod tightening pin 9 added can be effectively prevented connecting screw 3 and get loose;The screw rod tightening slot 3a added can be with screw rod tightening Pin 9 forms detent, can prevent connecting screw 3 from deviating from out of fixture bottom surface screw hole 1a in this way.
Moreover, the height h in the clamping portion of pedestal 2 by being designed to the height less than suspension string hanging point angle steel a by the present embodiment H is spent, in this way, pedestal 2 and clamping plate 4 can be tightly clamped at the upper and lower ends of two suspension string hanging point angle steel a;By by pedestal The width d in 2 clamping portion is designed to that the space D between two suspension string hanging point angle steel a matches, and can prevent pedestal 2 in this way It is subjected to displacement.
Finally, the present embodiment is by the way that the length L of clamping plate 4 to be designed between being greater than between two suspension string hanging point angle steel a Away from D so that it is convenient to the clamping of clamping plate 4;The lock washer 10 added can be effectively prevented clamp nut 5 and get loose.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of combination tool for replacing direct current grounding pole route suspension string, which is characterized in that including fixture main body (1), pedestal (2) and connecting screw (3);The pedestal (2) is the T-type structure that can be installed between two suspension string hanging point angle steel (a), described Pedestal (2) is mounted on the bottom surface of the fixture main body (1) by the connecting screw (3), and connecting screw (3) lower end is passed through It wears the pedestal (2) and extends downwardly, be set on the lower end extended segment of the connecting screw (3) compressible described two outstanding The clamping plate (4) to hang down on the bottom surface of string hanging point angle steel (a), the position that the clamping plate (4) bottom surface is corresponded on the connecting screw (3) are set Have clamp nut (5), the both ends of the fixture main body (1) are fitted with an anti-torsion wire bar (6), each anti-torsion wire bar respectively (6) it is respectively connected with an insulated pull rod (7) on, is respectively connected with one on the every insulated pull rod (7) suspension string can be hooked and lead The conducting wire (b) of line side mentions line suspension hook (8).
2. the combination tool of replacement direct current grounding pole route suspension string according to claim 1, which is characterized in that the card Has the bottom surface of main body (1) equipped with the fixture bottom surface screw hole (1a) for installing the connecting screw (3), the pedestal (2) is interior Equipped with the pedestal screw hole (2a) for running through the pedestal (2), the pedestal screw hole is run through in connecting screw (3) upper end from bottom to up It (2a) and is inserted into tool bottom surface screw hole (1a) to be fixed on the pedestal (2) on the bottom surface of the fixture main body (1).
3. the combination tool of replacement direct current grounding pole route suspension string according to claim 2, which is characterized in that the card The position that the connecting screw (3) upper end is corresponded on the side wall for having main body (1) is equipped with to be connected to fixture bottom surface screw hole (1a) Fixture side wall screw hole (1b), the screw rod for fixing the connecting screw (3) is installed in the fixture side wall screw hole (1b) Tightening pin (9).
4. the combination tool of replacement direct current grounding pole route suspension string according to claim 3, which is characterized in that the company Screw rod (3) upper end is connect to correspond to the position of the screw rod tightening pin (9) to be equipped with the screw rod that matches with the screw rod tightening pin (9) tight Determine slot (3a).
5. the combination tool of replacement direct current grounding pole route suspension string according to claim 1, which is characterized in that the bottom The height h in the clamping portion of seat (2) is less than the height H of the suspension string hanging point angle steel (a), the width in the clamping portion of the pedestal (2) Degree d is matched with the space D between described two suspension string hanging point angle steel (a).
6. the combination tool of replacement direct current grounding pole route suspension string according to claim 1, which is characterized in that the folder The length L of plate (4) is greater than the space D between described two suspension string hanging point angle steel (a).
7. the combination tool of replacement direct current grounding pole route suspension string according to claim 1, which is characterized in that the folder Lock washer (10) are equipped between plate (4) and the clamp nut (5).
8. replacing DC earthing polar curve using the combination tool of replacement direct current grounding pole route suspension string as described in claim 1 The method of road suspension string, which comprises the following steps:
1) ground potential electrician climbs to the ground potential electric work position of shaft tower, and ground potential electrician installs shaft tower fixed pulley simultaneously on shaft tower Shaft tower side transmission rope is put on shaft tower fixed pulley;
2) the first ground electrician passes through shaft tower side transmission rope for insulating bar and the conducting wire fixed pulley for putting on side of wire transmission rope Ground potential electrician is passed to, conducting wire fixed pulley is articulated on conducting wire by insulating bar and corresponds to old suspension string by ground potential electrician The position of conductor wire end;
3) the second ground electrician fastens insulated flexible ladder end using side of wire transmission rope, and it is soft to be insulated using side of wire transmission rope Ladder is mounted on the conducting wire at equipotential electrician's working position;
4) it after equipotential electrician puts on screening clothing and confirms that screening clothing connection is good, is climbed by insulated flexible ladder to away from conducting wire and is greater than Potential transfer is carried out at 0.2m, into equipotential, reaches equipotential electrician working position;
5) the first ground electrician by the fixture main body (1), the pedestal (2), the connecting screw (3), the clamping plate (4), After the clamp nut (5), the anti-torsion wire bar (6) and the insulated pull rod (7) assemble, the first ground electrician passes through shaft tower Side transmission rope is by the assembled fixture main body (1), the pedestal (2), the connecting screw (3), the clamping plate (4), institute It states clamp nut (5), the anti-torsion wire bar (6) and the insulated pull rod (7) and passes to ground potential electrician, the second ground electrician is logical It crosses side of wire transmission rope and the line suspension hook (8) that mentions is passed into equipotential electrician;
6) after ground potential electrician first successively removes the clamp nut (5) and the clamping plate (4), then by the pedestal (2) clamping portion is installed between two suspension string hanging point angle steel (a), then passes through the clamp nut (5) for the clamping plate (4) It is pressed on the bottom surface of described two suspension string hanging point angle steel (a), then equipotential electrician and ground potential electrician mutual cooperation will The insulated pull rod (7) is connected with the line suspension hook (8) that mentions, and last equipotential electrician will mention line suspension hook (8) respectively described in two Catch on two conducting wires (b);
7) ground potential electrician tightens the anti-torsion wire bar (6), by the tension on old suspension string be transferred to the fixture main body (1), It the anti-torsion wire bar (6), the insulated pull rod (7) and described mentions on line suspension hook (8);
8) after checking that bearing tool stress is normal, equipotential electrician takes out the locking pin of old suspension string conductor wire end, ground potential electrician Continue to tighten the anti-torsion wire bar (6), until equipotential electrician disengages the connection of old suspension string conductor wire end;
9) ground potential electrician fastens shaft tower side transmission rope one end on old suspension string shaft tower end, and the first ground electrician is by shaft tower side The transmission rope other end is fastened on new suspension string shaft tower end;
10) ground potential electrician takes out the locking pin at old suspension string shaft tower end, and the first ground electrician operates the cooperation of shaft tower side transmission rope Ground potential electrician disengages the connection at old suspension string shaft tower end;
11) the first ground electrician and ground potential electrician, which cooperate, reaches ground potential electric work position for new suspension string, old at this time Suspension string is just fallen to the ground automatically, and the first ground electrician and ground potential electrician cooperate and restore new suspension string shaft tower end Connection, and reset the locking pin at new suspension string shaft tower end;
12) ground potential electrician cooperates equipotential electrician to restore the connection of new suspension string conductor wire end, and installs new suspension string conductor wire end Locking pin, so far, the replacement of suspension string is completed.
CN201910110265.XA 2019-02-11 2019-02-11 Replace the combination tool and method of direct current grounding pole route suspension string Pending CN110011215A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910110265.XA CN110011215A (en) 2019-02-11 2019-02-11 Replace the combination tool and method of direct current grounding pole route suspension string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910110265.XA CN110011215A (en) 2019-02-11 2019-02-11 Replace the combination tool and method of direct current grounding pole route suspension string

Publications (1)

Publication Number Publication Date
CN110011215A true CN110011215A (en) 2019-07-12

Family

ID=67165720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910110265.XA Pending CN110011215A (en) 2019-02-11 2019-02-11 Replace the combination tool and method of direct current grounding pole route suspension string

Country Status (1)

Country Link
CN (1) CN110011215A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815206A (en) * 2020-08-26 2020-10-23 国网湖北省电力有限公司检修公司 Direct current grounding electrode electrical variable measuring system and state evaluation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105932599A (en) * 2016-06-17 2016-09-07 国网湖南省电力公司带电作业中心 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set
CN106840484A (en) * 2017-04-11 2017-06-13 浙江维思无线网络技术有限公司 High voltage transmission line hanging plate weighing sensor
CN207490441U (en) * 2017-12-06 2018-06-12 贵州电网有限责任公司 A kind of preformed strain insulator list insulator string charged for replacement fixture
CN207572853U (en) * 2017-12-19 2018-07-03 国网福建省电力有限公司莆田供电公司 A kind of shaft tower insulator chain electrification replacing tool
CN209434754U (en) * 2019-02-11 2019-09-24 国家电网有限公司 Replace the combination tool of direct current grounding pole route suspension string

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105932599A (en) * 2016-06-17 2016-09-07 国网湖南省电力公司带电作业中心 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set
CN106840484A (en) * 2017-04-11 2017-06-13 浙江维思无线网络技术有限公司 High voltage transmission line hanging plate weighing sensor
CN207490441U (en) * 2017-12-06 2018-06-12 贵州电网有限责任公司 A kind of preformed strain insulator list insulator string charged for replacement fixture
CN207572853U (en) * 2017-12-19 2018-07-03 国网福建省电力有限公司莆田供电公司 A kind of shaft tower insulator chain electrification replacing tool
CN209434754U (en) * 2019-02-11 2019-09-24 国家电网有限公司 Replace the combination tool of direct current grounding pole route suspension string

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111815206A (en) * 2020-08-26 2020-10-23 国网湖北省电力有限公司检修公司 Direct current grounding electrode electrical variable measuring system and state evaluation method

Similar Documents

Publication Publication Date Title
CN201263063Y (en) Tool for replacing straight-line simply connected double-string overhang insulator
CN209344700U (en) A kind of PVC cable protection pipe convenient for connection installation
CN203288783U (en) Electricity detection type high-voltage ground wire rod
CN104535804A (en) Portable current transformer test clamp
CN209434754U (en) Replace the combination tool of direct current grounding pole route suspension string
CN110011215A (en) Replace the combination tool and method of direct current grounding pole route suspension string
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN209434753U (en) For replacing the fixture component of direct current grounding pole route suspension string
CN201233972Y (en) Multifunctional connecting plug
CN209434748U (en) Side of wire yoke plate clamp for vertical rotary replacement direct current grounding pole line tension string
CN209434747U (en) The combination tool of horizontal rotation method replacement direct current grounding pole line tension string
CN106877262A (en) A kind of suspension clamp with weight hitch point
CN208656288U (en) The replacement tool of ground electrode circuit insulator and fitting
CN209434752U (en) The combination tool of vertical rotary method replacement direct current grounding pole line tension string
CN209434751U (en) Machete card component for vertical rotary method replacement direct current grounding pole line tension string
CN209434749U (en) For rotating horizontally the rotating hanger component of method replacement direct current grounding pole line tension string
CN211208698U (en) Novel complete set grounding device for 220kV power transmission line
CN209434750U (en) For rotating horizontally the bottle-holding rack hanger of method replacement direct current grounding pole line tension string
CN205863425U (en) A kind of earth lead in scalable direction
CN105449612A (en) A conductive wire insulation support plate apparatus
CN209119682U (en) A kind of dedicated side's of returning device of cable conductor
CN202550391U (en) High-voltage power maintenance implement
CN203166450U (en) A detachable lightning arrester
CN109672111A (en) The combination tool and method of horizontal rotation method replacement direct current grounding pole line tension string
CN109217170A (en) The replacement tool of ground electrode circuit insulator and fitting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190712