CN110006102A - Pedestal and air conditioner - Google Patents
Pedestal and air conditioner Download PDFInfo
- Publication number
- CN110006102A CN110006102A CN201910405963.2A CN201910405963A CN110006102A CN 110006102 A CN110006102 A CN 110006102A CN 201910405963 A CN201910405963 A CN 201910405963A CN 110006102 A CN110006102 A CN 110006102A
- Authority
- CN
- China
- Prior art keywords
- water receiving
- pedestal
- heat
- air
- insulation chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/0007—Indoor units, e.g. fan coil units
- F24F1/0043—Indoor units, e.g. fan coil units characterised by mounting arrangements
- F24F1/0057—Indoor units, e.g. fan coil units characterised by mounting arrangements mounted in or on a wall
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/22—Means for preventing condensation or evacuating condensate
- F24F13/222—Means for preventing condensation or evacuating condensate for evacuating condensate
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
Abstract
The present invention provides a kind of pedestal and air conditioners, wherein pedestal includes: air outlet;Water receiving component is arranged with air outlet interval, also, in the operating condition, and water receiving component and air outlet have temperature difference;And heat-insulation chamber, it is suitable for filling the interval region of air outlet and water receiving component.In the present invention, by the way that heat-insulation chamber is arranged between water receiving component and air outlet, it is possible to prevente effectively from the direct contact of water receiving component and air outlet, namely under the working condition of air conditioner (in operational process), the inside of water receiving component still can contact (temperature is higher) with without cooling air, because of the setting of heat-insulation chamber, the outside of water receiving component is allowed not contact (temperature is lower) directly with the air at air outlet after cooling, increase heat transfer time, reduce heat transference efficiency, to reduce the temperature difference in outside in water receiving component, thus, the generation of condensation on the outside of water receiving component can be effectively prevented, improve the comfort of air conditioner.
Description
Technical field
The present invention relates to the technical fields of air-conditioning, in particular to a kind of pedestal and air conditioner.
Background technique
With the continuous development of air conditioner, wall-hanging air conditioner is not limited etc. by installation site because of its split settings and excellent
Point, and by public welcome, it is used by more and more users.For wall-hanging air conditioner comprising be set to room
Interior indoor unit and the outdoor unit for being placed in outdoor, although the position that indoor unit and outdoor unit are arranged is different, the two is logical
It crosses its internal compressor and fan realizes heat transmitting.For indoor unit, usually there is fan, and pass through driving fan
Rotation, so that indoor air enters the room inside machine, the air being inhaled into carries out hot biography with the refrigerant for flowing through heat exchanger
It passs and turns cold, which passes through air outlet again and return to interior, to achieve the purpose that make the temperature of room air to reduce.
However, when being blown out from the cold air that air outlet is blown out along air outlet, so that being located at the side on air outlet along position
On the outside of plate (with the part for the cold air after heat exchange occurs contacting, such as water receiving tank bottom plate outside) temperature it is lower, and
Its opposite side plate interior sides (part contacted with the air without heat exchange, for example, water receiving tank bottom plate inside) temperature compared with
The temperature difference of height, the interior outside of the side plate is larger, easily makes to form condensation on air outlet on the outside of the side plate at position, condensation can be by air outlet
The wind at place brings the interior space into, causes room air extremely moist, also, with the increase of condensation, will also directly instill room
It is interior, cause air conditioner to be abnormal situation of dripping, thus by client using air conditioner when experience impact, reduce air-conditioning
Usage comfort.
Summary of the invention
The present invention in view of the above-mentioned prior art situation and complete, its purpose is to provide it is a kind of can drop low heat transfer effect
Pedestal and air conditioner of the rate to reduce the temperature difference and condensation is effectively prevent to generate.
For this purpose, an aspect of of the present present invention provides a kind of pedestal comprising: air outlet;Water receiving component, with the outlet air
The setting of mouth interval;And heat-insulation chamber, it is suitable for filling the interval region of the air outlet and the water receiving component.
In in one aspect of the invention, by the way that heat-insulation chamber is arranged between water receiving component and air outlet, it is possible to prevente effectively from
The direct contact of water receiving component and air outlet, namely under the working condition of the air conditioner with the pedestal (in operational process),
The inside of water receiving component still can contact (temperature is higher) with without cooling air, because of the setting of heat-insulation chamber, so that water receiving
The outside of component can not directly contact (temperature is lower) with the air at air outlet after cooling, increase heat transfer time,
Heat transference efficiency is reduced, so that the temperature difference in outside in water receiving component is reduced, thus, it is possible to effectively prevent on the outside of water receiving component
The generation of condensation improves the comfort of the air conditioner with the pedestal.
In addition, optionally, the air outlet is located at the preceding downside of the pedestal in pedestal provided by the present invention.?
In this case, can be effectively ensured air-flow enter and leave it is smooth while, improve the concentration degree of air-flow.
In addition, optionally, the heat-insulation chamber is configured to hollow structure in pedestal provided by the present invention.In this feelings
Under condition, the heat transmission medium inside heat-insulation chamber that outlet air side plate, water receiving bottom plate and cover board cooperatively form can be air, Ye Jitong
Crossing heat-insulation chamber internal structure is hollow structure, heat transmission medium can be made to become gas from solid, to reduce hot transmitting
Efficiency, reduce the temperature difference of side inside and outside outside in water receiving bottom plate in water receiving component and outlet air side plate, effectively prevent condensation
Generation, improve the comfort of the air conditioner using the pedestal.
In addition, optionally, the air in the heat-insulation chamber is in the state of stagnating in pedestal provided by the present invention.One
As in the case of, the heat transference efficiency of the air in sluggish state is almost nil, and heat-insulation chamber can be substantially prevented from water receiving group as a result,
The heat in the interior outside of water receiving bottom plate in part and the outlet air side plate on the upside of air outlet is transmitted, thus effectively prevent water receiving bottom plate and
The generation of condensation on outlet air side plate, improves the comfort of the air conditioner using the pedestal.
In addition, optionally, the water receiving component has to be connect described in water receiving tank and formation in pedestal provided by the present invention
The water receiving bottom plate of sink.Preferably, the water receiving component further includes water receiving side plate, the water receiving side plate and the water receiving bottom plate one
It rises and forms the water receiving tank.When the pedestal being applied to air conditioner as a result, heat exchange in air conditioner can be more easily realized
The collection for the condensed water that the positions such as device generate, prevents air conditioner from situations such as leak occur.
In addition, in pedestal provided by the present invention, optionally, the pedestal further include: outlet air side plate is set to institute
The downside of water receiving component is stated, and is located at the upside of the air outlet;And cover board, with the water receiving bottom plate and the air side
Plate is formed together the heat-insulation chamber.It, can quickly and conveniently shape as a result, by the cooperation of outlet air side plate, water receiving bottom plate and cover board
At heat-insulation chamber, to realize interval (isolation) setting of water receiving component and air outlet.
In addition, optionally, the cover board is formed through blow molding in pedestal provided by the present invention.In such case
Under, cover board and air side are also further ensured that while can quickly and conveniently realizing cover board molding by blow moulding process
The heat-insulation chamber formed between plate, water receiving bottom plate has more excellent closure.
In addition, optionally, being provided on the cover board in pedestal provided by the present invention and being adapted for described be blow molded into
The blow molding hole of type.In such a case, it is possible to quickly and conveniently realize the blow molding of cover board, also, setting by blow molding hole
It sets, is condensation or cold in the case where condensation or condensed water being formed in heat-insulation chamber and leak in heat-insulation chamber through water receiving bottom plate
Condensate provides outflow path, prevents heat-insulation chamber inner product dilutional hyponatremia, influences situations such as service performance using the air conditioner of the pedestal
Generation.
In addition, optionally, the cover board is heeling condition, and has least significant end in pedestal provided by the present invention.?
In this case, heeling condition is set by cover board and make it have least significant end, can make the condensation or cold in above-mentioned heat-insulation chamber
Condensate converges at the least significant end naturally due to gravity, to be more conducive to the discharge of condensation and condensed water.
In addition, optionally, the blow molding hole is located at the described minimum of the cover board in pedestal provided by the present invention
End.In such a case, it is possible to make the condensation for converging at cover board least significant end in above-mentioned heat-insulation chamber or condensed water via blow molding hole row
Out, while improving condensation or condensed water expulsion efficiency, and it can guarantee condensation or condensed water by being fully drained in heat-insulation chamber.
In addition, being vacuum state in the heat-insulation chamber optionally in pedestal provided by the present invention.Under normal circumstances,
Air is less under vacuum state, and vacuum degree is higher, and air is fewer, as a result, by making to pass through in heat-insulation chamber for vacuum state
The mode for reducing the transmission medium content of heat transmitting, achievees the purpose that reduce heat transference efficiency, forms heat-insulation chamber to reduce
The temperature difference in the interior outside of water receiving bottom plate and outlet air side plate is improved with the significantly more efficient generation for preventing condensation using the pedestal
Air conditioner comfort.
In addition, in pedestal provided by the present invention, optionally, the pedestal further include: connecting column is cylinder knot
Structure, and be set on the cover board;And connecting line, one end are connected with rubber stopper, the other end is connect with the connecting column,
In, the rubber stopper is suitable for blocking the blow molding hole.In this case, rubber stopper can effectively block blow molding hole
Effect, to ensure that air pressure inside heat-insulation chamber keeps certain, such as remain sluggish state or vacuum state etc.;Pass through connecting column
With the setting of connecting line, more easily rubber stopper can be stored, prevent from the feelings such as falling when being removed from blow molding hole
The generation of condition.
In addition, in pedestal provided by the present invention, optionally, the pedestal further include: drain assembly has card slot
And drainpipe, wherein the card slot is set on the cover board, and the drainpipe is suitable for being connected in the card slot, also, institute
The side end for stating drainpipe is suitable for connecting with the blow molding hole.In this case, blow molding hole and drainpipe are attached,
It can be to the condensation or the effective exit guide of condensed water progress in above-mentioned heat-insulation chamber;It, can be more preferable and by the setting of card slot
Drainpipe is stored on ground, to promote drainpipe and be blow molded the compactness that connects between hole, prevent because it is unexpected the accidents such as pull caused by arrange
The generation of the case where water pipe end falls off from blow molding hole, to prevent condensation or condensed water from revealing, to mention
Height applies the comfort of the air conditioner of the pedestal.
Another aspect provides a kind of air conditioners comprising: pedestal as described above.
In another aspect of the invention, it by will have the pedestal of heat-insulation chamber to be set on air conditioner, can effectively keep away
Exempt from the direct contact of water receiving component and air outlet, namely under the working condition of air conditioner (in operational process), water receiving component
Inside still can contact (temperature is higher) with without cooling air, because of the setting of heat-insulation chamber, so that the outside of water receiving component
It can not directly be contacted with the air at air outlet after cooling (temperature is lower), increase heat transfer time, reduce hot biography
Efficiency is passed, so that the temperature difference in outside in water receiving component is reduced, thus, it is possible to effectively prevent the production of condensation on the outside of water receiving component
It is raw, improve the comfort of air conditioner.
In addition, in air conditioner provided by the present invention, optionally, the air conditioner further include: drainage channel, setting
In a side end of the pedestal, and is formed and connected with the water receiving tank.Thus, it is possible to effectively realize condensed water in water receiving tank
Discharge, promote the overall performance of air conditioner.
In addition, in air conditioner provided by the present invention, optionally, the end side of the drainpipe and the draining
Channel forms connection.In this case, by the way that drainpipe and drainage channel are formed connection, it can be further improved heat-insulation chamber
Middle condensation or the validity of condensed water discharge, promote the working performance of air conditioner entirety.
Compared with the existing technology, pedestal and air conditioner of the present invention have the advantage that
(1) by the setting of heat-insulation chamber, and the pedestal with the heat-insulation chamber is set on air conditioner, it is possible to prevente effectively from
The direct contact of water receiving component and air outlet, namely under the working condition of air conditioner (in operational process), water receiving component it is interior
Side still can contact (temperature is higher) with without cooling air, because of the setting of heat-insulation chamber, so that the outside of water receiving component can
Not contact (temperature is lower) directly with the air at air outlet after cooling, heat transfer time is increased, reduces hot transmitting
Efficiency, so that the temperature difference in outside in water receiving component is reduced, thus, it is possible to it is effectively prevent the generation of condensation on the outside of water receiving component,
Improve the comfort of air conditioner.
(2) further, by the way that heat-insulation chamber is configured to hollow structure, and vacuum state is set by heat-insulation chamber or makes it
Internal gas is in the state of stagnating, and can achieve the purpose for reducing heat transference efficiency, to reduce the water receiving bottom for forming heat-insulation chamber
The temperature difference in the interior outside of plate and outlet air side plate improves the air-conditioning using the pedestal with the significantly more efficient generation for preventing condensation
The comfort of device.
(3) further, by the setting of the components such as rubber stopper or drainpipe, it may further ensure that the closing of heat-insulation chamber
State or in heat-insulation chamber condensation or condensed water carry out effective exit guide effect, improve the air conditioner with the pedestal
Overall performance.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention
It applies mode and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the partial structure diagram of air conditioner according to the present invention;
Fig. 2 is the side cross-sectional view of the part-structure of air conditioner according to the present invention;
Fig. 3 is the partial structural diagram in Fig. 1 after the truncation of the direction A-A ';
Fig. 4 is the structural schematic diagram of pedestal according to the present invention;
Fig. 5 is the partial enlarged view in Fig. 4 at I.
Description of symbols:
1- through-flow fan blade, 2- drainage channel, 3- pedestal, 31- air outlet, 32- water receiving component, 321- water receiving tank, 322- connect
Water-bed plate, 323- water receiving side plate, 33- heat-insulation chamber, 34- outlet air side plate, 35- cover board, 351- are blow molded hole.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can
To be combined with each other.
In addition, all directions being previously mentioned in a specific embodiment of the invention or positional relationship are based on attached drawing
Positional relationship, " front and back up and down " coordinate system occurred in attached drawing, only for the purposes of understand it is of the invention simplify description, without
It is the specific orientation that implies signified device or element and must have, is not considered as limiting the invention.
Below with reference to attached drawing and in conjunction with specific embodiment, the present invention will be described in detail.
Fig. 1 is the partial structure diagram of air conditioner according to the present invention;Fig. 2 is air conditioner according to the present invention
The side cross-sectional view of part-structure;Fig. 3 is the partial structural diagram in Fig. 1 after the truncation of the direction A-A ';Fig. 4 is the present invention
The structural schematic diagram of related pedestal.
Fig. 1, Fig. 2 and Fig. 3 schematically illustrate the part-structure of air conditioner according to the present invention, and Fig. 4 is schematically
It illustrates the part-structure of pedestal according to the present invention, omits in explanation below to the other structures of air conditioner and pedestal
Explanation.As depicted in figs. 1 and 2, air conditioner according to the present invention may include pedestal 3, and in some instances, air conditioner may be used also
To include through-flow fan blade 1, heat exchanger 4.Wherein, as shown in Figure 3 and Figure 4, pedestal 3 according to the present invention may include outlet air
Mouthfuls 31, with the spaced water receiving component 32 of air outlet 31 and the interval region suitable for filling air outlet 31 and water receiving component 32
Heat-insulation chamber 33.In some instances, in the operating condition, it can have temperature difference between water receiving component 32 and air outlet 31.
Preferably, by will have the pedestal of heat-insulation chamber to be set on air conditioner, it is possible to prevente effectively from water receiving component and going out
The direct contact in air port, namely under the working condition of air conditioner (in operational process), the inside of water receiving component still can be with
Contact (temperature is higher) without cooling air, because of the setting of heat-insulation chamber, allow water receiving component outside not with air outlet
The air of place after cooling directly contacts (temperature is lower), increases heat transfer time, reduces heat transference efficiency, to reduce
The temperature difference in outside thus, it is possible to effectively prevent the generation of condensation on the outside of water receiving component improves air conditioner in water receiving component
Comfort.
Preferably, air conditioner can also include drainage channel 2.In some instances, drainage channel 2 can be set in pedestal
3 side end, and formed and connected with water receiving tank 321 (being described later on).In other examples, drainage channel 2 can be direct
It is connect with water receiving tank 321, indirect connection can also be formed by other connectors.Thus, it is possible to effectively realize water receiving tank
The discharge of middle condensed water promotes the overall performance of air conditioner.
Preferably, the setting position of air outlet 31 is not particularly limited.In some instances, air outlet 31 can be located at bottom
The preceding downside of seat 3.In other examples, air outlet 31 can also be located at other positions of pedestal 3, such as front side or front upper side
Deng.In such a case, it is possible to be effectively ensured air-flow enter and leave it is smooth while, improve the concentration degree of air-flow, and can be according to reality
The air-out direction for needing to adjust air conditioner promotes the practicability of air conditioner.
Preferably, water receiving component 32 can have water receiving tank 321 and form the water receiving bottom plate 322 of water receiving tank 321.Some
In example, water receiving component 32 can also include water receiving side plate 323, also, water receiving side plate 323 can be with water receiving bottom plate 322 together
Form water receiving tank 321.In other examples, the heat exchanger 4 of air conditioner can be formed with water receiving tank 321 to be connected.This
In the case of, it can more easily realize the collection for the condensed water that heat exchanger of air conditioner position generates, prevent air conditioner from going out
Situations such as existing leak, improve the performance of air conditioner.
In addition, the quantity of water receiving tank 321 and water receiving side plate 323 is not particularly limited.In some instances, water receiving tank 321
It can be two, corresponding, water receiving side plate 323 can be three.In other examples, water receiving can be located in the middle
Groove is set on side plate 323.As a result, when condensation flow is through the water receiving tank, its impact to water receiving side plate can be effectively reduced
Power etc., prevent condensed water splash out and so on, promote the performance of air conditioner.
Preferably, pedestal 3 can also include outlet air side plate 34 and cover board 35.In some instances, outlet air side plate 34 can be with
It is set to the downside of water receiving component 32, and is located at the upside of air outlet 31;Cover board 35 can be with water receiving bottom plate 322 and outlet air side plate
34 are formed together heat-insulation chamber 33.The cooperation for passing through outlet air side plate, water receiving bottom plate and cover board as a result, can quickly and conveniently form
Heat-insulation chamber, to realize interval (isolation) setting of water receiving component and air outlet.
Preferably, the molding mode of cover board 35 is not particularly limited.In some instances, cover board 35 can be through blow molding
It forms.In this case, also further while can quickly and conveniently realizing cover board molding by blow moulding process
The heat-insulation chamber for ensuring to be formed between cover board and outlet air side plate, water receiving bottom plate has more excellent closure.
In addition, the concrete shape of heat-insulation chamber 33 is not particularly limited.In some instances, heat-insulation chamber 33 can be regular
Shape, or irregular shape.Thus, it is possible to according to actual needs, the shape feature of heat-insulation chamber be adjusted, to adapt to not
Same use demand.
Preferably, heat-insulation chamber 33 is it is so structured that hollow structure.In this case, outlet air side plate, water receiving bottom plate and lid
The heat transmission medium inside heat-insulation chamber that plate cooperatively forms can be air, namely by being hollow knot by heat-insulation chamber internal structure
Structure can make heat transmission medium become gas from solid, to reduce the efficiency of heat transmitting, reduce water receiving in water receiving component
The temperature difference of side, effectively prevents the generation of condensation, improves the sky using the pedestal inside and outside the interior outside of bottom plate and outlet air side plate
Adjust the comfort of device.
In addition, can be with filling with insulation material in heat-insulation chamber 33.In some instances, in heat-insulation chamber 33 can with filling sponge or
Plastic foamboard.In such a case, it is possible to effectively improve the heat-insulating capability of heat-insulation chamber, it is effectively prevent the generation of condensation, is promoted
The comfort of air conditioner.
Preferably, the air condition in heat-insulation chamber 33 is not particularly limited.In some instances, the air in heat-insulation chamber 33
It may be at the state that stagnates.Here, so-called sluggish state, as air stop the state of flowing.It is heat-insulated in other examples
Air in chamber 33 also may be at close to sluggish state.Under normal circumstances, the heat transmitting effect of the air in sluggish state
Rate is almost nil, and heat-insulation chamber can be substantially prevented from the water receiving bottom plate in water receiving component and the outlet air side plate on the upside of air outlet as a result,
Interior outside heat transmitting, to effectively prevent the generation of condensation on water receiving bottom plate and outlet air side plate, improve using the bottom
The comfort of the air conditioner of seat.
Preferably, the air pressure size in heat-insulation chamber 33 is not particularly limited.In some instances, the air pressure in heat-insulation chamber 33
It can be P, wherein less than one standard atmospheric pressure (about 101.325kPa) of P.It can be in other examples, in heat-insulation chamber 33
For vacuum state.Under normal circumstances, air is less under vacuum state, and vacuum degree is higher, and air is fewer, as a result, by making heat-insulation chamber
Interior is vacuum state, can achieve the purpose that reduce heat transference efficiency by way of reducing the transmission medium content of heat transmitting,
To which reduction forms the temperature difference of the water receiving bottom plate of heat-insulation chamber and the interior outside of outlet air side plate, with the significantly more efficient production for preventing condensation
It is raw, improve the comfort of the air conditioner using the pedestal.
In addition, the dimensional structure of cover board 35 is not particularly limited.In some instances, cover board 35 can be the knot of rule
Structure, or irregular structure.Thus, it is possible to according to the needs of actual conditions, the dimensional structure of cover board be adjusted, to improve
Its applicability.
Preferably, cover board 35 can be heeling condition, and there is least significant end.In some instances, cover board 35 can be to end
Roll tiltedly, for example, can sloped-end to the left, can also sloped-end to the right.In other examples, cover board 35 may be used also
To be tilted to intermediate any position, such as gradually tilted from the end of left and right side to centre respectively.In this case, will
Cover board is set as heeling condition and makes it have least significant end, can make condensation in above-mentioned heat-insulation chamber or condensed water due to gravity
And the least significant end is converged at naturally, to be more conducive to the discharge of condensation and condensed water.
Fig. 5 is the partial enlarged view in Fig. 4 at I.
Preferably, as shown in figure 5, blow molding hole 351 can also be arranged on cover board 35.In some instances, blow molding hole 351 can
It is suitable for carrying out blow molding.In such a case, it is possible to quickly and conveniently realize the blow molding of cover board, also, by blowing
The setting of mole is in the case where can forming condensation or condensed water in heat-insulation chamber and leak in heat-insulation chamber through water receiving bottom plate
Condensation or condensed water provide outflow path, prevent heat-insulation chamber inner product dilutional hyponatremia, influence to apply the usability of the air conditioner of the pedestal
Can and so on.
In addition, the size in blow molding hole 351 is not particularly limited.In some instances, the size for being blow molded hole 351 can be with
It is sufficiently small, such as 0.1mm etc. can be less than.It in this case, can not after the blow molding that cover board is carried out by blow molding hole
By structures such as extraneous plugs, flowing in or out for heat-insulated intracavity gas also can effectively prevent, promote its heat-proof quality.
Preferably, specific location of the blow molding hole 351 on cover board 35 is not particularly limited.In some instances, it is blow molded hole
351 can be located at the least significant end of cover board 35.In other examples, blow molding hole 351 can also be located at close to the minimum of cover board 35
The position at end.In such a case, it is possible to make the condensation for converging at cover board least significant end in above-mentioned heat-insulation chamber or condensed water via blowing
Mole discharge, while improving condensation or condensed water expulsion efficiency, and can guarantee condensation or condensed water by complete in heat-insulation chamber
Full discharge.
Preferably, pedestal 3 can also include the drain assembly (not shown) for having card slot and drainpipe.In some examples
In, card slot can be set on cover board 35, and drainpipe may be adapted to be connected in card slot.In other examples, drainpipe
One side end may be adapted to connect with blow molding hole 351.In this case, blow molding hole and drainpipe are attached, it can be right
Condensation or condensed water in above-mentioned heat-insulation chamber carry out effective exit guide;And by the setting of card slot, can preferably store
Drainpipe, to promote drainpipe and be blow molded the compactness that connects between hole, prevent because it is unexpected the accidents such as pull caused by drain pipe end
The generation of the case where portion falls off from blow molding hole, to prevent condensation or condensed water from revealing, to improve application
The comfort of the air conditioner of the pedestal.
It is connected preferably, the end side of drainpipe can be formed with drainage channel 2.In some instances, drainpipe
End side can pass through intermediate connector and drainage channel 2 and formed and connect.In this case, by direct or indirect
The mode of connection makes drainpipe and drainage channel form connection, can be further improved condensation or condensed water discharge in heat-insulation chamber
Validity, promoted air conditioner entirety working performance.
As another way of realization of the invention, pedestal 3 can also include the connecting column that is set on cover board 35 (not
Diagram) and one end is connected with rubber stopper and the other end is connect with connecting column connecting line.In some instances, connecting column can be
Column structure.In other examples, rubber stopper can be used for blocking blow molding hole 351.In this case, rubber stopper can be right
Be blow molded hole and carry out effective plugging action, to ensure that the air pressure inside heat-insulation chamber keeps certain, such as remain sluggish state or
Vacuum state etc.;By the setting of connecting column and connecting line, more easily rubber stopper can be stored, prevent by from
Blow molding hole is fallen when removing.
The foregoing is merely better embodiments of the invention, are not intended to limit the invention, any this field skill
Art personnel, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in this
Within the protection scope of invention.
Claims (13)
1. a kind of pedestal (3) characterized by comprising
Air outlet (31);
Water receiving component (32) is spaced with the air outlet (31) and is arranged, and
Heat-insulation chamber (33) is suitable for filling the interval region of the air outlet (31) and the water receiving component (32).
2. pedestal (3) according to claim 1, which is characterized in that the heat-insulation chamber (33) is configured to hollow structure.
3. pedestal (3) according to claim 2, which is characterized in that the air in the heat-insulation chamber (33) is in the shape that stagnates
State.
4. pedestal (3) according to claim 1, which is characterized in that the water receiving component (32) have water receiving tank (321) and
Form the water receiving bottom plate (322) of the water receiving tank (321).
5. pedestal (3) according to claim 4, which is characterized in that further include:
Outlet air side plate (34) is set to the downside of the water receiving component (32), and is located at the upside of the air outlet (31);With
And
Cover board (35) is formed together the heat-insulation chamber (33) with the water receiving bottom plate (322) and the outlet air side plate (34).
6. pedestal (3) according to claim 5, which is characterized in that the cover board (35) forms through blow molding.
7. pedestal (3) according to claim 6, which is characterized in that be provided on the cover board (35) described in being adapted for
The blow molding hole (351) of blow molding.
8. pedestal (3) according to claim 7, which is characterized in that the cover board (35) is heeling condition, and is had minimum
End.
9. pedestal (3) according to claim 8, which is characterized in that blow molding hole (351) is located at the cover board (35)
The least significant end.
10. pedestal (3) according to claim 2, which is characterized in that be vacuum state in the heat-insulation chamber (33).
11. pedestal (3) according to claim 7, which is characterized in that further include:
Connecting column is column structure, and is set on the cover board (35);And
Connecting line, one end are connected with rubber stopper, and the other end is connect with the connecting column, wherein
The rubber stopper is suitable for blocking the blow molding hole (351).
12. pedestal (3) according to claim 7, which is characterized in that further include:
Drain assembly has card slot and drainpipe, wherein
The card slot is set on the cover board (35),
The drainpipe is suitable for being connected in the card slot, also,
One side end of the drainpipe is suitable for connecting with the blow molding hole (351).
13. a kind of air conditioner characterized by comprising
Pedestal (3) as described in any one of claims 1 to 12.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910405963.2A CN110006102B (en) | 2019-05-16 | 2019-05-16 | Base and air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910405963.2A CN110006102B (en) | 2019-05-16 | 2019-05-16 | Base and air conditioner |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110006102A true CN110006102A (en) | 2019-07-12 |
CN110006102B CN110006102B (en) | 2020-07-07 |
Family
ID=67177106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910405963.2A Active CN110006102B (en) | 2019-05-16 | 2019-05-16 | Base and air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110006102B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111750434A (en) * | 2020-06-24 | 2020-10-09 | 宁波奥克斯电气股份有限公司 | Indoor unit of air conditioner |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201438033U (en) * | 2009-09-02 | 2010-04-14 | 珠海格力电器股份有限公司 | Air conditioner and structure of water collecting pan thereof |
CN204313464U (en) * | 2014-12-11 | 2015-05-06 | 广东志高空调有限公司 | A kind of drawing water structure of base of indoor unit of air conditioner |
CN105276682A (en) * | 2014-07-23 | 2016-01-27 | 三菱电机株式会社 | Indoor unit of air conditioning device |
CN106705402A (en) * | 2016-11-09 | 2017-05-24 | 珠海格力电器股份有限公司 | Split wall hanging internal unit condensed water draining structure |
CN206291323U (en) * | 2016-11-30 | 2017-06-30 | 青岛海尔空调器有限总公司 | A kind of indoor set bottom drip tray and wall indoor unit |
-
2019
- 2019-05-16 CN CN201910405963.2A patent/CN110006102B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201438033U (en) * | 2009-09-02 | 2010-04-14 | 珠海格力电器股份有限公司 | Air conditioner and structure of water collecting pan thereof |
CN105276682A (en) * | 2014-07-23 | 2016-01-27 | 三菱电机株式会社 | Indoor unit of air conditioning device |
CN204313464U (en) * | 2014-12-11 | 2015-05-06 | 广东志高空调有限公司 | A kind of drawing water structure of base of indoor unit of air conditioner |
CN106705402A (en) * | 2016-11-09 | 2017-05-24 | 珠海格力电器股份有限公司 | Split wall hanging internal unit condensed water draining structure |
CN206291323U (en) * | 2016-11-30 | 2017-06-30 | 青岛海尔空调器有限总公司 | A kind of indoor set bottom drip tray and wall indoor unit |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111750434A (en) * | 2020-06-24 | 2020-10-09 | 宁波奥克斯电气股份有限公司 | Indoor unit of air conditioner |
CN111750434B (en) * | 2020-06-24 | 2022-05-31 | 宁波奥克斯电气股份有限公司 | Indoor unit of air conditioner |
Also Published As
Publication number | Publication date |
---|---|
CN110006102B (en) | 2020-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203785210U (en) | Condensed-water discharging device and marine air-conditioning unit provided with same | |
CN104329848A (en) | Semiconductor refrigeration refrigerator | |
CN107131684A (en) | A kind of air-conditioner outdoor unit and air-conditioning | |
CN204630203U (en) | Air-conditioner | |
WO2023123771A1 (en) | Ceiling-cassette indoor unit and air conditioner | |
CN110006102A (en) | Pedestal and air conditioner | |
CN105276676B (en) | Air conditioner indoor unit | |
CN110068066B (en) | Mobile air conditioner | |
CN105020815A (en) | Evaporation condensation type air conditioner | |
CN204534933U (en) | A kind of Water cooled air conditioners | |
CN204889642U (en) | Drinking water apparatus | |
CN108151174A (en) | Dehumidifier | |
CN105526643A (en) | Outdoor unit of variable-frequency air conditioner, and variable-frequency air conditioner | |
CN206113277U (en) | Heat exchanger and have vertical air conditioner of this heat exchanger | |
CN203810823U (en) | Semiconductor refrigerating refrigerator | |
CN208170779U (en) | A kind of heat pump unit | |
CN204629842U (en) | Air-conditioner | |
CN211695336U (en) | Hydrophobic separation blade, hydrophobic device and evaporation condensing equipment | |
CN204535275U (en) | Drinking equipment | |
CN207407505U (en) | A kind of condensate water circulatory system and its air-conditioning | |
CN207763141U (en) | Dehumidifier | |
CN205279259U (en) | Air -conditioning indoor unit | |
CN206339009U (en) | A kind of freezer machine connecting waterhead and freezer machine | |
CN104776684B (en) | Drinking equipment | |
CN110986653A (en) | Anti-freezing high-efficiency water chamber and heat exchanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |