CN110005429A - The box top board structure of city tunnel bifurcation mouth - Google Patents

The box top board structure of city tunnel bifurcation mouth Download PDF

Info

Publication number
CN110005429A
CN110005429A CN201910428130.8A CN201910428130A CN110005429A CN 110005429 A CN110005429 A CN 110005429A CN 201910428130 A CN201910428130 A CN 201910428130A CN 110005429 A CN110005429 A CN 110005429A
Authority
CN
China
Prior art keywords
tunnel
mouth
box top
top board
lower plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910428130.8A
Other languages
Chinese (zh)
Inventor
郭炎伟
付大喜
阮飞鹏
卫涛
卢强
侯起阳
张百岁
曹文文
齐强
王卫中
刘雪
高晓培
刘喜歌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Provincial Communication Planning and Design Institute Co Ltd
Original Assignee
Henan Provincial Communication Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Provincial Communication Planning and Design Institute Co Ltd filed Critical Henan Provincial Communication Planning and Design Institute Co Ltd
Priority to CN201910428130.8A priority Critical patent/CN110005429A/en
Publication of CN110005429A publication Critical patent/CN110005429A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of box top board structures of city tunnel bifurcation mouth, including tunnel roof, the tunnel roof includes the upper plate being arranged at intervals between tunnel sidewalls and lower plate, the upper plate, cavity one end that lower plate and tunnel sidewalls surround is provided with main mouth end panel, the other end forms fork mouth structure by the branch mouth end panel in side bar and outside, the cavity inside is divided into multiple chambers being arranged in the vertical direction by web, the upper plate of each chamber is provided with demoulding hole, the lower plate of each chamber is all made of waterproof mortar and looks for the gradient and offer ventilating drainage hole.The present invention is small convenient for design, difficulty of construction, can reduce structure roof self weight, reduces structure roof thickness of earth covering, and then can reduce the load that structure is subject to, increases the span of city tunnel section;When prestressing force is arranged, the regular reinforcement dosage needed for crack-resisting design control can be not only reduced, it is also ensured that structure roof does not crack, and then improves the durability of structure roof.

Description

The box top board structure of city tunnel bifurcation mouth
Technical field
The present invention relates to municipal works city tunnel structure technique of design and construction fields, more particularly, to a kind of city tunnel The box top board structure of road bifurcation mouth.
Background technique
With the development of urban tunnel construction, functional requirement is higher and higher.In most cases, as long as city tunnel is full The unidirectional transport need of foot, but also need to consider traffic diverging and the linking of multiple directions sometimes, at this point, complicated tunnel Road bifurcation mouth form is just come into being.Under normal conditions, the city tunnel structure section span at bifurcation mouth can gradual change increasing Greatly, flat shape is complicated and irregular, and design and construction is very cumbersome.Currently, city tunnel bifurcation mouth top plate mostly uses plate Structure type, structure design are controlled by crack-resisting design, and top plate thickness is generally large, quantity of reinforcement is also very big, thus economy compared with Difference;Further, when tunnel structure top plate buried depth is larger, thickness of earth covering can not be effectively reduced.If be designed to Arch top board structure or folded plate top board structure, then top plate shape is both asymmetric or irregular, and structure type is unreasonable, and construction is more Add inconvenience.
Summary of the invention
To solve the above-mentioned problems, the present invention provide a kind of structure overall stiffness is big, cracking resistance is strong, span ability is big, Stress performance is good, endurance quality is good and can reduce engineering material dosage, reduce structure roof thickness of earth covering, city easy for construction The box top board structure of tunnel bifurcation mouth, specific technical solution are as follows:
The box top board structure of city tunnel bifurcation mouth of the present invention, including tunnel roof, between the tunnel roof includes Every the upper plate and lower plate being arranged between tunnel sidewalls, cavity one end that the upper plate, lower plate and tunnel sidewalls surround is provided with Main mouth end panel, the other end form fork mouth structure by the branch mouth end panel in side bar and outside, and the cavity inside passes through abdomen Plate is divided into multiple chambers being arranged in the vertical direction, and the upper plate of each chamber is provided with demoulding hole, the lower plate of each chamber Waterproof mortar is all made of to look for the gradient and offer ventilating drainage hole.
The upper plate and lower plate are the solid panel of reinforced concrete structure, with a thickness of the 1/8 ~ 1/ of adjacent web spacing 12。
The main mouth end panel and branch mouth end panel are the solid slab of the reinforced concrete structure with armpit angle.
The web with a thickness of the 1/4 ~ 1/8 of adjacent web spacing.
The lower plate of each chamber is all made of waterproof mortar and looks for the unidirectional slope of the draining of the gradient 0.3% ~ 0.5%.
It is provided with prestress pipe spacer bar on the web, wears bellows duct and steel strand wires steel beam.
The box top board structure of city tunnel bifurcation mouth provided by the invention, has the advantages that
1, the present invention can increase the span of city tunnel section, when prestressing force is especially arranged, can increase city to a greater extent The span of city's tunnel cross-section;
2, the present invention can reduce structure roof self weight, reduce structure roof thickness of earth covering, and then can reduce the load that structure is subject to;
3, the present invention can reduce the dosage of structure roof concrete, reinforcing bar;
4, when present invention setting prestressing force, the regular reinforcement dosage needed for crack-resisting design control can not only be reduced, it is also ensured that Structure roof does not crack, and then improves the durability of structure roof;
5, the present invention is small convenient for design, difficulty of construction.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of tunnel bifurcation mouth described in the embodiment of the present invention.
Fig. 2 is the A-A sectional view (only box top plate portion) in Fig. 1.
Fig. 3 is the B-B profile (only box top plate portion) in Fig. 1.
Fig. 4 is the C-C sectional view in Fig. 1.
Fig. 5 is the D-D sectional view in Fig. 1.
Fig. 6 is the structural schematic diagram of lower plate portions in Fig. 1.
Specific embodiment
The present invention is suitable for the top board structure design and construction at city tunnel complex node, is come below with specific embodiment Illustrate the box top board structure of city tunnel bifurcation mouth of the present invention.
The single hole city tunnel with bifurcation mouth as shown in figures 1 to 6, by bottom plate 10, side wall 1 and case of the present invention Type top plate composition.Specifically, above-mentioned tunnel box top plate includes spaced upper plate 2 and lower plate 3, upper plate 2, lower plate 3 and tunnel Road side wall 1 is surrounded along the tunnel cavity that longitudinally extension and cross section are gradually increased;Main mouth is arranged in the lesser one end of cavity cross-sectional profile Side bar 5 is arranged in end panel 4.1, the other end, and according to design requirement, two branch mouth end panels are extended on the outside of side bar 5 4.2,4.3, cavity inside then passes through web 6 and is divided into multiple chamber S being arranged in the vertical direction.The upper plate 2 of each chamber S is reserved Demoulding hole 7, the lower plate 3 of each chamber S are all made of waterproof mortar and look for the unidirectional slope of the draining of the gradient 0.3% ~ 0.5%, and in each case The four corners of room S lower plate 3 reserve ventilating drainage hole 8 using pvc pipe.Generally, upper plate 2, lower plate 3 and web 6 are that reinforcing bar is mixed The solid panel of Xtah Crude Clay structure, and web 6 is with a thickness of the 1/4 ~ 1/8 of adjacent web spacing, upper plate 2 and lower plate 3 with a thickness of phase The spacing of the 1/8 ~ 1/12 of adjacent web spacing, upper plate 2 and lower plate 3 is preferably greater than 1.7m;Main mouth end panel 4.1, branch mouth end panel 4.2,4.3 be the armored concrete solid slab with armpit angle, and thickness performs in favor of structure integral waterproofing as principle, often Deformation joint 4.4 is provided between a end panel and adjacent segment.In order to further increase the durability of structure roof, knot is reduced Concrete, the amount of reinforcement of structure top plate, a greater degree of span for increasing city tunnel section, can be arranged on web 6 and answer in advance Power along the pre-buried bellows duct of tunnel lateral direction that is, on web 6, and penetrates steel strand wires steel beam 9 in bellows duct.
City tunnel bifurcation mouth with above-mentioned box top board structure mainly includes the following steps: in construction
The first step, excavation pit perform the waterproof layer of bed course and tunnel floor 10;
Second step, the reinforcing bar of binding tunnel floor 10, part tunnel sidewalls 1 and bifurcation mouth sleeper 11, pours tunnel floor 10 Concrete pours the concrete of tunnel sidewalls 1 and bifurcation mouth sleeper 11 to the first longitudinal direction water for being reserved in 10 or more tunnel floor At flat construction joint, first longitudinal direction horizontal construction joint is usually at tunnel floor 10 or the above 300mm ~ 500mm in armpit angle;
Third step continues the reinforcing bar for binding tunnel sidewalls 1 and bifurcation mouth sleeper 11, pours tunnel sidewalls 1 and bifurcation mouth sleeper 11 Concrete to being reserved at box top plate second longitudinal direction horizontal construction joint below, second longitudinal direction horizontal construction joint usually for Below box top plate or armpit angle at 300mm ~ 500mm;
4th step installs 3 bed die of lower plate of box top plate, binds lower plate 3, web 6, side bar 5 and the main mouth end of box top plate The reinforcing bar of plate 4.1, branch mouth end panel 4.2,4.3 is bound using the pvc pipe of diameter 50mm and is used on the framework of steel reinforcement of lower plate 3 Reserved ventilating drainage hole 8;
5th step installs the inner side template of each chamber S, pours lower plate 3, web 6, side bar 5 and main mouth end panel 4.1, branch mouth The concrete of end panel 4.2,4.3;After the concrete of lower plate 3 reaches design strength, using waterproof mortar look for the gradient 0.3% ~ The unidirectional slope of 0.5% draining, direction are consistent with tunnel lateral direction drainage direction;
6th step installs 2 bed die of upper plate of box top plate, binds 2 reinforcing bar of upper plate, reserves demoulding hole 7;On the inside of to chamber S When template is removed, the size in demoulding hole 7 will pass in and out convenient for construction personnel;
7th step pours 2 concrete of upper plate;
8th step, removes the inner side template of chamber S, then restores 7 reinforcing bar of demoulding hole and pour closely knit, then performs tunnel sidewalls 1 And structurally waterproof layer, the progress earthing backfill of box top plate.
It is pre-buried along tunnel in web 6 usually after the 4th step is constructed when needing to apply prestressing force on web 6 The bellows duct that road is laterally arranged, and steel strand wires steel beam 9 is penetrated in bellows duct;Later when the coagulation that the 7th step pours After soil reaches design strength, tensioning simultaneously anchors the steel strand wires steel beam 9 in web 6, and " highway bridge and culvert is applied using existing industry standard Work technical specification " slurries of Special grouting material as defined in (JTG/T F50) or Special grouting agent configuration carry out bellows duct Mud jacking, notch should sealing off and covering anchorage as early as possible after the completion of mud jacking.

Claims (6)

1. a kind of box top board structure of city tunnel bifurcation mouth, including tunnel roof, it is characterised in that: the tunnel roof packet The upper plate being arranged at intervals between tunnel sidewalls and lower plate are included, cavity one end that the upper plate, lower plate and tunnel sidewalls surround is set It is equipped with main mouth end panel, the other end forms fork mouth structure by the branch mouth end panel in side bar and outside, and the cavity inside is logical It crosses web and is divided into multiple chambers being arranged in the vertical direction, the upper plate of each chamber is provided with demoulding hole, each chamber Lower plate is all made of waterproof mortar and looks for the gradient and offer ventilating drainage hole.
2. the box top board structure of city tunnel bifurcation mouth according to claim 1, it is characterised in that: the upper plate is under Plate is the solid panel of reinforced concrete structure, with a thickness of the 1/8 ~ 1/12 of adjacent web spacing.
3. the box top board structure of city tunnel bifurcation mouth according to claim 1, it is characterised in that: the main mouth end Plate and branch mouth end panel are the solid slab of the reinforced concrete structure with armpit angle.
4. the box top board structure of city tunnel bifurcation mouth according to claim 1, it is characterised in that: the thickness of the web Degree is the 1/4 ~ 1/8 of adjacent web spacing.
5. the box top board structure of city tunnel bifurcation mouth according to claim 1, it is characterised in that: each chamber Lower plate be all made of waterproof mortar and look for the unidirectional slope of the draining of the gradient 0.3% ~ 0.5%.
6. the box top board structure of city tunnel bifurcation mouth according to claim 1, it is characterised in that: set on the web It is equipped with prestress pipe spacer bar, wears bellows duct and steel strand wires steel beam.
CN201910428130.8A 2019-05-22 2019-05-22 The box top board structure of city tunnel bifurcation mouth Pending CN110005429A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910428130.8A CN110005429A (en) 2019-05-22 2019-05-22 The box top board structure of city tunnel bifurcation mouth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910428130.8A CN110005429A (en) 2019-05-22 2019-05-22 The box top board structure of city tunnel bifurcation mouth

Publications (1)

Publication Number Publication Date
CN110005429A true CN110005429A (en) 2019-07-12

Family

ID=67177582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910428130.8A Pending CN110005429A (en) 2019-05-22 2019-05-22 The box top board structure of city tunnel bifurcation mouth

Country Status (1)

Country Link
CN (1) CN110005429A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734442A (en) * 2020-05-15 2020-10-02 江苏瑞沃建设集团有限公司 Box roof structure of urban tunnel branch mouth

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4123485A (en) * 1977-04-20 1978-10-31 Dyckerhoff & Widmann Aktiengesellschaft Stage construction of an elevated box girder and roadway structure
JP2011001784A (en) * 2009-06-20 2011-01-06 Ohbayashi Corp Method of constructing underground structure
CN105221160A (en) * 2015-10-10 2016-01-06 上海市政工程设计研究总院(集团)有限公司 A kind of vertical fork arrangement of staggered floor tunnel
CN106638324A (en) * 2016-12-30 2017-05-10 河南省交通规划设计研究院股份有限公司 Construction method for ultra-high-performance concrete corrugated steel web composite box girder bridge
CN108678011A (en) * 2018-06-07 2018-10-19 深圳市市政设计研究院有限公司 A kind of high hydraulic pressure of seabed depth earthing secretly buries tunnel structure across open cut greatly
CN208105008U (en) * 2018-04-20 2018-11-16 中交一公局公路勘察设计院有限公司 A kind of urban viaduct prestress steel bundle arrangement structure
CN209875164U (en) * 2019-05-22 2019-12-31 河南省交通规划设计研究院股份有限公司 Box-type top plate structure of urban tunnel branch

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4123485A (en) * 1977-04-20 1978-10-31 Dyckerhoff & Widmann Aktiengesellschaft Stage construction of an elevated box girder and roadway structure
JP2011001784A (en) * 2009-06-20 2011-01-06 Ohbayashi Corp Method of constructing underground structure
CN105221160A (en) * 2015-10-10 2016-01-06 上海市政工程设计研究总院(集团)有限公司 A kind of vertical fork arrangement of staggered floor tunnel
CN106638324A (en) * 2016-12-30 2017-05-10 河南省交通规划设计研究院股份有限公司 Construction method for ultra-high-performance concrete corrugated steel web composite box girder bridge
CN208105008U (en) * 2018-04-20 2018-11-16 中交一公局公路勘察设计院有限公司 A kind of urban viaduct prestress steel bundle arrangement structure
CN108678011A (en) * 2018-06-07 2018-10-19 深圳市市政设计研究院有限公司 A kind of high hydraulic pressure of seabed depth earthing secretly buries tunnel structure across open cut greatly
CN209875164U (en) * 2019-05-22 2019-12-31 河南省交通规划设计研究院股份有限公司 Box-type top plate structure of urban tunnel branch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734442A (en) * 2020-05-15 2020-10-02 江苏瑞沃建设集团有限公司 Box roof structure of urban tunnel branch mouth
CN111734442B (en) * 2020-05-15 2022-06-28 江苏瑞沃建设集团有限公司 Box roof structure of urban tunnel branch mouth

Similar Documents

Publication Publication Date Title
CN109356173A (en) A kind of pin-connected panel anchor bolt frame girder construction and its construction method
CN206376276U (en) A kind of prefabricated pipe gallery
CN110042865A (en) Box top board structure for large span city tunnel
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
WO2023155469A1 (en) Road structure transformed from oversized detached underground garage and construction method thereof
KR101065555B1 (en) System preventing non-woven from mortar particles filled up the back space of PCL Precasting Concrete Lining and method constructing the non-woven to PCL
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN204753604U (en) A excavation supporting system for expanding soil district
CN110130934A (en) The construction method of city tunnel bifurcation mouth with box top board structure
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN108547316B (en) Double-layer corrugated steel structure for underground comprehensive pipe gallery
CN213173336U (en) Novel prefabricated assembled anticollision wall
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN110005429A (en) The box top board structure of city tunnel bifurcation mouth
CN210288417U (en) Rain sewage pipe excavation foundation pit supporting structure
CN104878863B (en) Construction method of light composite floor
CN110159272A (en) The construction method of large span city tunnel with box top board structure
CN217107046U (en) Corrugated steel plate self-plugging structure for highway tunnel transverse passage
CN212958666U (en) Multi-arch tunnel structure of double-layer primary support
CN209875164U (en) Box-type top plate structure of urban tunnel branch
CN210002441U (en) Box-type top plate structure for large-span urban tunnel
CN201395791Y (en) PHC tubular pile for broaching and grouting in soft soil region
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN208455661U (en) The high barrier wall structure of the embedding rock T shape combined type column plate of overlength

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination