CN110005168A - A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way - Google Patents

A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way Download PDF

Info

Publication number
CN110005168A
CN110005168A CN201910293902.1A CN201910293902A CN110005168A CN 110005168 A CN110005168 A CN 110005168A CN 201910293902 A CN201910293902 A CN 201910293902A CN 110005168 A CN110005168 A CN 110005168A
Authority
CN
China
Prior art keywords
resistance
impact
hyperbar
epoxy
resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910293902.1A
Other languages
Chinese (zh)
Inventor
于胜斌
杨涛
王晖
于清明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Kai Yuan Engineering Design Research Institute Co Ltd
Original Assignee
China Kai Yuan Engineering Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Kai Yuan Engineering Design Research Institute Co Ltd filed Critical China Kai Yuan Engineering Design Research Institute Co Ltd
Priority to CN201910293902.1A priority Critical patent/CN110005168A/en
Publication of CN110005168A publication Critical patent/CN110005168A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/24Implements for finishing work on buildings for laying flooring of masses made in situ, e.g. smoothing tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of dust proof workshop epoxide terrace fields, the heavy load epoxide terrace way that especially a kind of seamless, cracking resistance, resistance to hyperbar impact, its feature, ball blast technique is selected to handle concrete topping, ball blast technique can disposably remove concrete surface laitance layer, impurity completely, while carry out feather plucking to concrete surface, form the surface of even roughness, the adhesive force of resin and concrete is greatly improved, blasting craft is 2-3 times higher than grinding technics permeability.It provides a kind of tension, good impact resistance, and resistance to hyperbar performance is more excellent, is more suitable for the ground that load is big, impact force is big, the one kind that can improve global reliability is seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way.

Description

A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way
Technical field
The present invention relates to a kind of dust proof workshop epoxide terrace field, especially a kind of seamless, cracking resistance, the impact of resistance to hyperbar Heavy load epoxide terrace way.
Background technique
Existing dust proof workshop epoxide terrace generallys use following processing step:
(1) concrete topping is handled: when concrete is poured, the carbon ash lightweight object after vibration in cement can be in coagulation for terrace base Native surface forms one layer of separation layer after dry at one layer of laitance, and resin material is not easy to infiltrate through base, and currently employed is grinding Processing method grinds concrete floor surface with abrading block, can remove laitance layer, increases surface roughness.
(2) priming paint: with one of Thief zone epoxy primer of the uniform roller coating of roller, thickness 0.2mm.
(3) it loads screed: will be stirred evenly after epoxy floating coating mixing quartz sand with mortar mixer;Pave epoxy sand After pulp material, integrally smoothed out with scraper plate;After solidification, using parts fault locations such as grinder polishing batch tool marks, cleared up with dust catcher Completely.Load screed with a thickness of 2.5mm.
(4) it epoxy screed-coat: will be stirred evenly after epoxy floating coating mixing quartz sand;Quartz sand is added using epoxy resin It criticizes and scrapes levelling one.0.5 mm of epoxy screed-coat thickness.
(5) flexible epoxy gravity flow plane layer: epoxy face is painted to be made after mixing evenly in defined ratio on material label It is applied together with the uniform trowel of sawtooth trowel, according to using functional requirement Self-leveling surface thickness to be 0.8mm.
Problems and disadvantages of the existing technology:
(1) resin is depended on the adhesive force of substrate concrete to base's penetration degree and surface roughness, using milled processed When method, the penetration degree of resin to concrete is limited, epoxy primer and concrete adhesive force experimental data, grinding method it is attached Put forth effort to can achieve 1.56-2.17MPa, therefore leads to the globality poor of epoxy surface layer and concrete base layer.
(2) natural cracking of substrate concrete will lead to epoxy surface cracking, and the tensile property of epoxy surface layer is poor.
Summary of the invention
The object of the present invention is to provide a kind of tension, good impact resistance, resistance to hyperbar performance is more excellent, is more suitable for load Greatly, the big ground of impact force can improve a kind of seamless, cracking resistance of global reliability, the heavy load epoxy of resistance to hyperbar impact Terrace way.
The object of the present invention is achieved like this, a kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace Way, it is characterized in that: including at least following steps:
(1) ball blast technique is selected, concrete topping is handled;
(2) sundries such as polishing concrete topping dirt are cleared up with self-priming sand-blasting machine;
(3) with one of Thief zone epoxy primer of the uniform roller coating of ready roller, thickness 0.3mm;
(4) carbon fiber mixing quartz sand is added in epoxy floating coating;It is stirred evenly with mortar mixer;
(5) whole floating, compacting are carried out with mortar trowelling machine;
(6) after cured, the parts fault location such as polishing batch tool marks, is cleaned out with dust catcher;
(7) by following proportions construction resin and quartz sand, resin and carbon fiber;Resin: the weight proportion of quartz sand is 3: 1;Resin: the weight proportion of carbon fiber be 21:5, load screed with a thickness of 1.5 ~ 2mm;
(8) in the ratio of step (7), by epoxy resin brushing in epoxy resin mortar surface, will cut in a manner of blade coating One of 250gr/m2Glass fabric is layered in construction surface;
(9) by epoxy resin blade coating on glass fabric, and rolling extrusion, bubble is discharged;
(10) glass cloth that twice are intersected must be overlapped 10cm;
(11) the second 250gr/m that will be cut2Glass fabric is laid in construction surface again, and rolling extrusion, discharge Bubble;
(12) as be laid with third road glass fabric, FRP enhancement layer with a thickness of 1.5 ~ 2.5mm;
(13) it is stirred evenly after carbon fiber mixing quartz sand being added in epoxy floating coating;Using grinder to shape after FRP layers of solidification At frp layer be ground;
(14) epoxy face is painted and stirs evenly post curing 10 minutes in defined ratio on man, material factory Product labelling;Use saw The uniform trowel of tooth trowel applies together;
(15) carry out coating deflation with defoaming roller come rollback 2~3 times, according to use functional requirement Self-leveling surface thickness be 1 ~ 2mm。
The ball blast technique is to generate centrifugal force and wind in high-speed rotation process using motor-driven wheel abrator Power reaches 200Kg/min ball blast amount and enters in high-speed rotating sub-sand wheel, and under the action of the centrifugal force, bullet is dished out by sub-sand wheel It dishes out, is picked up by the blade of revolution at a high speed, and long along blade into orienting cover, then oriented set (bubble of control sand material beats direction) Degree direction, which constantly accelerates, dishes out, and bullet of dishing out forms certain fan-shaped a fluid stream, throws concrete ground with the speed of 120m/s On the surface of level ground, depth can reach 1-5mm according to the type of abrasive material, and convex-concave is uniform, and impact working face plays cleaning and strengthens work With.Then bullet and dust, impurity come the top of storage hopper by rebound room together.High-power deduster passes through on storage hopper Square separator separates pellet with dust, and pellet enters storage hopper and continues cycling through use, and dust, which then passes through cleaning shaft and enters, to be removed Dirt device.It is separated, is rested in dust removing funnel and cartridge surface by filter core.Automatic back blow deduster can be provided by compressed air Blowback air automatic spacing clears up each filter core.Finally by the gasflow clean-up of mating dust catcher inside machine, by pellet It is recycled with the classification of impurities cleared up, and pellet is recycled again.Impeller head is furnished with deduster, can accomplish Pollution-free construction improves working efficiency, protects environment.
The Thief zone epoxy primer is 2040 Thief zone epoxy primer of Yanfloor or Sikafloor -161.
The technical problems to be solved by the invention or beneficial effects of the present invention
(1) select ball blast technique concrete topping is handled, ball blast technique can disposably by concrete surface laitance layer, Impurity is removed completely, while carrying out feather plucking to concrete surface, forms the surface of even roughness, is greatly improved resin and is mixed The adhesive force of soil is coagulated, blasting craft is 2-3 times higher than grinding technics permeability.Slight ball blast adhesive force experimental data is 2.84 MPa, moderate ball blast adhesive force experimental data are 4.72 MPa, and severe ball blast adhesive force experimental data is 5.80 MPa.
(2) carbon fiber is a kind of high-strength nonmetallic materials higher than physical performance of glass fibre, especially tension, toughness, Usually building is used for structural strengthening, and chopped carbon fiber is added in epoxy resin and epoxy resin mortar and obtains than glass fibre is added The resin terrace tension that arrives, shock resistance, corrosion resistant performance are more superior.
Detailed description of the invention
Below with reference to embodiment attached drawing, the invention will be further described:
Fig. 1 is process flow chart of the embodiment of the present invention;
Fig. 2 is epoxy self-leveling floor surface layer Shot Blasting comparison diagram;
The ground Fig. 3 finishing coat and concrete adhesive force experimental data figure.
Specific embodiment
As shown in Figure 1, the heavy load epoxide terrace way of seamless, cracking resistance, resistance to hyperbar impact, it is characterized in that: at least Include the following steps: the heavy load epoxide terrace way of seamless, cracking resistance, the impact of resistance to hyperbar, it is characterized in that: including at least such as Lower step:
(1) ball blast technique is selected, concrete topping is handled;
(2) sundries such as polishing concrete topping dirt are cleared up with self-priming sand-blasting machine;
(3) with one of Thief zone epoxy primer of the uniform roller coating of ready roller, thickness 0.3mm;
(4) carbon fiber mixing quartz sand is added in epoxy floating coating;It is stirred evenly with mortar mixer;
(5) whole floating, compacting are carried out with mortar trowelling machine;
(6) after cured, the parts fault location such as polishing batch tool marks, is cleaned out with dust catcher;
(7) by following proportions construction resin and quartz sand, resin and carbon fiber;Resin: the weight proportion of quartz sand is 3: 1;Resin: the weight proportion of carbon fiber be 21:5, load screed with a thickness of 1.5 ~ 2mm;
(8) in the ratio of step (7), by epoxy resin brushing in epoxy resin mortar surface, will cut in a manner of blade coating One of 250gr/m2Glass fabric is layered in construction surface;
(9) by epoxy resin blade coating on glass fabric, and rolling extrusion, bubble is discharged;
(10) glass cloth that twice are intersected must be overlapped 10cm;
(11) the second 250gr/m that will be cut2Glass fabric is laid in construction surface again, and rolling extrusion, discharge Bubble;
(12) as be laid with third road glass fabric, FRP enhancement layer with a thickness of 1.5 ~ 2.5mm;
(13) it is stirred evenly after carbon fiber mixing quartz sand being added in epoxy floating coating;Using grinder to shape after FRP layers of solidification At frp layer be ground;
(14) epoxy face is painted and stirs evenly post curing 10 minutes in defined ratio on man, material factory Product labelling;Use saw The uniform trowel of tooth trowel applies together;
(15) carry out coating deflation with defoaming roller come rollback 2~3 times, according to use functional requirement Self-leveling surface thickness be 1 ~ 2mm。
The ball blast technique is to generate centrifugal force and wind in high-speed rotation process using motor-driven wheel abrator Power reaches 200Kg/min ball blast amount and enters in high-speed rotating sub-sand wheel, and under the action of the centrifugal force, bullet is dished out by sub-sand wheel It dishes out, is picked up by the blade of revolution at a high speed, and long along blade into orienting cover, then oriented set (bubble of control sand material beats direction) Degree direction, which constantly accelerates, dishes out, and bullet of dishing out forms certain fan-shaped a fluid stream, throws concrete ground with the speed of 120m/s On the surface of level ground, depth can reach 1-5mm according to the type of abrasive material, and convex-concave is uniform, and impact working face plays cleaning and strengthens work With.Then bullet and dust, impurity come the top of storage hopper by rebound room together.High-power deduster passes through on storage hopper Square separator separates pellet with dust, and pellet enters storage hopper and continues cycling through use, and dust, which then passes through cleaning shaft and enters, to be removed Dirt device.It is separated, is rested in dust removing funnel and cartridge surface by filter core.Automatic back blow deduster can be provided by compressed air Blowback air automatic spacing clears up each filter core.Finally by the gasflow clean-up of mating dust catcher inside machine, by pellet It is recycled with the classification of impurities cleared up, and pellet is recycled again.Impeller head is furnished with deduster, can accomplish Pollution-free construction improves working efficiency, protects environment.
The Thief zone epoxy primer is 2040 Thief zone epoxy primer of Yanfloor or Sikafloor -161.
As shown in Fig. 2, in the present invention, performance is more in terms of epoxy floor tension, shock resistance, resistance to hyperbar for carbon fiber Excellent, carbon fiber is more suitable for the ground that load is big, impact force is big, improves global reliability.
As shown in figure 3, ball blast technique is selected to handle concrete topping, ball blast technique can be disposably by concrete Surface laitance layer, impurity are removed completely, while carrying out feather plucking to concrete surface, are formed the surface of even roughness, are greatly mentioned The high adhesive force of resin and concrete, blasting craft are 2-3 times higher than grinding technics permeability.Slight ball blast adhesive force tests number According to for 2.84 MPa, moderate ball blast adhesive force experimental data is 4.72 MPa, and severe ball blast adhesive force experimental data is 5.80 MPa。
The well-known components and common structure of component and the structure category industry that the present embodiment does not describe in detail or common hand Section, does not describe one by one here.

Claims (3)

1. the heavy load epoxide terrace way of a kind of seamless, cracking resistance, the impact of resistance to hyperbar, it is characterized in that: including at least as follows Step:
(1) ball blast technique is selected, concrete topping is handled;
(2) sundries such as polishing concrete topping dirt are cleared up with self-priming sand-blasting machine;
(3) with one of Thief zone epoxy primer of the uniform roller coating of ready roller, thickness 0.3mm;
(4) carbon fiber mixing quartz sand is added in epoxy floating coating;It is stirred evenly with mortar mixer;
(5) whole floating, compacting are carried out with mortar trowelling machine;
(6) after cured, the parts fault location such as polishing batch tool marks, is cleaned out with dust catcher;
(7) by following proportions construction resin and quartz sand, resin and carbon fiber;Resin: the weight proportion of quartz sand is 3: 1;Resin: the weight proportion of carbon fiber be 21:5, load screed with a thickness of 1.5 ~ 2mm;
(8) in the ratio of step (7), by epoxy resin brushing in epoxy resin mortar surface, will cut in a manner of blade coating One of 250gr/m2 glass fabric is layered in construction surface;
(9) by epoxy resin blade coating on glass fabric, and rolling extrusion, bubble is discharged;
(10) glass cloth that twice are intersected must be overlapped 10cm;
(11) the second 250gr/m2 glass fabric cut is laid in construction surface, and rolling extrusion again, is discharged Bubble;
(12) as be laid with third road glass fabric, FRP enhancement layer with a thickness of 1.5 ~ 2.5mm;
(13) it is stirred evenly after carbon fiber mixing quartz sand being added in epoxy floating coating;Using grinder to shape after FRP layers of solidification At frp layer be ground;
(14) epoxy face is painted and stirs evenly post curing 10 minutes in defined ratio on man, material factory Product labelling;Use saw The uniform trowel of tooth trowel applies together;
(15) carry out coating deflation with defoaming roller come rollback 2~3 times, according to use functional requirement Self-leveling surface thickness be 1 ~ 2mm。
2. one kind according to claim 1 is seamless, the heavy load epoxide terrace way of cracking resistance, resistance to hyperbar impact, Be characterized in: the ball blast technique is to generate centrifugal force and wind in high-speed rotation process using motor-driven wheel abrator Power reaches 200Kg/min ball blast amount and enters in high-speed rotating sub-sand wheel, and under the action of the centrifugal force, bullet is dished out by sub-sand wheel Into orienting cover, then the bubble of oriented set control sand material beats direction and dishes out, and is picked up by the blade of revolution at a high speed, and along length of blade Direction constantly accelerates and dishes out, and bullet of dishing out forms certain fan-shaped a fluid stream, throws concrete floor with the speed of 120m/s On surface, depth can reach 1-5mm according to the type of abrasive material, and convex-concave is uniform, and then bullet and dust, impurity pass through instead together Play the top that storage hopper is come in room;High-power deduster is separated pellet with dust by storage hopper overhead separator, pellet into Enter storage hopper and continue cycling through use, dust then passes through cleaning shaft and enters deduster;It is separated, is rested in dust removing funnel by filter core And cartridge surface;Automatic back blow deduster can provide blowback air automatic spacing by compressed air and clear up each filter core; Finally pellet and the classification of impurities cleared up are recycled by the gasflow clean-up of mating dust catcher inside machine, and made Pellet can be recycled again.
3. one kind according to claim 1 is seamless, the heavy load epoxide terrace way of cracking resistance, resistance to hyperbar impact, Be characterized in: the Thief zone epoxy primer is 2040 Thief zone epoxy primer of Yanfloor or Sikafloor -161.
CN201910293902.1A 2019-04-12 2019-04-12 A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way Pending CN110005168A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910293902.1A CN110005168A (en) 2019-04-12 2019-04-12 A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910293902.1A CN110005168A (en) 2019-04-12 2019-04-12 A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way

Publications (1)

Publication Number Publication Date
CN110005168A true CN110005168A (en) 2019-07-12

Family

ID=67171320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910293902.1A Pending CN110005168A (en) 2019-04-12 2019-04-12 A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way

Country Status (1)

Country Link
CN (1) CN110005168A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110395944A (en) * 2019-08-23 2019-11-01 广东中南建设有限公司 Self leveling epoxy clay surface construction method
CN111472524A (en) * 2020-04-15 2020-07-31 广州市第二装修有限公司 Anti-hollowing floor construction method capable of achieving precise leveling
CN113152841A (en) * 2021-05-17 2021-07-23 中建八局第四建设有限公司 Epoxy self-leveling ground construction method for concrete sealing curing agent

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1076228A (en) * 1996-09-03 1998-03-24 Zetsupu Corp:Kk Flooring with corrugated surface using dust-proof coating agent for flooring
US6440538B1 (en) * 2000-04-03 2002-08-27 Lg Chem Ltd. Abrasion resistant laminate
CN1872766A (en) * 2006-06-16 2006-12-06 韩付勇 Cement concrete of resin
CN101265052A (en) * 2008-04-22 2008-09-17 上海阳森精细化工有限公司 Fibre reinforcement resin mortar terrace material and preparation method thereof
CN204571208U (en) * 2015-01-14 2015-08-19 济南捷盛建材新技术有限公司 The super flat auto-flowing floor structure of a kind of large area heavy duty
CN108343213A (en) * 2018-01-13 2018-07-31 银广厦集团有限公司 A kind of underground parking garage epoxy resin mortar abrasion-proof terrace and construction method
CN108385933A (en) * 2018-03-09 2018-08-10 青岛舜捷通生物科技有限公司 A kind of construction technology of high permanent seal cooling epoxide terrace

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1076228A (en) * 1996-09-03 1998-03-24 Zetsupu Corp:Kk Flooring with corrugated surface using dust-proof coating agent for flooring
US6440538B1 (en) * 2000-04-03 2002-08-27 Lg Chem Ltd. Abrasion resistant laminate
CN1872766A (en) * 2006-06-16 2006-12-06 韩付勇 Cement concrete of resin
CN101265052A (en) * 2008-04-22 2008-09-17 上海阳森精细化工有限公司 Fibre reinforcement resin mortar terrace material and preparation method thereof
CN204571208U (en) * 2015-01-14 2015-08-19 济南捷盛建材新技术有限公司 The super flat auto-flowing floor structure of a kind of large area heavy duty
CN108343213A (en) * 2018-01-13 2018-07-31 银广厦集团有限公司 A kind of underground parking garage epoxy resin mortar abrasion-proof terrace and construction method
CN108385933A (en) * 2018-03-09 2018-08-10 青岛舜捷通生物科技有限公司 A kind of construction technology of high permanent seal cooling epoxide terrace

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110395944A (en) * 2019-08-23 2019-11-01 广东中南建设有限公司 Self leveling epoxy clay surface construction method
CN110395944B (en) * 2019-08-23 2022-05-17 广东中南建设有限公司 Construction method of self-leveling epoxy daub surface layer
CN111472524A (en) * 2020-04-15 2020-07-31 广州市第二装修有限公司 Anti-hollowing floor construction method capable of achieving precise leveling
CN111472524B (en) * 2020-04-15 2021-05-04 广州市第二装修有限公司 Anti-hollowing floor construction method capable of achieving precise leveling
CN113152841A (en) * 2021-05-17 2021-07-23 中建八局第四建设有限公司 Epoxy self-leveling ground construction method for concrete sealing curing agent

Similar Documents

Publication Publication Date Title
CN110005168A (en) A kind of seamless, cracking resistance, the impact of resistance to hyperbar heavy load epoxide terrace way
US7591967B2 (en) Method for the aesthetic surface treatment of a monolithic concrete floor and product of the method
US11028582B2 (en) Method of forming a decorative concrete structure
US8257145B2 (en) Epoxy terrazzo flooring and method for polishing the same
CN107035103A (en) A kind of cement floor construction method
CN101787672A (en) Method for repairing concrete crack with multi-cracking cement-based composite
CN103882789B (en) A kind of road or the renovation technique of bridge pavement
CN1822921A (en) Polishing method for large-sized part and polishing particles used for the method
US8070558B2 (en) Porcelain epoxy flooring and method for producing the same
CN105822030A (en) Sand planting and wet combining process for vetrified tiles
CN205685124U (en) Polisher abrasive disc mounting structure and abrasive disc connection dish
KR101080958B1 (en) Construction method using the bridge surface processing apparatus with waterjet and suction apparatus
KR100858347B1 (en) Method for carrying out floor board of structure andfloor board of structure carried out by its method
CN114632587A (en) Outdoor weather-resistant type grindstone resin ground and processing device and construction process thereof
CN112792743B (en) But dust absorption formula epoxy terrace ground hand propelled polisher
CN213015187U (en) Interior marking off integral polishing terrace
CN111560828B (en) Construction device for leveling and polishing epoxy resin modified mortar
US20030077389A1 (en) Method and apparatus for surfacing inner wall of swimming pool
CN107053448B (en) Production technology with texture appearance artificial stone
CN113235863A (en) Epoxy terrace construction method for preventing cracking and settlement
CN218117327U (en) Polymer composite rapid repairing terrace
CN219840324U (en) Pouring type terrace structure
CN115977342A (en) Construction method of seamless wear-resistant polyurethane terrace of underground garage
CN107009498B (en) A kind of artificial stone with surface pearl not exactly round in shape reason
CN104533104A (en) Method for improving concrete impact resistance strength through surface repairing thin layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190712

RJ01 Rejection of invention patent application after publication