CN110005166A - A kind of mounting structure and its construction method on floor - Google Patents

A kind of mounting structure and its construction method on floor Download PDF

Info

Publication number
CN110005166A
CN110005166A CN201910328629.1A CN201910328629A CN110005166A CN 110005166 A CN110005166 A CN 110005166A CN 201910328629 A CN201910328629 A CN 201910328629A CN 110005166 A CN110005166 A CN 110005166A
Authority
CN
China
Prior art keywords
keel
floorboard
floor
installation cavity
locating piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910328629.1A
Other languages
Chinese (zh)
Other versions
CN110005166B (en
Inventor
王海勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Yijia Decoration Co Ltd
Original Assignee
Taizhou Yijia Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Yijia Decoration Co Ltd filed Critical Taizhou Yijia Decoration Co Ltd
Priority to CN201910328629.1A priority Critical patent/CN110005166B/en
Publication of CN110005166A publication Critical patent/CN110005166A/en
Application granted granted Critical
Publication of CN110005166B publication Critical patent/CN110005166B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • E04F2015/0205Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • E04F2015/0205Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
    • E04F2015/02066Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of mounting structure on floor and its construction methods, it is related to interior decoration technology, its key points of the technical solution are that: including floorboard, the forward keel and lateral keel of cross-cutting distribution, the installation cavity that rectangle is forward formed between keel and lateral keel, it is forward equipped with multipair locating piece along its length on the top surface of keel and lateral keel, the surrounding of the installation cavity has respectively corresponded a pair of of locating piece, each pair of locating piece is arranged side by side along the forward width direction of keel or lateral keel, each pair of locating piece is contacted by side walls.The contradiction that the mounting structure on this floor considerably reduces the laying of floorboard and personnel walk about indoors, convenient for the laying construction on floor;Frame is filled by setting, bonding strength, the consumption of cement of the comprehensive floorboard of the mounting structure on this floor are more preferred.

Description

A kind of mounting structure and its construction method on floor
Technical field
The present invention relates to interior decoration technology, in particular to the mounting structure and its construction method on a kind of floor.
Background technique
With the raising of Living consumption, the mode that interior decoration generallys use laying floor replaces cement floor, floor Keep ground as neat as wax, plays preferable decorative effect.It laydown, keel on the one hand to be used on the ground as laying floor is previous In ground grading, on the other hand make floor and surface separation, plays dampproof effect for floor.
Existing Authorization Notice No. is that the Chinese utility model patent of CN204418592U discloses a kind of ground of crossed keel Plate, including forward keel, lateral keel, floorboard, forward the keel catching groove phase upward with lateral keel by downward catching groove The keel for being formed and being intersected mutually are fastened, the top of keel of intersection is covered with damp-proof membrane, and floorboard is layed on damp-proof membrane.The utility model Use the keel intersected that cannot generate horizontal position between keel so that forward keel and lateral keel realize mutual restriction It moves.
To guarantee close proximity between adjacent floorboard, the laying of floorboard mostly uses sequence from inside to outside, from left to right Successively it is laid with;To guarantee the bonding strength between floorboard and keel, needs to smear cement between floorboard and keel and be fixed.? During the solidification of cement, personnel may walk about between door in the room, and personnel, which trample floorboard, will lead to floorboard sinking, Influence the flatness of floor entirety, the laying of floorboard and personnel indoors walk about that there are larger contradictions.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to provide a kind of mounting structure on floor, pole The contradiction that the earth reduces the laying of floorboard and personnel walk about indoors.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of mounting structure on floor, It is described that rectangle is forward formed between keel and lateral keel including floorboard, the forward keel of cross-cutting distribution and lateral keel Installation cavity, be equipped with multipair locating piece, the installation along its length on the top surface of the forward keel and lateral keel The surrounding of chamber has respectively corresponded a pair of of locating piece, each pair of locating piece along the forward width direction of keel or lateral keel side by side Setting, each pair of locating piece are contacted by side walls, and the top surface of the forward keel and lateral keel is equipped with for positioning The caulking groove one that block slides up and down, the caulking groove one is interior to be equipped with the spring for driving locating piece protrusion caulking groove one;
The floorboard and installation cavity correspond, when the floorboard is placed on installation cavity, the lucky energy of floorboard Four locating pieces close to corresponding installation cavity are depressed by bottom wall edge, the side wall of the floorboard is another with each pair of locating piece The side walls of locating piece contact.
Through the above technical solutions, forward keel and lateral keel for being supported to floorboard, make floorboard not with Ground face contact.When floorboard is placed on installation cavity, floorboard can be depressed close to corresponding installation cavity just by bottom wall edge Four locating pieces, the side wall of floorboard contacts with the side walls of another locating piece of each pair of locating piece.Installation indoors is originally When floor panel structure, the range that personnel walk about needed for being contemplated that, in the position installation floor block in the manner described above for being not required to walk about.Due to Four walls of floorboard are corresponding with locating piece and its sliding contact, then i.e. accurately, floorboard is not necessarily to for the floorboard position installed Use adjacent floorboard as reference.After the completion of first batch of floorboard is laid with, and after ensuring that personnel need not walk about, in remaining peace It behave affectedly position splicing floor block with tongue and groove, the installation of this floor panel structure can be completed.The mounting structure on this floor considerably reduces floor The contradiction that the laying of block and personnel walk about indoors, convenient for the laying construction on floor.
It preferably, further include the filling frame being placed in installation cavity, the filling frame includes bottom frame and side frame, the bottom frame It is close to by outline border wall with the side wall of forward keel, lateral keel, the side frame is located above bottom frame and upwardly extends, the side Frame and the space that forward formation is filled for cement between keel, lateral keel.
Through the above technical solutions, side frame and the space that forward formation is filled for cement between keel, lateral keel, in the sky After interior filling cement, the contact area of cement and floorboard is larger, floorboard and forward keel, lateral keel fixation more Securely.On this basis, due to need to only be not necessarily to fill up cement, this mounting structure in filling outer frame side filling concrete, installation cavity The effect for saving cement can be played.
Preferably, the frame face of the side frame tilts upward extension, along direction vertically upward, the cross section ruler of the side frame It is very little tapered.
Through the above technical solutions, side frame and the space that forward formation is filled for cement between keel, lateral keel, inclination are set The side frame set makes the top opening in the space have biggish area;Bonding strength, the water of the comprehensive floorboard of the mounting structure on this floor The consumption of mud is more preferred.
Preferably, the forward keel and the cross sectional shape of lateral keel are I-shaped, the lower end of the forward keel Face is equipped with locating slot one, and the depth of the locating slot one is the half of forward keel level;The upper surface of the lateral keel is set There is locating slot two, the depth of the locating slot two is the half of lateral keel height, and the forward keel, lateral keel are by determining The mode that position slot one, locating slot two mutually fasten carries out cross bearing;It is described forward to be formed between keel, lateral keel by adjacent peace It behave affectedly the through-hole of connection.
Through the above technical solutions, when filling frame and forward cement excess between keel, lateral keel, excessive cement energy Via through holes adaptively enter in adjacent installation cavity, and cement is not likely to produce waste.Since the viscosity of cement is higher, in nobody In the case that work is pressed down against floorboard, cement be not easy it is spontaneous flowed between through-hole, fill frame and forward between keel, lateral keel Cement be able to maintain the state of filling up, guarantee floorboard and the forward bonding strength between keel, lateral keel.
Preferably, the locating piece includes the receiving sheet positioned at top, and the receiving sheet is in the horizontal direction towards nearest peace It behave affectedly interior extension.
Through the above technical solutions, receiving sheet can have sufficient area to contact with floorboard, to guarantee that floorboard energy can Locating piece is depressed by ground.When installing new floorboard between mounted floorboard, floorboard is not easy stuck at locating piece.
Preferably, the locating piece can be completely embedded into caulking groove one, the top of the forward keel and lateral keel by sliding Caulking groove two is equipped on face, the caulking groove two is located at below receiving sheet, and the receiving sheet can be completely embedded into caulking groove two by sliding.
Through the above technical solutions, locating piece is completely embedded into caulking groove one, holds after floorboard depresses locating piece and receiving sheet Contact pin is completely embedded into caulking groove two, and floorboard is offseted by bottom wall edge and forward keel, lateral keel, and floorboard can steadily be put It is placed in above installation cavity.
Preferably, the bottom surface court of the receiving sheet is arranged with more thimbles.
Through the above technical solutions, thimble is used to offset with the slot bottom of caulking groove two;When the slot bottom of caulking groove two is stained with cement, Thimble can largely pierce through cement, it is ensured that receiving sheet can be completely embedded into caulking groove two, the bottom wall of floorboard can with forward Keel, lateral keel top surface reliably offset.
Preferably, the receiving sheet extends to above side frame to installation cavity direction, offers on the side frame for receiving sheet The caulking groove three of insertion.
Through the above technical solutions, after floorboard depresses receiving sheet, side frame by the slot bottom of caulking groove three to receiving sheet into Row Auxiliary support, receiving sheet are not easy to be crushed out of shape.
The second object of the present invention is to provide a kind of construction method on floor, can greatly reduce the laying of floorboard The contradiction walked about indoors with personnel.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of construction method on floor, Use a kind of mounting structure on above-mentioned floor, comprising the following steps:
Step 1: it is equidistantly laid with lateral keel on the ground, then is laid with forward keel in lateral keel, forward keel, cross Cross-like is formed in such a way that locating slot one, locating slot two mutually fasten to keel;
Step 2: the installation filling frame in installation cavity;
Step 3: personnel determine the position for being not required to walk about on ground according to the required range walked about, and the position is first batch of for installing Floorboard;Before installation floor block, cement is injected into side frame and forward in the frame shape space between keel, lateral keel, floorboard with Cement is forward also coated between keel, lateral keel, cement is levelling;
Step 4: the installation floor block at the installation cavity for having coated cement, make floorboard pass through just bottom wall edge depress it is close Four locating pieces of corresponding installation cavity, then personnel are installed floorboard to same height by way of touching floorboard top surface Degree;
Step 5: after the completion of first batch of floorboard is laid with, and after ensuring that personnel need not walk about, it is laid with ground in remaining installation cavity position Plate.
Through the above technical solutions, the construction method on this floor is directed to a kind of mounting structure on above-mentioned floor, pass through This construction method can be reliably completed the laying work of floor panel structure, and the laying and personnel that can greatly reduce floorboard exist The contradiction that interior is walked about, convenient for the laying construction on floor.
In conclusion the present invention having the beneficial effect that in contrast to the prior art
1, the contradiction that the mounting structure on this floor considerably reduces the laying of floorboard and personnel walk about indoors is convenient for floor Laying construction;
2, by setting filling frame, bonding strength, the consumption of cement of the comprehensive floorboard of the mounting structure on this floor are more excellent Choosing;
3, forward keel and lateral keel be it is I-shaped, the filling excessive cement energy via through holes of outer frame adaptively enter adjacent peace In behaveing affectedly, cement is not likely to produce waste.
Detailed description of the invention
Fig. 1 is a kind of overall diagram of the mounting structure on floor of embodiment one;
Fig. 2 is the Local map of embodiment, the composite structure of main prominent forward keel and lateral keel;
Fig. 3 is enlarged drawing at the A of Fig. 1;
Fig. 4 is the B-B cross-sectional view of Fig. 1.
In figure, 1, floorboard;4, frame is filled;2, forward keel;3, lateral keel;5, installation cavity;21, locating slot one;31, Locating slot two;51, through-hole;41, bottom frame;42, side frame;6, locating piece;61, receiving sheet;22, caulking groove one;23, caulking groove two;24, bullet Spring;421, caulking groove three;611, thimble.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
It referring to Fig.1, is a kind of mounting structure on floor disclosed by the invention, including floorboard 1, filling frame 4, cross-cutting distribution Forward keel 2 and lateral keel 3, forward between keel 2 and lateral keel 3 formed rectangle installation cavity 5, wherein filling frame 4 one One is accordingly installed in installation cavity 5, and floorboard 1 is installed on 4 top of filling frame correspondingly.
Referring to Fig. 2, forward keel 2 and lateral keel 3 are I-shaped along the cross sectional shape of its width direction, forward keel 2 lower end surface is equipped with multiple locating slots 1, and locating slot 1 is uniformly distributed along the length direction of forward keel 2, locating slot one 21 depth penetrates through for the forward half of 2 height of keel and with the two sidewalls of forward keel 2.The upper surface of lateral keel 3 is equipped with Multiple locating slots 2 31, the depth of locating slot 2 31 are the half of 3 height of lateral keel and pass through with the two sidewalls of lateral keel 3 Logical, the flute length of locating slot 2 31, shape are identical as locating slot 1.
Forward keel 2, lateral keel 3 carry out intersecting in such a way that locating slot 1, locating slot 2 31 mutually fasten fixed Position, then all forward keel 2 are parallel to each other and equidistantly, all lateral keels 3 are parallel to each other and equidistantly, forward keel 2 Length direction perpendicular to lateral keel 3 length direction, all forward keel 2, lateral keel 3 top surface be respectively positioned on it is same flat Face.Due to forward keel 2, lateral keel 3 be it is I-shaped, then when locating slot 1, locating slot 2 31 are contacted by slot bottom, The through-hole 51 for being connected to adjacent installation cavity 5 is forward formed between keel 2, lateral keel 3.
Referring to Fig. 2 and Fig. 3, filling frame 4 includes bottom frame 41 and side frame 42, and side frame 42 is integrally attached on the frame face of bottom frame 41 Side, the sidewall slope of side frame 42 upwardly extend, inclined direction are as follows: along direction vertically upward, the cross sectional dimensions of side frame 42 It is in gradually-reducing shape.The outer edge size of bottom frame 41 and the inward flange size of installation cavity 5 are consistent, after filling loading installation cavity 5 of frame 4, Bottom frame 41 is close to by outline border wall with the bottom sidewall of forward keel 2, lateral keel 3, and the apical side height of side frame 42 is slightly below suitable To the apical side height of keel 2, which is used for filling concrete.
Side frame 42 and the space that forward formation is filled for cement between keel 2, lateral keel 3, the side frame 42 being obliquely installed make The top opening in the space has biggish area, and after inserting cement in the space, cement and the contact area of floorboard 1 are larger, Floorboard 1 and forward keel 2, the fixation of lateral keel 3 are relatively firm.On this basis, due to need to only be filled out on the outside of filling frame 4 Water-filling mud, installation cavity 5 is interior without filling up cement, this mounting structure can play the effect for saving cement.The installation knot on this floor Bonding strength, the consumption of cement of the comprehensive floorboard 1 of structure are more preferred.
Referring to Figure 1 and Figure 3, multipair locating piece 6, multipair locating piece are forward equipped on the top surface of keel 2 and lateral keel 3 6 are uniformly distributed along forward keel 2 and the length direction of lateral keel 3 respectively, and locating piece 6 is slidably arranged in correspondence along the vertical direction Forward keel 2 or lateral keel 3 in.The surrounding of installation cavity 5 has respectively corresponded a pair of of locating piece 6, and each pair of locating piece 6 is along forward The width direction of keel 2 or lateral keel 3 is arranged side by side, and each pair of locating piece 6 is contacted by the side walls of face.
Referring to Fig. 3 and Fig. 4, locating piece 6 includes the receiving sheet 61 positioned at top, and receiving sheet 61 is in the horizontal direction towards nearest Extend in installation cavity 5.Forward the top surface of keel 2 and lateral keel 3 is equipped with multipair interconnected caulking groove 1 and caulking groove two 23, wherein for being slidably connected for locating piece 6, caulking groove 2 23 is used to be embedded in for receiving sheet 61 caulking groove 1.Locating piece 6 can pass through Sliding is completely embedded into caulking groove 1, and caulking groove 2 23 is located at 61 lower section of receiving sheet, when locating piece 6 is slid completely into caulking groove 1, Receiving sheet 61 is completely embedded into caulking groove 2 23.The spring 24 for driving 6 part of locating piece protrusion caulking groove 1 is equipped in caulking groove 1, Spring 24 is fixedly connected by end with the slot bottom of caulking groove 1, and the elastic force of spring 24 is not enough to accept the gravity of floorboard 1.
Referring to Figure 1 and Figure 3, floorboard 1 is rectangular slab, and floorboard 1 is sized to: when floorboard 1 is placed in installation When on chamber 5, floorboard 1 can depress four locating pieces 6 close to corresponding installation cavity 5, the side of floorboard 1 by bottom wall edge just Wall is contacted with the side walls of another locating piece 6 of each pair of locating piece 6.After floorboard 1 depresses locating piece 6 and receiving sheet 61, Floorboard 1 by bottom wall edge be placed in forward keel 2, lateral keel 3 top surface on, floorboard 1 can be stably placed at peace It behave affectedly above 5.
When installing this floor panel structure indoors, the range that personnel walk about needed for being contemplated that is as above in the position for being not required to walk about State mode installation floor block 1.Before installation, floorboard 1 and forward palpus coating cement between keel 2, lateral keel 3, then personnel are logical The mode for crossing tapping floorboard 1 installs floorboard 1 to sustained height.Due to four walls of floorboard 1 be corresponding with locating piece 6 with Its sliding contact, then i.e. accurately, floorboard 1 is used as reference without using adjacent floorboard 1 for 1 position of floorboard installed.
When installing new floorboard 1 between mounted floorboard 1, an edge of floorboard 1 can be conformed to it by personnel In one receiving sheet 61, the biggish receiving sheet 61 of area can have sufficient area to contact with floorboard 1, to guarantee 1 energy of floorboard Reliably depress locating piece 6.Subsequent personnel push the side wall of floorboard 1 to fall completely within it in installation site.
Referring to Fig. 3 and Fig. 4, receiving sheet 61 is preset with longer length, and receiving sheet 61 extends to side frame to 5 direction of installation cavity Above 42, the caulking groove 3 421 being embedded in for receiving sheet 61 is offered on side frame 42.The bottom surface court of receiving sheet 61 is arranged with more tops Needle 611, thimble 611 are used to offset with the slot bottom of caulking groove 2 23, caulking groove 3 421;When the slot bottom of caulking groove 2 23, caulking groove 3 421 is viscous When having cement, thimble 611 can largely pierce through cement, it is ensured that receiving sheet 61 can be completely embedded into caulking groove 2 23.It is local After plate 1 depresses receiving sheet 61, side frame 42 carries out Auxiliary support, receiving sheet 61 to receiving sheet 61 by the slot bottom of caulking groove 3 421 It is not easy to be crushed out of shape.
To sum up, by the mounting structure on this floor, personnel can be in the position for needing to walk about not flooring block 1, in laying Final tache is again laid with remaining floorboard 1;Without being used as reference by adjacent floorboard 1 when floorboard 1 is laid with, I.e. accurate positioning after the completion of floorboard 1 is laid with.The mounting structure on this floor considerably reduces laying and the personnel of floorboard 1 The contradiction walked about indoors, convenient for the laying construction on floor.
Embodiment two:
A kind of construction method on floor has used a kind of mounting structure on above-mentioned floor, comprising the following steps:
Step 1: it is equidistantly laid with lateral keel 3 on the ground, then is laid with forward keel 2 in lateral keel 3, forward keel 2, lateral keel 3 forms cross-like in such a way that locating slot 1, locating slot 2 31 mutually fasten.
Step 2: the installation filling frame 4 in installation cavity 5 installs locating piece 6 in caulking groove 1.
Step 3: personnel determine the position for being not required to walk about on ground according to the required range walked about, and the position is for installing First batch of floorboard 1;Before installation floor block 1, cement is injected into side frame 42 and forward the frame shape space between keel 2, lateral keel 3 It is interior, floorboard 1 and forward between keel 2, lateral keel 3 it is also coated with cement, cement is levelling.
Step 4: the installation floor block 1 at the installation cavity 5 for having coated cement makes floorboard 1 just by bottom wall edge pressure Lower four locating pieces 6 close to corresponding installation cavity 5, then personnel are installed floorboard 1 by way of touching 1 top surface of floorboard To sustained height.When filling frame 4 and forward cement excess between keel 2, lateral keel 3, excessive cement energy via through holes 51 from It adapts to enter in adjacent installation cavity 5, cement is not likely to produce waste.
Step 5: after the completion of first batch of floorboard 1 is laid with, and after ensuring that personnel need not walk about, in remaining 5 position of installation cavity Splicing floor block with tongue and groove 1;Specific paving mode with Step 3: step 4 is identical.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (9)

1. a kind of mounting structure on floor, including floorboard (1), the forward keel (2) of cross-cutting distribution and lateral keel (3), the installation cavity (5) that rectangle is formed between the forward keel (2) and lateral keel (3), it is characterized in that: the forward keel (2) and on the top surface of lateral keel (3) it is equipped with along its length multipair locating piece (6), the surrounding point of the installation cavity (5) Be not corresponding with a pair of of locating piece (6), each pair of locating piece (6) along the forward width direction of keel (2) or lateral keel (3) simultaneously Row's setting, each pair of locating piece (6) are contacted by side walls, on the top surface of the forward keel (2) and lateral keel (3) Equipped with the caulking groove one (22) slided up and down for locating piece (6), it is equipped in the caulking groove one (22) and locating piece (6) is driven to protrude caulking groove The spring (24) of one (22);
The floorboard (1) and installation cavity (5) correspond, described when the floorboard (1) is placed on installation cavity (5) Floorboard (1) can depress four locating pieces (6) close to corresponding installation cavity (5), the floorboard (1) by bottom wall edge just Side wall contacted with the side walls of another locating piece (6) of each pair of locating piece (6).
2. the mounting structure on a kind of floor according to claim 1, it is characterized in that: further including being placed in installation cavity (5) Filling frame (4), the filling frame (4) includes bottom frame (41) and side frame (42), the bottom frame (41) by outline border wall with forward The side wall abutting of keel (2), lateral keel (3), the side frame (42) are located above bottom frame (41) and upwardly extend, the side frame (42) space filled for cement and is forward formed between keel (2), lateral keel (3).
3. the mounting structure on a kind of floor according to claim 2, it is characterized in that: the frame face of the side frame (42) is tilted towards Upper extension, along direction vertically upward, the cross sectional dimensions of the side frame (42) is tapered.
4. the mounting structure on a kind of floor according to claim 3, it is characterized in that: the forward keel (2) and laterally dragon The cross sectional shape of bone (3) be it is I-shaped, the lower end surfaces of the forward keel (2) is equipped with locating slot one (21), the locating slot The depth of one (21) is the half of forward keel (2) height;The upper surface of the lateral keel (3) is equipped with locating slot two (31), The depth of the locating slot two (31) is the half of lateral keel (3) height, and the forward keel (2), lateral keel (3) pass through The mode that locating slot one (21), locating slot two (31) mutually fasten carries out cross bearing;The forward keel (2), lateral keel (3) through-hole (51) for being connected to adjacent installation cavity (5) is formed between.
5. the mounting structure on a kind of floor according to claim 2, it is characterized in that: the locating piece (6) includes being located at top The receiving sheet (61) in portion, the receiving sheet (61) is in the horizontal direction towards extension in nearest installation cavity (5).
6. the mounting structure on a kind of floor according to claim 5, it is characterized in that: the locating piece (6) can pass through sliding It is completely embedded into caulking groove one (22), is equipped with caulking groove two (23) on the top surface of the forward keel (2) and lateral keel (3), it is described Caulking groove two (23) is located at below receiving sheet (61), and the receiving sheet (61) can be completely embedded into caulking groove two (23) by sliding.
7. the mounting structure on a kind of floor according to claim 6, it is characterized in that: the bottom surface of the receiving sheet (61) is downward It is provided with more thimbles (611).
8. a kind of mounting structure on floor according to claim 7, it is characterized in that: the receiving sheet (61) is to installation cavity (5) direction extends to above side frame (42), and the caulking groove three (421) for receiving sheet (61) insertion is offered on the side frame (42).
9. a kind of construction method on floor has used a kind of mounting structure on above-mentioned floor, it is characterized in that: including following step It is rapid:
Step 1: being equidistantly laid with lateral keel (3) on the ground, then be laid with forward keel (2) on lateral keel (3), suitable Cross-like is formed in such a way that locating slot one (21), locating slot two (31) mutually fasten to keel (2), lateral keel (3);
Step 2: installation filling frame (4) in installation cavity (5) installs locating piece (6) in caulking groove one (22);
Step 3: personnel determine the position for being not required to walk about on ground according to the required range walked about, and the position is first batch of for installing Floorboard (1);Before installation floor block (1), cement is injected into side frame (42) and forward the frame shape between keel (2), lateral keel (3) In space, floorboard (1) and forward keel (2), lateral keel are also coated with cement between (3), and cement is levelling;
Step 4: the installation floor block (1) at the installation cavity (5) for having coated cement makes floorboard (1) pass through bottom wall edge just Pressure is close to four locating pieces (6) of corresponding installation cavity (5), and then personnel are by way of touching floorboard (1) top surface by ground Plate (1) is installed to sustained height;
Step 5: after the completion of first batch of floorboard (1) is laid with, and after ensuring that personnel need not walk about, in remaining installation cavity (5) position Splicing floor block with tongue and groove (1).
CN201910328629.1A 2019-04-23 2019-04-23 Floor mounting structure and construction method thereof Active CN110005166B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910328629.1A CN110005166B (en) 2019-04-23 2019-04-23 Floor mounting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910328629.1A CN110005166B (en) 2019-04-23 2019-04-23 Floor mounting structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN110005166A true CN110005166A (en) 2019-07-12
CN110005166B CN110005166B (en) 2021-02-23

Family

ID=67173689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910328629.1A Active CN110005166B (en) 2019-04-23 2019-04-23 Floor mounting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN110005166B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565899A (en) * 2019-09-17 2019-12-13 苏州金螳螂建筑装饰股份有限公司 leveling structure and leveling method for epoxy gold grindstone terrace base layer

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4622792A (en) * 1984-05-31 1986-11-18 Champion Building Systems, Inc. Modular deck structure and method for constructing same
KR100832663B1 (en) * 2007-04-30 2008-05-27 장석조 Structure of wooddeck and method for executing the same
CN106351418A (en) * 2016-10-11 2017-01-25 浙江理工大学 Method for antistatic floor construction for machine room
CN108756133A (en) * 2018-07-25 2018-11-06 湖州亨力木业有限公司 A kind of timber floor keel
CN109057287A (en) * 2018-07-26 2018-12-21 浙江亚厦装饰股份有限公司 Laying device and decorative cover pavement construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4622792A (en) * 1984-05-31 1986-11-18 Champion Building Systems, Inc. Modular deck structure and method for constructing same
KR100832663B1 (en) * 2007-04-30 2008-05-27 장석조 Structure of wooddeck and method for executing the same
CN106351418A (en) * 2016-10-11 2017-01-25 浙江理工大学 Method for antistatic floor construction for machine room
CN108756133A (en) * 2018-07-25 2018-11-06 湖州亨力木业有限公司 A kind of timber floor keel
CN109057287A (en) * 2018-07-26 2018-12-21 浙江亚厦装饰股份有限公司 Laying device and decorative cover pavement construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565899A (en) * 2019-09-17 2019-12-13 苏州金螳螂建筑装饰股份有限公司 leveling structure and leveling method for epoxy gold grindstone terrace base layer
CN110565899B (en) * 2019-09-17 2024-04-12 苏州金螳螂建筑装饰股份有限公司 Epoxy gold grindstone terrace base leveling structure and leveling method

Also Published As

Publication number Publication date
CN110005166B (en) 2021-02-23

Similar Documents

Publication Publication Date Title
CN108221503A (en) A kind of flush type vibration isolation sky ditch precast static pressure sheet pile and its construction method
CN110005166A (en) A kind of mounting structure and its construction method on floor
CN110067400A (en) It is a kind of for extending the construction method of the building underground space
CN109594578A (en) A kind of small micro- communication base station pile foundation mechanism of the 5G of tower cabinet
CN109972471A (en) A kind of permeable road structure for sponge urban construction
CN208717946U (en) A kind of prefabricated interlocking concrete retaining wall system
CN202599409U (en) Intelligent laser leveling instrument
CN208310290U (en) A kind of toilet floor tile looks for slope auxiliary supports
CN108708354A (en) A kind of simple sediment trapping promotees silt dam and its method of construction
CN107354872B (en) A kind of variable cross-section fish-bellied type cast-in-situ box girder concrete faulting of slab ends control structure and construction method
CN201679136U (en) Hollow block for building
CN112854245A (en) Classification design method for earth rock foundation pit support based on depth and medium-stroke fossil rock burial depth
CN201943244U (en) Hollow block for buildings
CN108517891A (en) Prefabricated assembled concrete retaining wall
CN213014742U (en) Flexible assembled ground settlement joint structure
CN211815304U (en) Stable pavior brick structure of permeating water
CN210459231U (en) Inner supporting structure for foundation pit
CN110259035B (en) Ground leveling system
CN208201563U (en) Permeable pavement skeleton and the porous pavement being laid with using the permeable pavement skeleton
CN106223364B (en) Prestressed assembly sink formula room Nei Di libraries construction method and ground library structure
CN206396570U (en) A kind of garden road pile foundation type spit of fland walks structure
CN110258641A (en) A kind of Urban Underground Passage
CN212200740U (en) Stone seat node structure
CN210395999U (en) Suspension terrace
CN106760366A (en) Based on the construction technology for improving marble hybrid procedure in furniture exhibition room

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 318014 No.59, 1st floor, building 2, No.818, east section of Kaifa Avenue, development zone, Taizhou City, Zhejiang Province

Applicant after: Zhejiang Yijia Construction Engineering Co.,Ltd.

Address before: 318001 2 / F, No. 577-581, Donghai avenue to No. 119-129, Jiepai Road, Taizhou City, Zhejiang Province

Applicant before: TAIZHOU YIJIA DECORATION Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant