CN109993509A - Supervision in improvement project - Google Patents
Supervision in improvement project Download PDFInfo
- Publication number
- CN109993509A CN109993509A CN201910340799.1A CN201910340799A CN109993509A CN 109993509 A CN109993509 A CN 109993509A CN 201910340799 A CN201910340799 A CN 201910340799A CN 109993509 A CN109993509 A CN 109993509A
- Authority
- CN
- China
- Prior art keywords
- building
- breakage
- label
- view
- supervision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000006872 improvement Effects 0.000 title claims abstract description 18
- 238000001514 detection method Methods 0.000 claims abstract description 23
- 239000012780 transparent material Substances 0.000 claims abstract description 14
- 229920003229 poly(methyl methacrylate) Polymers 0.000 claims description 9
- 239000004926 polymethyl methacrylate Substances 0.000 claims description 9
- 239000003550 marker Substances 0.000 claims description 6
- 239000003086 colorant Substances 0.000 claims description 3
- 238000012360 testing method Methods 0.000 abstract description 14
- 238000007689 inspection Methods 0.000 abstract description 11
- 238000007634 remodeling Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000004134 energy conservation Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
Abstract
The present invention relates to project supervision technical fields, aiming at the problem that testing staff is likely to occur missing inspection or false retrieval, provide the Supervision in a kind of improvement project, the technical solution is as follows: the following steps are included: S1. makes top plan view on transparent material;S2. two supervisor's independent detections;S3. building breakage label is irised out;S4. observation building breakage marks overlapping cases;S5. judge whether missing inspection, false retrieval;S6. without missing inspection, false retrieval after, make examining report.By making the top plan view of building on transparent material and the label building breakage in top plan view, breakage overlapping cases are built by judgement, it can judge to build breakage detection accuracy, quite convenient for judging the case where supervisor is with the presence or absence of missing inspection, false retrieval, it ensure that the validity of testing result, so that the safety after old building remodeling is preferably ensured.
Description
Technical field
The present invention relates to project supervision technical fields, more particularly, to the Supervision in a kind of improvement project.
Background technique
Old building remodeling refers to that building is in sub-health state, the danger that may be toppled at any time if such always,
So needing to be transformed Old building.
But Old building is usually local damage, if discovery Old building is in pressure health status and Old building is just pushed over reconstruction,
Will be so that project amount be very big, and vast resources can be wasted, thus need to find at local damage and to local breakage into
Row reinforcement or structure of modification so that the state of the whole health back to normal of Old building, therefore are found out by supervision examination old
Building is the important means for excluding Old building hidden danger at all local damages.
But supervision examination is usually to pass through supervisor to detect each position of building to judge each of building
Whether position also be compliant with the requirement of building intensity, since the quality of supervision examination is very easy by supervisor's detection effect
It influences, if testing staff's missing inspection or false retrieval will directly influence the safety of Old building, therefore, there are also improve space.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide the Supervision in a kind of improvement project,
Have the advantages that reduce missing inspection, false retrieval.
To achieve the above object, the present invention provides the following technical scheme that
A kind of Supervision in improvement project, comprising the following steps:
S1. Old building is divided as unit of layer, the top plan view of every layer of Old building structure is fabricated separately on transparent material;
S2. two supervisor's independent detections, supervisor must not simultaneously detect same layer;
S3. building breakage is scaled according to the ratio equal proportion of drawing and Old building to iris out the position of specific breakage with shape
At building breakage label;
S4. after two supervisors detect the several layers of Old building, two sheet of planar top views of same layer are overlapped
Building structure lines into top plan view are completely coincident, and observation building breakage marks overlapping cases;
S5. think that detection is errorless at this, records into examining report if building breakage label overlapping is consistent, if building is damaged
Occur building the label of breakage in the error of 10% or more place's label overlapping appearance or an only sheet of planar top view, then recognizes
It is wrong to be detected at this, it needs to recheck;
S6. recheck to all building breakages label overlapping and error below 10% after, make examining report.
By using above-mentioned technical proposal, by making the top plan view of building on transparent material and bowing in plane
Label building breakage in view, after being overlapped two identical top plan views so that building structure is completely coincident, by
In transparent material the label of the building breakage on two sheet of planar top views can be observed, and then together convenient for two sheet of planar of comparison
Breakage is built in top view to mark whether to be overlapped, breakage overlapping cases are built by judgement, can judge that building is damaged
Place's detection accuracy ensure that the effective of testing result quite convenient for judging the case where supervisor is with the presence or absence of missing inspection, false retrieval
Property, so that the safety after old building remodeling is preferably ensured;Supervisor must not be simultaneously to same when passing through detection
One layer is detected to avoid interfering with each other, and guarantees independent detection, so that more objective when comparison building breakage label.
The present invention is further arranged to: the transparent material in the S1 uses transparent PMMA offset plate.
By using above-mentioned technical proposal, by using PMMA offset plate to utilize the preferable translucency of PMMA material, so that
Two sheet of planar top views overlapping after be more easily observable comparison building breakage label overlapping cases, and PMMA offset plate have compared with
Good physical strength, not cracky, and it is light, it is easy to carry.
The present invention is further arranged to: in the S3, building breakage label uses rectangle, and the length and width of label is according to old
It builds the full-size of breakage in the horizontal direction to scale according to the ratio equal proportion of Old building structure and top plan view, and presses
The ratio of building structure and top plan view will build breakage label label in top plan view corresponding position as before.
By using above-mentioned technical proposal, rectangle is used by building breakage label, so that two flat top view overlappings
It builds more objective when breakage marks with comparison and more easily determines, facilitate operation.
The present invention is further arranged to: in the S3, every place builds breakage marker number, records in record sheet damaged
The full-size of the length of place's number and corresponding record building breakage.
Calculating is facilitated by the full-size of the length of record building breakage by using above-mentioned technical proposal
The damaged volume of breakage is built, in order to do further comparison, while being convenient for post-production examining report.
The present invention is further arranged to: in the S3, being marked by free ink pen.
By using above-mentioned technical proposal, it is marked by free ink pen so that the mark of mistake can wipe after reinspection
With modification, without spare, the energy conservation and environmental protection for preparing multiple top plan views.
The present invention is further arranged to: in the S1, top plan view being printed upon on transparent material by oil-based ink.
By using above-mentioned technical proposal, mill flower is not easy so that top plan view is not easy to fade by oil-based ink printing,
Improve the quality of top plan view.
The present invention is further arranged to: in the S3, comparing the corresponding length of each building breakage marker number
Full-size, judge to detect at this if total volume error is greater than 5% and wrong need to recheck.
By using above-mentioned technical proposal, by comparing breakage gross area error, so that contrast effect is more accurate, into
And make the better effect for judging whether false retrieval.
The present invention is further arranged to: in the S3, every supervisor is marked using the free ink pen of different colours.
By using above-mentioned technical proposal, so that the building breakage marker color on two sheet of planar top views is different, into
And building breakage label is more easily observable to compare, it improves to specific efficiency.
In conclusion the invention has the following advantages:
1. through the top plan view for making building on transparent material and in top plan view, label builds breakage,
Breakage overlapping cases are built by judgement, can judge to build breakage detection accuracy, quite convenient for judging supervisor
Member whether there is the case where missing inspection, false retrieval, ensure that the validity of testing result, so that the safety after old building remodeling
Preferably ensured;
2. by using PMMA offset plate to utilize the preferable translucency of PMMA material, so that after the overlapping of two sheet of planar top views more
It is easy to observe the overlapping cases of comparison building breakage label, and PMMA offset plate not cracky, light, easy to carry;
3. being marked by free ink pen so that the mark of mistake can be wiped after reinspection to modify, without preparing multiple put down
Face top view is spare, energy conservation and environmental protection.
Detailed description of the invention
Fig. 1 is the flow diagram of the Supervision in the present invention in improvement project.
Specific embodiment
With reference to the accompanying drawings and embodiments, invention is further described in detail.
A kind of Supervision in improvement project, referring to Fig.1, comprising the following specific steps
S1. Old building is divided as unit of layer, Old building structure size is measured by laser range finder or has access to Old building and sets
Drawing is counted, prints the top plan view of every layer of Old building structure on transparent material with oil-based ink by printer, every layer
Two sheet of planar top views are printed, transparent material uses transparent PMMA offset plate in the present embodiment, can be used in other embodiments
Bright PVC board, transparent PE plate etc..
S2. two supervisors get top plan view respectively, and every layer of building gets a sheet of planar top view, two prisons
Reason personnel, which separate, independently detects every layer of building structure.
S3. it by testing result and Comparison of standards, detects building breakage, it is damaged that building is irised out in top plan view
To form building breakage label, building breakage, which marks, uses rectangle marked for the position at place, the length of building breakage label,
Width carries out equal proportion according to top plan view and the ratio of building structure according to the building maximum length of breakage, maximum width
Scaling, and building breakage is marked according to top plan view with the scale marker of building structure in the corresponding position of top plan view
It sets, building breakage label is numbered, then maximum length, maximum width, the maximum height of measurement building breakage, and
Breakage number is recorded in record sheet, then maximum length, maximum width, the maximum height of corresponding record building breakage;
When label building breakage label, the free ink pen that different colours are respectively adopted in two supervisors is marked, and aqueous
The color of pen is different from the color of oil-based ink used in top plan view.
S4. after two supervisors detect every layer of Old building, by two sheet of planar top views of same layer building
The building structure lines being overlapped into top plan view are completely coincident, the overlapping cases of observation building breakage label.
If S5. the overlapping of building breakage is consistent, then it is assumed that detection is errorless at this, records into examining report, if building is broken
Inconsistent, then that two building breakages labels of measurement are staggered area and two building breakages labels are overlapped at damage
The area of overlapping, if the area that two building breakage labels are staggered builds breakage label overlapping less than two
The 10% of area, then preliminary judgement at this testing result it is errorless;
Then the maximum length, most of the building breakage in the table is recorded in S3 by calculating separately two supervisors
Product, that is, breakage volume of big width, maximum height, and compare, if the breakage volume of two records is differed less than 5%
Then determine that testing result is errorless at this, if the breakage volume of two records differs by more than 5%, determines there there is testing result at this
Accidentally, it needs to recheck;
If the area that two building breakage labels are staggered is greater than the 10% of the area of two building breakage label overlappings,
Then directly determine that testing result is wrong at this, needs to recheck;
If only occurring building breakage label in one of wherein top plan view and the correspondence in another top plan view
Place does not occur building breakage label, then directly determines that detection is wrong at this, needs to recheck.
S6. it will determine that detecting wrong building breakage label wipes and be replaced with the wrong mark of detection in top plan view
Note, detection have it is mis-marked be marked using circle, and be not required to carry out equal proportion scaling according to building breakage specific size;
Then two supervisors individually detect wrong place and detect and record newest testing number to determining in S5
According to that is, record building breakage maximum length, maximum width, maximum height, reinspection range extend to the wrong part of detection and build
Building structure is whole;
Former detection data is not carried when detection, and not using former detection data as reference, two supervisors are individually to all inspections
After surveying wrong place detection, the overlapping cases of building breakage label are compared again, if occurring determining inspection in S5 again
It surveys wrong situation then to recheck again, determines to detect errorless situation in S5 if all building breakages meet, determine
At detection operation, examining report is made according to newest detection data;
It will test report and send to unit in charge of construction and be transformed construction.
By printing Old building top plan view and the label Old building breakage in top plan view on transparent material
To compare, by compare can quickly find two supervisors testing result there are inconsistent places so that
It was found that the efficiency of missing inspection or false retrieval is higher, human cost is reduced, and shorten the duration of improvement project to a certain extent.
Building breakage label is marked by using free ink pen, wipes and is replaced with so that can mark breakage when reinspection
Detection has mis-marked, and label building breakage label is reduced every so that top plan view is reusable again after reinspection
Secondary reinspection all needs the consumptive material for printing top plan view again, energy conservation and environmental protection.
Whether the volumetric errors by comparison building breakage are reliable to further determine testing result, so that judging false retrieval
Better effect, and then preferably ensure the construction quality of improvement project.
Top plan view is printed by oil-based ink, so that top plan view is not easy to fade, grinds flower, so that plane is bowed
View remains relatively clear state during repeatedly using, convenient for observation comparison.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. the Supervision in a kind of improvement project, it is characterized in that: the following steps are included:
S1. Old building is divided as unit of layer, the top plan view of every layer of Old building structure is fabricated separately on transparent material;
S2. two supervisor's independent detections, supervisor must not simultaneously detect same layer;
S3. building breakage is scaled according to the ratio equal proportion of drawing and Old building to iris out the position of specific breakage with shape
At building breakage label;
S4. after two supervisors detect the several layers of Old building, two sheet of planar top views of same layer are overlapped
Building structure lines into top plan view are completely coincident, and observation building breakage marks overlapping cases;
S5. think that detection is errorless at this, records into examining report if building breakage label overlapping is consistent, if building is damaged
Occur building the label of breakage in the error of 10% or more place's label overlapping appearance or an only sheet of planar top view, then recognizes
It is wrong to be detected at this, it needs to recheck;
S6. recheck to all building breakages label overlapping and error below 10% after, make examining report.
2. the Supervision in improvement project according to claim 1, it is characterized in that: the transparent material in the S1
Using transparent PMMA offset plate.
3. the Supervision in improvement project according to claim 2, it is characterized in that: building breakage mark in the S3
Note uses rectangle, and the length and width of label according to Old building structure and is put down according to the full-size of Old building breakage in the horizontal direction
The ratio equal proportion of face top view scales, and will build breakage label mark according to the ratio of Old building structure and top plan view
Note is in top plan view corresponding position.
4. the Supervision in improvement project according to claim 3, it is characterized in that: every place's building is damaged in the S3
Locate marker number, the full-size of breakage number and the length of corresponding record building breakage is recorded in record sheet.
5. the Supervision in improvement project according to claim 4, it is characterized in that: in the S3, by free ink pen into
Line flag.
6. the Supervision in improvement project according to claim 1, it is characterized in that: passing through oil-based ink in the S1
Top plan view is printed upon on transparent material.
7. the Supervision in improvement project according to claim 4, it is characterized in that: comparing each building in the S3
The full-size of the corresponding length of breakage marker number judges to detect wrong need at this if total volume error is greater than 5%
It rechecks.
8. the Supervision in improvement project according to claim 1, it is characterized in that: in the S3, every supervisor
It is marked using the free ink pen of different colours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910340799.1A CN109993509A (en) | 2019-04-25 | 2019-04-25 | Supervision in improvement project |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910340799.1A CN109993509A (en) | 2019-04-25 | 2019-04-25 | Supervision in improvement project |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109993509A true CN109993509A (en) | 2019-07-09 |
Family
ID=67135200
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910340799.1A Pending CN109993509A (en) | 2019-04-25 | 2019-04-25 | Supervision in improvement project |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109993509A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110398238A (en) * | 2019-07-18 | 2019-11-01 | 广东建瀚工程管理有限公司 | Project supervision method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049899A (en) * | 2011-10-11 | 2013-04-17 | 镇江精英软件科技有限公司 | Method for realizing vehicle identification code comparison by using double-layer semitransparent dragging |
CN103279904A (en) * | 2013-02-05 | 2013-09-04 | 广州智品网络科技有限公司 | Mobile terminal and building information processing method thereof |
CN103499881A (en) * | 2013-10-16 | 2014-01-08 | 无锡优创生物科技有限公司 | X-ray comparison system |
CN105548186A (en) * | 2016-01-15 | 2016-05-04 | 浙江野马电池有限公司 | Visual inspection method for coated paper |
CN108960674A (en) * | 2018-07-24 | 2018-12-07 | 广东海外建设监理有限公司 | The Supervision that process joins in project supervision |
CN109145780A (en) * | 2018-08-02 | 2019-01-04 | 力当高(上海)智能科技有限公司 | A kind of face identification method |
CN109214711A (en) * | 2018-10-13 | 2019-01-15 | 广州名都建设项目管理有限公司 | The Supervision that process joins in project supervision |
-
2019
- 2019-04-25 CN CN201910340799.1A patent/CN109993509A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049899A (en) * | 2011-10-11 | 2013-04-17 | 镇江精英软件科技有限公司 | Method for realizing vehicle identification code comparison by using double-layer semitransparent dragging |
CN103279904A (en) * | 2013-02-05 | 2013-09-04 | 广州智品网络科技有限公司 | Mobile terminal and building information processing method thereof |
CN103499881A (en) * | 2013-10-16 | 2014-01-08 | 无锡优创生物科技有限公司 | X-ray comparison system |
CN105548186A (en) * | 2016-01-15 | 2016-05-04 | 浙江野马电池有限公司 | Visual inspection method for coated paper |
CN108960674A (en) * | 2018-07-24 | 2018-12-07 | 广东海外建设监理有限公司 | The Supervision that process joins in project supervision |
CN109145780A (en) * | 2018-08-02 | 2019-01-04 | 力当高(上海)智能科技有限公司 | A kind of face identification method |
CN109214711A (en) * | 2018-10-13 | 2019-01-15 | 广州名都建设项目管理有限公司 | The Supervision that process joins in project supervision |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110398238A (en) * | 2019-07-18 | 2019-11-01 | 广东建瀚工程管理有限公司 | Project supervision method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106123745B (en) | A kind of detection device in rapid survey aperture | |
CN103323464B (en) | For the apparatus and method that container inspection unit is tested | |
CN102539735A (en) | Test device and system with integrated quality assurance label | |
JP2007101277A5 (en) | ||
CN201715996U (en) | Interlayer offset measuring device | |
CN109993509A (en) | Supervision in improvement project | |
CN202719950U (en) | Tool for testing conicity of part | |
CN202141420U (en) | Clearance ruler | |
CN110111314A (en) | The Supervision of renovation project | |
CN1389728A (en) | Dry multipurpose test paper with identification marks | |
CN106768888A (en) | The spatial resolution test board and method of testing of a kind of electroluminescent defect detector | |
CN206270007U (en) | A kind of spatial resolution test board of electroluminescent defect detector | |
CN209446492U (en) | Portable glass defect comparison card | |
CN205808907U (en) | Hand-held retroreflective marking measuring instrument | |
CN100429672C (en) | Residence card verifying device | |
CN108489426A (en) | A kind of detection method and detecting system of non-rectangle display assembling product precision | |
CN209690462U (en) | A kind of ICT test fixture | |
CN106840004A (en) | A kind of device for the difference detection of escalator horizontal section rise | |
CN208269850U (en) | A kind of detection system of non-rectangle display assembling product precision | |
CN209027452U (en) | A kind of detection tool structure of bending component easy detection size | |
CN113624161A (en) | Inclination angle measuring device and method for square-shaped aluminum alloy frame | |
CN203929776U (en) | Pawl type illicit drugs inspection card | |
CN202836496U (en) | Interlayer deviation measuring device | |
CN205879062U (en) | Cambered surface defect measurement card | |
CN208255026U (en) | A kind of aging verifying attachment of photoelectric protector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190709 |