CN109992558A - A kind of device, method and calculator that highway engineering setting out data obtains - Google Patents
A kind of device, method and calculator that highway engineering setting out data obtains Download PDFInfo
- Publication number
- CN109992558A CN109992558A CN201910233899.4A CN201910233899A CN109992558A CN 109992558 A CN109992558 A CN 109992558A CN 201910233899 A CN201910233899 A CN 201910233899A CN 109992558 A CN109992558 A CN 109992558A
- Authority
- CN
- China
- Prior art keywords
- setting
- module
- out data
- parameter set
- input parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 61
- 230000015654 memory Effects 0.000 claims abstract description 33
- 238000013480 data collection Methods 0.000 claims abstract description 19
- 238000010276 construction Methods 0.000 abstract description 10
- 238000010586 diagram Methods 0.000 description 2
- 241001501039 Blaps Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 210000003813 thumb Anatomy 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F15/00—Digital computers in general; Data processing equipment in general
- G06F15/02—Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators
- G06F15/0225—User interface arrangements, e.g. keyboard, display; Interfaces to other computer systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F15/00—Digital computers in general; Data processing equipment in general
- G06F15/02—Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators
- G06F15/025—Digital computers in general; Data processing equipment in general manually operated with input through keyboard and computation using a built-in program, e.g. pocket calculators adapted to a specific application
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computing Systems (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Human Computer Interaction (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of highway engineering setting out data acquisition device, method and calculators;By the way that processor module, memory module, input module, display module is arranged;The memory module is configured as the storage preset program of the first setting-out;The input module is configured as obtaining the first input parameter set;The memory module is configured as storing the first input parameter set;The processor module is configured as determining setting out data collection according to the first input parameter set and the preset program of the first setting-out;The display module is configured as showing the first input parameter set and the setting out data collection;The power module is highway engineering setting out data acquisition device power supply;By the combination and cooperation of above-mentioned each module, highway engineering technical staff can need the obtainable calculated result of a large amount of calculating ability to reduce corresponding construction cost to improve person works' efficiency in live quickly calculate of setting-out.
Description
Technical field
The present invention relates to highway engineerings to survey and draw setting-out technique field, and in particular to what a kind of highway engineering setting out data obtained
Device, method and calculator.
Background technique
The calculating of highway engineering construction field lofting is cumbersome, formula is more, is related to highway, middle stake, skirt piles, elevation setting-out coordinate meter
It calculates, specifically further relates to, vertical alignment design calculates, roadbed Blaps femaralis widens calculating, central line surveying of forestroads calculates, highway middle line branch
Away from survey station point Lofting Calculation any on method, method of deflection angle Lofting Calculation, the circular curve without easement curve, highway Coordinate of central line setting-out meter
Calculation, topographic survey calculate and a variety of calculating such as subgrade cross section sideline Lofting Calculation are to obtain setting out data, and field lofting is because big
The calculating work of amount and the progress for being delayed follow-up process cause person works' low efficiency, corresponding engineering cost high.
Summary of the invention
For the defects in the prior art, the present invention provide device, method that a kind of highway engineering setting out data obtains and
Calculator, for solving the problems, such as that highway engineering construction scene needs to carry out a large amount of, quickly calculating.
On the one hand, the present invention provides a kind of highway engineering setting out data acquisition device, comprising: processor module, storage
Module, input module, display module;The memory module is configured as the storage preset program of the first setting-out;The input module
It is configured as obtaining the first input parameter set;The memory module is configured as storing the first input parameter set;The place
Reason device module is configured as determining setting out data collection according to the first input parameter set and the preset program of the first setting-out;Institute
Display module is stated to be configured as showing the first input parameter set and the setting out data collection;The power module is the public affairs
The power supply of road engineering setting out data acquisition facility.
Preferably, before the input module is configured as obtaining the first input parameter set;The memory module is configured
To store the preset procedure set of setting-out;The input module is configured as obtaining the second input parameter set;The processor module quilt
It is configured to determine the preset program of the first setting-out according to the second input parameter set and the preset procedure set of the setting-out.
Preferably, before the memory module is configured as the first preset program of storage, the input module is configured as
Obtain the described first preset program.
Preferably, before the memory module is configured as the storage preset procedure set of setting-out, the input module is configured
To obtain the preset procedure set of setting-out.
On the other hand, the present invention provides a kind of highway engineering setting out data acquisition methods, comprising: the first setting-out of storage is preset
Program;Obtain the first input parameter set;Store the first input parameter set;According to the first input parameter set and described the
The preset program of one setting-out determines setting out data collection;Show the first input parameter set and the setting out data collection.
Preferably, before acquisition first inputs parameter set, the preset procedure set of the setting-out is stored;Obtain the second input parameter
Collection;The preset program of the first setting-out is determined according to the second input parameter set and the preset procedure set of the setting-out.
Preferably, before storing the preset program of the first setting-out, the first preset program is obtained.
Preferably, before storing Setting-out procedures collection, the Setting-out procedures collection is obtained.
On the other hand, the present invention provides a kind of highway engineering setting out data calculator, including above-described highway engineering
Setting out data acquisition device.
On the other hand, the present invention provides a kind of highway engineering setting out data calculator, including processor and can be stored in
The memory of the computer instruction run on processor;Wherein, the processor is realized for running the computer instruction
The highway engineering setting out data acquisition methods stated.
The beneficial effects of the present invention are embodied in: by the way that processor module, memory module, input module, display module is arranged;
The memory module is configured as the storage preset program of the first setting-out;The input module is configured as obtaining the first input parameter
Collection;The memory module is configured as storing the first input parameter set;The processor module is configured as according to
First input parameter set and the preset program of the first setting-out determine setting out data collection;The display module is configured as display institute
State the first input parameter set and the setting out data collection;The power module is highway engineering setting out data acquisition device confession
Electricity;By the combination and cooperation of above-mentioned each module, highway engineering technical staff can quickly calculate needs at setting-out scene
The obtainable calculated result of a large amount of calculating ability reduces corresponding construction cost to improve person works' efficiency.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar element
Or part is generally identified by similar appended drawing reference.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is a kind of module diagram for highway engineering setting out data acquisition device that the embodiment of the present invention one provides;
Fig. 2 is a kind of flow diagram of highway engineering setting out data acquisition methods provided by Embodiment 2 of the present invention.
Specific embodiment
It is described in detail below in conjunction with embodiment of the attached drawing to technical solution of the present invention.Following embodiment is only used for
Clearly illustrate technical solution of the present invention, therefore be only used as example, and cannot be used as a limitation and limit protection model of the invention
It encloses.
It should be noted that unless otherwise indicated, technical term or scientific term used in this application should be this hair
The ordinary meaning that bright one of ordinary skill in the art are understood.
As shown in Figure 1, the embodiment of the present invention one provides a kind of highway engineering setting out data acquisition device M001, comprising:
Processor module M110, memory module M120, input module M130, display module M140;The memory module M120 is configured
To store the preset program of the first setting-out;The input module M130 is configured as obtaining the first input parameter set;The storage mould
Block M120 is configured as storing the first input parameter set;The processor module M110 is configured as defeated according to described first
Enter parameter set and the preset program of the first setting-out determines setting out data collection;The display module M140 is configured as described in display
First input parameter set and the setting out data collection;The power module M100 is the highway engineering setting out data acquisition device
Power supply.In a kind of specific embodiment, the memory module M120 is stored with center calculation program, and as the first setting-out is pre-
Program is set, drift angle, radius are inputted, as by this exemplary input module M130, i.e. keyboard at highway engineering setting-out scene
The first input parameter set, the processor module M110 call center calculation program according to drift angle, radius, obtain curved element
Element, i.e. setting out data collection, the display module M140 show curve calculated result, this exemplary display module M140 is LCD (liquid
Crystalline substance display, Liquid Crystal Display) display screen, it is also possible to other modules that can be realized display function.Ability
Field technique personnel should be understood that the input module M130 is not limited to keyboard, and touch input mode, voice input can also be used
The modes such as mode can provide the effect of convenient offer input data.Pass through the combination and cooperation of above-mentioned each module, highway
Engineers and technicians can quickly calculate a large amount of calculating of needs just obtainable calculated result at setting-out scene, to improve
Person works' efficiency, reduce corresponding construction cost.
Preferably, before the input module M130 is configured as obtaining the first input parameter set;The memory module
M120 is configured as the storage preset procedure set of setting-out;The input module M130 is configured as obtaining the second input parameter set;Institute
Processor module M110 is stated to be configured as determining that first puts according to the second input parameter set and the preset procedure set of the setting-out
The preset program of sample.In a specific embodiment, the memory module M120 is previously stored with the preset procedure set of setting-out, i.e.,
The more than one preset program of setting-out is led to for example, being stored with the preset program of the setting-outs such as center calculation program, pile No. calculation procedure
Keyboard input module input procedure selection parameter is crossed, is that the preset program of setting-out in the preset procedure set of the setting-out is compiled in this example
Number, the processor die root tuber described program number, it is that the first setting-out is preset that the corresponding preset program of setting-out of the number, which is arranged,
Program has selected pile No. calculation procedure as the first setting-out in this example by the second input preset program number of parameter, that is, setting-out
Preset program inputs pile No. by keyboard, i.e. the first parameter time, and processor module M110 is according to first parameter and described the
The preset program of one setting-out obtains the setting out data collection, the i.e. coordinate value of surveying and locating, and display module M140 shows surveying and locating
Coordinate value.The storage preset procedure set of setting-out is configured as by the memory module M120;The input module M130 is configured
To obtain the second input parameter set;The processor module M110 is configured as according to the second input parameter set and described puts
The preset procedure set of sample determines the preset program of the first setting-out, and highway engineering technical staff can store the preset journey of large batch of setting-out
Sequence, at the construction field (site), it is only necessary to which according to the index number or index name of program, i.e., the second input parameter set can conveniently, fastly
Speed progresss calculate accordingly and Lofting Calculation as a result, to further raising person works' efficiency, reduce phase
The construction cost answered.
Preferably, before the memory module M120 is configured as the first preset program of storage, the input module M130
It is configured as obtaining the preset program of the first setting-out;In a specific example, engineers and technicians pass through input module
The preset program of the first setting-out is arranged in M130 before reaching scene, and it is preset can also to work out according to field condition the first setting-out at the scene
Program.Can be more flexible solve the problems, such as to encounter in highway engineering Lofting Calculation.
Preferably, before the memory module M120 is configured as the storage preset procedure set of setting-out, the input module
M130 is configured as obtaining the preset procedure set of the setting-out.In a specific example, engineers and technicians pass through input mould
The preset procedure set of setting-out is arranged in block M130 before reaching scene, can also work out the preset program of setting-out according to field condition at the scene
Collection.Can be more flexible solve the problems, such as to encounter in highway engineering Lofting Calculation.
As shown in Fig. 2, second embodiment of the present invention provides a kind of highway engineering setting out data acquisition methods, comprising:
S210 stores the preset program of the first setting-out;
S220 obtains the first input parameter set;
S230 stores the first input parameter set;
S240 determines setting out data collection according to the first input parameter set and the preset program of the first setting-out;
S250 shows the first input parameter set and the setting out data collection.
In a kind of specific embodiment, storage center calculation procedure, the preset program of as the first setting-out, in highway work
Journey setting-out scene, inputs drift angle, radius, and the as described first input parameter set calls center calculation journey according to drift angle, radius
Sequence obtains curve element, i.e. setting out data collection, finally shows curve calculated result.By the combination and cooperation of above-mentioned each module,
Highway engineering technical staff can quickly calculate a large amount of calculating of needs just obtainable calculated result at setting-out scene, thus
Person works' efficiency is improved, corresponding construction cost is reduced.
Preferably, before acquisition first inputs parameter set, the preset procedure set of the setting-out is stored;Obtain the second input parameter
Collection;The preset program of the first setting-out is determined according to the second input parameter set and the preset procedure set of the setting-out.
In a specific embodiment, it is previously stored with the preset procedure set of setting-out, i.e., more than one setting-out is preset
Program, for example, it is stored with the preset program of the setting-outs such as center calculation program, pile No. calculation procedure, by inputting procedure selection parameter,
It is the preset program number of setting-out in the preset procedure set of the setting-out in this example, the number is arranged in root described program number
The corresponding preset program of setting-out is the preset program of the first setting-out, is compiled in this example by the second preset program of input parameter, that is, setting-out
It number has selected pile No. calculation procedure as the preset program of the first setting-out, has passed through keyboard and input pile No., i.e. the first parameter time, according to institute
It states the first parameter and the preset program of the first setting-out obtains the setting out data collection, the i.e. coordinate value of surveying and locating, finally show
Show surveying and locating coordinate value.By storing the preset procedure set of the setting-out before acquisition first inputs parameter set;It is defeated to obtain second
Enter parameter set;The preset program of the first setting-out is determined according to the second input parameter set and the preset procedure set of the setting-out,
Highway engineering technical staff can store the preset program of large batch of setting-out, at the construction field (site), it is only necessary to according to the index of program
Number or index name, i.e., the second input parameter set, can progress easily and fast calculate accordingly and Lofting Calculation
As a result, reducing corresponding construction cost to further improve person works' efficiency.
Preferably, before storing the preset program of the first setting-out, the first preset program is obtained.In a specific example
In, the preset program of the first setting-out is arranged in engineers and technicians before reaching scene, can also work out according to field condition at the scene
The preset program of first setting-out, can be more flexible solve the problems, such as to encounter in highway engineering Lofting Calculation.
Preferably, before storing Setting-out procedures collection, the Setting-out procedures collection is obtained.In a specific example, engineering
The preset program of the first setting-out is arranged in technical staff before reaching scene, can also work out the first setting-out according to field condition at the scene
Preset program, can be more flexible solve the problems, such as to encounter in highway engineering Lofting Calculation.
The embodiment of the present invention three provides a kind of highway engineering setting out data calculator, including described in any of the above-described embodiment
Highway engineering setting out data acquisition device.Small calculating appliance have the advantages that it is small in size, light-weight, portable, on highway often
Calculation formula is compiled into after program input can promptly and accurately calculated result in building-site.
The embodiment of the present invention four provides a kind of highway engineering setting out data calculator, including, it processor and can be stored in
The memory of the computer instruction run on processor;Wherein, the processor is realized for running the computer instruction
State highway engineering setting out data acquisition methods described in any embodiment.Small calculating appliance has small in size, light-weight, portable
The advantages of, calculation formula common on highway is compiled into after program input can promptly and accurately calculated result in building-site.
The processor in above embodiments includes central processing unit (CPU), microcontroller, Programmable logical controller
Any one in device (PLC), programming device, other processing equipments or combinations thereof.As non-limiting example, processor can
To include specific integrated circuit (ASIC), system on chip (SOC), logic gate array, programmable gate array (for example, scene
Programmable gate array (FPGA)), other hardware elements or combinations thereof.Processor is for executing the calculating being stored in memory module
Machine readable instruction.The memory module may include non-transient computer readable storage medium.As non-limiting example, deposit
Storing up module includes volatile storage (for example, random access memory (RAM)), non-volatile memories (for example, read-only memory
(ROM)) or combinations thereof.As non-limiting example, memory module may include dynamic ram (DRAM), electrically programmable is read-only deposits
Reservoir (EPROM), hard disk drive, solid state drive, flash drive, disk, removable media (storage card, thumb drives
Device, CD etc.) or other storage equipment.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme should all cover within the scope of the claims and the description of the invention.
Claims (10)
1. a kind of highway engineering setting out data acquisition device characterized by comprising
Processor module, memory module, input module, display module and power module;
The memory module is configured as the storage preset program of the first setting-out;
The input module is configured as obtaining the first input parameter set;
The memory module is configured as storing the first input parameter set;
The processor module is configured as being put according to the first input parameter set and the preset program determination of first setting-out
Sample data set;
The display module is configured as showing the first input parameter set and the setting out data collection;
The power module is highway engineering setting out data acquisition device power supply.
2. highway engineering setting out data acquisition device according to claim 1, which is characterized in that matched in the input module
Before being set to acquisition the first input parameter set;
The memory module is configured as the storage preset procedure set of setting-out;
The input module is configured as obtaining the second input parameter set;
The processor module is configured as determining first according to the second input parameter set and the preset procedure set of the setting-out
The preset program of setting-out.
3. highway engineering setting out data acquisition device according to claim 1, which is characterized in that matched in the memory module
Before being set to the first preset program of storage,
The input module is configured as obtaining the described first preset program.
4. highway engineering setting out data acquisition device according to claim 2, which is characterized in that matched in the memory module
Before being set to the storage preset procedure set of setting-out,
The input module is configured as obtaining the preset procedure set of the setting-out.
5. a kind of highway engineering setting out data acquisition methods characterized by comprising
Store the preset program of the first setting-out;
Obtain the first input parameter set;
Store the first input parameter set;
Setting out data collection is determined according to the first input parameter set and the preset program of the first setting-out;
Show the first input parameter set and the setting out data collection.
6. highway engineering setting out data acquisition methods according to claim 5, which is characterized in that input parameter in acquisition first
Before collection,
Store the preset procedure set of the setting-out;
Obtain the second input parameter set;
The preset program of the first setting-out is determined according to the second input parameter set and the preset procedure set of the setting-out.
7. highway engineering setting out data acquisition methods according to claim 5, which is characterized in that storing, the first setting-out is preset
Before program,
Obtain the described first preset program.
8. highway engineering setting out data acquisition methods according to claim 6, which is characterized in that in storage Setting-out procedures collection
Before,
Obtain the Setting-out procedures collection.
9. a kind of highway engineering setting out data calculator, which is characterized in that including Claims 1 to 4 any one claim
The highway engineering setting out data acquisition device.
10. a kind of highway engineering setting out data calculator, which is characterized in that transported on a processor including processor and capable of storing
The memory of capable computer instruction;
Wherein, the processor realizes highway engineering setting-out number described in claim 5~8 for running the computer instruction
According to acquisition methods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910233899.4A CN109992558A (en) | 2019-03-26 | 2019-03-26 | A kind of device, method and calculator that highway engineering setting out data obtains |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910233899.4A CN109992558A (en) | 2019-03-26 | 2019-03-26 | A kind of device, method and calculator that highway engineering setting out data obtains |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109992558A true CN109992558A (en) | 2019-07-09 |
Family
ID=67131488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910233899.4A Pending CN109992558A (en) | 2019-03-26 | 2019-03-26 | A kind of device, method and calculator that highway engineering setting out data obtains |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109992558A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101158993A (en) * | 2007-10-31 | 2008-04-09 | 重庆路高道路工程技术咨询有限公司 | Civil construction engineering GPS-RTK measurement integrated PDA device |
CN201392192Y (en) * | 2009-03-16 | 2010-01-27 | 华北电网有限公司北京超高压公司 | Novel total station |
CN103047975A (en) * | 2012-12-25 | 2013-04-17 | 河南省第二公路工程有限公司 | Method of accurate and rapid measurement lofting system |
CN107192381A (en) * | 2017-05-24 | 2017-09-22 | 中国建筑局(集团)有限公司 | A kind of surveying and locating method of any disorder space structure |
CN108842578A (en) * | 2018-07-23 | 2018-11-20 | 上海力阳道路加固科技股份有限公司 | Road telltale mark equipment and its automatic lofting method based on BIM |
-
2019
- 2019-03-26 CN CN201910233899.4A patent/CN109992558A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101158993A (en) * | 2007-10-31 | 2008-04-09 | 重庆路高道路工程技术咨询有限公司 | Civil construction engineering GPS-RTK measurement integrated PDA device |
CN201392192Y (en) * | 2009-03-16 | 2010-01-27 | 华北电网有限公司北京超高压公司 | Novel total station |
CN103047975A (en) * | 2012-12-25 | 2013-04-17 | 河南省第二公路工程有限公司 | Method of accurate and rapid measurement lofting system |
CN107192381A (en) * | 2017-05-24 | 2017-09-22 | 中国建筑局(集团)有限公司 | A kind of surveying and locating method of any disorder space structure |
CN108842578A (en) * | 2018-07-23 | 2018-11-20 | 上海力阳道路加固科技股份有限公司 | Road telltale mark equipment and its automatic lofting method based on BIM |
Non-Patent Citations (3)
Title |
---|
朱纯伟: "CASIO5800计算器在公路放样中的应用", 《科技促进发展(应用版)》 * |
李旭: "Pocket PC在高等级公路施工放样中的应用", 《华东公路》 * |
田大明: "基于公路单曲线三维坐标计算编程模型", 《北京测绘》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103149600B (en) | Automatic wiring method for determining hydrogeological parameters based on optimization control point | |
CN106843809B (en) | A kind of convolution algorithm method based on NOR FLASH array | |
WO2021180100A1 (en) | Swmm and efdc coupling model-based regulation and storage project environmental effect assessment method and device | |
CN104459776B (en) | A kind of Fractal analysis of fault optimized calculation method | |
CN103886135B (en) | Two-dimensional unsteady-flow numerical model based power engineering location method | |
CN111611664B (en) | Power transmission line path selection method and system | |
CN106247926B (en) | Farm machinery tillage Area computing method based on cell scanning and GPS track interpolation | |
CN107860374A (en) | A kind of tunnel tunnel face excavation line intelligent positioning measuring method | |
CN104375211B (en) | A kind of weather forecast isogram update method and system | |
CN107038278A (en) | Parametric sensitivity optimization method based on SWMM Yu MATLAB data interactions | |
CN112686424A (en) | Flat ground path range determining method, flat ground path planning method and related device | |
CN104833347A (en) | Irrigated area canal system surveying method and system based on GPS (Global Position System) positioning | |
CN105512390B (en) | It is classified the dynamic prediction method of large-scale material storage yard foundation deformation under piling prepressing | |
CN109992558A (en) | A kind of device, method and calculator that highway engineering setting out data obtains | |
CN106970415A (en) | It is determined that method, device and the electronic equipment of the track of navigation focus | |
CN113792369B (en) | Soil deformation prediction method, system, equipment and readable storage medium | |
CN105184807A (en) | Automatic efficiency selection method for increasing charted depth | |
CN105467100A (en) | County territory soil erosion time-space dynamic monitoring method based on remote sensing and GIS | |
CN103955932A (en) | Automatic charted depth selection method of water-leakage-free depth points | |
CN107907114A (en) | Data error correction method, apparatus, electronic equipment and read/write memory medium | |
Mikhaylova | Assessment of organizational and technological reliability of the construction company in the construction of foundations | |
CN115660229B (en) | Dynamic reservoir management method and system for urban water affair regulation | |
CN103901076B (en) | A kind of electric osmose pilot system of Electrode influence factor switching time | |
CN103256923A (en) | BIM (Building Information Modeling)-based surveying, mapping and lofting system | |
CN114969939A (en) | Method, device, equipment and medium for determining space layout of controllable large reservoir |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190709 |