CN109989753A - A kind of townhouse hole cutting groove forming process - Google Patents

A kind of townhouse hole cutting groove forming process Download PDF

Info

Publication number
CN109989753A
CN109989753A CN201910154950.2A CN201910154950A CN109989753A CN 109989753 A CN109989753 A CN 109989753A CN 201910154950 A CN201910154950 A CN 201910154950A CN 109989753 A CN109989753 A CN 109989753A
Authority
CN
China
Prior art keywords
hole
townhouse
impactor
cutting groove
blast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910154950.2A
Other languages
Chinese (zh)
Inventor
郑伯坤
张要贺
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201910154950.2A priority Critical patent/CN109989753A/en
Publication of CN109989753A publication Critical patent/CN109989753A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of townhouse hole cutting groove forming processes, comprising the following steps: 1) forms Volleyball Association's round using the impactor with guiding device;2) in the several blast holes of two sidetrackings in townhouse hole;3) using Volleyball Association's round as the scope of freedom, then successively the blast hole of explosion scope of freedom two sides forms cutting groove.Townhouse hole cutting groove forming process provided by the invention, design is scientific and reasonable, simple process, strong operability, and the explosion number of this method is few, reduces the workload of scope of freedom formation, has saved blasting cost, improved construction efficiency.

Description

A kind of townhouse hole cutting groove forming process
Technical field
The present invention relates to mine mining field, in particular to a kind of townhouse hole cutting groove forming process.
Background technique
With the development of industry, metal demand amount is consequently increased, and mineral industry is also greatly improved, mining process In, the demolition effect of cutting groove is very significant considering that ore recovery ratio and explosion block uniformity, the demolition effect of cutting groove Good, ore recovery ratio height, blast fragmentation size are more evenly.
Currently, common cutting groove forming technique, which cuts kerve method, scallop hole for courtyard, raises into channel process and wedge by angle Shape kerve method.It is using courtyard as the scope of freedom of explosion and compensation space, with shallow bore hole, medium-length hole, major diameter that courtyard, which cuts kerve method, Deep hole etc. carries out explosion and forms cutting groove, and entire driling explosion is all to carry out in the chamber of cutting groove upper end, but early period digs Chamber heavy workload, rock penetration performance is low, long construction period, and construction cost is higher.Scallop hole raises into channel process and wedge shape by angle Kerve method beats the blasthole of differing tilt angles applying man-hour requirement, then explosion forms cutting groove, simple process, but construction period Long, construction cost is high.
Patent No. CN201610384398.2 discloses a kind of quick formation process of big structure stope cutting groove, including with Lower step: 1) Slice stoping: the high 80-150m of stope, width 20-25m, length is orebody thickness, is divided into 4 layerings, and layering is high Degree is 20-30m;2) cutting lane arrangement: cutting lane is arranged in disk end on stope;3) it cuts well arrangement: cutting well and be arranged in stope and cut The side of crosscut is cut close to stope boundary or is arranged among stope cutting lane;4) cutting groove is formed: quick-fried using medium-length hole Broken technology shaft formatting by one blasting, cutting lane explosion quickly form cutting groove using method from top to bottom.The technique is to cut well For the scope of freedom, successively explosion formation cutting groove, complex process, explosion number are layered using cutting well and the medium-length hole for cutting lane More, heavy workload, construction efficiency are low.
Therefore, it is badly in need of a kind of novel cutting groove manufacturing process, to reduce the construction cost of mining, improve construction efficiency.
Summary of the invention
The technical problem to be solved by the present invention is overcoming the deficiencies of the prior art and provide a kind of forming of townhouse hole cutting groove Method, this method using townhouse hole as scope of freedom explosion after form cutting groove, it is simple process, high-efficient, effectively reduce mining Workload shortens construction period.
The technical solution adopted by the present invention to solve the technical problems is: a kind of townhouse hole cutting groove forming process, including with Lower step:
1) Volleyball Association's round is formed using the impactor with guiding device;
2) in the several blast holes of two sidetrackings in townhouse hole;
3) using Volleyball Association's round as the scope of freedom, then successively the blast hole of explosion scope of freedom two sides forms cutting groove.
Further, the impactor with guiding device includes impactor ontology and guiding device, the guiding device Including guide rod and the impactor casing being fixedly arranged on guide rod, the impactor casing is set on the impactor ontology, The impactor ontology includes drill bit and drilling rod, and the guide rod is equipped with groove, and the radius of the drill bit is greater than outside guide rod The distance between the axis of wall and impactor ontology, and it is less than the distance between the axis of groove and impactor ontology, the brill The left side of head is located in the groove.
Further, the step 1) forms the specific steps of Volleyball Association's round are as follows:
A) upward pilot hole is bored in production face with drilling machine;
B) by the guide rod insertion pilot hole of guiding device, impactor ontology is installed;
C) first drilling hole is bored upwards with impactor ontology, pilot hole and first drilling hole form townhouse hole;
D) guide rod of guiding device is inserted into first drilling hole again, installs impactor ontology;
E) second drilling hole is bored upwards with impactor ontology, and so on, Volleyball Association's round can be formed.
Further, the blast hole is symmetrically provided with the two sides in townhouse hole.
Further, the sequence of step 3) borehole blasting hole explosion are as follows: the explosion of side in the middle part of townhouse hole described in first explosion The blast hole of the other side in the middle part of hole, then explosion townhouse hole, then explosion simultaneously are opened in close to the two sides on one side in the middle part of townhouse hole Blast hole, last explosion simultaneously are opened in the blast hole close to the two sides of another side in the middle part of townhouse hole.
It is preferred that the quantity of the blast hole be 6, the blast hole include the first hole, the second hole, third hole, the 4th hole, 5th hole, the 6th hole.
Further, first hole, the second hole and third hole are located in same level, the 4th hole, the 5th hole and 6th hole is located in same level, and first hole and the 4th hole, the second hole and the 5th hole, third hole and the 6th hole are right respectively Claim the two sides for being set to the scope of freedom.
Further, the blasting sequence of the blast hole is followed successively by the second hole, the 5th hole, third hole, the first hole, and the described 4th Hole and the explosion simultaneously of the first hole, the 6th hole and the explosion simultaneously of third hole.
Further, the blast hole is 1.5-1.8 meters with a distance from the scope of freedom, and the distance between two neighboring blast hole is 1-1.5 rice.
Further, the blast hole is 1.5 meters with a distance from the scope of freedom, and the distance between two neighboring blast hole is 1.2 Rice.
According to composite factors such as toe burden, Blasting height (step height), aperture, explosives, determine blast hole to certainly It is 1.5 meters by the distance in face, the distance between two neighboring blast hole is 1.2 meters, is to rely on to form 3 meters × 3 with the scope of freedom The cutting groove of rice, toe burden is excessive, and backlash also increases;Toe burden is too small, not only increases boring work amount, wave Take explosive, and operation is dangerous.
A kind of townhouse hole cutting groove forming process of the present invention the utility model has the advantages that the present invention passes through with the band for being capable of forming townhouse hole Have guiding device impactor formed Volleyball Association's round, then using townhouse hole as scope of freedom explosion after form cutting groove, the cutting groove Simple process, the strong operability of manufacturing process, and its explosion number is few, reduces the workload of scope of freedom formation, saves Blasting cost improves construction efficiency.
Detailed description of the invention
Fig. 1-is using the impactor with guiding device in the present invention in the operation schematic diagram for forming townhouse hole;
Fig. 2-is the schematic diagram that Volleyball Association's round and blast hole form cutting groove in the present invention;
Fig. 3-is the structural schematic diagram for the impactor with guiding device applied in the present invention.
Above-mentioned appended drawing reference: the first hole 1-, the second hole 2-, 3- third hole, the 4th hole 4-, the 5th hole 5-, the 6th hole 6-, 7- One Volleyball Association's round, 8- guide rod, 9- impactor sleeve body, 10- impactor ontology, 11- groove, 12- drill bit, 13- dustband, 14- lantern ring, 141- steel ball, 15- stop collar, 16- disc spring, 17- positioning ring, 18- pilot hole, 19- production face.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and embodiments, but these specific embodiments are not with any side Formula limits the scope of the invention.
Embodiment 1
A kind of townhouse hole cutting groove forming process, comprising the following steps: a 1) Volleyball Association is formed using the impactor with guiding device Round 7;2) in two sidetrackings, 6 blast holes in townhouse hole;It 3) is the scope of freedom with Volleyball Association's round 7, then the successively explosion scope of freedom two The blast hole of side forms cutting groove.
The working state figure of one Volleyball Association's round is formed using above-mentioned impactor as shown in Figure 1, it forms Volleyball Association's round Specific steps are as follows: a) bore a upward pilot hole 18 in production face 19 with drilling machine;B) insertion of the guide rod of guiding device 8 is led Into hole 18, impactor ontology 10 is installed;C) first drilling hole, pilot hole 18 and first are bored upwards with impactor ontology 10 A drilling hole forms townhouse hole;D) guide rod of guiding device 8 is inserted into first drilling hole again, installs impactor ontology 10;E) second drilling hole is bored upwards with impactor ontology 10, and so on, Volleyball Association's round 7 can be formed.
Referring to fig. 2, it is the scope of freedom with Volleyball Association's round 7, is being to bore 6 blast holes, phase at 1.5 meters with a distance from the scope of freedom The distance between adjacent two blast holes are 1.2 meters, and blast hole includes the first hole 1, the second hole 2, third hole 3, the 4th hole the 4, the 5th Hole 5, the 6th hole 6, the first hole 1, the second hole 2 and third hole 3 are located in same level, the 4th hole 4, the 5th hole 5 and the 6th hole 6 In same level.First hole 1 and the 4th hole 4, the second hole 2 and the 5th hole 5, third hole 3 and the 6th hole 6 are respectively symmetrically set It is placed in the two sides on the scope of freedom.The blasting sequence of blast hole is followed successively by the second hole 2, the 5th hole 5, third hole 3, the first hole 1, and described Four holes 4 are ignited simultaneously with the first hole 1, and the 6th hole 6 is ignited simultaneously with third hole 3, form cutting groove.First hole 1, the second hole 2, Three holes 3, the 4th hole 4, the 5th hole 5, the 6th hole 6 cannot ignite simultaneously, otherwise will cause explosion insufficient space, cutting groove forming effect Fruit is bad.
The structure of impactor with guiding device is as shown in figure 3, working condition of the impactor when forming townhouse hole For figure as shown in figure 3, the impactor includes impactor ontology 10 and guiding device, guiding device includes that guide rod 8 and being fixedly arranged on is led Impactor casing on bar 8, impactor casing are set on the impactor ontology 10, and impactor ontology 10 includes drill bit 12 And drilling rod, guide rod 8 are equipped with groove 11, the radius (see D in Fig. 3) of drill bit 12 is greater than 8 outer wall of guide rod and impactor ontology The distance between 10 axis (see L in Fig. 3), and the distance between axis for being less than groove 11 and impactor ontology 10 is (see Fig. 3 Middle M), the left side of drill bit 12 is located in groove 11.The depth of groove 11 is 10-15mm.
Impactor casing includes impactor sleeve body 9, and impactor sleeve body 9 is successively arranged dustband from top to bottom 13,2 groups of lantern rings 14 and limit assembly.8 steel balls 141 uniformly distributed along lantern ring periphery are equipped in lantern ring 14.
Limit assembly is located at the lower section of guide rod 8, and limit assembly includes stop collar 15, positioning ring 17 and is located at stop collar Disc spring 16 between 15 and positioning ring 17.The bottom end of guide rod 8 is located at the top of stop collar 15.Positioning ring 17 is welded on impactor On ontology 10.The outer diameter of guide rod 8 is less than the outer diameter of drill bit 12.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, Although the present invention has been disclosed as a preferred embodiment, however, it is not intended to limit the invention, any technology for being familiar with this profession Personnel, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or repair Decorations are the equivalent embodiment of equivalent variations, but without departing from the technical solutions of the present invention, according to the technical essence of the invention Any simple modification, equivalent change and modification to the above embodiments still fall within the range of technical solution of the present invention It is interior.

Claims (10)

1. a kind of townhouse hole cutting groove forming process, which comprises the following steps:
1) Volleyball Association's round is formed using the impactor with guiding device;
2) in the several blast holes of two sidetrackings in townhouse hole;
3) using Volleyball Association's round as the scope of freedom, then successively the blast hole of explosion scope of freedom two sides forms cutting groove.
2. a kind of townhouse hole cutting groove forming process as described in claim 1, which is characterized in that the impact with guiding device Device includes impactor ontology and guiding device, and the guiding device includes guide rod and the impactor set that is fixedly arranged on guide rod Pipe, the impactor casing are set on the impactor ontology, and the impactor ontology includes drill bit and drilling rod, the guiding Bar is equipped with groove, and the radius of the drill bit is greater than the distance between the axis of guide rod outer wall and impactor ontology, and is less than The left side of the distance between the axis of groove and impactor ontology, the drill bit is located in the groove.
3. a kind of townhouse hole cutting groove forming process as claimed in claim 2, which is characterized in that the step 1) forms Volleyball Association row The specific steps in hole are as follows:
A) upward pilot hole is bored in production face with drilling machine;
B) by the guide rod insertion pilot hole of guiding device, impactor ontology is installed;
C) first drilling hole is bored upwards with impactor ontology, pilot hole and first drilling hole form townhouse hole;
D) guide rod of guiding device is inserted into first drilling hole again, installs impactor ontology;
E) second drilling hole is bored upwards with impactor ontology, and so on, Volleyball Association's round can be formed.
4. a kind of townhouse hole cutting groove forming process as described in claim 1, which is characterized in that the blast hole is symmetrically provided with connection The two sides of round.
5. a kind of townhouse hole cutting groove forming process as described in claim 1, which is characterized in that step 3) borehole blasting hole explosion Sequence are as follows: in the middle part of first explosion townhouse hole in the middle part of the blast hole of side, then explosion townhouse hole the other side blast hole, then it is quick-fried simultaneously The blast hole for being provided close to the two sides on one side in the middle part of townhouse hole is broken, last explosion simultaneously is opened in another in the middle part of townhouse hole The blast hole of the two sides on side.
6. a kind of townhouse hole cutting groove forming process as claimed in claim 5, which is characterized in that the quantity of the blast hole is 6, The blast hole includes the first hole, the second hole, third hole, the 4th hole, the 5th hole, the 6th hole.
7. a kind of townhouse hole cutting groove forming process as claimed in claim 6, which is characterized in that first hole, the second hole and the Three holes are located in same level, and the 4th hole, the 5th hole and the 6th hole are located in same level, first hole and Four holes, the second hole and the 5th hole, third hole and the 6th hole are symmetrically arranged in the two sides on the scope of freedom.
8. a kind of townhouse hole cutting groove forming process as claimed in claim 6, which is characterized in that the blasting sequence of the blast hole according to Secondary is the second hole, the 5th hole, third hole, the first hole, the 4th hole and the explosion simultaneously of the first hole, the 6th hole and third hole Explosion simultaneously.
9. a kind of townhouse hole cutting groove forming process as described in claim any one of 1-8, which is characterized in that the blast hole is from certainly It is 1.5-1.8 by the distance in face, the distance between two neighboring blast hole is 1-1.5 meters.
10. a kind of townhouse hole cutting groove forming process as claimed in claim 9, which is characterized in that the blast hole is from the scope of freedom Distance is 1.5 meters, and the distance between two neighboring blast hole is 1.2 meters.
CN201910154950.2A 2019-03-01 2019-03-01 A kind of townhouse hole cutting groove forming process Pending CN109989753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910154950.2A CN109989753A (en) 2019-03-01 2019-03-01 A kind of townhouse hole cutting groove forming process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910154950.2A CN109989753A (en) 2019-03-01 2019-03-01 A kind of townhouse hole cutting groove forming process

Publications (1)

Publication Number Publication Date
CN109989753A true CN109989753A (en) 2019-07-09

Family

ID=67129255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910154950.2A Pending CN109989753A (en) 2019-03-01 2019-03-01 A kind of townhouse hole cutting groove forming process

Country Status (1)

Country Link
CN (1) CN109989753A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU831955A1 (en) * 1978-11-20 1981-05-23 Всесоюзный Ордена Трудового Красного Знаменинаучно-Исследовательский Горно-Металлур-Гический Институт Цветных Металлов Device for drilling conjugated parallel blast-holes
CN101994314A (en) * 2010-03-05 2011-03-30 安通建设有限公司 Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN205000894U (en) * 2015-09-10 2016-01-27 长沙矿山研究院有限责任公司 Mine inside groove basement rock excavating equipment that takes shape
CN108775226A (en) * 2018-06-08 2018-11-09 兖州煤业股份有限公司 A kind of device and method of underground static crushing armored concrete arch body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU831955A1 (en) * 1978-11-20 1981-05-23 Всесоюзный Ордена Трудового Красного Знаменинаучно-Исследовательский Горно-Металлур-Гический Институт Цветных Металлов Device for drilling conjugated parallel blast-holes
CN101994314A (en) * 2010-03-05 2011-03-30 安通建设有限公司 Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN205000894U (en) * 2015-09-10 2016-01-27 长沙矿山研究院有限责任公司 Mine inside groove basement rock excavating equipment that takes shape
CN108775226A (en) * 2018-06-08 2018-11-09 兖州煤业股份有限公司 A kind of device and method of underground static crushing armored concrete arch body

Similar Documents

Publication Publication Date Title
CN205561688U (en) Go up big gun hole arrangement structure to medium -length hole undercutting blasting
CN104989404B (en) It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method
CN110067557B (en) Pressure relief method for fully mechanized caving mining bottom coal of steeply inclined coal seam
CN202866644U (en) Way-type drilling unit of roller cone and DTH hammer
CN103063094A (en) Channeling method in rapid roadway explosion
CN102296958A (en) Method for preventing rock burst by artificial space defect body
CN106767212B (en) A kind of two-region undercut blast hole arrangement and its explosion well completion method of application
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN205537381U (en) Deep hole blasting simultaneous shaft -sinking's big gun hole arrangement structure in non - colliery mountain
CN105674816A (en) Medium-length hole blasting one-time shaft-forming method used for non-coal mine mountain
CN109341449A (en) A kind of high courtyard primary drilling Discrete control explosion well completion method of big section
CN105202984A (en) Blasting method for improving step deep hole blasting quality by using auxiliary blast holes
CN108362179A (en) A kind of energy saving cut shot method of star
CN110595308B (en) Method for treating goaf by ultra-deep hole blasting of strip mine
CN109945753B (en) Full-section one-time blasting construction method for high-gas tunnel
CN104296609B (en) Containing the controlled blasting method of different hardness rock stratum in Deep hole bench balsting
CN102817633B (en) The device drawing out methane and the pre-splitting method of the controlled blasting of deep hole crack
CN112031771A (en) Groove cutting and pulling method for safe construction
CN112983418A (en) Method for hydraulic fracturing pressure relief of coal mine underground coal face withdrawal channel
CN104594903A (en) Ore breaking method for whole-section high combination rock drilling blasting
CN106643355B (en) A kind of overhead caving method of the huge thick tight roof of deep coalmine
CN102620614B (en) Cave depot is slagged tap the construction method of funnel
CN108548460B (en) Method for preventing rock burst by coupling and pressure relief of blast hole and large-diameter drill hole
CN103868420A (en) Mine gallery driving cut blasting method
CN109989753A (en) A kind of townhouse hole cutting groove forming process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190709