CN109989393A - Bored concrete pile and its pile crown breaking construction method - Google Patents

Bored concrete pile and its pile crown breaking construction method Download PDF

Info

Publication number
CN109989393A
CN109989393A CN201711492819.4A CN201711492819A CN109989393A CN 109989393 A CN109989393 A CN 109989393A CN 201711492819 A CN201711492819 A CN 201711492819A CN 109989393 A CN109989393 A CN 109989393A
Authority
CN
China
Prior art keywords
pile
pile body
truncation
casing
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711492819.4A
Other languages
Chinese (zh)
Inventor
黄树其
何勇传
关超文
梁胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU XIEAN CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
GUANGZHOU XIEAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU XIEAN CONSTRUCTION ENGINEERING Co Ltd filed Critical GUANGZHOU XIEAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201711492819.4A priority Critical patent/CN109989393A/en
Publication of CN109989393A publication Critical patent/CN109989393A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/005Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of field of civil engineering, aiming at the problem that pile crown abolishes construction quality and inefficiency, provide a kind of bored concrete pile and its pile crown breaking construction method, the technical solution is as follows: bored concrete pile includes pile body, pile crown more than stake top absolute altitude and it is fixed on the intracorporal steel reinforcement cage of stake, the main reinforcement being arranged in pile crown in steel reinforcement cage main reinforcement loosens casing, steel reinforcement cage is equipped with the truncation hoop more than stake top absolute altitude, axially be embedded with perpendicular to pile body in pile crown it is several with truncation hoop close to it is closed at both ends and stretch out the split tube outside pile body, above-mentioned filling pile head restructuring bankrupt is as follows: (1) main reinforcement casing and blocking, installation truncation hoop;(2) pile body, pre-buried split tube are poured;(3) cushion cap excavation of foundation pit extracts truncation hoop;(4) impact splitting nozzle, cleaves pile crown;(5) it lifts by crane pile crown and stores.By pre-buried split tube to form weak spot, replace the drilling operating after excavating cushion cap, improves construction efficiency.

Description

Bored concrete pile and its pile crown breaking construction method
Technical field
The present invention relates to field of civil engineering, and in particular to a kind of bored concrete pile and its pile crown breaking construction method.
Background technique
(punching) hole pouring pile is bored because of its reliable in quality, ground adaptability is strong, it is widely used in high building project, And brill (punching) hole stake of skyscraper has diameter big, superfilled more feature;Therefore, major diameter bores the pile crown of (punching) hole stake pile foundation Abolish an always problem.In present engineering construction, also manually abolished or human assistance is small-sized using traditional always substantially Mechanical breaking is primarily present following problem:
1) traditional artificial restructuring bankrupt expends a large amount of manpower and material resources, large labor intensity, low efficiency.
2) traditional artificial restructuring bankrupt damages larger, part reinforcing bar buckling deformation to pile quality, pile body main reinforcement, and tension is strong Degree is lower, and becomes the weak spot in earthquake, high-effect high-quality required by conventional method and present infrastructure development project It is not inconsistent.
3) in conventional method portable pneumatic equipment it is huge tremble, noise and dust are harmful to the health of operating personnel, It is unfavorable for the realization of green construction.
Therefore, efficient construction required by traditional drilled pile pile crown restructuring bankrupt and present infrastructure development project Speed does not match that there are also improve space.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to provide a kind of bored concrete pile, it is broken with pile crown Except high-efficient advantage.
To achieve the above object, the present invention provides the following technical scheme that
A kind of bored concrete pile, including pile body and it is fixed on the intracorporal steel reinforcement cage of stake, the pile body includes being located at stake top absolute altitude or more Pile crown, the main reinforcement being arranged in pile crown in the main reinforcement of the steel reinforcement cage loosens casing, and the steel reinforcement cage is equipped with truncation Hoop, the truncation hoop is located at stake top absolute altitude or more, is axially embedded with several split tubes perpendicular to pile body in the pile crown, described to split Pipe and truncation hoop are split close to the split tube is closed at both ends and stretches out outside pile body.
By adopting the above technical scheme, casing is loosened by being arranged with the main reinforcement in pile crown in the main reinforcement of steel reinforcement cage, with Interlayer is formed between main reinforcement and pile crown concrete, partition pile crown cuts section concrete to the bond stress of main reinforcement, so that pile crown is dug Except section is easily removed and reduces the damage to pile body main reinforcement;By installing truncation hoop on steel reinforcement cage in cushion cap excavation of foundation pit Afterwards, it taps dash area concrete and extracts truncation hoop, enclose groove surface to generate level one in section stake position, greatly improve and abolish stake top Concrete cover construction efficiency;By pre-buried split tube, to occupy volume using split tube, so that pile body is generated by frame Empty position at the nozzle of split tube to form weak spot, and split-point when as splitting pile crown may replace after excavating cushion cap Drilling operating, improve construction efficiency;Since the nozzle of split tube easy to find outside split tube both ends stretching pile body is impacted, Facilitate operation;It is closed at both ends due to split tube, it avoids cement and sandstone from pouring into split tube, guarantees the effect of split tube, Improve stability.
Preferably, several split tubes intersect with the axis of pile body.
By adopting the above technical scheme, intersected due to split tube with the axis of pile body, so that split tube prolongs along the radial direction of pile body It stretches, so that the vulnerable area of pile body extends to inside pile body, the effect of splitting pile crown is further increased, so that cleavage operations are more It is easy, improves construction efficiency.
Preferably, several split tubes are uniformly distributed along the circumferential direction of pile body.
By adopting the above technical scheme, uniformly distributed along the circumferential direction of pile body due to split tube, so that split tube was formed on pile body Weak part is evenly distributed, so that cleavage operations effect stability, guarantees construction efficiency.
Preferably, the truncation hoop includes wirerope and the casing that loosens being set in outside wirerope, described to loosen casing It is interior to be filled with filler.
By adopting the above technical scheme, volume is occupied by filler, avoids loosening casing being squeezed and is deformed, guarantee to cut The stability of disconnected hoop.
Preferably, it is PVC sponge tube that main ribs, which loosen casing, and the split tube is PVC hard plastic tube.
By adopting the above technical scheme, PVC sponge tube is used to loosen casing as main reinforcement with preferable elastic using it, so that Poling, tube sealing are easy and convenient, reduce main reinforcement loosen casing occur piercing through and when be poured concrete casing shrink due to cause vertically The case where direction resistance increases;Since PVC hard plastic tube has certain rigidity, concrete is avoided to flatten split tube when being poured, guaranteed Split tube makes somebody a mere figurehead pile body to form the effect of weak spot, while using the lower characteristic of intensity of PVC hard plastic tube, so that splitting pile When head, impact force can easily be smashed split tube, so that impact force is transferred on pile body to cleave, guarantee splitting effect, Construction efficiency is improved, while PVC sponge tube and PVC hard plastic tube are low in cost, reduces construction cost.
Preferably, the split tube is 4cm longer than pile body diameter.
By adopting the above technical scheme, since split tube is than stake path length 4cm, so that after pile body concrete is flowed to two sides, also It can be easily found at the nozzle of split tube, avoid concrete from flowing to close split tube nozzle, while avoid split tube too long Lead to not be put into pile body mounting hole.
The second object of the present invention is to provide a kind of construction method for abolishing pouring pile head, high-efficient with pile crown is abolished The advantages of.
A kind of pile crown breaking construction method of bored concrete pile, it is characterized in that: the following steps are included:
(1) it is arranged main reinforcement in main ribs to loosen casing and block, the truncation hoop is installed more than stake top absolute altitude;
(2) it is poured the pile body, it is straight greater than pile body along the pre-buried length in direction perpendicular to the pile body axis at stake top absolute altitude The split tube of diameter, the split tube both ends are stretched out outside pile body and are closed;
(3) cushion cap foundation pit is excavated, the truncation hoop is extracted;
(4) nozzle of the split tube is impacted to cleave pile crown;
(5) it lifts by crane the pile crown and stores.
By adopting the above technical scheme, casing is loosened between main reinforcement and pile crown concrete by being arranged main reinforcement in main reinforcement Interlayer is formed, partition pile crown cuts section concrete to the bond stress of main reinforcement, so that pile crown cuts section and is easily removed and reduces to stake The damage of body main reinforcement and sound detecting pipe;By truncation hoop being installed more than stake top absolute altitude to tap yin after cushion cap excavation of foundation pit Shadow part concrete simultaneously extracts truncation hoop, to cut the stake position generation circle groove surface of level one, greatly improves the concrete for abolishing stake top The construction efficiency of protective layer;By pre-buried split tube, to occupy volume using split tube, so that pile body is generated by overhead position With at the nozzle of split tube formed weak spot, as splitting pile crown when split-point, may replace excavate cushion cap after drillman Sequence improves construction efficiency;Since the nozzle of split tube easy to find outside split tube both ends stretching pile body is impacted, facilitate behaviour Make;It is closed at both ends due to split tube, it avoids cement and sandstone from pouring into split tube, guarantees the effect of split tube, improve steady It is qualitative.
Preferably, it is added before step (5) after the step (4) and shakes separation pile crown step.
By adopting the above technical scheme, by shaking pile body to shake isolated pile crown, it is ensured that pile crown and reinforcing bar and Concrete piles are kept completely separate.
Preferably, main reinforcement loosens and binds several flexible pieces outside casing in the step (1), and adjacent soft part loosens set along main reinforcement The axially spaced 20cm-30cm of pipe.
By adopting the above technical scheme, being bound when main reinforcement loosens casing to avoid concrete vibrating by flexible piece leads to main reinforcement It loosens casing to loosen, while main reinforcement being overcome to loosen the effect of casing itself and internal gas buoyancy, improve stability.
Preferably, split tube ties on steel reinforcement cage in the step (2).
By adopting the above technical scheme, it by tying split tube on steel reinforcement cage, to fix split tube and resist buoyancy, protects Demonstrate,prove the precision of stability and split tube mounting height.
In conclusion the invention has the following advantages: casing is loosened by being arranged main reinforcement in main reinforcement, so that pile crown Section is cut to be easily removed and reduce the damage to pile body main reinforcement;It is located at stake top mark specified location installation truncation hoop by steel reinforcement cage To enclose groove surface cutting stake position generation level one, greatly improve and abolish stake top eminence concrete protective after extracting truncation hoop The construction efficiency of layer;By pre-buried split tube to form weak spot, replace the drilling operating after excavating cushion cap, improves construction effect Rate;Pile crown step is separated by shaking, it is ensured that pile crown is kept completely separate with reinforcing bar and concrete piles;Guarantee to cleave using PVC hard plastic tube When impact force be easy to reach on pile body, while it is cheap, save construction cost;Overall technology difficulty is lower, hence it is evident that reduction is applied It is easy to spread between working hour.
Detailed description of the invention
Fig. 1 is the technical process figure that filling pile head construction method is abolished in the present invention;
Fig. 2 is the overall structure diagram of bored concrete pile in the present invention;
Fig. 3 is the schematic diagram of internal structure of bored concrete pile in the present invention;
Fig. 4 is that the pile crown of bored concrete pile in the present invention lifts by crane the structural schematic diagram of state.
In figure: 1, pile body;11, pile crown;2, main reinforcement loosens casing;3, split tube;4, truncation hoop;41, casing is loosened;5, steel Muscle cage;51, main reinforcement.
Specific embodiment
With reference to the accompanying drawings and embodiments, the present invention will be described in detail.
Embodiment one
A kind of bored concrete pile, referring to Fig. 2 and Fig. 3, including pile body 1 and the steel reinforcement cage being arranged in pile body 15, steel reinforcement cage 5 is parallel Casing 2 is loosened in being arranged with main reinforcement in the axial main reinforcement 51 of pile body 1.
Referring to Fig. 3 and Fig. 4, pile body 1 includes the pile crown 11 more than stake top absolute altitude, and main reinforcement loosens casing 2 and is located at stake In first 11, the bottom level that main reinforcement loosens casing 2 is consistent with the height of stake top absolute altitude, and the length that main reinforcement loosens casing 2 is greater than stake First 11 height, main reinforcement, which loosens, is banded with several flexible piece (not shown)s on casing 2, flexible piece loosens casing 2 along main reinforcement Axial distribution, adjacent flexible part interval 20cm-30cm.
It is PVC sponge tube that main reinforcement, which loosens casing 2, in the present embodiment, and flexible piece is tied rope in the present embodiment.
It is located at the above 10cm-15cm of stake top absolute altitude on steel reinforcement cage 5 and truncation hoop 4 is installed, truncation hoop 4 includes wirerope It (not shown) and is set in outside wirerope and loosens casing 41, loosen in casing 41 filled with filler, truncation hoop 4 Around 51 outside of main reinforcement, one circle, which is arranged and is pressed on main reinforcement, loosens on casing 2, and truncation hoop 4 is tightened to be loosened on casing 2 in main reinforcement.
In the present embodiment, filler is fine sand.
It is located on truncation hoop 4 on steel reinforcement cage 5 and is embedded with split tube 3, split tube 3 is arranged radially along pile body 1 and tightens in steel On muscle cage 5, split tube 3 two and is intersected on the axis of pile body totally, and two split tubes 3 are circumferential uniformly distributed along pile body 1, split tube 3 Length be greater than the diameter of pile body 1, the both ends of split tube 3 are stretched out outside pile body 1.
Split tube 3 is PVC hard plastic tube in the present embodiment.
Embodiment two
One kind abolishing filling pile head construction method, comprising:
1. material and facility
(1) material is as shown in table 1
1 main material of table is equipped with table
Serial number Title material Specification Remarks
1 PVC sponge casing Wall thickness 10mm
2 Fine sand Filling is used
3 Wirerope Diameter is 16 or 18mm
4 PVC hard plastic tube Diameter is 20 or 25mm It is used according to stake diameter size
(2) plant is as shown in table 2
2 main mechanical table of table
Serial number Title Model Purposes
1 Pneumatic pick It is selected according to stake diameter Drill embedded hole
2 Crane It is selected according to stake diameter Lift by crane pile crown
2. construction procedure:
Referring to Fig.1, comprising the following specific steps
S100, main reinforcement casing simultaneously block, installation truncation hoop.
It is specific: firstly, drilling in working region, to bore the operation dug to complete stake holes.
During stake holes is bored and dug, reinforcing bar is pricked into cage, stake top mark is then located in the main reinforcement for being parallel to pile body axial direction Eminence draws colo(u)r streak mark, and then, upper main reinforcement is covered in the main reinforcement of steel reinforcement cage and loosens casing, main reinforcement loosens casing towards reinforcing bar The end of cage is located at tag line, then binds main reinforcement by rope and loosens casing, main reinforcement loosens end of the casing far from steel reinforcement cage Portion's bending simultaneously seals the both ends that main reinforcement loosens casing by adhesive tape.
In the present embodiment, main reinforcement loosens casing using PVC sponge tube, and main reinforcement loosen casing wall thickness need to guarantee 10mm with On, with the preferable elasticity having using itself, so that poling, tube sealing are easy and convenient, and it is not easy to occur piercing through and because pouring Casing shrink when building concrete and the case where lead to the increase of vertical resistance, not only protected main reinforcement, but also reduce the resistance of subsequent lifting pile crown Power.
It need to be every in order to overcome main reinforcement to loosen the effect of casing itself and internal gas buoyancy, when rope binds main reinforcement 20cm-30cm binding is together.
The internal diameter that main reinforcement loosens casing is bigger than the outer diameter of main reinforcement, is inserted in preferably facilitating main reinforcement to loosen casing, together When further pile crown is convenient for lift by crane.
After completing the installation that main reinforcement loosens casing, the installation of truncation hoop is carried out, truncation hoop loosens set by being arranged outside wirerope It manages and fills fine sand in casing loosening to form, a circle, truncation on the outside of main reinforcement at the above 10cm of stake top absolute altitude are bound round in truncation Hoop is connected to main reinforcement and loosens on the side wall of casing and tightened by tied silk, and 10cm length is reserved in the end of wirerope, in order to pull out Out.
After completing truncation hoop installation, steel reinforcement cage is sunk to.
Main reinforcement loosens casing and the installation of truncation hoop can also be such that steel reinforcement cage not exclusively sinks to, stay when steel reinforcement cage is sunk to It needs to cut the reinforcing bar of pile crown part out, carries out installation exercise, sink completely again after inspection.
S200, casting pile body, pre-buried split tube.
It is specific: during pouring pile body, to be located at pre-buried several split tubes, split tube axial direction and stake at stake top absolute altitude Body it is radially consistent, split tube intersects on the axis of pile body, and split tube is uniformly distributed along the circumferential direction of pile body, and the length of split tube is greater than Pile body diameter 4cm, and the center of split tube is located on the axis of pile body, split tube both ends are stretched out outside pile body.
Split tube is the thin PVC hard plastic tube of φ 30, split tube both ends seal closure and glue sealing, will be cleaved by iron wire Pipe ties on steel reinforcement cage to fix split tube and resist buoyancy.
According to pile body diameter, selection specifically uses the quantity of split tube.
S300, cushion cap excavation of foundation pit extract truncation hoop.
It is specific: after the completion of split tube is pre-buried, when pile foundation intensity reaches 70%, to excavate cushion cap foundation pit.
In cushion cap Excavation Process, the main reinforcement being exposed at outside pile crown will be protected, and avoided damage to or be bent, to avoid shadow It rings pile crown and abolishes operation.
After cushion cap excavation of foundation pit, expose pile crown, taps dash area concrete with iron hammer, then driven using wirerope, extracted Truncation hoop, i.e., it can be seen that forming level one on pile body encloses groove surface, which cuts stake position.
S400, impact splitting nozzle, cleave pile crown.
It is specific: after extracting truncation hoop, to find the nozzle of split tube, impact nozzle directly with pneumatic pick to cleave pile crown.
S500, lifting pile crown are simultaneously stored.
It is specific: to drill, drill circumferentially equal along pile crown along pile crown diametrical direction in the same level on pile crown side wall Then cloth has installed hanging piece, hang up properly wirerope on playing hanging piece, by loop wheel machine vertical lifting pile crown, pile crown concrete is integrally hung out Foundation pit is simultaneously placed on the pile crown storage space preset, and concentration is transported.
Rise hanging piece drill rod can be used, can also when pouring pile body pre-buried hanging ring.
It is added after S400, before S500 and shakes separation pile body step.
It is specific: using hydraulic device horizontal direction top chisel one circle, isolated pile crown is shaken, it is ensured that pile crown with Reinforcing bar and concrete piles are kept completely separate.
Since split tube is PVC hard plastic tube, when so that pneumatic pick impacting split tube, split tube is easily broken, and avoids split tube The excessively high impact energy to absorb pneumatic pick of intensity.
It is cheap by using PVC hard plastic tube and PVC sponge tube, reduce construction cost.
Whole construction process is simple, and operating efficiency is higher and easy to spread.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of bored concrete pile, it is characterized in that: including pile body (1) and the steel reinforcement cage (5) being fixed in pile body (1), the pile body (1) include the pile crown (11) for being located at stake top absolute altitude or more, be arranged in the main reinforcement (51) of the steel reinforcement cage (5) positioned at pile crown (11) Interior main reinforcement loosens casing (2), and the steel reinforcement cage (5) is equipped with truncation hoop (4), the truncation bind round (4) be located at stake top absolute altitude with On, it is axially embedded with several split tubes (3) in the pile crown (11) perpendicular to pile body (1), the split tube (3) and truncation are bound round (4) close to the split tube (3) is closed at both ends and stretches out pile body (1) outside.
2. bored concrete pile according to claim 1, it is characterized in that: the axis phase of several split tubes (3) and pile body (1) It hands over.
3. bored concrete pile according to claim 2, it is characterized in that: several split tubes (3) are circumferentially uniformly distributed along pile body (1).
4. bored concrete pile according to claim 3, it is characterized in that: truncation hoop (4) includes wirerope and is set in steel Loosening casing (41) outside cord, it is described to loosen in casing (41) filled with filler.
5. bored concrete pile according to claim 1 to 4, it is characterized in that: it is PVC sponge that main ribs, which loosen casing (2), Pipe, the split tube (3) are PVC hard plastic tube.
6. bored concrete pile according to claim 5, it is characterized in that: the split tube (3) is 4cm longer than pile body (1) diameter.
7. the pile crown breaking construction method of bored concrete pile as described in claim 1-6 is any, it is characterized in that: the following steps are included:
(1) it is arranged main reinforcement in main ribs to loosen casing and block, the truncation hoop is installed more than stake top absolute altitude;
(2) it is poured the pile body, it is straight greater than pile body along the pre-buried length in direction perpendicular to the pile body axis at stake top absolute altitude The split tube of diameter, the split tube both ends are stretched out outside pile body and are closed;
(3) cushion cap foundation pit is excavated, the truncation hoop is extracted;
(4) nozzle of the split tube is impacted to cleave pile crown;
(5) it lifts by crane the pile crown and stores.
8. the pile crown breaking construction method of bored concrete pile according to claim 7, it is characterized in that: after the step (4) It is added before step (5) and shakes separation pile crown step.
9. the pile crown breaking construction method of bored concrete pile according to claim 8, it is characterized in that: main reinforcement in the step (1) It loosens and binds several flexible pieces outside casing, adjacent soft part loosens the axially spaced 20cm-30cm of casing along main reinforcement.
10. the pile crown breaking construction method of bored concrete pile according to claim 9, it is characterized in that: splitting in the step (2) Pipe ties on steel reinforcement cage.
CN201711492819.4A 2017-12-30 2017-12-30 Bored concrete pile and its pile crown breaking construction method Pending CN109989393A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711492819.4A CN109989393A (en) 2017-12-30 2017-12-30 Bored concrete pile and its pile crown breaking construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711492819.4A CN109989393A (en) 2017-12-30 2017-12-30 Bored concrete pile and its pile crown breaking construction method

Publications (1)

Publication Number Publication Date
CN109989393A true CN109989393A (en) 2019-07-09

Family

ID=67111571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711492819.4A Pending CN109989393A (en) 2017-12-30 2017-12-30 Bored concrete pile and its pile crown breaking construction method

Country Status (1)

Country Link
CN (1) CN109989393A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700259A (en) * 2019-11-06 2020-01-17 陕西建工第八建设集团有限公司 Breaking device and method for breaking super-poured concrete of underground continuous wall in advance
CN113123339A (en) * 2021-04-30 2021-07-16 南京农业大学 Quick breaking structure for super-grouting part of pile top of cast-in-place pile
CN113174953A (en) * 2021-04-30 2021-07-27 珠海君豪岩土科技有限公司 Pretreatment structure of super-grouting part of pile top of cast-in-place pile
CN110700259B (en) * 2019-11-06 2024-05-31 陕西建工第八建设集团有限公司 Device and method for advanced breaking of underground diaphragm wall superfilling concrete

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014095254A (en) * 2012-11-12 2014-05-22 Haseko Corp Pile head treatment method for cast-in-place pile
CN106400802A (en) * 2016-08-24 2017-02-15 中交公局厦门工程有限公司 Integral quick lifting method for pile head of drilled pile during pre-embedding and drilling-free ring-cutting
CN106592591A (en) * 2017-01-23 2017-04-26 中交三公局第工程有限公司 Drilling pile head overall removal construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014095254A (en) * 2012-11-12 2014-05-22 Haseko Corp Pile head treatment method for cast-in-place pile
CN106400802A (en) * 2016-08-24 2017-02-15 中交公局厦门工程有限公司 Integral quick lifting method for pile head of drilled pile during pre-embedding and drilling-free ring-cutting
CN106592591A (en) * 2017-01-23 2017-04-26 中交三公局第工程有限公司 Drilling pile head overall removal construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700259A (en) * 2019-11-06 2020-01-17 陕西建工第八建设集团有限公司 Breaking device and method for breaking super-poured concrete of underground continuous wall in advance
CN110700259B (en) * 2019-11-06 2024-05-31 陕西建工第八建设集团有限公司 Device and method for advanced breaking of underground diaphragm wall superfilling concrete
CN113123339A (en) * 2021-04-30 2021-07-16 南京农业大学 Quick breaking structure for super-grouting part of pile top of cast-in-place pile
CN113174953A (en) * 2021-04-30 2021-07-27 珠海君豪岩土科技有限公司 Pretreatment structure of super-grouting part of pile top of cast-in-place pile

Similar Documents

Publication Publication Date Title
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN102587380A (en) Construction method for wholly removing drilling pile head
CN207062970U (en) The double steel pile casting structures of stake in a kind of deep water major diameter water
CN106592591A (en) Drilling pile head overall removal construction method
CN105297729A (en) Bridge pile foundation pile head breaking device and method
CN109989393A (en) Bored concrete pile and its pile crown breaking construction method
CN108286268A (en) A kind of deep basal pit monitoring inclinometer pipe protective device and method
CN110144899A (en) Shallow foundation building foundation pit Deformation control structure and construction method are closed in a kind of soft soil layer underground parking
CN209958343U (en) Connecting joint for connecting reinforced concrete cast-in-place piles
KR101034782B1 (en) Construction method of heat circulation pipe
KR101248393B1 (en) Concrete file drawing public law and the drawing which are laid in
KR101008478B1 (en) Geogrid structure preventing bulging failure of stone column and method constructing the stone column by the geogrid structure
KR101241382B1 (en) Micro pile capable of withdrawing upper cassing and method for constructing foundation using the same
JP2016053273A (en) Slope stabilizing method as countermeasure to earthquake and rain in soil structure with pressure insertion type bar reinforcement
CN104110034B (en) The construction of Static Pressure Pile method of casting and penetrating resistance can be reduced
CN107084649A (en) A kind of high cut slope excavation blasting protection device and its application method
CN109680681A (en) A kind of pile crown restructuring bankrupt of cast-in-situ bored pile
KR100758502B1 (en) Entrance machine for driving waterwork pipe and method for constructing it
CN108086306A (en) A kind of pile crown concrete construction and cut method
KR101337223B1 (en) Apparatus Equipped with Double Casing for Inserting Plastic Drain Board and Process thereof
CN108589727A (en) The construction method of bored concrete pile broken pile head
CN113356190A (en) Pile forming method for cast-in-place pile in karst development area
JP5528200B2 (en) Groundwater level lowering method using well points
JP3696294B2 (en) Hollow foundation foundation method using air bag
JP2015151842A (en) Pile head treatment method and pile head burial bag used for pile head treatment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190709