CN109989352A - A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure - Google Patents

A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure Download PDF

Info

Publication number
CN109989352A
CN109989352A CN201910345501.6A CN201910345501A CN109989352A CN 109989352 A CN109989352 A CN 109989352A CN 201910345501 A CN201910345501 A CN 201910345501A CN 109989352 A CN109989352 A CN 109989352A
Authority
CN
China
Prior art keywords
boom
lower boom
moulding bed
top boom
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910345501.6A
Other languages
Chinese (zh)
Inventor
曾臻
马顺忠
徐灵童
王传武
叶鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinghu Heavy Industry Co Ltd
Original Assignee
Jiangsu Jinghu Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jinghu Heavy Industry Co Ltd filed Critical Jiangsu Jinghu Heavy Industry Co Ltd
Priority to CN201910345501.6A priority Critical patent/CN109989352A/en
Publication of CN109989352A publication Critical patent/CN109989352A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of Steel Truss Beam top booms and lower boom assembly moulding bed and splicing structure, it is characterised in that: including jig structure and girder frame structure;The jig structure and girder frame structure, which are arranged on moulding bed, carries out assembly;The when low strength formwork of the girder frame structure of broken line type and the requirement of stability are met in the present invention by using the assembled moulding bed of the girder frame structure of dedicated broken line type, avoids sheltering from welding position in assembly, structure is simpler and stability is higher;Furthermore the Application in Pre-camber of girder truss can be achieved in the girder frame structure of broken line type after assembly, convenient for being installed with the joining section structure of bridge floor, so that installation effectiveness is higher while also meeting camber requirement required for bridge.

Description

A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure
Technical field
The present invention relates to Steel Bridge splicing structure field more particularly to a kind of Steel Truss Beam top booms and lower boom assembly to use Moulding bed and splicing structure.
Background technique
Being assembled on moulding bed on general Steel Truss Beam carries out assembled, and general jig structure is according to the shape of truss two The sub-truss girder construction by the way of supporting block causes a riveted holes and welding position to be blocked the welding in inconvenient later period Assembling;Furthermore it is directed to general linear Steel Truss Beam, the side of support frame and Steel Truss Beam on support baseboard may deposit Being easy to cause Steel Truss Beam in the problem of out of plumb in laying is that there is a phenomenon where discontinuity;Furthermore general steel truss It is assemblied into linear structure, the splicing structure of broken line type needs the position of camber to be connected with joining section in bridge floor It connects, it is therefore desirable to which a kind of Steel Truss Beam structure of bending-type realizes assembled welding.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of Steel Truss Beam top booms and lower boom assembly moulding bed and spelling Assembling structure can also can solve the steel truss for needing camber while solving the assembly of girder frame structure of novel broken line type and asking Structure of setting a roof beam in place realizes that the welding of pre- joining section meets the requirement of camber.
In order to solve the above technical problems, the technical solution of the present invention is as follows: a kind of Steel Truss Beam top boom and lower boom are assembled With moulding bed and splicing structure, innovative point is: including jig structure and girder frame structure;The jig structure and girder truss knot Structure, which is arranged on moulding bed, carries out assembly;
The jig structure includes support baseboard and support frame;The support baseboard is horizontally disposed, and the one of the support baseboard is flat The side profile structure for having girder frame structure is delineated on face;Support frame as described above is in door type structure along the girder truss on support baseboard Side profile carry out contour laying, support frame as described above is connected on support baseboard by anchoring piece;
The girder frame structure includes top boom, lower boom and connection web member;The top boom and lower boom are broken line type structure And top boom and lower boom form camber;The top boom is successively weldingly connected including at least four chord member segments and top boom Outside splice the bottom board unit that has;The lower boom includes at least four chord member segments and is successively weldingly connected and is located at both ends In the angle structure less than 180 ° between two chord members and remaining chord member segment;It is provided with and connects on the top boom and lower boom The ox leg structure of web member cooperation is connect, and is provided with stiffening plate in ox leg structure;The inclined alternately shape of the connection web member is connected to On the ox leg structure of top boom and lower boom.
Further, the extending direction of bottom board unit is provided with spaced set in the bottom board unit has several U Rib;Vertical U rib and bottom board unit are provided with several stiffener plate structures on the U rib.
Further, support frame as described above on support baseboard the side of spaced set and support frame perpendicular to being attached thereto The profile scribing line of girder frame structure on the support baseboard connect.
Further, using molten between the ox leg structure of the ox leg structure and lower boom of the connection web member and top boom Welding thoroughly.
The present invention has the advantages that
1) girder truss of broken line type is met in the present invention by using the assembled moulding bed of the girder frame structure of dedicated broken line type The when low strength formwork of structure and the requirement of stability avoid sheltering from welding position in assembly, and structure is simpler and stability It is higher;Furthermore the Application in Pre-camber of girder truss can be achieved in the girder frame structure of broken line type after assembly, convenient for the embedding benefit with bridge floor Segmental structure is installed, so that installation effectiveness is higher while also meeting camber requirement required for bridge.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
Fig. 1 is a kind of Steel Truss Beam top boom and lower boom assembly moulding bed figure of the invention.
Fig. 2 is a kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure installation diagram of the invention.
Specific embodiment
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this It is bright to be limited among the embodiment described range.
Such as a kind of Fig. 1 Steel Truss Beam top boom shown in Fig. 2 and lower boom assembly moulding bed and splicing structure, including moulding bed Structure 1 and girder frame structure 2;The jig structure 1 and girder frame structure 2, which are arranged on moulding bed, carries out assembly.
Jig structure 1 includes support baseboard 11 and support frame 12;The support baseboard 11 is horizontally disposed, the support baseboard The side profile structure for having girder frame structure 2 is delineated in 11 plane;Support frame as described above 12 is in door type structure along support bottom The side profile of girder truss on plate 11 carries out contour laying, and support frame as described above 12 is connected on support baseboard 11 by anchoring piece.
Girder frame structure 2 includes top boom 21, lower boom 22 and connection web member 23;The top boom 21 is with lower boom 22 Broken line type structure and top boom 21 and lower boom 22 formation camber;The top boom 21 includes at least four chord member segments successively It is weldingly connected and the bottom board unit 25 having is spliced in the outside of top boom 21;The lower boom 22 include at least four chord member segments according to In the angle structure less than 180 ° between secondary two chord members and remaining chord member segment for being weldingly connected and being located at both ends;It is described to wind up It is provided on bar 21 and lower boom 22 and connect the ox leg structure 24 of the cooperation of web member 23, and be provided with reinforcement in ox leg structure 25 Plate;The inclined alternately shape of the connection web member 23 is connected on the ox leg structure 24 of top boom 21 and lower boom 22.
Extending direction in bottom board unit 25 along bottom board unit, which is provided with spaced set, several U ribs;On the U rib Vertical U rib and bottom board unit 25 are provided with several stiffener plate structures.
Support frame 23 on support baseboard 23 side of spaced set and support frame 12 perpendicular to connected branch Support the profile scribing line of girder frame structure on bottom plate 23.
It connects and uses penetration weld between the ox leg structure 24 of web member 23 and top boom and the ox leg structure 24 of lower boom 22 It connects.
It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, above-described embodiment and explanation It is merely illustrated the principles of the invention described in book, without departing from the spirit and scope of the present invention, the present invention also has Various changes and modifications, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention It is defined by the appending claims and its equivalent thereof.

Claims (4)

1. a kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure, it is characterised in that: including jig structure And girder frame structure;The jig structure and girder frame structure, which are arranged on moulding bed, carries out assembly;
The jig structure includes support baseboard and support frame;The support baseboard is horizontally disposed, and the one of the support baseboard is flat The side profile structure for having girder frame structure is delineated on face;Support frame as described above is in door type structure along the girder truss on support baseboard Side profile carry out contour laying, support frame as described above is connected on support baseboard by anchoring piece;
The girder frame structure includes top boom, lower boom and connection web member;The top boom and lower boom are broken line type structure And top boom and lower boom form camber;The top boom is successively weldingly connected including at least four chord member segments and top boom Outside splice the bottom board unit that has;The lower boom includes at least four chord member segments and is successively weldingly connected and is located at both ends In the angle structure less than 180 ° between two chord members and remaining chord member segment;It is provided with and connects on the top boom and lower boom The ox leg structure of web member cooperation is connect, and is provided with stiffening plate in ox leg structure;The inclined alternately shape of the connection web member is connected to On the ox leg structure of top boom and lower boom.
2. a kind of Steel Truss Beam top boom according to claim 1 and lower boom assembly moulding bed and splicing structure, special Sign is: the extending direction in the bottom board unit along bottom board unit, which is provided with spaced set, several U ribs;The U rib Upper vertical U rib and bottom board unit are provided with several stiffener plate structures.
3. a kind of Steel Truss Beam top boom according to claim 1 and lower boom assembly moulding bed and splicing structure, special Sign is: support frame as described above on support baseboard the side of spaced set and support frame perpendicular to connected support bottom The profile scribing line of girder frame structure on plate.
4. a kind of Steel Truss Beam top boom according to claim 1 and lower boom assembly moulding bed and splicing structure, special Sign is: being welded between the ox leg structure of the ox leg structure and lower boom of the connection web member and top boom using penetration.
CN201910345501.6A 2019-04-26 2019-04-26 A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure Pending CN109989352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910345501.6A CN109989352A (en) 2019-04-26 2019-04-26 A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910345501.6A CN109989352A (en) 2019-04-26 2019-04-26 A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure

Publications (1)

Publication Number Publication Date
CN109989352A true CN109989352A (en) 2019-07-09

Family

ID=67135375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910345501.6A Pending CN109989352A (en) 2019-04-26 2019-04-26 A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure

Country Status (1)

Country Link
CN (1) CN109989352A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670803A (en) * 2019-11-01 2020-01-10 江苏沪宁钢机股份有限公司 Half-box half-truss structure
CN111021223A (en) * 2019-12-12 2020-04-17 中铁九桥工程有限公司 Manufacturing method of hyperbolic all-welded structural steel truss girder
CN113550223A (en) * 2021-08-23 2021-10-26 江苏京沪重工有限公司 Pre-assembly process of truss bridge with double-assembly bolt holes
CN113695771A (en) * 2021-08-20 2021-11-26 江苏京沪重工有限公司 Cold-pressing welding forming process for arched decorative plate
CN116226972A (en) * 2023-01-04 2023-06-06 中铁大桥勘测设计院集团有限公司 Continuous steel truss girder pre-camber setting method and continuous steel truss girder

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7146672B1 (en) * 2005-09-23 2006-12-12 Meheen H Joe Tunable load sharing arch bridge
KR20120034187A (en) * 2012-03-21 2012-04-10 원대연 Constrution methoed for prestressed composite truss girder using steel truss member
CN102912736A (en) * 2012-11-07 2013-02-06 中铁六局集团有限公司 Vertical assembling construction method for trussed arch bridge
CN203782538U (en) * 2014-03-21 2014-08-20 中国能源建设集团广东省电力设计研究院 Upper chord horizontal supporting structure for long-span trestle truss
CN105735129A (en) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 Full-welding truss section modularized splicing method
CN107489090A (en) * 2017-10-11 2017-12-19 成都研筑舍建筑设计有限公司 A kind of circle bamboo space truss bridge based on novel joint make
CN108103938A (en) * 2017-11-28 2018-06-01 江苏中铁山桥重工有限公司 A kind of double deck module solid trial assembly method of large steel girder
CN208202138U (en) * 2018-04-16 2018-12-07 中建二局第三建筑工程有限公司 A kind of truss arch door system
CN109208486A (en) * 2018-10-19 2019-01-15 江苏京沪重工有限公司 Joining section manufacturing process between a kind of Steel Bridge top plate
CN109583119A (en) * 2018-12-11 2019-04-05 佛山科学技术学院 A kind of setting method for large span through truss girder bridge factory camber
CN210066513U (en) * 2019-04-26 2020-02-14 江苏京沪重工有限公司 Jig frame system for assembling upper chord and lower chord of steel truss girder

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7146672B1 (en) * 2005-09-23 2006-12-12 Meheen H Joe Tunable load sharing arch bridge
KR20120034187A (en) * 2012-03-21 2012-04-10 원대연 Constrution methoed for prestressed composite truss girder using steel truss member
CN102912736A (en) * 2012-11-07 2013-02-06 中铁六局集团有限公司 Vertical assembling construction method for trussed arch bridge
CN203782538U (en) * 2014-03-21 2014-08-20 中国能源建设集团广东省电力设计研究院 Upper chord horizontal supporting structure for long-span trestle truss
CN105735129A (en) * 2016-02-26 2016-07-06 江苏中铁山桥重工有限公司 Full-welding truss section modularized splicing method
CN107489090A (en) * 2017-10-11 2017-12-19 成都研筑舍建筑设计有限公司 A kind of circle bamboo space truss bridge based on novel joint make
CN108103938A (en) * 2017-11-28 2018-06-01 江苏中铁山桥重工有限公司 A kind of double deck module solid trial assembly method of large steel girder
CN208202138U (en) * 2018-04-16 2018-12-07 中建二局第三建筑工程有限公司 A kind of truss arch door system
CN109208486A (en) * 2018-10-19 2019-01-15 江苏京沪重工有限公司 Joining section manufacturing process between a kind of Steel Bridge top plate
CN109583119A (en) * 2018-12-11 2019-04-05 佛山科学技术学院 A kind of setting method for large span through truss girder bridge factory camber
CN210066513U (en) * 2019-04-26 2020-02-14 江苏京沪重工有限公司 Jig frame system for assembling upper chord and lower chord of steel truss girder

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670803A (en) * 2019-11-01 2020-01-10 江苏沪宁钢机股份有限公司 Half-box half-truss structure
CN111021223A (en) * 2019-12-12 2020-04-17 中铁九桥工程有限公司 Manufacturing method of hyperbolic all-welded structural steel truss girder
CN113695771A (en) * 2021-08-20 2021-11-26 江苏京沪重工有限公司 Cold-pressing welding forming process for arched decorative plate
CN113550223A (en) * 2021-08-23 2021-10-26 江苏京沪重工有限公司 Pre-assembly process of truss bridge with double-assembly bolt holes
CN116226972A (en) * 2023-01-04 2023-06-06 中铁大桥勘测设计院集团有限公司 Continuous steel truss girder pre-camber setting method and continuous steel truss girder
CN116226972B (en) * 2023-01-04 2024-04-19 中铁大桥勘测设计院集团有限公司 Continuous steel truss girder pre-camber setting method and continuous steel truss girder

Similar Documents

Publication Publication Date Title
CN109989352A (en) A kind of Steel Truss Beam top boom and lower boom assembly moulding bed and splicing structure
AU2017206280B2 (en) Corrugated metal plate and overhead structure incorporating same
JP2022530596A (en) Secondary lining high-speed construction structure and method in excavation tunnels with various variable cross sections
JP4985540B2 (en) Vertical beam system for mobile work vehicles for cantilever installation
US20150053636A1 (en) Crane, particularly bridge crane or gantry crane, comprising at least one crane girder
CN108240069A (en) A kind of large span multi-section combined truss roof structure system and its construction method
CN108678398B (en) Pre-assembly method for steel structure truss of reinforced layer of super high-rise building
JP2019131978A (en) Bridge construction method
CN212689312U (en) Assembled external wallboard
JP2020090785A (en) Widening structural body, widening structure, floor slab widening construction method, and floor slab renewal method
CN109736179B (en) Assembled construction method for tied arch bridge
CN106436550A (en) Two-span continuous spatial special-shaped arch combination bridge structure
CN104583496B (en) Without chord member purlin unit's method and built-up type node bridge
CN214739366U (en) Assembly type overhanging eave structure for building
CN108518008B (en) Rigid roof structure on flexible inhaul cable structure and mounting method thereof
CN208501465U (en) A kind of windproof double deck steel truss girder
CN210066513U (en) Jig frame system for assembling upper chord and lower chord of steel truss girder
CN214329275U (en) Connecting node structure of continuous box type crane beam and lattice type column
CN108867872A (en) One kind is for rigidly connected node structure of beam column of steel structure and preparation method thereof, Housing Structure System
CN109881890B (en) Multi-corridor construction method for super high-rise building
KR101883116B1 (en) Steel bridge supported by hybrid structures
CN112412012B (en) Interim strutting arrangement is used to floor
CN219653895U (en) Steel construction and reinforced concrete board combination form vestibule structure
CN111139959A (en) Assembly structure of steel bar truss building carrier plate
CN117328687B (en) Method for installing steel structure-concrete combined structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination