CN109985693A - A kind of construction site husky equipment of sieve - Google Patents

A kind of construction site husky equipment of sieve Download PDF

Info

Publication number
CN109985693A
CN109985693A CN201910378121.2A CN201910378121A CN109985693A CN 109985693 A CN109985693 A CN 109985693A CN 201910378121 A CN201910378121 A CN 201910378121A CN 109985693 A CN109985693 A CN 109985693A
Authority
CN
China
Prior art keywords
sieve
screen box
slide bar
milling roller
transmission component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910378121.2A
Other languages
Chinese (zh)
Inventor
顾文明
钱璐
景荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinhuan Global Construction Co Ltd
Original Assignee
Jiangsu Jinhuan Global Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jinhuan Global Construction Co Ltd filed Critical Jiangsu Jinhuan Global Construction Co Ltd
Priority to CN201910378121.2A priority Critical patent/CN109985693A/en
Publication of CN109985693A publication Critical patent/CN109985693A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/16Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/02Crushing or disintegrating by roller mills with two or more rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/28Details
    • B02C4/40Detachers, e.g. scrapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/28Details
    • B02C4/42Driving mechanisms; Roller speed control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • B07B1/30Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens jigging or moving to-and-fro within their own plane in or approximately in or transverse to the direction of conveyance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/16Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
    • B02C2023/165Screen denying egress of oversize material

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Combined Means For Separation Of Solids (AREA)

Abstract

The invention discloses a kind of construction sites with husky equipment is sieved, and belongs to Architectural Equipment field;It includes screen box and sieve that husky equipment is sieved in a kind of construction site, the one end of first milling roller and the second milling roller far from screen box inner sidewall is connected with the first transmission component, bull stick, which is located on the bar wall for screening intracavitary portion, is connected with blade, bull stick is connected by the second transmission component with the driving end of motor, first bevel gear is connected on the outer wall that bull stick is located in drive cavity, reciprocator is connected on first slide bar, reciprocator is connected far from one end of the first slide bar with sieve;The present invention, motor work drives the first transmission component and the work of the second transmission component, first transmission component drives coupled the first milling roller and the rotation of the second milling roller, it is fallen again after the sand pressure of conglomeration is dissipated, second transmission component will drive flabellum rotation and will fall sand and break up, reciprocator drives coupled sieve to move back and forth again, to improve the screening efficiency of sieve.

Description

A kind of construction site husky equipment of sieve
Technical field
The present invention relates to Architectural Equipment technical field more particularly to a kind of construction site husky equipment of sieve.
Background technique
With constantly striding forward for scientific and technological modernization, scientific equipment is gradually dissolved into people's lives, scientific equipment Utilization can not only improve production efficiency, while can effectively save human and material resources, the sand screening of architectural engineering is also gradually With machine instead of artificial, in construction site, it is often necessary to a large amount of sand.
The husky equipment of existing sieve all direct plunges into when carrying out dispensing sand, is clumped together since sand often has Phenomenon, if directly launch carry out screening may result in sieve screening be not thorough, screening efficiency is not high, thus a kind of construction site With sieving, husky equipment is particularly important.
Summary of the invention
The purpose of the present invention is to solve the problems of the prior art, and a kind of construction site proposed is set with sieve sand It is standby.
To achieve the goals above, present invention employs following technical solutions:
A kind of construction site husky equipment of sieve, including screen box and sieve, the screen box inside are divided into screening chamber and biography by partition Dynamic chamber, it is intracavitary that the sieve is placed in screening, is rotatably connected to first by shaft between the partition and screen box inner sidewall and rolls Roller and the second milling roller are connected with motor on the screen box inner sidewall, and the driving end of the motor is connected with the first transmission component With the second transmission component, the one end of first milling roller and the second milling roller far from screen box inner sidewall and the first transmission component phase Even, bull stick is connected on the screen box inner sidewall, the bull stick, which is located on the bar wall for screening intracavitary portion, is connected with blade, and described turn The bar wall that bar is placed in inside drive cavity is connected by the second transmission component with the driving end of motor, is connected in the screen box bottom interior wall It is connected to the first slide bar, first slide bar is connected with second bevel gear far from one end of screen box bottom wall, and the bull stick is located at transmission First bevel gear is connected on intracavitary outer wall, the first bevel gear is meshed with second bevel gear, on first slide bar It is connected with reciprocator, the reciprocator is connected far from one end of the first slide bar with sieve.
Preferably, first transmission component includes first pulley and the second belt wheel, the drive of the first pulley and motor Moved end is connected, and the one end of the first pulley far from motor is connected with the first milling roller, second belt wheel and the second milling roller It is connected, the first pulley is connected with the second belt wheel by belt.
Preferably, second transmission component includes third belt wheel and the 4th belt wheel, the drive of the third belt wheel and motor Moved end is connected, and the 4th belt wheel is connected with bull stick, and the third belt wheel is connected with the 4th belt wheel by belt.
Preferably, the reciprocator includes cam, and the cam is connected with the first slide bar, the partition slide over side walls It is connected with the second slide bar, second slide bar, which is placed in, to be screened the one end in intracavitary portion and be connected with screen side wall, and second slide bar is remote One end from sieve is connected with idler wheel, and the idler wheel offsets with cam, and second slide bar, which is placed on the outer wall in drive cavity, to be covered It is connected to spring.
Preferably, it is connected with symmetrically arranged scraper plate on the screen box inner sidewall, the scraper plate is far from screen box inner sidewall One end offsets with the first milling roller and the second milling roller.
Preferably, feed inlet is equipped at the top of the screen box, the screen box bottom is equipped with discharge port.
Compared with prior art, the present invention provides a kind of construction sites with husky equipment is sieved, have it is following the utility model has the advantages that
1, the construction site is with husky equipment is sieved, and when sand is launched into sandbox, motor work drives coupled first to pass Dynamic component and the work of the second transmission component, the first transmission component then will drive coupled the first milling roller and the second milling roller Rotation, rolls the sand fallen, falls again after the sand pressure of conglomeration is dissipated, and the work of the second transmission component will drive and turn Bar rotation, bull stick drive coupled flabellum to rotate to fall to fall on sieve after sand is broken up and be screened again, and bull stick also can The coupled first bevel gear rotation of band, first bevel gear drives second bevel gear rotation, so that the first slide bar be driven to turn Dynamic, so that the first slide bar be made to drive reciprocator's work, reciprocator drives coupled sieve to move back and forth again, to mention The screening efficiency of high sieve.
2, the construction site can drive the second belt wheel to rotate together when first pulley rotates with husky equipment is sieved by belt, To which first pulley and the second belt wheel drive the first milling roller and the second milling roller to rotate respectively, sand is rolled.
3, the construction site, which is used, sieves husky equipment, the 4th belt wheel can be driven to rotate by belt when third belt wheel rotates, and the 4th Belt wheel then will drive bar rotation, to make bull stick that coupled blade be driven to rotate.
4, the construction site is rotated with husky equipment, the first slide bar rotation band moving cam is sieved, the rolling that cam driven offsets with it Wheel movement, idler wheel drive the second coupled slide bar mobile, and the second slide bar then will drive coupled sieve movement, spring It is easy to implement the reset of the second slide bar, to make the second slide bar that sieve be driven to move back and forth.
5, the construction site can will be sticked to the first milling roller and second by scraper plate and be rolled roller surface with husky equipment is sieved Sand scrapes, and can block the sand cast, and sand is avoided to fall from the reserving gaps of the first milling roller and the second milling roller Under without being rolled.
6, sand is launched by feed inlet with sand equipment is sieved convenient for personnel, discharge port screens convenient for collecting in the construction site Good fine sand.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that husky equipment is sieved in a kind of construction site proposed by the present invention;
Fig. 2 is that one of husky equipment inner structure schematic diagram is sieved in a kind of construction site proposed by the present invention;
Fig. 3 is that one of husky equipment inner structure schematic diagram is sieved in a kind of construction site proposed by the present invention;
Fig. 4 is that one of husky equipment inner structure schematic diagram is sieved in a kind of construction site proposed by the present invention.
In figure: 1, screen box;101, feed inlet;102, discharge port;103, sieve;2, the first milling roller;3, the second milling roller; 4, scraper plate;5, partition;6, motor;601, belt;7, first pulley;8, the second belt wheel;9, third belt wheel;10, the 4th belt wheel; 11, first bevel gear;12, second bevel gear;13, bull stick;1301, blade;14, the first slide bar;15, cam;16, idler wheel;17, Spring;18, the second slide bar.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
Embodiment 1:
Referring to Fig.1-4, a kind of construction site is divided inside screen box 1 by partition 5 with husky equipment, including screen box 1 and sieve 103 is sieved At screening chamber and drive cavity, it is intracavitary that sieve 103 is placed in screening, is rotatably connected between 1 inner sidewall of partition 5 and screen box by shaft First milling roller 2 and the second milling roller 3 are connected with motor 6 on 1 inner sidewall of screen box, and the driving end of motor 6 is connected with the first transmission Component and the second transmission component, the one end of the first milling roller 2 and the second milling roller 3 far from 1 inner sidewall of screen box and the first transmission group Part is connected, and bull stick 13 is connected on 1 inner sidewall of screen box, and bull stick 13, which is located on the bar wall for screening intracavitary portion, is connected with blade 1301, The bar wall that bull stick 13 is placed in inside drive cavity is connected by the second transmission component with the driving end of motor 6, in 1 bottom interior wall of screen box It is connected with the first slide bar 14, the first slide bar 14 is connected with second bevel gear 12 far from one end of 1 bottom wall of screen box, and bull stick 13, which is located at, to be passed It moves and is connected with first bevel gear 11 on intracavitary outer wall, first bevel gear 11 is meshed with second bevel gear 12, the first slide bar 14 On be connected with reciprocator, reciprocator is connected far from one end of the first slide bar 14 with sieve 103;
When sand is launched into screen box 1, the work of motor 6 drives coupled the first transmission component and the second transmission component work Make, the first transmission component then will drive coupled the first milling roller 2 and the rotation of the second milling roller 3, to the sand fallen into Row rolls, and falls again after the sand of conglomeration pressure is dissipated, and the work of the second transmission component will drive the rotation of bull stick 13, the band again of bull stick 13 Move the coupled rotation of blade 1301 and will fall to fall on sieve 103 after sand is broken up and be screened, bull stick 13 also can band with Its connected first bevel gear 11 rotates, and first bevel gear 11 drives second bevel gear 12 to rotate, to drive the first slide bar 14 Rotation, so that the first slide bar 14 be made to drive reciprocator's work, reciprocator drives coupled sieve 103 back and forth to move again It is dynamic, to improve the screening efficiency of sieve 103.
Embodiment 2:
Referring to Fig. 2-4, a kind of construction site husky equipment of sieve is substantially the same manner as Example 1, the difference is that the first transmission group Part includes first pulley 7 and the second belt wheel 8, and first pulley 7 is connected with the driving end of motor 6, and first pulley 7 is far from motor 6 One end is connected with the first milling roller 2, and the second belt wheel 8 is connected with the second milling roller 3, and first pulley 7 and the second belt wheel 8 pass through belt 601 are connected;
First pulley 7 can drive the second belt wheel 8 to rotate together when rotating by belt 601, thus first pulley 7 and the second belt wheel 8 drive the first milling roller 2 and the second milling roller 3 to rotate respectively, roll to sand.
Embodiment 3:
Referring to Fig. 2-4, a kind of construction site husky equipment of sieve is substantially the same manner as Example 2, the difference is that the second transmission group Part includes third belt wheel 9 and the 4th belt wheel 10, and third belt wheel 9 is connected with the driving end of motor 6, the 4th belt wheel 10 and 13 phase of bull stick Even, third belt wheel 9 is connected with the 4th belt wheel 10 by belt 601;
Third belt wheel 9 can drive the rotation of the 4th belt wheel 10 when rotating by belt 601, and the 4th belt wheel 10 then will drive 13 turns of bull stick It is dynamic, to make bull stick 13 that coupled blade 1301 be driven to rotate.
Embodiment 4:
Referring to Fig. 2-3, a kind of construction site husky equipment of sieve is substantially the same manner as Example 3, moreover, reciprocator Including cam 15, cam 15 is connected with the first slide bar 14, and 5 slide over side walls of partition is connected with the second slide bar 18, the second slide bar 18 It is placed in and screens the one end in intracavitary portion and be connected with 103 side wall of sieve, the second slide bar 18 is connected with idler wheel far from one end of sieve 103 16, idler wheel 16 offsets with cam 15, and the second slide bar 18, which is placed on the outer wall in drive cavity, is socketed with spring 17;
First slide bar 14 rotation band moving cam 15 rotates, and cam 15 drives the idler wheel 16 that offsets with it mobile, idler wheel 16 drive and Its second connected slide bar 18 is mobile, and the second slide bar 18 then will drive the coupled movement of sieve 103, and spring 17 is easy to implement Second slide bar 18 resets, to make the second slide bar 18 that sieve 103 be driven to move back and forth.
Embodiment 5:
Referring to Fig. 2-4, a kind of construction site husky equipment of sieve is substantially the same manner as Example 1, moreover, 1 inside of screen box Symmetrically arranged scraper plate 4, the one end of scraper plate 4 far from 1 inner sidewall of screen box and the first milling roller 2 and the second milling roller are connected on wall 3 offset;
The sand for being sticked to 3 surface of the first milling roller 2 and the second milling roller can be scraped by scraper plate 4, and throwing can be blocked Under sand, avoid sand from falling from the reserving gaps of the first milling roller 2 and the second milling roller 3 without being rolled.
Embodiment 6:
Referring to Fig.1-2, a kind of construction site husky equipment of sieve, it is substantially the same manner as Example 1, moreover, 1 top of screen box Equipped with feed inlet 101,1 bottom of screen box is equipped with discharge port 102;
Sand, the fine sand that discharge port 102 is convenient for collection screen to choose are launched by feed inlet 101 convenient for personnel.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of construction site husky equipment of sieve, including screen box (1) and sieve (103), which is characterized in that in the screen box (1) Portion is divided into screening chamber and drive cavity by partition (5), and the sieve (103), which is placed in, screens intracavitary, the partition (5) and screen box (1) the first milling roller (2) and the second milling roller (3), screen box (1) drive cavity are rotatably connected to by shaft between inner sidewall It is connected on inner sidewall motor (6), the driving end of the motor (6) is connected with the first transmission component and the second transmission component, institute The first milling roller (2) and the second milling roller (3) is stated to be connected far from one end of screen box (1) inner sidewall with the first transmission component, it is described It is connected with bull stick (13) on screen box (1) inner sidewall, the bull stick (13), which is located on the bar wall for screening intracavitary portion, is connected with blade (1301), the bar wall that the bull stick (13) is placed in inside drive cavity is connected by the second transmission component with the driving end of motor (6), It is connected with the first slide bar (14) in screen box (1) bottom interior wall, the one end of first slide bar (14) far from screen box (1) bottom wall It is connected with second bevel gear (12), is connected with first bevel gear (11), institute on the outer wall that the bull stick (13) is located in drive cavity It states first bevel gear (11) to be meshed with second bevel gear (12), is connected with reciprocator on first slide bar (14), it is described The one end of reciprocator far from the first slide bar (14) is connected with sieve (103).
2. a kind of construction site according to claim 1 husky equipment of sieve, which is characterized in that the first transmission component packet First pulley (7) and the second belt wheel (8) are included, the first pulley (7) is connected with the driving end of motor (6), the first pulley (7) one end far from motor (6) is connected with the first milling roller (2), and second belt wheel (8) is connected with the second milling roller (3), institute It states first pulley (7) and is connected with the second belt wheel (8) by belt (601).
3. a kind of construction site according to claim 2 husky equipment of sieve, which is characterized in that the second transmission component packet Third belt wheel (9) and the 4th belt wheel (10) are included, the third belt wheel (9) is connected with the driving end of motor (6), the 4th belt wheel (10) it is connected with bull stick (13), the third belt wheel (9) is connected with the 4th belt wheel (10) by belt (601).
4. a kind of construction site according to claim 3 husky equipment of sieve, which is characterized in that the reciprocator includes convex It takes turns (15), the cam (15) is connected with the first slide bar (14), and partition (5) slide over side walls is connected with the second slide bar (18), second slide bar (18), which is placed in, screens the one end in intracavitary portion and is connected with sieve (103) side wall, second slide bar (18) One end far from sieve (103) is connected with idler wheel (16), and the idler wheel (16) offsets with cam (15), second slide bar (18) It is placed on the outer wall in drive cavity and is socketed with spring (17).
5. a kind of construction site husky equipment of sieve described in -4 according to claim 1, which is characterized in that on the inside of the screen box (1) It is connected on wall symmetrically arranged scraper plate (4), the scraper plate (4) one end and the first milling roller (2) far from screen box (1) inner sidewall It offsets with the second milling roller (3).
6. a kind of construction site husky equipment of sieve described in -4 according to claim 1, which is characterized in that at the top of the screen box (1) Equipped with feed inlet (101), screen box (1) bottom is equipped with discharge port (102).
CN201910378121.2A 2019-05-08 2019-05-08 A kind of construction site husky equipment of sieve Withdrawn CN109985693A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910378121.2A CN109985693A (en) 2019-05-08 2019-05-08 A kind of construction site husky equipment of sieve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910378121.2A CN109985693A (en) 2019-05-08 2019-05-08 A kind of construction site husky equipment of sieve

Publications (1)

Publication Number Publication Date
CN109985693A true CN109985693A (en) 2019-07-09

Family

ID=67135995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910378121.2A Withdrawn CN109985693A (en) 2019-05-08 2019-05-08 A kind of construction site husky equipment of sieve

Country Status (1)

Country Link
CN (1) CN109985693A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111842117A (en) * 2020-07-22 2020-10-30 刘磊 Building site is with getting rid of solid debris device in grit
CN111871780A (en) * 2020-08-17 2020-11-03 翁璐 Sand screening equipment for building
CN112007721A (en) * 2020-08-03 2020-12-01 张业武 Ore processing is with hierarchical breaker with select separately function
CN114308233A (en) * 2021-12-20 2022-04-12 李细香 Milling and screening equipment for flour manufacturing

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111842117A (en) * 2020-07-22 2020-10-30 刘磊 Building site is with getting rid of solid debris device in grit
CN112007721A (en) * 2020-08-03 2020-12-01 张业武 Ore processing is with hierarchical breaker with select separately function
CN111871780A (en) * 2020-08-17 2020-11-03 翁璐 Sand screening equipment for building
CN111871780B (en) * 2020-08-17 2022-11-08 华虹建筑安装工程集团有限公司 Building sand screening equipment
CN114308233A (en) * 2021-12-20 2022-04-12 李细香 Milling and screening equipment for flour manufacturing
CN114308233B (en) * 2021-12-20 2023-12-19 安徽信息工程学院 Milling and screening equipment for flour manufacturing

Similar Documents

Publication Publication Date Title
CN109985693A (en) A kind of construction site husky equipment of sieve
CN208583427U (en) A kind of separation foundry loam rotary screen
CN110124991A (en) A kind of construction sand screening plant
CN218340289U (en) Rotary screen with material raising function
CN208066745U (en) A kind of circulating Sand screen of architectural engineering
CN210022256U (en) Sand screening equipment for construction site
CN107931090A (en) A kind of roller sand sieving machine for building
CN108097569A (en) A kind of anticlogging drum-type Sand screen
CN109999949B (en) Grit screening grinding device for building engineering
CN215877607U (en) Stirring device for mixing solid fertilizer and liquid fertilizer
CN208161761U (en) A kind of construction husky equipment of sieve
CN110369264A (en) A kind of rotary screen with screen drum clearing function
CN220091503U (en) Screening device for vanadium-titanium production and processing
CN108855403A (en) A kind of reversible hammer crushing sand making machine of complete machine discharge
CN209646977U (en) A kind of multi-use architecture construction Sand screen
CN210436376U (en) Mud mixing device for ancient black bricks
CN111744764A (en) Screening sand device for building engineering
CN216727522U (en) Mine cement raw material grinding device
CN109174653A (en) A kind of agricultural seed screening plant
CN109105448A (en) A kind of continuous fish scale removal machine being able to carry out adjusting
CN114559548A (en) Production mixing arrangement of concrete for construction
CN207401574U (en) A kind of crushing retracting device of building gypsum fracture
CN217663615U (en) Super little environmental protection reducing mechanism is used in preparation of gypsum retarder
CN220345976U (en) Mechanical pulverizing and crushing combined device
CN219232529U (en) Grinding and powder selecting integrated machine for building materials

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190709