CN109982344A - Configure update method and device, computer storage medium - Google Patents
Configure update method and device, computer storage medium Download PDFInfo
- Publication number
- CN109982344A CN109982344A CN201711448748.8A CN201711448748A CN109982344A CN 109982344 A CN109982344 A CN 109982344A CN 201711448748 A CN201711448748 A CN 201711448748A CN 109982344 A CN109982344 A CN 109982344A
- Authority
- CN
- China
- Prior art keywords
- configuration
- sent
- task
- new
- new task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/02—Arrangements for optimising operational condition
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
This application discloses configuration update method and devices, computer storage medium to allow to carry out configuration update in time in opposite end base station with the discarding updated to avoid configuration; ensure accordant configuration information between base station; network is normal, and terminal traffic is avoided to interrupt, and improves user's perception.A kind of configuration update method provided by the embodiments of the present application, comprising: cache the configuration needed to be implemented more new task, wherein configuration more new task of the configuration more new task between base station;The configuration more new task in the caching is executed according to preset rules;Wherein, when meeting one of following condition or combination, the configuration needed to be implemented more new task is cached: cell status and/or parameter change;Link between base station has built up;Configuration more new task is currently needed to be implemented, and last configuration more new technological process does not complete.
Description
Technical field
This application involves fields of communication technology, more particularly to configuration update method and device, computer storage medium.
Background technique
With the continuous expansion of long term evolution (Long Term Evolution, LTE) network, optimization to network, evolution
Type base station (evolved Node B, eNB) also carries more characteristics, such as carrier wave polymerization, uplink and downlink collaborative process, load
The characteristics such as balanced, multiband instruction, this needs the X2 link between eNB to carry more interacting messages, that is, eNB configuration updates
Process is completed.Such as: uplink and downlink collaborative process characteristic will transmit the available mode of two cells, between base station to help opposite end
How base station selects cell when carrying out collaborative process;Load balancing characteristic will transmit two between coverage cell between base station
Load condition, to help how opposite end base station selects cell to be equalized when carrying out load balancing.
Configuration update interaction information it is more, triggering it is also more frequent, when cell activation, deactivate or modification parameter
Shi Douhui triggering, in the case where just will appear it cannot be guaranteed that target side base station is normally handled, first configuration update message processing
After complete, Article 2 configuration update message comes again.Because 3GPP agreement provide base station only previous configuration renewal process at
Function is likely to initiate another secondary eNB configuration renewal process after executing.So the realization of base station is at present, there is this configuration more
When new concurrent scene, then Article 2 configuration is updated and can directly be abandoned.This results in Article 2 configuration to update can not be to end group
It stands and carries out configuration update in time, and cause configuration information between base station inconsistent, lead to Network Abnormal, terminal traffic is interrupted, and is influenced
User's perception.
Summary of the invention
The embodiment of the present application provides configuration update method and device, computer storage medium, is updated with to avoid configuration
Discarding, allow to carry out configuration update in time in opposite end base station, it is ensured that accordant configuration information between base station, network is normal, keeps away
Exempt from terminal traffic interruption, improves user's perception.
A kind of configuration update method provided by the embodiments of the present application, comprising:
The configuration needed to be implemented more new task is cached, wherein configuration more new task the matching between base station
Set more new task;
The configuration more new task in the caching is executed according to preset rules;
Wherein, when meeting one of following condition or combination, the configuration needed to be implemented more new task is cached:
Cell status and/or parameter change;
Link between base station has built up;Configuration more new task is currently needed to be implemented, and last configuration updates stream
Journey does not complete.
In this way, the configuration needed to be implemented more new task is cached, wherein the configuration more new task is base
Configuration more new task between standing executes the configuration more new task in the caching according to preset rules;Wherein, following when meeting
When one of condition or combination, the configuration needed to be implemented more new task is cached: cell status and/or parameter change;
Link between base station has built up;Configuration more new task is currently needed to be implemented, and last configuration more new technological process does not complete,
Thus when the configuration of X2 interface updates the concurrent scene of appearance, it can be by being cached to configuration more new task, to caching
Configuration more new task can be executed sequentially, and complete each configuration renewal process, and the discarding for avoiding configuration from updating has ensured X2 interface
Information exchange integrality allows to carry out configuration update in time in opposite end base station, it is ensured that accordant configuration information between base station, network
Normally, it avoids terminal traffic from interrupting, therefore improves the stability of existing net, effective guarantee simultaneously improves user's perception.
Optionally, last configuration more new technological process is determined as follows not complete:
If the response message of last configuration more new technological process is received, by the last corresponding shape of configuration more new technological process
State position position;
If the last corresponding non-set of mode bit of configuration more new technological process, it is determined that the configuration of the last time updates stream
Journey does not complete.
Optionally, the configuration more new task needed to be implemented is cached in the form of the tables of data of preset format.
Optionally, include following content in the tables of data: configuration more new task index, configuration update task identification, match
Set update task status.
Optionally, it includes one of following content or combination that the configuration in the tables of data, which updates task status:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
Optionally, the configuration more new task for executing caching, specifically includes: the configuration executed in the tables of data updates
Task status is configuration to be sent more new task.
Optionally, this method further include:
If configuration to be sent more new task has been sent, the configuration more new task updated in the tables of data is corresponding
It is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data that configuration, which updates task status,;
Also, it is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then the tables of data is updated
In the corresponding configuration of the configuration more new task to update task status be to be completed, or the configuration is deleted from the tables of data
More new task;Also, it is to be sent for updating next not sent configuration and updating task status.
Correspond to the above method ground, a kind of configuration updating device provided by the embodiments of the present application, comprising:
First unit, for caching the configuration needed to be implemented more new task, wherein the configuration more new task is
Configuration more new task between base station;
Second unit, for executing the configuration more new task in the caching according to preset rules;
Wherein, when meeting one of following condition or combination, the first unit is by the configuration needed to be implemented more new task
It is cached:
Cell status and/or parameter change;
Link between base station has built up;
Configuration more new task is currently needed to be implemented, and last configuration more new technological process does not complete.
Optionally, the first unit is determined as follows last configuration more new technological process and does not complete:
If the response message of last configuration more new technological process is received, by the last corresponding shape of configuration more new technological process
State position position;
If the last corresponding non-set of mode bit of configuration more new technological process, it is determined that the configuration of the last time updates stream
Journey does not complete.
Optionally, the first unit by the configuration more new task needed to be implemented in the form of the tables of data of preset format into
Row caching.
Optionally, include following content in the tables of data: configuration more new task index, configuration update task identification, match
Set update task status.
Optionally, it includes one of following content or combination that the configuration in the tables of data, which updates task status:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
Optionally, the second unit is specifically used for: it is pending for executing the configuration in the tables of data to update task status
The configuration sent more new task.
Optionally, the second unit is also used to:
If configuration to be sent more new task has been sent, the configuration more new task updated in the tables of data is corresponding
It is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data that configuration, which updates task status,;
Also, it is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then the tables of data is updated
In the corresponding configuration of the configuration more new task to update task status be to be completed, or the configuration is deleted from the tables of data
More new task;Also, it is to be sent for updating next not sent configuration and updating task status.
Another configuration updating device provided by the embodiments of the present application, comprising:
Memory, for storing program instruction;
Processor executes any of the above-described for calling the program instruction stored in the memory according to the program of acquisition
Kind method.
Another embodiment of the application provides a kind of computer storage medium, and the computer-readable recording medium storage has
Computer executable instructions, the computer executable instructions are for making the computer execute any of the above-described kind of method.
Detailed description of the invention
In order to more clearly explain the technical solutions in the embodiments of the present application, make required in being described below to embodiment
Attached drawing is briefly introduced, it should be apparent that, the drawings in the following description are only some examples of the present application, for this
For the those of ordinary skill in field, without creative efforts, it can also be obtained according to these attached drawings other
Attached drawing.
Fig. 1 is the idiographic flow schematic diagram of configuration update method provided by the embodiments of the present application;
Fig. 2 is the detailed process signal of concurrent flow processing step in configuration update method provided by the embodiments of the present application
Figure;
Fig. 3 is a kind of overall procedure schematic diagram of configuration update method of base station side provided by the embodiments of the present application;
Fig. 4 is a kind of structural schematic diagram for configuring updating device provided by the embodiments of the present application;
Fig. 5 is the structural schematic diagram of another configuration updating device provided by the embodiments of the present application.
Specific embodiment
The embodiment of the present application provides configuration update method and device, computer storage medium, is updated with to avoid configuration
Discarding, allow to carry out configuration update in time in opposite end base station, it is ensured that accordant configuration information between base station, network is normal, keeps away
Exempt from terminal traffic interruption, improves user's perception.
The embodiment of the present application, such as can adopt the following technical scheme that, it is excellent to configure update process concurrency scene progress to X2
Change, as shown in Figure 1, specific method includes:
Step 1: prepare triggering configuration more new technological process;
The specific operation of this step, such as main Operation and Maintenance (OM) module including in base station judge whether that satisfaction is matched
Set the condition of update.
Wherein, the condition for example may include:
Following change occurs for condition one, cell status and/or parameter:
Cell activation;
Cell deactivates;
Interactive parameter value is needed to change between base station;Wherein, the parameter may include: the public land of cell
Upper mobile network (Public Land Mobile Network, PLMN), Tracking Area Code (Tracking Area Code,
TAC), Cell Global Identity (E-UTRAN Cell Global Identifier E-UTRAN, ECGI), Physical Cell Identifier
(Physical Cell Identifier, PCI), frequency point, bandwidth, sub-frame configuration, multiband indicate relevant parameter, automatic neighbour
Relevant parameter of cell relation (Automatic Neighbor Relation, ANR) etc..
X2 link between condition two, base station has built up;
There is X2 link between base station and have built up success, then explanation has neighboring BS relationship, can send configuration more new technological process.
Step 2: when meeting the condition that above-mentioned configuration updates, Operation and Maintenance (OM) module of base station notifies the base station
Upper-layer protocol unit (HL) module can trigger configuration more new technological process.
Step 3: it after HL module receives the triggering of OM module, first determines whether last configuration more new technological process is completed, has
Body, the stateful position of flow setting is updated for the configuration sent in HL module and is identified, if receiving the configuration more
New confirmation message (ACK) then illustrates that the configuration more new technological process is completed, by corresponding mode bit set;If not receiving this
The ACK updated is configured, then illustrates that configuration update is not completed, then the corresponding non-set of mode bit of the configuration more new task.Cause
This, the mode bit of the configuration more new technological process sent by the last time whether set, can judge that last configuration more new technological process is
No completion, so as to judge that whether should currently execute configuration updates concurrent flow, specifically, in two kinds of situation:
If last time configuration more new technological process does not complete, the concurrent flow of configuration more new technological process is needed to be implemented, that is, is entered
Step 4;
If last time configuration more new technological process is completed, the concurrent flow for executing configuration more new technological process is not needed, that is, is entered
Step 5;
Step 4: executing the concurrent flow of configuration more new technological process, and detailed process is as shown in Fig. 2, include following first steps
To step 6:
Step 1: storing a plurality of configuration in the database updates index, specific method is to increase configuration more in the database
New data table content records concurrent configuration more new task information, as shown in table 1 below:
Configure more new task index | Configure more new task ALLOC | Configuration updates task status |
1 | 123 | It is to be sent |
2 | xxx | It is not sent |
3 | xxx | It is not sent |
… | … | … |
50 | … | … |
Table 1
Structure shown in table 1 (or format), which can be, to be stored in advance, and is updated requirements of process specific to each configuration and is held
When row, need to update the content in the table, i.e. increase a line or multiple line content, the corresponding configuration more new task of every a line.
Parameter and parameter description in table 1 are described below:
Configuration more new task index: for recording the number information of configuration more new technological process (or task);
Configure more new task ALLOC: once to configure more newly assigned mark, it is understood that for configuration more new technological process
The mark of (or task) can distinguish different configuration more new technological process based on this mark, carry out for updating ACK message with configuration
Matching, i.e., configuration update ACK message in also has configuration update ALLOC, so as to based on configuration more new task ALLOC and
The ALLOC in the ACK message of more new task is configured, can be confirmed that the ACK message of configuration more new task is matching for which time
Set the confirmation message of more new technological process;
Configuration updates task status: indicating the processing status of configuration more new technological process, such as may include one of following content
Or combination:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
Wherein, response to be received has been sent and waited, has indicated that corresponding configuration more new task has been performed, but receives not yet
To the response message of opposite end base station feedback;
It is completed, indicates that corresponding configuration more new task has been performed, and received the response of opposite end base station feedback
Message;
It is to be sent, indicate that corresponding configuration more new task will be next configuration more new task for needing to be performed;
It is not sent, it indicates that corresponding configuration more new task is performed not yet, needs configuration to be sent more new task quilt
It performs, can just take turns to not sent configuration more new task.
It should be noted that the table, which can only record occurent but also unfinished configuration, updates procedure information, example
It, can only to be sent, not sent two states such as the configuration more new state in table 1;
It in addition, the table also can store the relevant information of all configuration more new technological process, such as can also include executing completion
Configuration more new technological process, corresponding state then such as can be sent and it is to be received response, be completed.
That is, when meeting following condition, the configuration needed to be implemented more new task is delayed in the first step
It deposits:
Configuration more new task is currently needed to be implemented, and last configuration more new technological process does not complete.
Step 2: the response message for last configuration more new technological process of the opposite end base station feedback to be received such as HL module,
If the configuration for receiving the transmission of opposite end base station updates confirmation (eNB CONFIGURATION UPDATE ACKNOWLEDGE) message, table
Show that last configuration is updated successfully, if the configuration for receiving the transmission of opposite end base station updates failure (eNB CONFIGURATION
UPDATE FAILUE) message, then it represents that last time configuration updates mission failure;
Step 3: HL module updates in list in configuration, by checking in list that the state for configuring more new technological process can look for
To the information of configuration more new technological process to be sent, wherein may include the parameter for specifically needing to update etc. information;
Step 4: configuration to be sent more new technological process (including the parameter updated is specifically needed) is sent to by HL module
Opposite end base station;
Step 5: the information in configuration update list is updated, for example, the phase for the configuration more new technological process that can will have been sent
Close information deletion, i.e. a full line content in deletion table, the state of next configuration more new technological process be it is not sent be updated to
It sends, as shown in table 2 below:
Configuration updates index | Configuration updates ALLOC | Configure more new state |
1 | 456 | It is to be sent |
2 | xxx | It is not sent |
3 | xxx | It is not sent |
… | … | … |
50 | … | … |
Table 2
That is, configuration not sent in table more new state can successively be updated to state to be sent, so that configuration
More new technological process is successively sent to opposite end base station.
Specifically, the 5th step for example may include:
If configuration to be sent more new task has been sent, the configuration more new task updated in the tables of data is corresponding
It is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data that configuration, which updates task status,;
Also, it is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then the tables of data is updated
In the corresponding configuration of the configuration more new task to update task status be to be completed, or the configuration is deleted from the tables of data
More new task;Also, it is to be sent for updating next not sent configuration and updating task status.
Step 6: judge whether that there are also configuration to be sent more new technological process, in two kinds of situation:
If entering above-mentioned second step there are also configuration to be sent more new technological process, that is, it is directed to each configuration to be sent
More new technological process executes aforesaid operations;
If configuration not to be sent more new technological process, i.e., in table the configuration more new technological process of transmission in need all sent
It finishes, then enters following step six;
Step 5: HL module sends configuration more new technological process to opposite end base station;
The execution of step 5 is executed in the case where upper primary configuration more new technological process is completed, concrete operations, example
It such as may include: that HL module in local terminal base station to opposite end base station sends base station configuration updating information (ENB CONFIGURATION
UPDATE), this message include one group of local terminal eNB just in operation used newest configuration data relevant information collection
Close, i.e., above-mentioned transmission configures more new technological process, or executes configuration more new task, including the parameter that updates of configuration believe
Breath, such as may include: the complete list of serving cell increasing, modifying, deleting.
Step 6: the configuration of opposite end base station feedback to be received is waited to update response, with the second step in step 4.
Step 7: configuration renewal process terminates.
In addition, it is necessary to illustrate, in the embodiment of the present application, above-mentioned step three can not also be executed, but is directly existed
After step 2, the content of above-mentioned list is updated, that is to say, that, then can need to when meeting one of following condition or combination
The configuration to be executed more new task is cached:
Cell status and/or parameter change;
Link between base station has built up.
Then, according to the state of last column in list, configuration more new technological process is successively executed.Execute to be sent match
More new technological process is set, is had sent in configuration to be sent more new technological process, updating its state is to have sent, or sent waiting
Receive ACK message;Also, by the state of the configuration more new technological process of next call number from it is not sent be updated to it is to be sent.And so on,
All configuration needed to be implemented the more new technological process cached in table can successively be executed, avoid abandoning.
In conclusion having been carried out by implementation procedure of the method provided by the embodiments of the present application to configuration more new technological process excellent
Change, base station can cache a plurality of configuration simultaneously and update flow tasks, and successively issue to opposite end base station, and X2 matches between ensure that base station
The interactive information integrality of update is set, while improving the stability of network, effectively ensure and improves user's perception.
Therefore, referring to Fig. 3, in base station side, a kind of configuration update method provided by the embodiments of the present application, comprising:
S101, the configuration needed to be implemented more new task is cached, wherein the configuration more new task is between base station
Configuration more new task;
S102, configuration more new task in the caching is executed according to preset rules;
Wherein, when meeting one of following condition or combination, the configuration needed to be implemented more new task is cached:
Cell status and/or parameter change;
Link between base station has built up;
Configuration more new task is currently needed to be implemented, and last configuration more new technological process does not complete.
In this way, the configuration needed to be implemented more new task is cached, wherein the configuration more new task is base
Configuration more new task between standing executes the configuration more new task in the caching, so that the configuration in X2 interface updates appearance
When concurrent scene, can by configuration more new task cache, the configuration more new task of caching can be executed sequentially, it is complete
At each configuration renewal process, the discarding for avoiding configuration from updating has ensured X2 interface information exchange integrality, has allowed to right
End group station carries out configuration update in time, it is ensured that accordant configuration information between base station, network is normal, and terminal traffic is avoided to interrupt, therefore
The stability of existing net is improved, effective guarantee simultaneously improves user's perception.
That is, a kind of optional way provided by the embodiments of the present application is, when the configuration more new task of execution in need
When, directly the configuration needed to be implemented more new task is cached.
Another kind optional way provided by the embodiments of the present application is, when the configuration more new task of execution in need, but upper one
Secondary configuration just caches the configuration needed to be implemented more new task when more new task has not been completed.
Optionally, last configuration more new technological process is determined as follows not complete:
If the response message of last configuration more new technological process is received, by the last corresponding shape of configuration more new technological process
State position position;
If the last corresponding non-set of mode bit of configuration more new technological process, it is determined that the configuration of the last time updates stream
Journey does not complete.
That is, in the embodiment of the present application, can by check the corresponding mode bit of configuration more new technological process whether set,
To judge whether the configuration more new technological process is completed.And configure the corresponding mode bit of more new technological process whether set, being specifically dependent upon is
The no response message for the configuration more new technological process for receiving opposite end base station feedback.It is specifically described in the above content, herein
It repeats no more.
Optionally, the configuration more new task needed to be implemented is cached in the form of the tables of data of preset format.For example,
Format shown in above-mentioned table 1 is cached, furthermore, it is desirable to illustrate, in the embodiment of the present application, is not limited to lattice shown in above-mentioned table 1
Formula and content can be set according to actual needs the information content of data tableau format and storage.
Optionally, include following content in the tables of data: configuration more new task index, configuration update task identification, match
Set update task status.
It also is stored in tables of data alternatively, it is also possible to which the corresponding configuration undated parameter of more new task will be configured.
Optionally, it includes one of following content or combination that the configuration in the tables of data, which updates task status:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
Optionally, the configuration more new task for executing caching, specifically includes: the configuration executed in the tables of data updates
Task status is configuration to be sent more new task.
Optionally, this method further includes the steps that following more new data table:
If configuration to be sent more new task has been sent, the configuration more new task updated in the tables of data is corresponding
It is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data that configuration, which updates task status,;
Also, it is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then the tables of data is updated
In the corresponding configuration of the configuration more new task to update task status be to be completed, or the configuration is deleted from the tables of data
More new task;Also, it is to be sent for updating next not sent configuration and updating task status.
Correspond to the above method ground, referring to fig. 4, a kind of configuration updating device provided by the embodiments of the present application, comprising:
First unit 11, for caching the configuration needed to be implemented more new task, wherein the configuration more new task
Configuration more new task between base station;
Second unit 12, for executing the configuration more new task in the caching according to preset rules;
Wherein, when meeting one of following condition or combination, the configuration needed to be implemented more new task is cached:
Cell status and/or parameter change;
Link between base station has built up;
Configuration more new task is currently needed to be implemented, and last configuration more new technological process does not complete.
Optionally, the first unit is determined as follows last configuration more new technological process and does not complete:
If the response message of last configuration more new technological process is received, by the last corresponding shape of configuration more new technological process
State position position;
If the last corresponding non-set of mode bit of configuration more new technological process, it is determined that the configuration of the last time updates stream
Journey does not complete.
Optionally, the first unit by the configuration more new task needed to be implemented in the form of the tables of data of preset format into
Row caching.
Optionally, include following content in the tables of data: configuration more new task index, configuration update task identification, match
Set update task status.
Optionally, it includes one of following content or combination that the configuration in the tables of data, which updates task status:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
Optionally, the second unit is specifically used for: it is pending for executing the configuration in the tables of data to update task status
The configuration sent more new task.
Optionally, the second unit is also used to:
If configuration to be sent more new task has been sent, the configuration more new task updated in the tables of data is corresponding
It is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data that configuration, which updates task status,;
Also, it is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then the tables of data is updated
In the corresponding configuration of the configuration more new task to update task status be to be completed, or the configuration is deleted from the tables of data
More new task;Also, it is to be sent for updating next not sent configuration and updating task status.
Referring to Fig. 5, another configuration updating device provided by the embodiments of the present application, comprising:
Memory 21, for storing program instruction;
Processor 22 executes above-mentioned according to the program of acquisition for calling the program instruction stored in the memory
A kind of method.
Any configuration updating device provided by the embodiments of the present application, can be base station itself, naturally it is also possible to be it
His equipment.
Configuration updating device provided by the embodiments of the present application can be a kind of calculating equipment, which is specifically as follows
Desktop computer, portable computer, smart phone, tablet computer, personal digital assistant (Personal Digital
Assistant, PDA) etc..The calculating equipment may include central processing unit (Center Processing Unit, CPU), deposit
Reservoir, input-output apparatus etc., input equipment may include keyboard, mouse, touch screen etc., and output equipment may include display
Equipment, as liquid crystal display (Liquid Crystal Display, LCD), cathode-ray tube (Cathode Ray Tube,
CRT) etc..
Memory may include read-only memory (ROM) and random access memory (RAM), and provide storage to processor
The program instruction and data stored in device.In the embodiment of the present application, memory can be used for storing the embodiment of the present application offer
Any the method program.
Processor is by the program instruction for calling memory to store, and processor is for executing sheet according to the program instruction of acquisition
Apply for any the method that embodiment provides.
The embodiment of the present application provides a kind of computer storage medium, for being stored as calculating used in above-mentioned calculating equipment
Machine program instruction, it includes the programs for executing above-mentioned either method provided by the embodiments of the present application.
The computer storage medium can be any usable medium or data storage device that computer can access, packet
Include but be not limited to magnetic storage (such as floppy disk, hard disk, tape, magneto-optic disk (MO) etc.), optical memory (such as CD, DVD,
BD, HVD etc.) and semiconductor memory (such as it is ROM, EPROM, EEPROM, nonvolatile memory (NAND FLASH), solid
State hard disk (SSD)) etc..
Method provided by the embodiments of the present application can be applied to the network equipment.The network equipment can be base station (for example, access
Point), it refers to the accession in net in the sky on interface by the equipment of one or more sectors and wireless terminal communications.Base station can be used for by
The air frame received is mutually converted with IP grouping, the router between rest part netted as wireless terminal and access,
The rest part for wherein accessing net may include Internet protocol (IP) network.Attribute management of the base station also tunable to air interface.
For example, base station can be the base station (BTS, Base Transceiver Station) in GSM or CDMA, it is also possible to WCDMA
In base station (NodeB), can also be evolved base station (NodeB or eNB or e-NodeB, the evolutional in LTE
Node B), in present aspect embodiment without limitation.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The shape for the computer program product implemented in usable storage medium (including but not limited to magnetic disk storage and optical memory etc.)
Formula.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Obviously, those skilled in the art can carry out various modification and variations without departing from the essence of the application to the application
Mind and range.In this way, if these modifications and variations of the application belong to the range of the claim of this application and its equivalent technologies
Within, then the application is also intended to include these modifications and variations.
Claims (16)
1. a kind of configuration update method, which is characterized in that this method comprises:
The configuration needed to be implemented more new task is cached, wherein configuration of the configuration more new task between base station is more
New task;
The configuration more new task in the caching is executed according to preset rules;
Wherein, when meeting one of following condition or combination, the configuration needed to be implemented more new task is cached:
Cell status and/or parameter change;
Link between base station has built up;Configuration more new task is currently needed to be implemented, and last configuration more new technological process is not
It completes.
2. the method according to claim 1, wherein being determined as follows last configuration more new technological process
It does not complete:
If the response message of last configuration more new technological process is received, by the last corresponding mode bit of configuration more new technological process
Set;
If the last corresponding non-set of mode bit of configuration more new technological process, it is determined that the configuration more new technological process of the last time is not
It completes.
3. the method according to claim 1, wherein by the configuration more new task needed to be implemented with preset format
The form of tables of data is cached.
4. according to the method described in claim 3, it is characterized in that, including following content in the tables of data: configuration is more newly appointed
Business index, configuration update task identification, configuration updates task status.
5. according to the method described in claim 4, it is characterized in that, configuration in the tables of data updates under task status includes
One of column content or combination:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
6. according to the method described in claim 5, it is characterized in that, the configuration for executing caching according to preset rules is more newly appointed
Business, specifically includes: executing the configuration in the tables of data to update task status is configuration to be sent more new task.
7. according to the method described in claim 6, it is characterized in that, this method further include:
If configuration to be sent more new task has been sent, the corresponding configuration of the configuration more new task in the tables of data is updated
Updating task status is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data;Also,
It is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then update in the tables of data
It is to be completed, or configuration update is deleted from the tables of data that the corresponding configuration of the configuration more new task, which updates task status,
Task;Also, it is to be sent for updating next not sent configuration and updating task status.
8. a kind of configuration updating device characterized by comprising
First unit, for caching the configuration needed to be implemented more new task, wherein the configuration more new task is base station
Between configuration more new task;
Second unit, for executing the configuration more new task in the caching according to preset rules;
Wherein, when meeting one of following condition or combination, the first unit carries out the configuration needed to be implemented more new task
Caching:
Cell status and/or parameter change;
Link between base station has built up;Configuration more new task is currently needed to be implemented, and last configuration more new technological process is not
It completes.
9. device according to claim 8, which is characterized in that the first unit is determined as follows last
More new technological process is configured not complete:
If the response message of last configuration more new technological process is received, by the last corresponding mode bit of configuration more new technological process
Set;
If the last corresponding non-set of mode bit of configuration more new technological process, it is determined that the configuration more new technological process of the last time is not
It completes.
10. device according to claim 8, which is characterized in that the first unit is more newly appointed by the configuration needed to be implemented
Business is cached in the form of the tables of data of preset format.
11. device according to claim 10, which is characterized in that include following content in the tables of data: configuration updates
Task index, configuration update task identification, configuration updates task status.
12. device according to claim 11, which is characterized in that the configuration in the tables of data updates task status and includes
One of following content or combination:
It has sent and has waited and to be received responded, be completed, is to be sent, is not sent.
13. device according to claim 12, which is characterized in that the second unit is specifically used for: executing the data
It is configuration to be sent more new task that configuration in table, which updates task status,.
14. device according to claim 13, which is characterized in that the second unit is also used to:
If configuration to be sent more new task has been sent, the corresponding configuration of the configuration more new task in the tables of data is updated
Updating task status is to have sent and waited response to be received, or the configuration more new task is deleted from the tables of data;Also,
It is to be sent for updating next not sent configuration and updating task status;
If configuration to be sent more new task has been sent, and receives corresponding response message, then update in the tables of data
It is to be completed, or configuration update is deleted from the tables of data that the corresponding configuration of the configuration more new task, which updates task status,
Task;Also, it is to be sent for updating next not sent configuration and updating task status.
15. a kind of configuration updating device characterized by comprising
Memory, for storing program instruction;
Processor requires 1 to 7 according to the program execution benefit of acquisition for calling the program instruction stored in the memory
Described in any item methods.
16. a kind of computer storage medium, which is characterized in that the computer-readable recording medium storage has computer executable
Instruction, the computer executable instructions are for making the computer perform claim require 1 to 7 described in any item methods.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711448748.8A CN109982344B (en) | 2017-12-27 | 2017-12-27 | Configuration updating method and device and computer storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711448748.8A CN109982344B (en) | 2017-12-27 | 2017-12-27 | Configuration updating method and device and computer storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109982344A true CN109982344A (en) | 2019-07-05 |
CN109982344B CN109982344B (en) | 2021-02-26 |
Family
ID=67072139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711448748.8A Active CN109982344B (en) | 2017-12-27 | 2017-12-27 | Configuration updating method and device and computer storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109982344B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112714458A (en) * | 2019-10-24 | 2021-04-27 | 大唐移动通信设备有限公司 | Base station parameter updating method and base station |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101370244A (en) * | 2007-08-13 | 2009-02-18 | 大唐移动通信设备有限公司 | Method and device for concurrent cell updating in switching course of mobile terminal |
CN102111792A (en) * | 2009-12-25 | 2011-06-29 | 大唐移动通信设备有限公司 | Update configuration method and equipment |
WO2013069627A1 (en) * | 2011-11-07 | 2013-05-16 | 株式会社エヌ・ティ・ティ・ドコモ | Mobile communication method |
CN103118359A (en) * | 2011-11-17 | 2013-05-22 | 中兴通讯股份有限公司 | Implement method and device of self-healing of base station equipment |
-
2017
- 2017-12-27 CN CN201711448748.8A patent/CN109982344B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101370244A (en) * | 2007-08-13 | 2009-02-18 | 大唐移动通信设备有限公司 | Method and device for concurrent cell updating in switching course of mobile terminal |
CN102111792A (en) * | 2009-12-25 | 2011-06-29 | 大唐移动通信设备有限公司 | Update configuration method and equipment |
WO2013069627A1 (en) * | 2011-11-07 | 2013-05-16 | 株式会社エヌ・ティ・ティ・ドコモ | Mobile communication method |
CN103118359A (en) * | 2011-11-17 | 2013-05-22 | 中兴通讯股份有限公司 | Implement method and device of self-healing of base station equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112714458A (en) * | 2019-10-24 | 2021-04-27 | 大唐移动通信设备有限公司 | Base station parameter updating method and base station |
CN112714458B (en) * | 2019-10-24 | 2022-06-21 | 大唐移动通信设备有限公司 | Base station parameter updating method and base station |
Also Published As
Publication number | Publication date |
---|---|
CN109982344B (en) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016045336A1 (en) | Method and device for reporting and acquiring terminal capability | |
US20130329628A1 (en) | Resource allocation method and device | |
CN101296477B (en) | Method and device for planning network topological | |
CN108011935A (en) | A kind of programme upgrade method of NB-IOT equipment, server and NB-IOT equipment | |
CN107925876A (en) | Node and method for the mobile process for handling wireless device | |
US12010570B2 (en) | Method and device for establishing aggregated connection | |
CN111465098B (en) | Information transmission method and device | |
US20200358653A1 (en) | Method, apparatus and system for changing a network based on received network information | |
CN108810987A (en) | The method of wireless communication, AMF, RAN and SMF | |
CN101176356B (en) | Relocation method for service wireless network controller avoiding UE survey report interference | |
WO2021088642A1 (en) | Secondary node changing method, master node, second node, and terminal | |
CN106063313B (en) | Cancel the change made to communication network | |
CN108307429A (en) | A kind of method and device that base station user data restores | |
CN109982344A (en) | Configure update method and device, computer storage medium | |
US20160360523A1 (en) | Access system, device and method | |
CN102457959B (en) | Method and device for reporting locating information | |
CN107925923A (en) | Serving cell management | |
CN106341889B (en) | A kind of method and apparatus for handling paging message | |
CN104883715A (en) | Mobile switching management system, method thereof, main controller and edge controller | |
CN107801220A (en) | The method and computer-readable recording medium of automatic switchover cell type | |
CN112399491B (en) | Method and device for sending and receiving historical information of UE (user equipment), main node and auxiliary node | |
CN106303983B (en) | Group data transmission method and device | |
US10999404B2 (en) | Method, apparatus and system for SON coordination depending on SON function priority | |
JP6794778B2 (en) | Base station and communication method | |
CN109428882A (en) | Control method and edge arithmetic device for network communication system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |