CN109972775A - It is a kind of to synchronize the metal splicing curtain wall for beating outline border gum - Google Patents

It is a kind of to synchronize the metal splicing curtain wall for beating outline border gum Download PDF

Info

Publication number
CN109972775A
CN109972775A CN201910225569.0A CN201910225569A CN109972775A CN 109972775 A CN109972775 A CN 109972775A CN 201910225569 A CN201910225569 A CN 201910225569A CN 109972775 A CN109972775 A CN 109972775A
Authority
CN
China
Prior art keywords
curtain wall
gum
outline border
frame
rubber sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910225569.0A
Other languages
Chinese (zh)
Other versions
CN109972775B (en
Inventor
黄艺伟
林志鹏
曾燕萍
黄彬庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Haifeng Architectural Decoration Engineering Co.,Ltd.
Original Assignee
Huian County Electronic Commerce Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huian County Electronic Commerce Co Ltd filed Critical Huian County Electronic Commerce Co Ltd
Priority to CN201910225569.0A priority Critical patent/CN109972775B/en
Publication of CN109972775A publication Critical patent/CN109972775A/en
Application granted granted Critical
Publication of CN109972775B publication Critical patent/CN109972775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Abstract

The metal splicing curtain wall for beating outline border gum can be synchronized the invention discloses one kind, its structure includes: splicing curtain wall panel, wall fixed frame, reinforcing rib, reinforcing rib be installed on wall fixed frame both ends and with wall fixed frame interlocking, splicing curtain wall panel is equipped on front side of wall fixed frame, splice curtain wall panel and wall fixed frame snapping, when using equipment, pass through the synchronization gum-filling mechanism being equipped with, it enables the invention to realize and avoid when every piece of splicing curtain wall installs, it needs manually to carry out gluing operation along curtain wall outline border edge with glue beating apparatus, this operating process trouble, gum is difficult to cover comprehensively again, and since splicing curtain wall column is more, the problem of the case where being easy to appear no marking glue simultaneously, it enables a device to cover outline border gum more comprehensively, injecting glue simultaneously with assembly bolt synchronous, it is more convenient to operate.

Description

It is a kind of to synchronize the metal splicing curtain wall for beating outline border gum
Technical field
The present invention is a kind of metal splicing curtain wall that can be synchronized and beat outline border gum, belongs to curtain wall decoration technical field.
Background technique
Metal curtain wall is decorated due to excellent processing performance, the diversified and good safety of color, Er Qieke To process the curved lines of various types, and then the favor by many architects.
The prior art has following deficiency: when every piece of splicing curtain wall installs, needing manually to use glue beating apparatus along curtain wall Outline border edge carries out gluing operation, this operating process trouble, and gum is difficult to cover comprehensively again, and due to splice curtain wall column compared with It is more, while the case where be easy to appear no marking glue.
Summary of the invention
In view of the deficienciess of the prior art, the metal splicing for beating outline border gum can be synchronized it is an object of the present invention to provide one kind Curtain wall, it is existing to solve the problems, such as.
To achieve the goals above, the present invention is to realize by the following technical solutions: one kind, which can synchronize, beats outline border back The metal of glue splices curtain wall, and structure includes: splicing curtain wall panel, wall fixed frame, reinforcing rib, and the reinforcing rib is installed on wall Fixed frame both ends and with wall fixed frame interlocking, be equipped with splicing curtain wall panel, the splicing curtain wall panel on front side of the wall fixed frame With wall fixed frame snapping, the splicing curtain wall panel includes fixed body, composite panel, decorative metal board, the decoration gold Belong to plate be installed on above composite panel and with composite panel snapping, the composite panel inside middle portion is solid through being connected with Determine body, the fixed body be installed on above wall fixed frame and with wall fixed frame clearance fit.
Preferably, the fixed body is set including assembly wound packages, interface frame, mating frame, fixing bolt column, cramp, the assembly cylinder Device be installed on above fixing bolt column and with fixing bolt column clearance fit, the assembly wound packages, which is set, is installed on interface frame, mating frame inside And with interface frame, mating frame snapping, the interface frame, mating frame upper and lower ends are equipped with cramp, the cramp and interface frame, mating frame interlocking, the interface frame, mating frame installation Below the composite panel and with composite panel snapping.
Preferably, the assembly wound packages is set including built-in rubber sleeve, upper cover, linkage rack, outer barrel, bolt inside groove, small Groups of springs, the upper cover be installed on above outer barrel and with outer barrel clearance fit, side is equipped with bolt inside groove in the outer barrel, The bolt inside groove and outer barrel snapping, the bolt inside groove top are equipped with linkage rack, the linkage rack and bolt inside groove snapping, Built-in rubber sleeve, the built-in rubber sleeve and linkage rack clearance fit, the built-in rubber sleeve are equipped on the outside of the bolt inside groove Lower section is equipped with little spring group, the little spring group and built-in rubber sleeve clearance fit.
Preferably, the built-in rubber sleeve includes gum-injecting port, storage rubber sleeve, plastic hole, the gum-injecting port is installed on storage Above rubber sleeve and with storage rubber sleeve snapping, below the storage rubber sleeve equipped with plastic hole and with plastic hole snapping, the plastic emitting Hole and interface frame, mating frame clearance fit.
Preferably, the interface frame, mating frame includes buttcover plate, outline border slot, linking pullover, the outline border slot is installed on buttcover plate Outside and with buttcover plate snapping, be equipped with linking pullover, the linking pullover and buttcover plate snapping, the rank on the inside of the buttcover plate Female connector head upper end and built-in rubber sleeve clearance fit.
Preferably, the linking pullover is two-way open-celled structure and matches each other with plastic hole that the assembly wound packages is set Be connected pullover clearance fit.
Preferably, the built-in rubber sleeve loads glue capacity and slightly more than covers outline border slot, it can be ensured that glue covers Gai Xing.
Preferably, user can be fixed by the wall fixed frame being equipped with a wall to be mounted, pass through reinforcement Muscle for splicing curtain wall panel higher stability is provided, during being installed by by cramp upper and lower ends along corresponding Slot position is embedded into, and provides main sound-insulating and heat-insulating function by composite panel, when snapping finishes, by unscrewing upper cover, And bolt column is fixed along bolt inside groove screw-in, due to the mutual cooperation of linkage rack, so that built-in glue by tool Sleeve, to being embedded in, deeply gradually compresses little spring group with fixing bolt column, when plastic emitting hole site and rank along outer barrel When female connector head matches, storage rubber sleeve glue can then ooze out outward along outline border slot, and then cover the periphery of buttcover plate Frame can carry out the installation of next piece of splicing curtain wall panel at this time.
Beneficial effect
Compared with prior art, the beneficial effects of the present invention are: when cramp and wall fixed frame abutting joint finish It waits, by the crushes linkage rack of the tight bolt column of tool key, so that built-in rubber sleeve is small along outer barrel decline extruding Groups of springs, when reaching certain position, plastic hole is worked in coordination with pullover is connected, and preset glue is along specific outline border slot stream Out, outline border is effectively covered, installation operation is more efficient between curtain wall panel, while the case where avoid the occurrence of no marking glue.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is that one kind of the present invention can synchronize the surface structure schematic diagram for beating the metal splicing curtain wall of outline border gum.
Fig. 2 is the side the schematic diagram of the section structure of present invention splicing curtain wall panel.
Fig. 3 is the side the schematic diagram of the section structure of the fixed body of the present invention.
Fig. 4 is the normal cross-section structural schematic diagram that present invention assembly wound packages is set.
Fig. 5 is the structural schematic diagram of rubber sleeve built in the present invention.
Fig. 6 is the overlooking structure diagram of interface frame, mating frame of the present invention.
In figure: splicing curtain wall panel -1, wall fixed frame -2, reinforcing rib -3, fixed body-a, composite panel-b, decoration Metal plate-c, assembly wound packages set-a1, interface frame, mating frame-a2, fixing bolt column-a3, cramp-a4, built-in rubber sleeve-a11, upper cover- A12, linkage rack-a13, outer barrel-a14, bolt inside groove-a15, little spring group-a16, gum-injecting port-a111, storage rubber sleeve- A112, plastic hole-a113, buttcover plate-a21, outline border slot-a22, linking pullover-a23.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
Fig. 1-Fig. 6 is please referred to, the present invention provides a kind of metal splicing curtain wall technology scheme that can be synchronized and beat outline border gum: its Structure include: splicing curtain wall panel 1, wall fixed frame 2, reinforcing rib 3, the reinforcing rib 3 be installed on 2 both ends of wall fixed frame and with 2 interlocking of wall fixed frame, splicing curtain wall panel 1 is equipped on front side of the wall fixed frame 2, and the splicing curtain wall panel 1 is fixed with wall 2 snapping of frame, the splicing curtain wall panel 1 include fixed body a, composite panel b, decorative metal board c, the decorative metal board c Be installed on above composite panel b and with composite panel b snapping, the composite panel b inside middle portion is solid through being connected with Determine body a, the fixed body a be installed on 2 top of wall fixed frame and with 2 clearance fit of wall fixed frame.The fixed machine Body a includes that assembly wound packages sets a1, interface frame, mating frame a2, fixing bolt column a3, cramp a4, and the assembly wound packages sets a1 and is installed on fixed spiral shell Above hitching post a3 and with fixing bolt column a3 clearance fit, the assembly wound packages set a1 be installed on the inside interface frame, mating frame a2 and with dock Frame a2 snapping, the interface frame, mating frame a2 upper and lower ends are equipped with cramp a4, the cramp a4 and interface frame, mating frame a2 interlocking, the interface frame, mating frame a2 Be installed below composite panel b and with composite panel b snapping.
The assembly wound packages set a1 include built-in rubber sleeve a11, upper cover a12, linkage rack a13, outer barrel a14, in bolt Slot a15, little spring group a16, the upper cover a12 be installed on above outer barrel a14 and with outer barrel a14 clearance fit, it is described outer Side is equipped with bolt inside groove a15, the bolt inside groove a15 and outer barrel a14 snapping, the top bolt inside groove a15 in cylinder a14 Equipped with linkage rack a13, the linkage rack a13 and bolt inside groove a15 snapping, the outside bolt inside groove a15 are equipped with built-in gum cover Cylinder a11, the built-in rubber sleeve a11 and linkage rack a13 clearance fit, the lower section built-in rubber sleeve a11 are equipped with little spring group A16, the little spring group a16 and built-in rubber sleeve a11 clearance fit, the assembly wound packages are set a1 and are filled by bolt inside groove a15 With fixing bolt column a3, and the displacement with the built-in rubber sleeve a11 of linkage rack a13 cooperation drive.
The built-in rubber sleeve a11 includes gum-injecting port a111, storage rubber sleeve a112, plastic hole a113, the gum-injecting port A111 be installed on above storage rubber sleeve a112 and with storage rubber sleeve a112 snapping, equipped with plastic hole below the storage rubber sleeve a112 A113 and with plastic hole a113 snapping, the plastic hole a113 and interface frame, mating frame a2 clearance fit, the built-in rubber sleeve a11 passes through For storing up rubber sleeve a112 glue deposit, plastic hole a113's gum-injecting port a111 matches each other with interface frame, mating frame a2's.
The interface frame, mating frame a2 includes buttcover plate a21, outline border slot a22, linking pullover a23, and the outline border slot a22 is installed on pair On the outside of fishplate bar a21 and with buttcover plate a21 snapping, be equipped with linking pullover a23, the linking pullover a23 on the inside of the buttcover plate a21 With buttcover plate a21 snapping, the linking upper end pullover a23 and built-in rubber sleeve a11 clearance fit, the interface frame, mating frame a2 by pair Fishplate bar a21 is mutually interlocked with wall fixed frame 2, by being connected the matching of pullover a23 and plastic hole a113, enables its glue edge Distinctive outline border slot a22 penetrate into and cover.
The method is mainly characterized in that: user can be consolidated by the wall fixed frame 2 being equipped with and a wall to be mounted It is fixed, it is that splicing curtain wall panel 1 provides higher stability by reinforcing rib 3, by will be on cramp a4 during being installed Lower both ends are embedded into along corresponding slot position, main sound-insulating and heat-insulating function are provided by composite panel b, when snapping finishes When, bolt column a3 is fixed along bolt inside groove a15 screw-in, due to linkage rack by unscrewing upper cover a12, and by tool The mutual cooperation of a13 so that built-in rubber sleeve a11 along outer barrel a14 to being embedded in, with the depth of fixing bolt column a3 Enter gradually compression little spring group a16, when the plastic hole position a113 is with being connected pullover a23 and matching, storage rubber sleeve A112 glue can then ooze out outward along outline border slot a22, and then cover the peripheral frame of buttcover plate a21, can carry out at this time next The installation of block splicing curtain wall panel 1.
The present invention is combined with each other by above-mentioned component, is made equipment in use, passing through the synchronization gum-filling mechanism being equipped with, is made this Invention, which can be realized, to be avoided when every piece of splicing curtain wall installs, and needs manually to be carried out with glue beating apparatus along curtain wall outline border edge Gluing operation, this operating process trouble, gum are difficult to cover comprehensively again, and since splicing curtain wall column is more, while being easy The problem of the case where existing no marking glue, enables a device to cover more comprehensively outline border gum, at the same with assembly bolt synchronous, operation It is more convenient.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from spirit of the invention or In the case where essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that including all changes that fall within the meaning and scope of the equivalent elements of the claims in the present invention It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (6)

1. one kind can synchronize the metal splicing curtain wall for beating outline border gum, structure includes: splicing curtain wall panel (1), wall fixed frame (2), reinforcing rib (3), the reinforcing rib (3) be installed on wall fixed frame (2) both ends and with wall fixed frame (2) interlocking, it is described Splicing curtain wall panel (1) is equipped on front side of wall fixed frame (2), it is characterised in that:
The splicing curtain wall panel (1) includes fixed body (a), composite panel (b), decorative metal board (c), the decoration metal Plate (c) be installed on above composite panel (b) and with composite panel (b) snapping, composite panel (b) inside middle portion passes through It wears and is connected with fixed body (a).
2. one kind according to claim 1 can synchronize the metal splicing curtain wall for beating outline border gum, it is characterised in that: described solid Determining body (a) includes that assembly wound packages sets (a1), interface frame, mating frame (a2), fixing bolt column (a3), cramp (a4), and the assembly wound packages is set (a1) be installed on above fixing bolt column (a3) and with fixing bolt column (a3) clearance fit, the assembly wound packages sets (a1) and installs On the inside of interface frame, mating frame (a2), interface frame, mating frame (a2) upper and lower ends are equipped with cramp (a4).
3. one kind according to claim 2 can synchronize the metal splicing curtain wall for beating outline border gum, it is characterised in that: the dress Setting (a1) with wound packages includes built-in rubber sleeve (a11), upper cover (a12), linkage rack (a13), outer barrel (a14), bolt inside groove (a15), little spring group (a16), the upper cover (a12) are installed on above outer barrel (a14), and side is set in the outer barrel (a14) Have bolt inside groove (a15), be equipped with linkage rack (a13) above the bolt inside groove (a15), is set on the outside of the bolt inside groove (a15) Have built-in rubber sleeve (a11), is equipped with little spring group (a16) below the built-in rubber sleeve (a11).
4. one kind according to claim 3 can synchronize the metal splicing curtain wall for beating outline border gum, it is characterised in that: in described Setting rubber sleeve (a11) includes gum-injecting port (a111), storage rubber sleeve (a112), plastic hole (a113), gum-injecting port (a111) peace Above storage rubber sleeve (a112), plastic hole (a113) is equipped with below the storage rubber sleeve (a112).
5. one kind according to claim 2 can synchronize the metal splicing curtain wall for beating outline border gum, it is characterised in that: described right Connecing frame (a2) includes buttcover plate (a21), outline border slot (a22), linking pullover (a23), and the outline border slot (a22) is installed on buttcover plate (a21) outside and with buttcover plate (a21) snapping, be equipped with linking pullover (a23) on the inside of the buttcover plate (a21).
6. one kind according to claim 5 can synchronize the metal splicing curtain wall for beating outline border gum, it is characterised in that: the rank Female connector head (a23) is two-way open-celled structure and matches each other with plastic hole (a113) that the assembly wound packages sets (a1) and convergence set Head (a23) clearance fit.
CN201910225569.0A 2019-03-25 2019-03-25 Metal splicing curtain wall capable of synchronously gluing outer frame back glue Active CN109972775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910225569.0A CN109972775B (en) 2019-03-25 2019-03-25 Metal splicing curtain wall capable of synchronously gluing outer frame back glue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910225569.0A CN109972775B (en) 2019-03-25 2019-03-25 Metal splicing curtain wall capable of synchronously gluing outer frame back glue

Publications (2)

Publication Number Publication Date
CN109972775A true CN109972775A (en) 2019-07-05
CN109972775B CN109972775B (en) 2021-02-12

Family

ID=67080340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910225569.0A Active CN109972775B (en) 2019-03-25 2019-03-25 Metal splicing curtain wall capable of synchronously gluing outer frame back glue

Country Status (1)

Country Link
CN (1) CN109972775B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529990A (en) * 2021-07-22 2021-10-22 曹丰浩 Sound insulation material for decoration and installation method thereof
CN113550470A (en) * 2021-07-20 2021-10-26 南京明辉建设有限公司 Aluminum plate curtain wall mounting structure convenient to installation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT403824B (en) * 1995-06-16 1998-05-25 Pagitz Elisabeth Mag FIRE PROTECTION FACADE
CN202347694U (en) * 2011-09-06 2012-07-25 苏州苏明装饰有限公司 Picture frame type glue injection small-unit exposed framing curtain wall system
CN206987133U (en) * 2017-08-02 2018-02-09 深圳市建筑装饰(集团)有限公司 A kind of fireproof heat insulating energy-saving building curtain wall
CN208039562U (en) * 2018-01-05 2018-11-02 北京汉能光伏投资有限公司 Curtain wall panel fixing device and curtain wall system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT403824B (en) * 1995-06-16 1998-05-25 Pagitz Elisabeth Mag FIRE PROTECTION FACADE
CN202347694U (en) * 2011-09-06 2012-07-25 苏州苏明装饰有限公司 Picture frame type glue injection small-unit exposed framing curtain wall system
CN206987133U (en) * 2017-08-02 2018-02-09 深圳市建筑装饰(集团)有限公司 A kind of fireproof heat insulating energy-saving building curtain wall
CN208039562U (en) * 2018-01-05 2018-11-02 北京汉能光伏投资有限公司 Curtain wall panel fixing device and curtain wall system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550470A (en) * 2021-07-20 2021-10-26 南京明辉建设有限公司 Aluminum plate curtain wall mounting structure convenient to installation
CN113529990A (en) * 2021-07-22 2021-10-22 曹丰浩 Sound insulation material for decoration and installation method thereof
CN113529990B (en) * 2021-07-22 2023-02-21 曹丰浩 Sound insulation material for decoration and installation method thereof

Also Published As

Publication number Publication date
CN109972775B (en) 2021-02-12

Similar Documents

Publication Publication Date Title
CN109972775A (en) It is a kind of to synchronize the metal splicing curtain wall for beating outline border gum
CN207165854U (en) A kind of wearable device and its attachment structure
CN106014131A (en) Aluminum alloy door frame, door board with aluminum alloy door frame and use method of aluminum alloy door frame
CN107355456B (en) Board connecting device and cabinet body
CN217379368U (en) Green building energy-saving wall
CN104297862B (en) Optical fiber connector plug and release clamp part thereof
CN209556282U (en) A kind of floor panel assembly
CN207597779U (en) Decorative wall panels component
CN210776994U (en) Face recognition consumption system
CN207568098U (en) A kind of mounting structure of large cantilever sunshade decorative
CN209712163U (en) Decoration hopes open wiring
CN206865623U (en) Show surface frame component and display device
CN206159187U (en) Plate connection part
CN206443452U (en) A kind of furniture with decorative thread
CN207245070U (en) Limited block and trim components
CN205578421U (en) From area handle position aluminium sheet material package assembly
CN205400086U (en) A spring leaf for baseboard installation
CN210032419U (en) Building decorative panel connecting and mounting structure convenient to fix
CN211229318U (en) Metal decorative panel mounting structure
CN205160666U (en) Frame
CN216020307U (en) Screen
CN212617181U (en) Piezoelectric ceramic sensor mounting structure convenient to dismouting
CN212543424U (en) Expandable substrate
CN203788385U (en) Track slot type fixing structure for flat television set
CN211313215U (en) Modular floor laying structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210121

Address after: 528429 Xinfeng North Road, Huangpu town, Zhongshan City, Guangdong Province

Applicant after: Zhongshan Haifeng Architectural Decoration Engineering Co.,Ltd.

Address before: 362000 No.36, 450m west of fairy tale kindergarten, cuodou Houyuan Road, Dongqiao Town, Hui'an County, Quanzhou City, Fujian Province

Applicant before: HUIAN WANWU ELECTRONIC COMMERCE Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant