CN109967727A - A kind of high temperature casting atomization air cooling system - Google Patents
A kind of high temperature casting atomization air cooling system Download PDFInfo
- Publication number
- CN109967727A CN109967727A CN201910349170.3A CN201910349170A CN109967727A CN 109967727 A CN109967727 A CN 109967727A CN 201910349170 A CN201910349170 A CN 201910349170A CN 109967727 A CN109967727 A CN 109967727A
- Authority
- CN
- China
- Prior art keywords
- water
- cooling
- switch
- electrically connected
- microprocessor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D30/00—Cooling castings, not restricted to casting processes covered by a single main group
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
The invention discloses a kind of high temperature casting to be atomized air cooling system, is related to casting cooling technology field.The present invention includes a gantry u-bracket for cooling down platform and being mounted on the cooling platform of casting;The two sides of gantry u-bracket and the cooling fan at top, cooling fan are connected in series through switch and are electrically connected with the power supply;The air outlet of cooling fan is respectively and fixedly provided with spray assembly, spray assembly is connected with a water supplying pipe, the water inlet end of water supplying pipe is connected with water pump, water pump is mounted in cooling water tank, is equipped with a liquid level sensor in cooling water tank, and the side of cooling water tank is additionally provided with a water inlet and in being communicated with water supply pipe on water inlet, the end of water supply pipe is communicated with water source, it further include microprocessor, microprocessor and water pump are electrically connected, and microprocessor and liquid level sensor are electrically connected.The present invention passes through the operation for controlling cooling fan and spray assembly respectively, convenient for according to the operation of the control cooling fan of casting cooling requirement selectivity and spray assembly.
Description
Technical field
The invention belongs to casting cooling technology fields, are atomized air cooling system more particularly to a kind of high temperature casting.
Background technique
Currently, the cooling of casting is paid close attention to always in casting industry.Casting after various foundry production lines are unpacking
During transportation, in the prevalence of the problem of be the very long of pipeline design, to make casting obtain longer cooling time,
The manipulable level of next procedure is dropped to meet the temperature of casting, prevents next procedure from normally producing.For this purpose, some lifes
Producing pipeline will also pass through from outdoor, or even increase more Hairdryers, to obtain better cooling effect.
Summary of the invention
The purpose of the present invention is to provide a kind of high temperature casting to be atomized air cooling system, controls cooling fan and spray respectively
The operation of mist component, convenient for improving casting according to the operation of the control cooling fan of casting cooling requirement selectivity and spray assembly
The cooling effect of part.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is that a kind of high temperature casting is atomized air cooling system, including one cools down platform and is mounted on casting cooling
Gantry u-bracket on platform;
The two sides of gantry u-bracket are separately installed with N row cooling fan, the top installation of gantry u-bracket
There is M to arrange cooling fan, cooling fan described in every row is connected and is electrically connected with the power supply by a first switch, cooling described in every row
Fan is connected and is electrically connected with the power supply by a second switch;The air outlet of each cooling fan is respectively and fixedly provided with spraying group
Spray assembly described in part, every row or every row is connected with a water supplying pipe, and the water inlet end of the water supplying pipe is connected with water pump, described
Water pump is mounted in cooling water tank, and the water supplying pipe is switched equipped with a third;
A liquid level sensor is equipped in the cooling water tank, the side of the cooling water tank is additionally provided with a water inlet and in institute
It states and is communicated with water supply pipe on water inlet, the end of the water supply pipe is communicated with water source, and the water supply pipe is equipped with one the 4th switch;
Further include a microprocessor, the output end and water pump of the microprocessor are electrically connected, the microprocessor it is defeated
Enter end and liquid level sensor is electrically connected;
The input terminal of the microprocessor is also electrically connected with one for detecting the temperature sensor of room temperature, the micro process
The output end of device is also electrically connected with a display screen.
Further, the quantity of cooling fan described in every row is 2-9, and the quantity of cooling fan described in every row is 2-9, described
The value range of N is 1-5, and the value range of the M is 1-5.
Further, the first switch and the second switch is a manual switch or relay switch.
Further, the first switch and the second switch is relay switch, the relay switch and micro process
Device is electrically connected.
Further, the spray assembly includes at least one spraying nozzle, and the spraying nozzle is connected with water supplying pipe.
Further, a flow sensor, the flow sensor and microprocessor are equipped on each water supplying pipe
It is electrically connected.
Further, water temperature sensor for detecting water temperature is also equipped in the cooling water tank and for detecting
The water quality sensing unit of water quality, the water temperature sensor and water quality sensing unit are electrically connected with microprocessor;The water
Matter sensing unit includes one of residual chlorine sensor, PH sensor, turbidity transducer, conductivity sensor and ORP sensor
Or it is a variety of.
Gantry u-bracket includes the first fan fixed mount that cooling platform two sides are arranged in, two first blowers
Several first blowers are relatively set on fixed frame respectively;
One second fan fixed mount is fixed at the top of two first fan fixed mounts, on second fan fixed mount
It is fixed with several second blowers;
First fan fixed mount from top to bottom includes several rectangle frames, is connected between the adjacent two shape frame several
Pillar is equipped with one on first fan fixed mount for fixing the fixed plate of the first blower, and the both ends of the fixed plate are equal
It is fixed with a mounting plate for being mounted on fixed plate on the first fan fixed mount, the side of the mounting plate is equipped with and fixation
The card slot of plate matching ends, the mounting plate are fixedly connected with fixed plate by several first fixing screws, the mounting plate
Both ends be equipped with a waist-shaped hole;
The mounting plate is connected by a fixing piece with pillar, and the fixing piece includes the set of one Yu pillar pivot bush unit
It manages, is symmetrically arranged with the first fixed part and the second fixed part, first fixed part along the center of circle in the circumferential lateral surface of described sleeve pipe
Upper to be equipped with a fastening screw through sleeve side walls, second fixed part is externally provided with the fixed link of one with waist-shaped hole activity cooperation,
The end thread of the fixed link is combined with a stop nut.
Further, the top of first fan fixed mount is equipped with the support plate for being used to support the second fan fixed mount,
The support plate is connected with the second fan fixed mount by several support components.
Further, second fan fixed mount includes the main beam for being fixed on several support component ends, described in two
It is equipped with several main support stringers between main beam, is equipped between the adjacent two main support stringer several for installing the second blower
Fan installation plate, the main beam upper surface is equipped with several support plates, is equipped with auxiliary crossbeam, two institutes at the top of several support plates
It states and is connected with auxiliary stringer between auxiliary crossbeam, connect connecting plate, the auxiliary stringer and support stringer between the adjacent two auxiliary stringer
Between be connected with support column, the fan installation plate is equipped with threaded hole.
Further, the outlet air end of second blower is equipped with a fixed substrate, and the fixed substrate is equipped with and screw thread
The fixation hole that hole is coupled.
Further, second blower is solid by a standing screw component by fixation kit and the second fan fixed mount
It is fixed to be connected.
Further, the standing screw component includes a standing screw being threadedly secured on threaded hole, the fixation
The bottom end of screw rod is equipped with a limiting section, and an adjusting nut, institute have been threadedly engaged on the standing screw above the limiting section
It states adjusting nut upper surface and one first gasket is connected with by one first spring, the screw top of the standing screw is combined with one
The bottom side of fixture nut, the fixture nut is connected with one second gasket by a second spring.
Further, first blower bottom end is equipped with a blower rack, and the blower rack is bolted mode and fixes
In fixed plate.
Further, the support component selects electric expansion column or metal mainstay.
Further, the cooling platform is slidably matched with the guide rail of setting on the ground, places on the cooling platform
There is casting to be cooled.
The invention has the following advantages:
1, the present invention is convenient for being selected according to casting cooling requirement by the operation of control cooling fan and spray assembly respectively
The control cooling fan of property and the operation of spray assembly;The spray flow of spray assembly can be controlled according to casting cooling requirement simultaneously
Amount, improves the cooling effect of casting.
2, the gantry frame type frame of the invention by being made of the first fan fixed mount and the second fan fixed mount, and in wind
Blower is installed on machine fixed frame, realizes comprehensive quenching, improves casting cooling velocity.
3, the present invention can select the unlatching of blower according to actual needs, and adjustment is located at top or the blower of two sides inclines
Angle, to change the cooling requirement that the wind direction of blower is suitable for unlike signal casting.
4, the present invention is by cooling platform and Track desigh, and it is cold directly to carry out next batch for the cooling platform of removal after cooling
But, the utilization rate of Fan Equipment is improved
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is 1 cooling spray control system block diagram of embodiment;
Fig. 2 is 2 cooling spray control system block diagram of embodiment;
Fig. 3 is casting schematic diagram of cooling system structure of the present invention;
Fig. 4 is partial enlarged view at A in Fig. 1;
Fig. 5 is the first fan fixed mount of the invention and the second fan fixed mount assembly structure diagram;
Fig. 6 is the second fan fixed mount structural schematic diagram of the invention;
Fig. 7 is anchor structure schematic diagram of the present invention;
Fig. 8 is fixed plate structure schematic diagram of the present invention;
Fig. 9 is the first blower fan structure schematic diagram of the invention;
Figure 10 is the second blower fan structure schematic diagram of the invention;
Figure 11 is casting cooling system schematic view of the front view of the present invention;
Figure 12 is standing screw component structure diagram of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " aperture ", "upper", "lower", " thickness ", "top", " in ",
Indicating positions or the positional relationship such as " length ", "inner", " surrounding ", are merely for convenience of description of the present invention and simplification of the description, without
It is that the component of indication or suggestion meaning or element must have a particular orientation, is constructed and operated in a specific orientation, therefore not
It can be interpreted as limitation of the present invention.
Embodiment 1
Refering to Figure 1, the present invention is that a kind of high temperature casting is atomized air cooling system, including a cooling platform and
Gantry u-bracket being mounted on the cooling platform of casting;
The two sides of gantry u-bracket are separately installed with 3 row cooling fan a, the top installation of gantry u-bracket
There are 3 row's cooling fan b, 5 cooling fan a on every row connect and are electrically connected with the power supply by a first switch, on every row
5 cooling fan b series connection and be electrically connected with the power supply by a second switch;
The air outlet of each cooling fan a and cooling fan b is respectively and fixedly provided with spray assembly, and every row or every row's spray assembly are equal
It is connected with a water supplying pipe, the water inlet end of water supplying pipe is connected with water pump, and water pump is mounted in cooling water tank, and water supplying pipe is equipped with one
Third switch, third switch are a relay switch;
It is equipped with a liquid level sensor in cooling water tank, the side of cooling water tank is additionally provided with a water inlet and in connecting on water inlet
It is connected with water supply pipe, the end of water supply pipe is communicated with water source, and water supply pipe is equipped with one the 4th switch, and the 4th switch is that a relay is opened
It closes;
It further include a microprocessor, the output end and water pump of microprocessor are electrically connected, the input terminal and liquid of microprocessor
Level sensor is electrically connected;
The input terminal of microprocessor is also electrically connected with one for detecting the temperature sensor of room temperature, the output of microprocessor
End is also electrically connected with a display screen.
Preferably, first switch and the second switch is a manual switch or relay switch.
Preferably, spray assembly includes at least one spraying nozzle, and spraying nozzle is connected with water supplying pipe.
Preferably, a flow sensor is equipped on each water supplying pipe, flow sensor and microprocessor are electrically connected.
Preferably, water temperature sensor for detecting water temperature is also equipped in cooling water tank and for detecting water quality
Water quality sensing unit, water temperature sensor and water quality sensing unit are electrically connected with microprocessor;Water quality sensing unit includes
One of residual chlorine sensor, PH sensor, turbidity transducer, conductivity sensor and ORP sensor are a variety of.
Preferably, output end of microprocessor is connected with alarm.
In use, when casting hardness is of less demanding, by it is air-cooled be achieved with required hardness when, only open the cooling of two sides
Fan a and the cooling fan b at top can be cooled down;
Casting hardness require it is high when, two sides cooling fan a and top cooling fan b while must be turned on spraying
Mist drives spraying nozzle ejection to be sprayed by spraying in cast(ing) surface using cooling fan a and cooling fan b;It simultaneously can be according to casting
Changing firmness requirements are different, and the spraying time is arranged by microprocessor.
When cast shape is irregular, it can also singly open the big side cooling fan a of amount of stored heat and first cool down, then open again another
The cooling fan a of side, to realize uniformly cooling;It requires to decide whether to open and cooling fan a phase according to casting hardness simultaneously
Corresponding spray assembly.
For heavy castings, the cooling fan a of two sides and the cooling fan b at top can be opened simultaneously and is corresponded to by spraying,
Such as the top work die face of stamping die, it can get more uniform hardness.
For small-sized casting, the cooling fan a for being located at the cooling platform two sides of casting is optionally opened, what every side was opened
Quantity is 2 rows, while requiring to decide whether to open spray assembly corresponding with cooling fan a according to casting hardness.
In use, by the aperture of microprocessor driven water pump operation and control third switch, to make cooling water tank
Water is successively sprayed through water supplying pipe and spraying nozzle under the action of water pump;According to room temperature, the cooling requirement of casting, in flow sensing
The spray amount sprayed to control from spraying nozzle under the action of device and by the aperture that microprocessor controls third switch;
In use, detecting the water level of cooling water tank by liquid level sensor, and pass through the 4th switch of microprocessor control
On-off is so that it is guaranteed that the water level of cooling water tank is in a constant range.
In use, being detected to spraying in cooling water tank with water quality by water quality sensing unit, when there are quality problems
It is and alarm and stops spraying;Metal ion that may be present in water body, acidic materials etc. are avoided to spray in cast(ing) surface shadow
Ring cast(ing) surface structure.
Embodiment 2,
Based on the above embodiment 1, when first switch and the second switch is relay switch, relay switch and Wei Chu
Device is managed to be electrically connected.The unlatching situation of cooling fan a and cooling fan b can be selectively turned on by microprocessor at this time.
Embodiment 3
It please refers to shown in Fig. 3-10, gantry u-bracket includes the first fan fixed mount that cooling 82 two sides of platform are arranged in
1, it is relatively set with several first blowers 2 respectively on two first fan fixed mounts 1;
The top of two first fan fixed mounts 1 is fixed with one second fan fixed mount 3, fixes on the second fan fixed mount 3
There are several second blowers 4;
First fan fixed mount 1 from top to bottom includes several rectangle frames 11, is connected between adjacent two shapes frame 11 several
Column 12 is equipped with one on first fan fixed mount 1 for fixing the fixed plate 5 of the first blower 2, and the both ends of fixed plate 5 are fixed
There is a mounting plate 51 for being mounted on fixed plate 5 on first fan fixed mount 1, the side of mounting plate 51 is equipped with and fixation
The card slot 52 of 5 matching ends of plate, mounting plate 51 are fixedly connected with fixed plate 5 by several first fixing screws 54, mounting plate
51 both ends are equipped with a waist-shaped hole 53;
Mounting plate 51 is connected by a fixing piece with pillar 12, and fixing piece includes the casing 6 of one Yu 12 pivot bush unit of pillar,
It is symmetrically arranged with the first fixed part 61 and the second fixed part 62 along the center of circle in the circumferential lateral surface of casing 6, is passed through on the first fixed part 61
6 side wall of sleeve-penetrating is equipped with a fastening screw 65, and the second fixed part 62 is externally provided with the fixed link of one with 53 activity cooperation of waist-shaped hole
63, the end thread of fixed link 63 is combined with a stop nut 64.
Preferably, the top of the first fan fixed mount 1 is equipped with the support plate 13 for being used to support the second fan fixed mount 3, branch
Fagging 13 is connected with the second fan fixed mount 3 by several support components 14.
Preferably, the second fan fixed mount 3 includes the main beam 31 for being fixed on several 14 ends of support component, two main cross
It is equipped with several main support stringers 32 between beam 31, is equipped between adjacent two main support stringer 32 several for installing the second blower 4
Fan installation plate 33,31 upper surface of main beam is equipped with several support plates 34, be equipped with auxiliary crossbeam 35 at the top of several support plates 34, two
It is connected with auxiliary stringer 36 between auxiliary crossbeam 35, connects connecting plate 37, auxiliary stringer 36 and support stringer between adjacent two auxiliary stringer 36
Support column 38 is connected between 32, fan installation plate 33 is equipped with threaded hole.
Preferably, the outlet air end of the second blower 4 is equipped with a fixed substrate 41, and fixed substrate 41 is equipped with to be cooperated with threaded hole
The fixation hole 42 of installation.
Preferably, the second blower 4 passes through a screw bolt and nut stationary phase by fixation kit and the second fan fixed mount 3
Even.
Preferably, 2 bottom end of the first blower is equipped with a blower rack 21, and blower rack 21 is bolted mode and is fixed on fixation
On plate 5.
Preferably, support component 14 selects electric expansion column.
Preferably, cooling platform 82 is slidably matched with the guide rail 81 being arranged on ground 8, is placed on cooling platform 82
Casting 83 to be cooled, cooling platform 82 are equipped with the transmission mechanism free to slide along guide rail 81, and transmission mechanism includes motor, shaft coupling
Device, brake, speed reducer, transmission belt and idler wheel.
In use, the second blower 4 is directly fixed on the second fan fixed mount 3 by screw bolt and nut, bolt is successively
Through fixation hole 42 and threaded hole, the first blower 2 is fixed in the fixed plate 5 of the first fan fixed mount 1;In installation first
Before blower 2, first in one end of fixed plate 5 mounting plate 51 is fixed, 51 both ends of mounting plate are passed through into fixing piece respectively and are fixed on the
It on the pillar 12 of one fan fixed mount 1, and is secured the fix on pillar 12 by fastening screw 65, passes through tune according to demand
The height adjustment of the whole fixing piece for being located at 1 two sides of the first fan fixed mount is located at the horizontal tilt of 5 two sides of fixed plate, is being located at peace
Mounting fixing parts on the pillar 12 of the other end of dress install mounting plate 51 in 5 other end of fixed plate, and by the both ends of mounting plate 51
It is separately fixed on two fixing pieces, crosses fastening screw 65 and secure the fix on pillar 12.
Embodiment 2
It please refers to shown in Fig. 3-12, gantry u-bracket includes the first fan fixed mount that cooling 82 two sides of platform are arranged in
1, it is relatively set with several first blowers 2 respectively on two first fan fixed mounts 1;
The top of two first fan fixed mounts 1 is fixed with one second fan fixed mount 3, fixes on the second fan fixed mount 3
There are several second blowers 4;
First fan fixed mount 1 from top to bottom includes several rectangle frames 11, is connected between adjacent two shapes frame 11 several
Column 12 is equipped with one on first fan fixed mount 1 for fixing the fixed plate 5 of the first blower 2, and the both ends of fixed plate 5 are fixed
There is a mounting plate 51 for being mounted on fixed plate 5 on first fan fixed mount 1, the side of mounting plate 51 is equipped with and fixation
The card slot 52 of 5 matching ends of plate, mounting plate 51 are fixedly connected with fixed plate 5 by several first fixing screws 54, mounting plate
51 both ends are equipped with a waist-shaped hole 53;
Mounting plate 51 is connected by a fixing piece with pillar 12, and fixing piece includes the casing 6 of one Yu 12 pivot bush unit of pillar,
It is symmetrically arranged with the first fixed part 61 and the second fixed part 62 along the center of circle in the circumferential lateral surface of casing 6, is passed through on the first fixed part 61
6 side wall of sleeve-penetrating is equipped with a fastening screw 65, and the second fixed part 62 is externally provided with the fixed link of one with 53 activity cooperation of waist-shaped hole
63, the end thread of fixed link 63 is combined with a stop nut 64.
Preferably, the top of the first fan fixed mount 1 is equipped with the support plate 13 for being used to support the second fan fixed mount 3, branch
Fagging 13 is connected with the second fan fixed mount 3 by several support components 14.
Preferably, the second fan fixed mount 3 includes the main beam 31 for being fixed on several 14 ends of support component, two main cross
It is equipped with several main support stringers 32 between beam 31, is equipped between adjacent two main support stringer 32 several for installing the second blower 4
Fan installation plate 33,31 upper surface of main beam is equipped with several support plates 34, be equipped with auxiliary crossbeam 35 at the top of several support plates 34, two
It is connected with auxiliary stringer 36 between auxiliary crossbeam 35, connects connecting plate 37, auxiliary stringer 36 and support stringer between adjacent two auxiliary stringer 36
Support column 38 is connected between 32, fan installation plate 33 is equipped with threaded hole.
Preferably, the outlet air end of the second blower 4 is equipped with a fixed substrate 41, and fixed substrate 41 is equipped with to be cooperated with threaded hole
The fixation hole 42 of installation.
Preferably, the second blower 4 passes through a standing screw component stationary phase by fixation kit and the second fan fixed mount 3
Even.
Preferably, standing screw component includes a standing screw 7 being threadedly secured on threaded hole, the bottom of standing screw 7
End is equipped with a limiting section 76, and an adjusting nut 71, adjusting nut have been threadedly engaged on the standing screw 7 above limiting section 76
71 upper surfaces are connected with one first gasket 74 by one first spring 75, and the screw top of standing screw 7 is combined with a fixed spiral shell
The bottom side of mother 72, fixture nut 72 are connected with one second gasket 73 by a second spring 76.
Preferably, 2 bottom end of the first blower is equipped with a blower rack 21, and blower rack 21 is bolted mode and is fixed on fixation
On plate 5.
Preferably, support component 14 selects metal mainstay.
Preferably, cooling platform 82 is slidably matched with the guide rail 81 being arranged on ground 8, is placed on cooling platform 82
Casting 83 to be cooled.
In use, the first blower 2 is fixed in the fixed plate 5 of the first fan fixed mount 1;Before the first blower 2 is installed,
First in one end of fixed plate 5 mounting plate 51 is fixed, 51 both ends of mounting plate are passed through into fixing piece is respectively fixed on the first blower and consolidate
Determine on the pillar 12 of frame 1, and secured the fix on pillar 12 by fastening screw 65, according to demand by adjusting being located at the
The height adjustment of the fixing piece of one fan fixed mount, 1 two sides is located at the horizontal tilt of 5 two sides of fixed plate, is being located at the another of installation
Mounting fixing parts on the pillar 12 at end install mounting plate 51 in 5 other end of fixed plate, and the both ends of mounting plate 51 are solid respectively
It is scheduled on two fixing pieces, crosses fastening screw 65 and secure the fix on pillar 12.
In use, 4 standing screw component of the second blower is fixed on the second fan fixed mount 3 by mother, standing screw 7
Fixation hole 42 and threaded hole are sequentially passed through,
First standing screw 7 is fixed on threaded hole, according to the horizontal tilt actual demand of the second blower 4, passes through rotation
Adjusting nut 71 adjusts adjusting nut 71 and is located at the position on standing screw 7, and the fixation hole 42 of the second blower 4 is passed through fixed spiral shell
Bar 7 screws in fixture nut 72 and is fixed.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention
In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example.
Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close
Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment
All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification,
It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention
Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only
It is limited by claims and its full scope and equivalent.
Claims (7)
1. a kind of high temperature casting is atomized air cooling system, it is characterised in that: including a cooling platform and be mounted on casting cooling
Gantry u-bracket on platform;
The two sides of gantry u-bracket are separately installed with N row cooling fan, and M row is equipped at the top of gantry u-bracket
Cooling fan, the series connection of cooling fan described in every row and is electrically connected with the power supply, cooling fan described in every row by a first switch
It connects and is electrically connected with the power supply by a second switch;
The air outlet of each cooling fan is respectively and fixedly provided with spray assembly, and spray assembly described in every row or every row supplies water with one
Pipe is connected, and the water inlet end of the water supplying pipe is connected with water pump, and the water pump is mounted in cooling water tank, sets on the water supplying pipe
There is third switch;
Be equipped with a liquid level sensor in the cooling water tank, the side of the cooling water tank be additionally provided with a water inlet and in it is described into
Water supply pipe is communicated on the mouth of a river, the end of the water supply pipe is communicated with water source, and the water supply pipe is equipped with one the 4th switch;
It further include a microprocessor, the output end and water pump of the microprocessor are electrically connected, the input terminal of the microprocessor
It is electrically connected with liquid level sensor;
The input terminal of the microprocessor is also electrically connected with a temperature sensor for being used to detect room temperature, the microprocessor
Output end is also electrically connected with a display screen.
2. a kind of high temperature casting according to claim 1 is atomized air cooling system, which is characterized in that cooling described in every row
The quantity of fan is 2-9, and the quantity of cooling fan described in every row is 2-9, and the value range of the N is 1-5, the value of the M
Range is 1-5.
3. a kind of high temperature casting according to claim 1 is atomized air cooling system, which is characterized in that the first switch
It is a manual switch or relay switch with second switch.
4. a kind of high temperature casting according to claim 3 is atomized air cooling system, which is characterized in that the first switch
It is relay switch with second switch, the relay switch and microprocessor are electrically connected.
5. a kind of high temperature casting according to claim 1 is atomized air cooling system, which is characterized in that the spray assembly
Including at least one spraying nozzle, the spraying nozzle is connected with water supplying pipe.
6. a kind of high temperature casting according to claim 1 is atomized air cooling system, which is characterized in that each water supply
A flow sensor is equipped on pipe, the flow sensor and microprocessor are electrically connected.
7. a kind of high temperature casting according to claim 1 is atomized air cooling system, which is characterized in that the cooling water tank
It is inside also equipped with the water temperature sensor for detecting water temperature and the water quality sensing unit for detecting water quality, the water temperature passes
Sensor and water quality sensing unit are electrically connected with microprocessor;The water quality sensing unit includes residual chlorine sensor, PH biography
One of sensor, turbidity transducer, conductivity sensor and ORP sensor are a variety of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910349170.3A CN109967727B (en) | 2019-04-28 | 2019-04-28 | High-temperature casting atomization air cooling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910349170.3A CN109967727B (en) | 2019-04-28 | 2019-04-28 | High-temperature casting atomization air cooling system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109967727A true CN109967727A (en) | 2019-07-05 |
CN109967727B CN109967727B (en) | 2021-04-09 |
Family
ID=67086776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910349170.3A Active CN109967727B (en) | 2019-04-28 | 2019-04-28 | High-temperature casting atomization air cooling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109967727B (en) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101198826A (en) * | 2005-04-22 | 2008-06-11 | 度控公司 | Auxiliary patch block of intelligent fan for executing self-adapting environmental management |
CN201931074U (en) * | 2010-12-30 | 2011-08-17 | 苏州石川制铁有限公司 | Iron backing plate cooling device |
CN202905378U (en) * | 2012-11-28 | 2013-04-24 | 潢川县电业局 | Box-type heat dissipation transformer |
CN103691905A (en) * | 2013-11-30 | 2014-04-02 | 雄邦压铸(南通)有限公司 | Rotating inclined spray nozzle |
CN105195718A (en) * | 2015-09-16 | 2015-12-30 | 安徽永茂泰汽车零部件有限公司 | Cooling device used in machining process of automotive part |
CN105700581A (en) * | 2014-12-09 | 2016-06-22 | Abb技术有限公司 | A cooling system for a high voltage electromagnetic induction device, a system and a method of cooling the same |
CN205406244U (en) * | 2016-03-01 | 2016-07-27 | 孟祥慧 | Automatic control large -scale transformer cooling device |
CN206322041U (en) * | 2016-12-15 | 2017-07-11 | 长安石门发电有限公司 | A kind of exciting transformer cooling controller |
CN206567523U (en) * | 2017-02-06 | 2017-10-20 | 镇平华星机械制造有限公司 | A kind of auto parts machinery casting cooling device |
CN207170929U (en) * | 2017-09-07 | 2018-04-03 | 四川省金镭铸业有限公司 | A kind of cooler for foundry |
US20180202013A1 (en) * | 2014-09-18 | 2018-07-19 | Consolidated Engineering Company, Inc. | System and method for quenching castings |
CN208045246U (en) * | 2018-02-12 | 2018-11-02 | 华润电力(宜昌)有限公司 | A kind of cooling system of dry-type transformer |
JP2019011907A (en) * | 2017-06-30 | 2019-01-24 | 特殊電極株式会社 | Cooling device for high-temperature component |
CN109666781A (en) * | 2018-12-11 | 2019-04-23 | 河北利镔通用设备有限公司 | A kind of radiating treatment technique of grid section |
-
2019
- 2019-04-28 CN CN201910349170.3A patent/CN109967727B/en active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101198826A (en) * | 2005-04-22 | 2008-06-11 | 度控公司 | Auxiliary patch block of intelligent fan for executing self-adapting environmental management |
CN201931074U (en) * | 2010-12-30 | 2011-08-17 | 苏州石川制铁有限公司 | Iron backing plate cooling device |
CN202905378U (en) * | 2012-11-28 | 2013-04-24 | 潢川县电业局 | Box-type heat dissipation transformer |
CN103691905A (en) * | 2013-11-30 | 2014-04-02 | 雄邦压铸(南通)有限公司 | Rotating inclined spray nozzle |
US20180202013A1 (en) * | 2014-09-18 | 2018-07-19 | Consolidated Engineering Company, Inc. | System and method for quenching castings |
CN105700581A (en) * | 2014-12-09 | 2016-06-22 | Abb技术有限公司 | A cooling system for a high voltage electromagnetic induction device, a system and a method of cooling the same |
CN105195718A (en) * | 2015-09-16 | 2015-12-30 | 安徽永茂泰汽车零部件有限公司 | Cooling device used in machining process of automotive part |
CN205406244U (en) * | 2016-03-01 | 2016-07-27 | 孟祥慧 | Automatic control large -scale transformer cooling device |
CN206322041U (en) * | 2016-12-15 | 2017-07-11 | 长安石门发电有限公司 | A kind of exciting transformer cooling controller |
CN206567523U (en) * | 2017-02-06 | 2017-10-20 | 镇平华星机械制造有限公司 | A kind of auto parts machinery casting cooling device |
JP2019011907A (en) * | 2017-06-30 | 2019-01-24 | 特殊電極株式会社 | Cooling device for high-temperature component |
CN207170929U (en) * | 2017-09-07 | 2018-04-03 | 四川省金镭铸业有限公司 | A kind of cooler for foundry |
CN208045246U (en) * | 2018-02-12 | 2018-11-02 | 华润电力(宜昌)有限公司 | A kind of cooling system of dry-type transformer |
CN109666781A (en) * | 2018-12-11 | 2019-04-23 | 河北利镔通用设备有限公司 | A kind of radiating treatment technique of grid section |
Also Published As
Publication number | Publication date |
---|---|
CN109967727B (en) | 2021-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101835575B (en) | System and process for introducing a rigid lance into a concrete mixing truck using an articulated arm | |
KR101926095B1 (en) | water purifier | |
CN107127646B (en) | Five-axis linkage numerically controlled grinder for rotary file machining | |
CN109967727A (en) | A kind of high temperature casting atomization air cooling system | |
CN207681653U (en) | A kind of multi-functional tapping equipment | |
CN110523571B (en) | Anti-dead-angle spraying equipment for micro pipeline | |
CN213631647U (en) | Condenser with atomizing sprays structure | |
CN209155624U (en) | A kind of scarvenger machine for producing tool mixing plant | |
CN216245657U (en) | Spray cooling device | |
CN208551574U (en) | A kind of multifunctional bathtub of panel control | |
CN109442719A (en) | Central air-conditioning outlet air guide frame | |
CN217613789U (en) | Vapor-water mixer for paint mist purifier | |
CN210448901U (en) | Blendor convenient to last feeding | |
CN209646306U (en) | A kind of concentration of water paint adjusting test device | |
CN209577124U (en) | A kind of spray equipment for graphene coating | |
CN208340519U (en) | A kind of ratio adjustable gas-liquid fast mixed dissolving device | |
CN218278104U (en) | High-temperature early warning monitoring device for greenery protection | |
KR20130033540A (en) | Electric fan | |
CN110253003A (en) | A kind of dedicated quenching apparatus of metal smelt | |
CN209560260U (en) | A kind of spraying device for the 3D spray suspension projection being easily installed | |
CN220901843U (en) | Spraying device for die casting | |
CN109296884A (en) | A kind of pressure container apparatus with vertical fine adjustment mechanism | |
CN217160337U (en) | Large-flow fluid control device | |
CN209666261U (en) | A kind of nozzle flaring mechanism for polyethylene pipe | |
CN221157418U (en) | Pneumatic glue gun |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |