CN109958452A - A kind of tunnel exit slips the body control method that collapses - Google Patents

A kind of tunnel exit slips the body control method that collapses Download PDF

Info

Publication number
CN109958452A
CN109958452A CN201910192023.XA CN201910192023A CN109958452A CN 109958452 A CN109958452 A CN 109958452A CN 201910192023 A CN201910192023 A CN 201910192023A CN 109958452 A CN109958452 A CN 109958452A
Authority
CN
China
Prior art keywords
slope
gutter
construction
collapses
crown beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910192023.XA
Other languages
Chinese (zh)
Inventor
南勇
周益辉
韩松
王超
孟乃川
马海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAILWAY TENTH GROUP NORTHWEST ENGINEERING
Original Assignee
RAILWAY TENTH GROUP NORTHWEST ENGINEERING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RAILWAY TENTH GROUP NORTHWEST ENGINEERING filed Critical RAILWAY TENTH GROUP NORTHWEST ENGINEERING
Priority to CN201910192023.XA priority Critical patent/CN109958452A/en
Publication of CN109958452A publication Critical patent/CN109958452A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel exits to slip the body control method that collapses, its method is the following steps are included: A, traffic lead and change: widening after approved to original road, operation area enclosing closed operation area, upstream and downstream are provided with security warning speed(-)limit sign and facility, are equipped with the measures such as special messenger directs traffic.21 Φ 2.2m friction piles are arranged in the present invention, increase stake top crown beam, Reinforced Concrete Retaining Walls structure side slope carries out gear shield, ensure to slip the body that collapses integrally to consolidate, after abutment platform, platform side increases fender post+crown beam, form three face building enclosures, ensure that Foundation Pit of Abutment excavates safety, hole uses the advanced pre-reinforcement of horizontal jet grouting stake, it is oriented to wall+shield and encircles method tunneling into hole, ensure into hole safety, reasonably adjust through chainage, ensure safety of appearing, adjust light and shade boundary mileage, outlet forms building enclosure using pile foundation open cut tunnel portal, ensure later period railroad embankment safety, barricade side slope uses arched framework slope protection revetment, ensure stability of slope.

Description

A kind of tunnel exit slips the body control method that collapses
Technical field
The present invention relates to technical field of tunnel construction, specially a kind of tunnel exit slips the body control method that collapses.
Background technique
Tunnel is the engineering works being embedded in stratum, is a kind of form of human use's underground space.Tunnel can divide For traffic tunnel, Hydraulic Tunnel, municipal tunnel, mining tunnel, the structure in tunnel includes main building object and auxiliary device two Point, main building object is made of barrel and portal, and auxiliary device includes that refuge chamber, fire fighting device, emergency communication and guarded drainage are set It applies, there are also special ventilation and lighting apparatus, tunnels in the construction process, often will appear tunnel exit and slip the body that collapses for major long tunnel Phenomenon occurs, if it not being prevented and being administered, the safety in tunnel will be seriously threatened, for this purpose, it is proposed that one Kind tunnel exit slips the body control method that collapses.
Summary of the invention
The purpose of the present invention is to provide a kind of tunnel exits to slip the body control method that collapses, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of tunnel exit slips the body control method that collapses, side Method the following steps are included:
A, traffic, which is led, changes: widening after approved to original road, operation area enclosing closed operation area, upstream and downstream setting Security warning speed(-)limit sign and facility are equipped with special messenger and direct traffic equal measures, it is ensured that construction period the coast is clear, traffic Safe passing;
B, it cuts draining: intercepting water to slipping body crack of collapsing and taking, drains the mode combined and carry out waterproof, surface cracks take filling Slurry sealing, prevents rainwater from immersing, and hole slips to collapse and slips the line peripheral hardware armored concrete that collapses and intercept water gutter, and the excessively steep section in part sets chute, Highway lateral sulcus carries out restoration and reconstruction after the completion of Retaining wall, it is ensured that draining is unobstructed;
C, it slips body reinforcing of collapsing: taking mound back-pressure, reinforced concrete structure supporting and retaining system, grouts the measures such as slope protection progress Synthetic Reason;
D, builder's road and job platform → perform platform side Φ 1.8m fender post abutment and building enclosure: are built (containing crown beam) → performing platform side Φ 1.25m fender post → performs side platform Φ 1.25m pile foundation → backfilling of earthwork → builder's road and is trimmed to hole It is oriented to wall.
It preferably, include gutter excavation and gutter construction in the step B, and gutter excavates the following steps are included: 1. surveying Measure unwrapping wire: surveyor requires according to construction drawing, releases the excavation contour line of gutter;2. gutter uses hand excavation, by measurement Contour line and cross dimensions are excavated, are modified;3. operating personnel hangs safety rope when excavating, special messenger commands nurse, forbids straight It is access to spoir under slope;4. gutter construction should avoid raining working, wet and slippery fall is avoided;5. after excavating, first removing vegetation, pine Soil, substrate repairing is smooth, and report quality inspection engineer after the assay was approved, can carry out next procedure construction;Gutter construction includes following Step: 1. tamping ditch substrate with small-sized rammed earth machinery before construction, and 30cm thickness 3:7 cushion lime, laying is arranged in bottom of trench and periphery EVA splash guard prevents substrate differential settlement from causing gutter concrete cracking;2. gutter selects I type, III type according to terrain slope Intercepting ditch, bottom of trench connect with highway lateral sulcus, it is ensured that draining is smooth, chute is set when longitudinal slope is excessively steep, bottom of trench sets energy dissipation tank.
Preferably, the every 10m of the gutter that intercepts water is a cast-in-place production unit, expansion joint is set between every two unit together, seam Wide 2cm, expansion joint is using water expandable waterstop waterproof and is placed in the middle part of gutter concrete bodies, and face uses 30mm near water at expansion joint Thick M10 cement mortar closing, remaining is filled closely knit using pitch wood wool board.
Preferably, in the step C include that slope foot bankets back-pressure and slope foot retaining structure, and slope foot back-pressure of banketing is slope foot Bottom takes rammer to banket stone back-pressure in friction pile boundary of works area, is highly 1~1.5m, and placement in layers is simultaneously compacted, meanwhile, friction pile And section construction is taken in crown beam construction, closes in time, crown beam, barricade are divided into 6 construction sections (construction joint at 5);Slope foot branch Gear structure uses 21 Φ 2.2m cast-in-situ bored piles the following steps are included: 1. slipping in range of collapsing slope foot, pile center spacing 4m, and stake is long 10~12m, bored concrete pile use rotary digging drilled as holes, C40 armored concrete;2. stake top sets crown beam, high * wide is 2m*2.2m, in crown beam Portion uses C35 Reinforced Concrete Retaining Walls, is highly 5.5m, upper width 0.825m, lower width 2.2m, to slipping turned-down edge slope Carry out gear shield.
Preferably, the following steps are included: 12 Φ 1.25m cast-in-situ bored piles, stake are 1. arranged after abutment platform in the step D Long 26m/ root, C30 pile foundation concrete, stake top set crown beam as 1.45m*2.4m, stake after platform are linked to be entirety, it is ensured that steady into hole side slope It is fixed;2. 4 Φ 1.8m fender posts, the long 25m/ root of stake are respectively arranged in abutment two sides, pile center's spacing is 2.6m, and stake top sets 1.5m*2m Crown beam, fender post also serve as cut-and-cover tunnel basis, and open cut tunnel joint bar is reserved on top when crown beam performs, and are tunnel exit tunneling into hole and bridge Platform foundation excavation provides blocking effect;3. successively ramming the stone that bankets on the left of the route builds builder's road to hole operation platform, just Road width is 6m, a length of 120m, head fall 19%, and hole operation platform size is not less than 10m × 12m, it is ensured that plant machinery Operating radius, sidewalk, which is built, firmly avoids the side of brush from disturbing existing side slope.
Compared with prior art, beneficial effects of the present invention are as follows:
21 Φ 2.2m friction piles are arranged in the present invention, increase stake top crown beam, Reinforced Concrete Retaining Walls structure side slope carries out Gear shield, it is ensured that slip the body that collapses and integrally consolidate, after abutment platform, platform side increase fender post+crown beam, form three face building enclosures, it is ensured that Foundation Pit of Abutment excavates safety, and hole uses the advanced pre-reinforcement of horizontal jet grouting stake, and guiding wall+shield encircles method tunneling into hole, it is ensured that into hole Safety, reasonably adjusts through chainage, it is ensured that safety of appearing, adjustment light and shade boundary mileage, outlet is enclosed using the formation of pile foundation open cut tunnel portal Protection structure, it is ensured that later period railroad embankment safety, barricade side slope use arched framework slope protection revetment, it is ensured that stability of slope.
Detailed description of the invention
Fig. 1 is the method for the present invention flow diagram;
Fig. 2 is I type gutter sectional schematic diagram of the invention;
Fig. 3 is III type gutter sectional schematic diagram of the invention;
Fig. 4 is that crown beam of the present invention and Retaining wall section divide schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-4, a kind of tunnel exit slips the body control method that collapses, method the following steps are included:
A, traffic, which is led, changes: widening after approved to original road, operation area enclosing closed operation area, upstream and downstream setting Security warning speed(-)limit sign and facility are equipped with special messenger and direct traffic equal measures, it is ensured that construction period the coast is clear, traffic Safe passing;
B, it cuts draining: intercepting water to slipping body crack of collapsing and taking, drains the mode combined and carry out waterproof, surface cracks take filling Slurry sealing, prevents rainwater from immersing, and hole slips to collapse and slips the line peripheral hardware armored concrete that collapses and intercept water gutter, and the excessively steep section in part sets chute, Highway lateral sulcus carries out restoration and reconstruction after the completion of Retaining wall, it is ensured that draining is unobstructed;
C, it slips body reinforcing of collapsing: taking mound back-pressure, reinforced concrete structure supporting and retaining system, grouts the measures such as slope protection progress Synthetic Reason;
D, builder's road and job platform → perform platform side Φ 1.8m fender post abutment and building enclosure: are built (containing crown beam) → performing platform side Φ 1.25m fender post → performs side platform Φ 1.25m pile foundation → backfilling of earthwork → builder's road and is trimmed to hole It is oriented to wall, 21 Φ 2.2m friction piles are set, increase stake top crown beam, Reinforced Concrete Retaining Walls structure side slope carry out gear shield, really Guarantor slips the body that collapses and integrally consolidates, and after abutment platform, platform side increase fender post+crown beam, forms three face building enclosures, it is ensured that Foundation Pit of Abutment Safety is excavated, hole uses the advanced pre-reinforcement of horizontal jet grouting stake, and guiding wall+shield encircles method tunneling into hole, it is ensured that into hole safety, rationally Adjust through chainage, it is ensured that safety of appearing, adjustment light and shade boundary mileage, outlet form building enclosure using pile foundation open cut tunnel portal, really Later period railroad embankment safety is protected, barricade side slope uses arched framework slope protection revetment, it is ensured that stability of slope.
It include that gutter excavates and gutter construction, and gutter excavates the following steps are included: 1. surveying setting-out: measurement in step B Member requires according to construction drawing, releases the excavation contour line of gutter;2. gutter uses hand excavation, by measurement contour line and section Size is excavated, is modified;3. operating personnel hangs safety rope when excavating, special messenger commands nurse, forbids directly toward spoir under slope; 4. gutter construction should avoid raining working, wet and slippery fall is avoided;5. after excavating, first removing vegetation, loosening the soil, substrate is repaired flat Whole, report quality inspection engineer after the assay was approved, can carry out next procedure construction;1. gutter construction is the following steps are included: construct before Ditch substrate is tamped with small-sized rammed earth machinery, bottom of trench and periphery are arranged 30cm thickness 3:7 cushion lime, lay EVA splash guard, prevent Substrate differential settlement causes gutter concrete cracking;2. gutter according to terrain slope select I type, III type intercepting ditch, bottom of trench with Highway lateral sulcus connects, it is ensured that draining is smooth, chute is set when longitudinal slope is excessively steep, bottom of trench sets energy dissipation tank.
The every 10m of the gutter that intercepts water is a cast-in-place production unit, and expansion joint is set between every two unit together, slit width 2cm, expansion joint It using water expandable waterstop waterproof and is placed in the middle part of gutter concrete bodies, face uses 30mm thickness M10 cement bonded sand near water at expansion joint Slurry closing, remaining is filled closely knit using pitch wood wool board.
In step C include that slope foot bankets back-pressure and slope foot retaining structure, and slope foot back-pressure of banketing is slope foot antiskid pile driving construction Bottom takes rammer to banket stone back-pressure in range, is highly 1~1.5m, and placement in layers is simultaneously compacted, meanwhile, friction pile and crown beam construction Section construction is taken, closes in time, crown beam, barricade is divided into 6 construction sections (construction joint at 5);Slope foot retaining structure includes Following steps: it 1. slips slope foot in range of collapsing and uses 21 Φ 2.2m cast-in-situ bored piles, pile center spacing 4m, the long 10~12m of stake are filled It infuses stake and uses rotary digging drilled as holes, C40 armored concrete;2. stake top sets crown beam, high * wide is 2m*2.2m, and crown beam top uses C35 Reinforced Concrete Retaining Walls are highly 5.5m, upper width 0.825m, lower width 2.2m, carry out gear shield to turned-down edge slope is slipped.
The following steps are included: 12 Φ 1.25m cast-in-situ bored piles are 1. arranged after abutment platform in step D, the long 26m/ root of stake, C30 pile foundation concrete, stake top set crown beam as 1.45m*2.4m, stake after platform are linked to be entirety, it is ensured that into hole stability of slope;2. abutment 4 Φ 1.8m fender posts, the long 25m/ root of stake are respectively arranged in two sides, and pile center's spacing is 2.6m, and stake top sets 1.5m*2m crown beam, goes along with sb. to guard him Stake also serves as cut-and-cover tunnel basis, and open cut tunnel joint bar is reserved on top when crown beam performs, and opens for tunnel exit tunneling into hole and abutment foundation It digs and blocking effect is provided;3. successively ramming the stone that bankets on the left of route builds builder's road to hole operation platform, sidewalk width is 6m, A length of 120m, head fall 19%, hole operation platform size are not less than 10m × 12m, it is ensured that plant machinery operating radius, Sidewalk, which is built, firmly avoids the side of brush from disturbing existing side slope.
In use, 21 Φ 2.2m friction piles are arranged along the body slope foot that collapses is slipped, increase stake top crown beam, Reinforced Concrete Retaining Walls knot Structure side slope carries out gear shield, it is ensured that slips the body that collapses and integrally consolidates, after abutment platform, platform side increase fender post+crown beam, forms three faces and enclose Protection structure, it is ensured that Foundation Pit of Abutment excavates safety, and hole uses the advanced pre-reinforcement of horizontal jet grouting stake, guiding wall+shield encircle method tunneling into Hole, it is ensured that into hole safety, reasonably adjust through chainage, it is ensured that safety of appearing, adjustment light and shade boundary mileage, outlet are bright using pile foundation Portal forms building enclosure, it is ensured that later period railroad embankment safety, barricade side slope use arched framework slope protection revetment, it is ensured that side slope is steady It is fixed, it by reinforcing above and supporting and retaining system measure, slips the body that collapses generally in safety and stability state, is lower fore-and-aft gangway platform and exit into hole Construction is laid a good foundation.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of tunnel exit slips the body control method that collapses, it is characterised in that: its method the following steps are included:
A, traffic, which is led, changes: widening after approved to original road, operation area enclosing closed operation area, upstream and downstream is provided with peace Full warning speed(-)limit sign and facility are equipped with the measures such as special messenger directs traffic, it is ensured that construction period the coast is clear, traffic safety It is current;
B, it cuts draining: intercepting water to slipping body crack of collapsing and taking, drains the mode combined and carry out waterproof, surface cracks take grouting close Envelope, prevents rainwater from immersing, and hole slips to collapse and slips the line peripheral hardware armored concrete that collapses and intercept water gutter, and the excessively steep section in part sets chute, highway Lateral sulcus carries out restoration and reconstruction after the completion of Retaining wall, it is ensured that draining is unobstructed;
C, it slips body reinforcing of collapsing: taking mound back-pressure, reinforced concrete structure supporting and retaining system, grouts the measures such as slope protection progress comprehensive treatment;
D, abutment and building enclosure: builder's road and job platform → performing platform side Φ 1.8m fender post (containing crown beam) → are built and is applied It does platform side Φ 1.25m fender post → perform side platform Φ 1.25m pile foundation → backfilling of earthwork → builder's road and is trimmed to hole guiding Wall.
2. a kind of tunnel exit according to claim 1 slips the body control method that collapses, it is characterised in that: wrapped in the step B Include gutter to excavate and gutter construction, and gutter excavates the following steps are included: 1. surveying setting-out: surveyor wants according to construction drawing It asks, releases the excavation contour line of gutter;2. gutter uses hand excavation, is excavated, repaired by measurement contour line and cross dimensions It is whole;3. operating personnel hangs safety rope when excavating, special messenger commands nurse, forbids directly toward spoir under slope;4. gutter construction should be kept away Raining working is opened, wet and slippery fall is avoided;5. after excavating, first removing vegetation, loosening the soil, substrate repairs smooth, report quality inspection engineering Teacher after the assay was approved, can carry out next procedure construction;Gutter construction is the following steps are included: 1. mechanical with small-sized rammed earth before construction Ditch substrate is tamped, bottom of trench and periphery are arranged 30cm thickness 3:7 cushion lime, lay EVA splash guard, prevent substrate differential settlement Cause gutter concrete cracking;2. gutter selects I type, III type intercepting ditch according to terrain slope, bottom of trench connects with highway lateral sulcus, really It is smooth to protect draining, chute is set when longitudinal slope is excessively steep, bottom of trench sets energy dissipation tank.
3. a kind of tunnel exit according to claim 2 slips the body control method that collapses, it is characterised in that: the gutter that intercepts water is every 10m is a cast-in-place production unit, expansion joint is set between every two unit together, slit width 2cm, expansion joint uses water expandable waterstop It waterproof and is placed in the middle part of gutter concrete bodies, face is closed using 30mm thickness M10 cement mortar near water at expansion joint, remaining is using pitch Wood wool board filling is closely knit.
4. a kind of tunnel exit according to claim 1 slips the body control method that collapses, it is characterised in that: wrapped in the step C It includes slope foot to banket back-pressure and slope foot retaining structure, and slope foot back-pressure of banketing is that bottom takes rammer to fill out in slope foot friction pile boundary of works area Native stone back-pressure is highly 1~1.5m, and placement in layers is simultaneously compacted, meanwhile, section construction is taken in friction pile and crown beam construction, in time Closing, is divided into 6 construction sections (construction joint at 5) for crown beam, barricade;1. slope foot retaining structure is the following steps are included: slip the model that collapses It encloses interior slope foot and uses 21 Φ 2.2m cast-in-situ bored piles, pile center spacing 4m, the long 10~12m of stake, bored concrete pile is drilled to using rotary digging Hole, C40 armored concrete;2. stake top sets crown beam, high * wide is 2m*2.2m, and crown beam top uses C35 Reinforced Concrete Retaining Walls, high Degree is 5.5m, upper width 0.825m, lower width 2.2m, carries out gear shield to turned-down edge slope is slipped.
5. a kind of tunnel exit according to claim 1 slips the body control method that collapses, it is characterised in that: wrapped in the step D It includes following steps: 1. 12 Φ 1.25m cast-in-situ bored piles, the long 26m/ root of stake, C30 pile foundation concrete, stake top is set after abutment platform If crown beam is 1.45m*2.4m, stake after platform is linked to be entirety, it is ensured that into hole stability of slope;2. 4 Φ are respectively arranged in abutment two sides 1.8m fender post, the long 25m/ root of stake, pile center's spacing are 2.6m, and stake top sets 1.5m*2m crown beam, and fender post also serves as cut-and-cover tunnel base Plinth, open cut tunnel joint bar is reserved on top when crown beam performs, and provides blocking effect into hole and abutment foundation excavation for tunnel exit tunneling;③ The stone that bankets successively is rammed on the left of route and builds builder's road to hole operation platform, and sidewalk width is 6m, a length of 120m, head fall It is 19%, hole operation platform size is not less than 10m × 12m, it is ensured that plant machinery operating radius, sidewalk build firmly avoid brushing Side disturbs existing side slope.
CN201910192023.XA 2019-03-14 2019-03-14 A kind of tunnel exit slips the body control method that collapses Pending CN109958452A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910192023.XA CN109958452A (en) 2019-03-14 2019-03-14 A kind of tunnel exit slips the body control method that collapses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910192023.XA CN109958452A (en) 2019-03-14 2019-03-14 A kind of tunnel exit slips the body control method that collapses

Publications (1)

Publication Number Publication Date
CN109958452A true CN109958452A (en) 2019-07-02

Family

ID=67024290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910192023.XA Pending CN109958452A (en) 2019-03-14 2019-03-14 A kind of tunnel exit slips the body control method that collapses

Country Status (1)

Country Link
CN (1) CN109958452A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203308470U (en) * 2013-05-28 2013-11-27 山西省交通科学研究院 Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
KR20140123317A (en) * 2013-04-12 2014-10-22 한국철도기술연구원 Hood structure and system for reducing tunnel micro pressure wave using the same
CN104153789A (en) * 2014-08-21 2014-11-19 铁道第三勘察设计院集团有限公司 High-speed railway separation type tunnel-bridge concatenation tunnel portal
CN204140086U (en) * 2014-08-21 2015-02-04 铁道第三勘察设计院集团有限公司 High-speed railway separate type tunnel bridge serial connection portal
CN104389628A (en) * 2014-11-21 2015-03-04 山西省交通科学研究院 Landslide section tunnel reinforcing device and reinforcing construction method
CN204283438U (en) * 2014-11-28 2015-04-22 中铁第四勘察设计院集团有限公司 Portal supporting and protection structure
CN204419195U (en) * 2014-12-29 2015-06-24 山西省交通科学研究院 A kind of supporting and protection structure pattern being applicable to tunnel portal section
CN105840207A (en) * 2016-03-24 2016-08-10 杭州江润科技有限公司 Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN106968690A (en) * 2017-04-20 2017-07-21 中冶建工集团有限公司 The method for tunnel construction for soil property of caving in
CN207598248U (en) * 2017-12-11 2018-07-10 中铁二院成都勘察设计研究院有限责任公司 A kind of Mountainous high speed railway tunnel protects bridge open-cut tunnel structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140123317A (en) * 2013-04-12 2014-10-22 한국철도기술연구원 Hood structure and system for reducing tunnel micro pressure wave using the same
CN203308470U (en) * 2013-05-28 2013-11-27 山西省交通科学研究院 Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN104153789A (en) * 2014-08-21 2014-11-19 铁道第三勘察设计院集团有限公司 High-speed railway separation type tunnel-bridge concatenation tunnel portal
CN204140086U (en) * 2014-08-21 2015-02-04 铁道第三勘察设计院集团有限公司 High-speed railway separate type tunnel bridge serial connection portal
CN104389628A (en) * 2014-11-21 2015-03-04 山西省交通科学研究院 Landslide section tunnel reinforcing device and reinforcing construction method
CN204283438U (en) * 2014-11-28 2015-04-22 中铁第四勘察设计院集团有限公司 Portal supporting and protection structure
CN204419195U (en) * 2014-12-29 2015-06-24 山西省交通科学研究院 A kind of supporting and protection structure pattern being applicable to tunnel portal section
CN105840207A (en) * 2016-03-24 2016-08-10 杭州江润科技有限公司 Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN106968690A (en) * 2017-04-20 2017-07-21 中冶建工集团有限公司 The method for tunnel construction for soil property of caving in
CN207598248U (en) * 2017-12-11 2018-07-10 中铁二院成都勘察设计研究院有限责任公司 A kind of Mountainous high speed railway tunnel protects bridge open-cut tunnel structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李冬生: "隧道洞口风积砂质新黄土地层溜塌综合治理", 《中国高新科技》 *
许占良: "长昆客专湖南段隧道洞口设计研究", 《隧道建设》 *
齐喜锋: "坪桥2号隧道进口隧道出洞施工方案探讨", 《低碳世界》 *

Similar Documents

Publication Publication Date Title
CN106013191B (en) Environment-friendly type grass planting Concrete Highway protective slope structure and construction method
CN107762535B (en) Cut-and-cover tunnel secretly does construction technology under complicated geological environment
CN102505695B (en) Construction method for deep foundation pit of three-dimensional garage
CN108868778B (en) Non-excavation construction method for large underground structure
CN205999903U (en) Environment-friendly type grass planting Concrete Highway protective slope structure
CN105839643A (en) Tunnel in-hole construction method adopting foundation pit support
CN110159294B (en) Construction method for lengthening open cut tunnel at tunnel junction section of high and steep terrain bridge
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN108625879A (en) Mountain Tunnels half-open and half-hidden structure and its construction method
CN109778869A (en) Foundation ditch construction method
CN104878719B (en) Mutual embedding reinforcement formula Ecological Retaining Wall construction method
CN115450221B (en) Construction method for subway crossing river channel
CN107740446A (en) Combined construction method of the passive supplement in existing building basis with underpining system in hole
CN111322087A (en) Construction method for soft soil highway tunnel entrance semi-open semi-hidden tunnel in mountainous area
CN107938680A (en) A kind of excavation of foundation pit safe construction method
CN114575355A (en) Soil protection and descent construction method
CN208416561U (en) A kind of Mountain Tunnels half-open and half-hidden structure
CN109610505A (en) A kind of tunnel upper foundation pit construction method
CN110284505A (en) Construction method of mountain foundation pit
CN1190566C (en) Method and structure for preventing and protecting near structure settlement by tunnel and isolation piling wall method
CN113550336B (en) Construction method of loose formation region railway deep cutting adjacent to existing building
CN110454189A (en) A kind of river tunnel Xia Chuan construction technology
CN115012957A (en) Safe and efficient tunneling construction process for large-section extra-long tunnel under complex condition
CN109958452A (en) A kind of tunnel exit slips the body control method that collapses
KR100355946B1 (en) Construction method for open cutting tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 710065 No. two, No. 69, Jin Industry Zone, Xi'an hi tech Zone, Shaanxi

Applicant after: Railway Tenth Group Northwest Engineering

Address before: 710065 No. 69, No. 2 Road, Cotton Industry, Xi'an High-tech Zone, Shaanxi Province

Applicant before: Railway Tenth Group Northwest Engineering

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190702