CN109958244A - A kind of folded grade canopy mounting system and an mounting method thereof - Google Patents
A kind of folded grade canopy mounting system and an mounting method thereof Download PDFInfo
- Publication number
- CN109958244A CN109958244A CN201910339135.3A CN201910339135A CN109958244A CN 109958244 A CN109958244 A CN 109958244A CN 201910339135 A CN201910339135 A CN 201910339135A CN 109958244 A CN109958244 A CN 109958244A
- Authority
- CN
- China
- Prior art keywords
- canopy
- installation
- layer
- panel
- lattice truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F10/00—Sunshades, e.g. Florentine blinds or jalousies; Outside screens; Awnings or baldachins
Abstract
A kind of multi-laminate grade awning provided by the invention, it is mounted on main steel construction, it include: the first quantity lattice truss and muti-piece panel corresponding with each lattice truss, wherein, in the corresponding installation to each lattice truss of panel described in muti-piece, the first quantity canopy layer is formed, from top to bottom successively installation is fixed on the main steel construction the first quantity canopy layer.Folded grade canopy in the present invention completes the work integrally assembled on ground before upper air installing, in manufacturing process can quick assembling, industrialization degree is high, when awning layer is transported to erecting bed, then unified carries out upper air installing.High altitude operation and welding capacity is greatly decreased in the integral hoisting scheme, not only contributes to reduce cost of labor, industrialization degree is high, is also beneficial to the control of welding quality.
Description
Technical field
The present invention relates to folded grade canopy installation system, in particular to a kind of folded grade canopy installation system and its monoblock type installation
Method.
Background technique
Important composition part of the canopy as modern architecture is kept away when main function is that protection entrance personnel are current
It is drenched from rainwater and dripping while preventing from falling object by high-altitude and injured by a crashing object.With architectural aesthetic and the big hair of building structure, material
Exhibition, canopy moulding and its Facing material, decorative effect are gradually complicated and changeable, and effect, which is also gradually evolved into, to be met using function
Simultaneously be also the important component of building external decoration, the raising of esthetic requirement also to the design of the structure of curtain wall, installation generate compared with
Big challenge.
For folding grade canopy, the design and installation of current most of buildings still use traditional mode --- and it is layered, divides component
Keel, installation plane materiel are welded, this mode site workload is big, and the scattered confusion of material structure, erecting and welding amount is big, canopy truss peace
Dress is mostly to weld in the overhead position, and precision and quality are difficult to ensure.
Summary of the invention
The present invention is to carry out to solve the above-mentioned problems, and it is an object of the present invention to provide a kind of folded grade canopy and its monoblock type peace
Dress method completes most of whole assembly on ground, then unifies to carry out upper air installing, and overhead welding amount is greatly decreased, industrializes
Degree is high, is also beneficial to the control of welding quality.
To achieve the above object, the present invention proposes a kind of folded grade canopy installation system, is mounted on main steel construction, has this
The feature of sample, comprising: the first quantity lattice truss and muti-piece panel corresponding with each lattice truss, wherein more
In the corresponding installation to each lattice truss of panel described in block, the first quantity canopy layer, the first quantity canopy are formed
From top to bottom successively installation is fixed on the main steel construction layer.
A kind of folded grade canopy installation system proposed by the present invention, also has the feature that, each panel passes through machine
Tool connection or structure glue are fixed on the lattice truss.
A kind of folded grade canopy installation system proposed by the present invention, also has the feature that, the mechanical connection is self tapping
One of screw or machine screws or combination.
A kind of folded grade canopy installation system proposed by the present invention, also has the feature that, the first quantity canopy
Layer is from top to bottom successively welded on the main steel construction.
In addition, the present invention also proposes a kind of folded grade canopy installation method, have the feature that, for installing above-mentioned fold
Grade canopy installation system, comprising the following steps:
Panel installation: every piece of panel installation is fixed on the corresponding lattice truss, the first quantity is obtained
The canopy layer;
Canopy installation: the first quantity canopy layer is from top to bottom successively fixed with the main Steel Structure Installation, is obtained
To the folded grade canopy.
A kind of folded grade canopy installation method proposed by the present invention, also has the feature that, in the panel installation steps
In, each panel is fixed on the lattice truss by mechanical connection or structure glue.
A kind of folded grade canopy installation method proposed by the present invention, also has the feature that, the mechanical connection is self tapping
One of screw or machine screws or combination.
A kind of folded grade canopy installation method proposed by the present invention, also has the feature that, in the awning installation steps
In, the first quantity canopy layer is from top to bottom successively welded on the main steel construction.
Invention effect and effect
A kind of folded grade canopy installation system according to the present invention and folded grade canopy installation method, different from it is traditional successively
Welded truss, then the method for every piece of panel is installed respectively in high-altitude, but folded grade awning is divided into multilayered structure according to structure,
The each lattice girders layer of production is respectively welded, corresponding decoration panel is being sequentially arranged on each lattice girders layer, thus
Each individual awning layer is obtained, then successively lifting is fixed in main body steel construction from top to bottom by each awning layer, thus complete
The integral installation of grade awning is folded at this.Color difference amendment and comprehensive is carried out to copper decoration panel after whole awning layers are all installed
The protection of brushing F-C paint.Folded grade canopy in the present invention completes the work integrally assembled on ground before upper air installing, makes
During work can quick assembling, industrialization degree is high, when awning layer is transported to erecting bed, then unified carries out upper air installing.
High altitude operation and welding capacity is greatly decreased in the integral hoisting scheme, not only contributes to reduce cost of labor, and industrialization degree is high,
Be conducive to the control of welding quality.In addition, the folded grade awning in the present invention carries out cross construction during integral hoisting, greatly
It is big to save the duration.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the first layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 2 is the second layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 3 is the third layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 4 is the panel scheme of installation of the folded grade awning of the present invention in embodiment.
Fig. 5 is the overall structure diagram of the folded grade awning of the present invention in embodiment.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
Referring to the drawings and embodiment is explained in detail folded grade canopy according to the present invention.Below in conjunction with attached drawing
Principles and features of the present invention are described, the given examples are served only to explain the present invention, is not intended to limit model of the invention
It encloses.
Fig. 5 is the overall structure diagram of the folded grade awning of the present invention in embodiment.
As shown in figure 5, the present invention proposes a kind of folded grade canopy installation system, it is mounted on main steel construction 3, comprising: first
Quantity lattice truss 1 and muti-piece panel 2 corresponding with each lattice truss,
Specifically, in above-mentioned folded grade awning installation system, the quantity of possessed lattice truss 1 should be according to setting
It is common depending on the quantity of meter, grade awning is folded with two layers or two layers or more lattice truss 1.Correspondingly, each lattice purlin
All successively splice installation by muti-piece canopy panel 2 on frame 1 into corresponding awning layer, it is common, the size of canopy panel 2 according to
Depending on the lattice size of lattice truss 1.From top to bottom successively installation is fixed to the main steel knot to all awning layers being completed
On structure 3.Above-mentioned awning layer installs fixed mode on main steel construction 3 as welding, and the first quantity canopy layer is by upper
It is successively welded under on the main steel construction 3.
Further, in some embodiments, above-mentioned lattice truss 1 uses 60x60x5 electro-galvanized steel logical and 50x50x5
Galvanizing by dipping angle steel separately constitutes the lattice truss 1 of every layer of support, and every purlin Pin length is canopy cantilever span, and width is 1/2 axis
Line width.Each component of lattice truss 1 answers strict control weldquality and thermal stress deformation by welding assembly, welding, if any
Deformation, need to correct in time, guarantee surfacing.After the completion of lattice truss 1 welds, butt welding point weld seam position brush antirust paint twice,
Carry out preservative treatment.
In addition, each panel 2 passes through mechanical connection or structure glue installation in folded grade canopy installation system of the invention
It is fixed on the lattice truss 1.Above-mentioned mechanical connection is one of tapping screw or machine screws or combines, preferably
For tapping screw.
Fig. 1 is the first layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 2 is the second layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 3 is the third layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 4 is the panel scheme of installation of the folded grade awning of the present invention in embodiment.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, in some embodiments, there are three lattices for above-mentioned folded grade awning installation system tool
Truss 1, respectively first layer lattice truss 11, second layer lattice truss, 12, third layer lattice truss 13, panel 2 described in muti-piece
It installs by the way that tapping screw is corresponding to each lattice truss 1, including panel 21 corresponding with first layer lattice truss 11, with
The corresponding panel 22 of point each truss of the second layer, panel 23 corresponding with third layer lattice truss 1 form three canopy layers, and three
The awning layer being completed from top to bottom successively is soldered on the main steel construction 3.
In addition, the present invention also proposes a kind of folded grade canopy installation method, for installing above-mentioned folded grade canopy installation system,
The following steps are included:
Structure positioning: according to folded grade awning structural design drawing and erecting bed structure measurement unwrapping wire, the lattice purlin is determined
Installation site of the frame main structure at actual installation scene.Further according to the Deepen Design typesetting figure and lattice truss further determined that
Structure chart successively determines the installation site of each the lattice truss 1 and corresponding panel 2.
Above-mentioned structure positioning step in erecting bed surveying setting-out mainly by completing, specifically, should basis
Folded grade awning design drawing and field agent structure level absolute altitude control line, play vertical line, horizontal line, absolute altitude control line, come true
The actual location of the lattice truss main structure of erecting bed main stress is determined, then according to the Deepen Design moulding chosen the best alternatives
The typesetting figure of upper each installation component position, the lattice truss hierarchical structure chart for being connected between lattice truss main structure
Determine the actual installation position control line of each lattice truss 1 and panel 2 at the scene.
Panel installation: every piece of installation of panel 2 is fixed on the corresponding lattice truss 1, the first quantity is obtained
A canopy layer.
In the panel installation steps, each panel 2 is fixed on described by mechanical connection or structure glue
On lattice truss 1.The mechanical connection is one of tapping screw or machine screws or combination, preferably tapping screw.
Specifically, every piece of panel 2 has its number on corresponding lattice truss 1 on in-depth typesetting figure.According to depth
Change typesetting figure, the decoration panel 2 accordingly numbered is fixed on the lattice truss 1 welded with tapping screw, should be noted that when fixed
Using stainless steel screw and connecting corner yard, bimetallic corrosion is avoided.Screw spacing is not greater than 300mm, and tie point answers uniform cloth
It sets, first slightly fastens screw when fixed, temporary support is removed after in place, adjust flatness, then by screw tightening.Decoration panel
After 2 are installed, in plate seaming position injecting glue, and after being embedded in 2mm, copper filler rod blocks glue-line.After glue to be sealed is completely dried,
Whole 2 surface pasting protective film of panel protections, and anticollision strip is set in corner.
Canopy installation: the first quantity canopy layer is from top to bottom successively fixed with the main installation of steel construction 3, is obtained
To the folded grade canopy.Above-mentioned mounting means can be welding, and the first quantity canopy layer from top to bottom successively welds
On the main steel construction 3.
Specifically, assembled canopy layer is risen using electric block cooperation truck crane when lifting each canopy layer
It hangs to corresponding position, every Pin canopy layer configures 6 electric blocks and a truck crane.According to the absolute altitude control marked in advance
Line, horizontal line and vertical line determine that position is errorless first by first layer canopy layer tie point in place and main body steel construction spot welding
Afterwards, it then is fully welded, the protection of decoration panel 2 is paid attention in welding process, welding slag is forbidden to fall.The welding of first layer canopy layer is completed
Butt welding point weld seam position brush antirust paint twice afterwards, carry out preservative treatment.After first layer canopy layer is installed, in kind pacify
Fill the second layer, third layer canopy layer.
In addition, in folded grade canopy installation method proposed by the invention, before the panel installation steps, also have with
Lower step:
Panel processing: raw panels are processed according to the Deepen Design typesetting figure, obtain the panel 2.
Specifically, canopy panel 2 uses 25mm thickness honeycomb copper sheet (2mm thickness copper sheet+22mm honeycomb core+1mm aluminium backboard)
It is made by predetermined size bending, 1 meter of plate face spreading width, 4-6 meters of length are differed, according to specifically wanting for Deepen Design typesetting figure
It asks and plate is processed to obtain panel 2, and carry out the corresponding number of every piece of panel 2 according to biochemical typesetting figure.
In addition, further including following step after the canopy installation steps in folded grade canopy installation method proposed by the invention
It is rapid:
Panel processing: oxidation color is successively carried out to each panel 2 and is handled, at integral spray fluorine carbon finishing varnish protection
Reason and panel cleaning treatment obtain being protected treated to fold grade canopy.
Specifically, copper sheet surface easy oxidation discoloration can be because of entire folded each layer of grade canopy because decoration panel is copper sheet production
Set-up time should carry out unified aoxidize at color there are span to which color has differences before removing scaffold to panel
It manages, integral spray fluorine carbon finishing varnish is protected after the completion of color treatments.Finishing varnish spraying requires spraying, and uniformly glossiness is excellent, hand
Sense is fine and smooth, falls phenomenon without holiday, stream.After finishing varnish is completely dried, glue trace is removed with degumming agent and with neutral cleaners cleaner plate
Face, and pay attention to the protection to other components in canopy.
Embodiment 1
Fig. 5 is the overall structure diagram of the folded grade awning of the present invention in embodiment.
As shown in figure 5, the present invention proposes a kind of folded grade canopy installation system, it is mounted on main steel construction 3, comprising: first
Quantity lattice truss 1 and muti-piece panel 2 corresponding with each lattice truss,
Specifically, there are three lattice truss for tool, correspondingly, each lattice purlin in above-mentioned folded grade awning installation system
Tapping screw splicing installation is all passed sequentially through into corresponding awning layer, common, canopy face by muti-piece canopy panel 2 on frame 1
The size of plate 2 is depending on the lattice size of lattice truss 1.Three canopy layers are from top to bottom successively welded on the main steel
In structure 3.
Above-mentioned lattice truss 1 is led to using 60x60x5 electro-galvanized steel and 50x50x5 galvanizing by dipping angle steel, separately constitutes
The lattice truss 1 of every layer of support, every purlin Pin length are canopy cantilever span, and width is 1/2 axis width.Lattice truss 1 it is each
Component is answered strict control weldquality and thermal stress deformation, if any deformation, need to be corrected in time by welding assembly, welding, guarantees
Surfacing.After the completion of lattice truss 1 welds, butt welding point weld seam position brush antirust paint twice carry out preservative treatment.
Fig. 1 is the first layer lattice truss structure schematic diagram of the folded grade canopy in the present embodiment.
Fig. 2 is the second layer lattice truss structure schematic diagram of the folded grade canopy in the present embodiment.
Fig. 3 is the third layer lattice truss structure schematic diagram of the folded grade canopy in the present embodiment.
Fig. 4 is the panel scheme of installation of the folded grade awning in the present embodiment.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, above-mentioned folded grade awning installation system tool is there are three lattice truss 1, and respectively the
One layer of lattice truss 11, second layer lattice truss, 12, third layer lattice truss 13, panel 2 described in muti-piece passes through tapping screw pair
It should install to each lattice truss 1, including panel 21 corresponding with first layer lattice truss 11, with each truss of the second layer point
Corresponding panel 22, panel 23 corresponding with third layer lattice truss 1 form three canopy layers, three awnings being completed
Layer is from top to bottom successively soldered on the main steel construction 3.
In addition, the present embodiment also proposes a kind of folded grade canopy installation method, for installing above-mentioned folded grade canopy installation system
System, comprising the following steps:
Structure positioning: according to folded grade awning design drawing and field agent structure level absolute altitude control line, vertical line, water are played
Horizontal line, absolute altitude control line, come determine erecting bed main stress lattice truss main structure actual location, then according to selection most
The typesetting figure of each installation component position in the Deepen Design moulding of excellent scheme, for connecting between lattice truss main structure
The lattice truss hierarchical structure chart connect determines the actual installation position control line of each lattice truss 1 and panel 2 at the scene.
Panel installation: on in-depth typesetting figure, every piece of panel 2 has its number on corresponding lattice truss 1.According to depth
Change typesetting figure, the decoration panel 2 accordingly numbered is fixed on the lattice truss 1 welded with tapping screw, should be noted that when fixed
Using stainless steel screw and connecting corner yard, bimetallic corrosion is avoided.Screw spacing is not greater than 300mm, and tie point answers uniform cloth
It sets, it is fixed first slightly to fasten screw, temporary support is removed after in place, adjusts flatness, then by screw tightening.Decoration panel
After 2 are installed, in plate seaming position injecting glue, and after being embedded in 2mm, copper filler rod blocks glue-line.After glue to be sealed is completely dried,
Whole 2 surface pasting protective film of panel protections, and anticollision strip is set in corner.
Canopy installation: when lifting each canopy layer, assembled canopy layer is risen using electric block cooperation truck crane
It hangs to corresponding position, every Pin canopy layer configures 6 electric blocks and a truck crane.According to the absolute altitude control marked in advance
Line, horizontal line and vertical line determine that position is errorless first by first layer canopy layer tie point in place and main body steel construction spot welding
Afterwards, it then is fully welded, the protection of decoration panel 2 is paid attention in welding process, welding slag is forbidden to fall.The welding of first layer canopy layer is completed
Butt welding point weld seam position brush antirust paint twice afterwards, carry out preservative treatment.
After first layer canopy layer is installed, the second layer, third layer canopy layer are in kind installed.
In addition, before the panel installation steps, also having in the folded grade canopy installation method that the present embodiment is proposed
Following steps:
Panel processing: canopy panel 2 uses 25mm thickness honeycomb copper sheet (2mm thickness copper sheet+22mm honeycomb core+1mm aluminium backboard)
It is made by predetermined size bending, 1 meter of plate face spreading width, 4-6 meters of length are differed, according to specifically wanting for Deepen Design typesetting figure
It asks and plate is processed to obtain panel 2, and carry out the corresponding number of every piece of panel 2 according to biochemical typesetting figure.
In addition, further including following after the canopy installation steps in the folded grade canopy installation method that the present embodiment is proposed
Step:
Panel processing: because decoration panel is copper sheet production, copper sheet surface easy oxidation discoloration can be because of entire folded each layer of grade canopy
Set-up time should carry out unified aoxidize at color there are span to which color has differences before removing scaffold to panel
It manages, integral spray fluorine carbon finishing varnish is protected after the completion of color treatments.Finishing varnish spraying requires spraying, and uniformly glossiness is excellent, hand
Sense is fine and smooth, falls phenomenon without holiday, stream.After finishing varnish is completely dried, glue trace is removed with degumming agent and with neutral cleaners cleaner plate
Face, and pay attention to the protection to other components in canopy.
The action and effect of embodiment
A kind of folded grade canopy installation system and folded grade canopy installation method according to involved in the present embodiment are different from tradition
Successively welded truss, then the method for every piece of panel is installed in high-altitude respectively, but folded grade awning is divided into according to structure more
Layer structure is respectively welded each lattice girders layer of production, corresponding decoration panel is being sequentially arranged at each lattice girders layer
On, so that each individual awning layer is obtained, then successively lifting is fixed in main body steel construction from top to bottom by each awning layer,
To complete the integral installation of the folded grade awning.Color difference amendment is carried out to copper decoration panel after whole awning layers are all installed
And brushing F-C paint protection comprehensively.Folded grade canopy in the present embodiment completes whole assembly on ground before upper air installing
Work, in manufacturing process can quick assembling, industrialization degree is high, when awning layer is transported to erecting bed, then unified carries out
Upper air installing.High altitude operation and welding capacity is greatly decreased in the integral hoisting scheme, not only contributes to reduce cost of labor, industrialization
Degree is high, is also beneficial to the control of welding quality.In addition, the folded grade awning in the present embodiment carries out during integral hoisting
Cross construction greatlys save the duration.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (8)
1. a kind of folded grade canopy installation system, is mounted on main steel construction characterized by comprising
First quantity lattice truss and muti-piece panel corresponding with each lattice truss,
Wherein, in the corresponding installation to each lattice truss of panel described in muti-piece, the first quantity canopy layer is formed,
From top to bottom successively installation is fixed on the main steel construction the first quantity canopy layer.
2. folded grade canopy installation system as described in claim 1, which is characterized in that each panel by mechanical connection or
Structure glue is fixed on the lattice truss.
3. folded grade canopy installation system as claimed in claim 2, which is characterized in that the mechanical connection is tapping screw or machine
One of screw-making or combination.
4. folded grade canopy installation system as described in claim 1, which is characterized in that the first quantity canopy layer by up to
Under be successively welded on the main steel construction.
5. a kind of folded grade canopy installation method, which is characterized in that for installing folded grade canopy installation system described in claim 1-4
System, comprising the following steps:
Panel installation: every piece of panel installation is fixed on the corresponding lattice truss, it is described to obtain the first quantity
Canopy layer;
Canopy installation: the first quantity canopy layer is from top to bottom successively fixed with the main Steel Structure Installation, institute is obtained
State folded grade canopy.
6. folded grade canopy installation method as claimed in claim 5, which is characterized in that in the panel installation steps, each
The panel is fixed on the lattice truss by mechanical connection or structure glue.
7. folded grade canopy installation method as claimed in claim 6, which is characterized in that the mechanical connection is tapping screw or machine
One of screw-making or combination.
8. folded grade canopy installation method as claimed in claim 5, which is characterized in that in the awning installation steps, first
The quantity canopy layer is from top to bottom successively welded on the main steel construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910339135.3A CN109958244A (en) | 2019-04-25 | 2019-04-25 | A kind of folded grade canopy mounting system and an mounting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910339135.3A CN109958244A (en) | 2019-04-25 | 2019-04-25 | A kind of folded grade canopy mounting system and an mounting method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109958244A true CN109958244A (en) | 2019-07-02 |
Family
ID=67026670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910339135.3A Pending CN109958244A (en) | 2019-04-25 | 2019-04-25 | A kind of folded grade canopy mounting system and an mounting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109958244A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152807A (en) * | 2021-04-08 | 2021-07-23 | 中建铁路投资建设集团有限公司 | Construction method of circular arch-shaped hyperbolic canopy structure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201620318U (en) * | 2010-04-09 | 2010-11-03 | 中铁第一勘察设计院集团有限公司 | Railroad bed sunshade shed in permafrost region |
CN202644872U (en) * | 2012-06-15 | 2013-01-02 | 湖北弘毅钢结构工程有限公司 | Rain cover of steel-structure factory building |
CN203429935U (en) * | 2013-07-15 | 2014-02-12 | 江西锦前金属建筑有限公司 | Overhanging type awning |
US20160340959A1 (en) * | 2015-06-29 | 2016-11-24 | Masoud Valinejadshoubi | Adaptive ventilating window for different weather conditions |
CN206693526U (en) * | 2017-05-16 | 2017-12-01 | 金华金瓦片户外用品有限公司 | A kind of integral type awning support |
CN207761200U (en) * | 2017-12-11 | 2018-08-24 | 美建建筑系统(中国)有限公司 | A kind of modularization steel canopy convenient for assembly |
CN208396176U (en) * | 2018-05-11 | 2019-01-18 | 宝胜系统集成科技股份有限公司 | The rain cover structure of steel building |
CN209907771U (en) * | 2019-04-25 | 2020-01-07 | 中建八局装饰工程有限公司 | Stack-level awning installation system |
-
2019
- 2019-04-25 CN CN201910339135.3A patent/CN109958244A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201620318U (en) * | 2010-04-09 | 2010-11-03 | 中铁第一勘察设计院集团有限公司 | Railroad bed sunshade shed in permafrost region |
CN202644872U (en) * | 2012-06-15 | 2013-01-02 | 湖北弘毅钢结构工程有限公司 | Rain cover of steel-structure factory building |
CN203429935U (en) * | 2013-07-15 | 2014-02-12 | 江西锦前金属建筑有限公司 | Overhanging type awning |
US20160340959A1 (en) * | 2015-06-29 | 2016-11-24 | Masoud Valinejadshoubi | Adaptive ventilating window for different weather conditions |
CN206693526U (en) * | 2017-05-16 | 2017-12-01 | 金华金瓦片户外用品有限公司 | A kind of integral type awning support |
CN207761200U (en) * | 2017-12-11 | 2018-08-24 | 美建建筑系统(中国)有限公司 | A kind of modularization steel canopy convenient for assembly |
CN208396176U (en) * | 2018-05-11 | 2019-01-18 | 宝胜系统集成科技股份有限公司 | The rain cover structure of steel building |
CN209907771U (en) * | 2019-04-25 | 2020-01-07 | 中建八局装饰工程有限公司 | Stack-level awning installation system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152807A (en) * | 2021-04-08 | 2021-07-23 | 中建铁路投资建设集团有限公司 | Construction method of circular arch-shaped hyperbolic canopy structure |
CN113152807B (en) * | 2021-04-08 | 2022-08-26 | 中建铁路投资建设集团有限公司 | Construction method of circular arch-shaped hyperbolic canopy structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760560B (en) | Complicated arc list construction of Pyramid engineering method | |
CN107489215A (en) | A kind of construction technology of new network type glass curtain wall | |
CN107905536A (en) | Glass curtain wall construction method | |
CN108915188B (en) | Low-relief decorative wall and low-relief metal plate installation and construction method | |
CN106049766A (en) | Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure | |
CN103334593A (en) | Construction technology of cable net dot-mode glass curtain wall | |
CN111335476A (en) | Staggered floor steel mesh frame subsection lifting accumulative assembling construction method | |
CN109958244A (en) | A kind of folded grade canopy mounting system and an mounting method thereof | |
CN104631650B (en) | Screen plate outer wall with heat insulation layer and construction method | |
CN209907771U (en) | Stack-level awning installation system | |
CN209163180U (en) | A kind of extensive high-altitude suspended-cable structure aluminum veneer moulding furred ceiling | |
CN111119368A (en) | Construction method for externally-hung metal rock wool sandwich board of autoclaved sand aerated concrete wallboard | |
CN103953197B (en) | Glass curtain wall construction method | |
CN217924247U (en) | Unit type clear water-imitating concrete skeleton partition wall structure | |
CN102839803A (en) | Construction method for installing decorating and modeling concrete slab | |
CN203684562U (en) | Anti-crack suspended ceiling structure | |
CN203334488U (en) | Connection structure of glass plate of cable-net-type glass curtain wall and a steel cable | |
CN208518081U (en) | A kind of folded grade type sets of brackets on top of the columns aluminium sheet connector system | |
CN106939699B (en) | Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall | |
CN108729580B (en) | Wall manufacturing method | |
CN212358610U (en) | Mounting structure of top surface spherical net rack | |
CN104018591B (en) | Mechanized construction method for wall thermal insulation | |
KR101499751B1 (en) | Urethane system board using the same roof waterproofing structure and construction methods | |
CN204983517U (en) | Mounting structure of dalle | |
CN110820921A (en) | Waterscape waterproof structure and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |