CN109958244A - A kind of folded grade canopy mounting system and an mounting method thereof - Google Patents

A kind of folded grade canopy mounting system and an mounting method thereof Download PDF

Info

Publication number
CN109958244A
CN109958244A CN201910339135.3A CN201910339135A CN109958244A CN 109958244 A CN109958244 A CN 109958244A CN 201910339135 A CN201910339135 A CN 201910339135A CN 109958244 A CN109958244 A CN 109958244A
Authority
CN
China
Prior art keywords
canopy
installation
layer
panel
lattice truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910339135.3A
Other languages
Chinese (zh)
Inventor
孙士东
周亮
于跃
刘振永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
China Construction Eighth Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Bureau Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau Decoration Engineering Co Ltd filed Critical China Construction Eighth Bureau Decoration Engineering Co Ltd
Priority to CN201910339135.3A priority Critical patent/CN109958244A/en
Publication of CN109958244A publication Critical patent/CN109958244A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F10/00Sunshades, e.g. Florentine blinds or jalousies; Outside screens; Awnings or baldachins

Abstract

A kind of multi-laminate grade awning provided by the invention, it is mounted on main steel construction, it include: the first quantity lattice truss and muti-piece panel corresponding with each lattice truss, wherein, in the corresponding installation to each lattice truss of panel described in muti-piece, the first quantity canopy layer is formed, from top to bottom successively installation is fixed on the main steel construction the first quantity canopy layer.Folded grade canopy in the present invention completes the work integrally assembled on ground before upper air installing, in manufacturing process can quick assembling, industrialization degree is high, when awning layer is transported to erecting bed, then unified carries out upper air installing.High altitude operation and welding capacity is greatly decreased in the integral hoisting scheme, not only contributes to reduce cost of labor, industrialization degree is high, is also beneficial to the control of welding quality.

Description

A kind of folded grade canopy mounting system and an mounting method thereof
Technical field
The present invention relates to folded grade canopy installation system, in particular to a kind of folded grade canopy installation system and its monoblock type installation Method.
Background technique
Important composition part of the canopy as modern architecture is kept away when main function is that protection entrance personnel are current It is drenched from rainwater and dripping while preventing from falling object by high-altitude and injured by a crashing object.With architectural aesthetic and the big hair of building structure, material Exhibition, canopy moulding and its Facing material, decorative effect are gradually complicated and changeable, and effect, which is also gradually evolved into, to be met using function Simultaneously be also the important component of building external decoration, the raising of esthetic requirement also to the design of the structure of curtain wall, installation generate compared with Big challenge.
For folding grade canopy, the design and installation of current most of buildings still use traditional mode --- and it is layered, divides component Keel, installation plane materiel are welded, this mode site workload is big, and the scattered confusion of material structure, erecting and welding amount is big, canopy truss peace Dress is mostly to weld in the overhead position, and precision and quality are difficult to ensure.
Summary of the invention
The present invention is to carry out to solve the above-mentioned problems, and it is an object of the present invention to provide a kind of folded grade canopy and its monoblock type peace Dress method completes most of whole assembly on ground, then unifies to carry out upper air installing, and overhead welding amount is greatly decreased, industrializes Degree is high, is also beneficial to the control of welding quality.
To achieve the above object, the present invention proposes a kind of folded grade canopy installation system, is mounted on main steel construction, has this The feature of sample, comprising: the first quantity lattice truss and muti-piece panel corresponding with each lattice truss, wherein more In the corresponding installation to each lattice truss of panel described in block, the first quantity canopy layer, the first quantity canopy are formed From top to bottom successively installation is fixed on the main steel construction layer.
A kind of folded grade canopy installation system proposed by the present invention, also has the feature that, each panel passes through machine Tool connection or structure glue are fixed on the lattice truss.
A kind of folded grade canopy installation system proposed by the present invention, also has the feature that, the mechanical connection is self tapping One of screw or machine screws or combination.
A kind of folded grade canopy installation system proposed by the present invention, also has the feature that, the first quantity canopy Layer is from top to bottom successively welded on the main steel construction.
In addition, the present invention also proposes a kind of folded grade canopy installation method, have the feature that, for installing above-mentioned fold Grade canopy installation system, comprising the following steps:
Panel installation: every piece of panel installation is fixed on the corresponding lattice truss, the first quantity is obtained The canopy layer;
Canopy installation: the first quantity canopy layer is from top to bottom successively fixed with the main Steel Structure Installation, is obtained To the folded grade canopy.
A kind of folded grade canopy installation method proposed by the present invention, also has the feature that, in the panel installation steps In, each panel is fixed on the lattice truss by mechanical connection or structure glue.
A kind of folded grade canopy installation method proposed by the present invention, also has the feature that, the mechanical connection is self tapping One of screw or machine screws or combination.
A kind of folded grade canopy installation method proposed by the present invention, also has the feature that, in the awning installation steps In, the first quantity canopy layer is from top to bottom successively welded on the main steel construction.
Invention effect and effect
A kind of folded grade canopy installation system according to the present invention and folded grade canopy installation method, different from it is traditional successively Welded truss, then the method for every piece of panel is installed respectively in high-altitude, but folded grade awning is divided into multilayered structure according to structure, The each lattice girders layer of production is respectively welded, corresponding decoration panel is being sequentially arranged on each lattice girders layer, thus Each individual awning layer is obtained, then successively lifting is fixed in main body steel construction from top to bottom by each awning layer, thus complete The integral installation of grade awning is folded at this.Color difference amendment and comprehensive is carried out to copper decoration panel after whole awning layers are all installed The protection of brushing F-C paint.Folded grade canopy in the present invention completes the work integrally assembled on ground before upper air installing, makes During work can quick assembling, industrialization degree is high, when awning layer is transported to erecting bed, then unified carries out upper air installing. High altitude operation and welding capacity is greatly decreased in the integral hoisting scheme, not only contributes to reduce cost of labor, and industrialization degree is high, Be conducive to the control of welding quality.In addition, the folded grade awning in the present invention carries out cross construction during integral hoisting, greatly It is big to save the duration.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the first layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 2 is the second layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 3 is the third layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 4 is the panel scheme of installation of the folded grade awning of the present invention in embodiment.
Fig. 5 is the overall structure diagram of the folded grade awning of the present invention in embodiment.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
Referring to the drawings and embodiment is explained in detail folded grade canopy according to the present invention.Below in conjunction with attached drawing Principles and features of the present invention are described, the given examples are served only to explain the present invention, is not intended to limit model of the invention It encloses.
Fig. 5 is the overall structure diagram of the folded grade awning of the present invention in embodiment.
As shown in figure 5, the present invention proposes a kind of folded grade canopy installation system, it is mounted on main steel construction 3, comprising: first Quantity lattice truss 1 and muti-piece panel 2 corresponding with each lattice truss,
Specifically, in above-mentioned folded grade awning installation system, the quantity of possessed lattice truss 1 should be according to setting It is common depending on the quantity of meter, grade awning is folded with two layers or two layers or more lattice truss 1.Correspondingly, each lattice purlin All successively splice installation by muti-piece canopy panel 2 on frame 1 into corresponding awning layer, it is common, the size of canopy panel 2 according to Depending on the lattice size of lattice truss 1.From top to bottom successively installation is fixed to the main steel knot to all awning layers being completed On structure 3.Above-mentioned awning layer installs fixed mode on main steel construction 3 as welding, and the first quantity canopy layer is by upper It is successively welded under on the main steel construction 3.
Further, in some embodiments, above-mentioned lattice truss 1 uses 60x60x5 electro-galvanized steel logical and 50x50x5 Galvanizing by dipping angle steel separately constitutes the lattice truss 1 of every layer of support, and every purlin Pin length is canopy cantilever span, and width is 1/2 axis Line width.Each component of lattice truss 1 answers strict control weldquality and thermal stress deformation by welding assembly, welding, if any Deformation, need to correct in time, guarantee surfacing.After the completion of lattice truss 1 welds, butt welding point weld seam position brush antirust paint twice, Carry out preservative treatment.
In addition, each panel 2 passes through mechanical connection or structure glue installation in folded grade canopy installation system of the invention It is fixed on the lattice truss 1.Above-mentioned mechanical connection is one of tapping screw or machine screws or combines, preferably For tapping screw.
Fig. 1 is the first layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 2 is the second layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 3 is the third layer lattice truss structure schematic diagram of the folded grade canopy of the present invention in embodiment.
Fig. 4 is the panel scheme of installation of the folded grade awning of the present invention in embodiment.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, in some embodiments, there are three lattices for above-mentioned folded grade awning installation system tool Truss 1, respectively first layer lattice truss 11, second layer lattice truss, 12, third layer lattice truss 13, panel 2 described in muti-piece It installs by the way that tapping screw is corresponding to each lattice truss 1, including panel 21 corresponding with first layer lattice truss 11, with The corresponding panel 22 of point each truss of the second layer, panel 23 corresponding with third layer lattice truss 1 form three canopy layers, and three The awning layer being completed from top to bottom successively is soldered on the main steel construction 3.
In addition, the present invention also proposes a kind of folded grade canopy installation method, for installing above-mentioned folded grade canopy installation system, The following steps are included:
Structure positioning: according to folded grade awning structural design drawing and erecting bed structure measurement unwrapping wire, the lattice purlin is determined Installation site of the frame main structure at actual installation scene.Further according to the Deepen Design typesetting figure and lattice truss further determined that Structure chart successively determines the installation site of each the lattice truss 1 and corresponding panel 2.
Above-mentioned structure positioning step in erecting bed surveying setting-out mainly by completing, specifically, should basis Folded grade awning design drawing and field agent structure level absolute altitude control line, play vertical line, horizontal line, absolute altitude control line, come true The actual location of the lattice truss main structure of erecting bed main stress is determined, then according to the Deepen Design moulding chosen the best alternatives The typesetting figure of upper each installation component position, the lattice truss hierarchical structure chart for being connected between lattice truss main structure Determine the actual installation position control line of each lattice truss 1 and panel 2 at the scene.
Panel installation: every piece of installation of panel 2 is fixed on the corresponding lattice truss 1, the first quantity is obtained A canopy layer.
In the panel installation steps, each panel 2 is fixed on described by mechanical connection or structure glue On lattice truss 1.The mechanical connection is one of tapping screw or machine screws or combination, preferably tapping screw.
Specifically, every piece of panel 2 has its number on corresponding lattice truss 1 on in-depth typesetting figure.According to depth Change typesetting figure, the decoration panel 2 accordingly numbered is fixed on the lattice truss 1 welded with tapping screw, should be noted that when fixed Using stainless steel screw and connecting corner yard, bimetallic corrosion is avoided.Screw spacing is not greater than 300mm, and tie point answers uniform cloth It sets, first slightly fastens screw when fixed, temporary support is removed after in place, adjust flatness, then by screw tightening.Decoration panel After 2 are installed, in plate seaming position injecting glue, and after being embedded in 2mm, copper filler rod blocks glue-line.After glue to be sealed is completely dried, Whole 2 surface pasting protective film of panel protections, and anticollision strip is set in corner.
Canopy installation: the first quantity canopy layer is from top to bottom successively fixed with the main installation of steel construction 3, is obtained To the folded grade canopy.Above-mentioned mounting means can be welding, and the first quantity canopy layer from top to bottom successively welds On the main steel construction 3.
Specifically, assembled canopy layer is risen using electric block cooperation truck crane when lifting each canopy layer It hangs to corresponding position, every Pin canopy layer configures 6 electric blocks and a truck crane.According to the absolute altitude control marked in advance Line, horizontal line and vertical line determine that position is errorless first by first layer canopy layer tie point in place and main body steel construction spot welding Afterwards, it then is fully welded, the protection of decoration panel 2 is paid attention in welding process, welding slag is forbidden to fall.The welding of first layer canopy layer is completed Butt welding point weld seam position brush antirust paint twice afterwards, carry out preservative treatment.After first layer canopy layer is installed, in kind pacify Fill the second layer, third layer canopy layer.
In addition, in folded grade canopy installation method proposed by the invention, before the panel installation steps, also have with Lower step:
Panel processing: raw panels are processed according to the Deepen Design typesetting figure, obtain the panel 2.
Specifically, canopy panel 2 uses 25mm thickness honeycomb copper sheet (2mm thickness copper sheet+22mm honeycomb core+1mm aluminium backboard) It is made by predetermined size bending, 1 meter of plate face spreading width, 4-6 meters of length are differed, according to specifically wanting for Deepen Design typesetting figure It asks and plate is processed to obtain panel 2, and carry out the corresponding number of every piece of panel 2 according to biochemical typesetting figure.
In addition, further including following step after the canopy installation steps in folded grade canopy installation method proposed by the invention It is rapid:
Panel processing: oxidation color is successively carried out to each panel 2 and is handled, at integral spray fluorine carbon finishing varnish protection Reason and panel cleaning treatment obtain being protected treated to fold grade canopy.
Specifically, copper sheet surface easy oxidation discoloration can be because of entire folded each layer of grade canopy because decoration panel is copper sheet production Set-up time should carry out unified aoxidize at color there are span to which color has differences before removing scaffold to panel It manages, integral spray fluorine carbon finishing varnish is protected after the completion of color treatments.Finishing varnish spraying requires spraying, and uniformly glossiness is excellent, hand Sense is fine and smooth, falls phenomenon without holiday, stream.After finishing varnish is completely dried, glue trace is removed with degumming agent and with neutral cleaners cleaner plate Face, and pay attention to the protection to other components in canopy.
Embodiment 1
Fig. 5 is the overall structure diagram of the folded grade awning of the present invention in embodiment.
As shown in figure 5, the present invention proposes a kind of folded grade canopy installation system, it is mounted on main steel construction 3, comprising: first Quantity lattice truss 1 and muti-piece panel 2 corresponding with each lattice truss,
Specifically, there are three lattice truss for tool, correspondingly, each lattice purlin in above-mentioned folded grade awning installation system Tapping screw splicing installation is all passed sequentially through into corresponding awning layer, common, canopy face by muti-piece canopy panel 2 on frame 1 The size of plate 2 is depending on the lattice size of lattice truss 1.Three canopy layers are from top to bottom successively welded on the main steel In structure 3.
Above-mentioned lattice truss 1 is led to using 60x60x5 electro-galvanized steel and 50x50x5 galvanizing by dipping angle steel, separately constitutes The lattice truss 1 of every layer of support, every purlin Pin length are canopy cantilever span, and width is 1/2 axis width.Lattice truss 1 it is each Component is answered strict control weldquality and thermal stress deformation, if any deformation, need to be corrected in time by welding assembly, welding, guarantees Surfacing.After the completion of lattice truss 1 welds, butt welding point weld seam position brush antirust paint twice carry out preservative treatment.
Fig. 1 is the first layer lattice truss structure schematic diagram of the folded grade canopy in the present embodiment.
Fig. 2 is the second layer lattice truss structure schematic diagram of the folded grade canopy in the present embodiment.
Fig. 3 is the third layer lattice truss structure schematic diagram of the folded grade canopy in the present embodiment.
Fig. 4 is the panel scheme of installation of the folded grade awning in the present embodiment.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, above-mentioned folded grade awning installation system tool is there are three lattice truss 1, and respectively the One layer of lattice truss 11, second layer lattice truss, 12, third layer lattice truss 13, panel 2 described in muti-piece passes through tapping screw pair It should install to each lattice truss 1, including panel 21 corresponding with first layer lattice truss 11, with each truss of the second layer point Corresponding panel 22, panel 23 corresponding with third layer lattice truss 1 form three canopy layers, three awnings being completed Layer is from top to bottom successively soldered on the main steel construction 3.
In addition, the present embodiment also proposes a kind of folded grade canopy installation method, for installing above-mentioned folded grade canopy installation system System, comprising the following steps:
Structure positioning: according to folded grade awning design drawing and field agent structure level absolute altitude control line, vertical line, water are played Horizontal line, absolute altitude control line, come determine erecting bed main stress lattice truss main structure actual location, then according to selection most The typesetting figure of each installation component position in the Deepen Design moulding of excellent scheme, for connecting between lattice truss main structure The lattice truss hierarchical structure chart connect determines the actual installation position control line of each lattice truss 1 and panel 2 at the scene.
Panel installation: on in-depth typesetting figure, every piece of panel 2 has its number on corresponding lattice truss 1.According to depth Change typesetting figure, the decoration panel 2 accordingly numbered is fixed on the lattice truss 1 welded with tapping screw, should be noted that when fixed Using stainless steel screw and connecting corner yard, bimetallic corrosion is avoided.Screw spacing is not greater than 300mm, and tie point answers uniform cloth It sets, it is fixed first slightly to fasten screw, temporary support is removed after in place, adjusts flatness, then by screw tightening.Decoration panel After 2 are installed, in plate seaming position injecting glue, and after being embedded in 2mm, copper filler rod blocks glue-line.After glue to be sealed is completely dried, Whole 2 surface pasting protective film of panel protections, and anticollision strip is set in corner.
Canopy installation: when lifting each canopy layer, assembled canopy layer is risen using electric block cooperation truck crane It hangs to corresponding position, every Pin canopy layer configures 6 electric blocks and a truck crane.According to the absolute altitude control marked in advance Line, horizontal line and vertical line determine that position is errorless first by first layer canopy layer tie point in place and main body steel construction spot welding Afterwards, it then is fully welded, the protection of decoration panel 2 is paid attention in welding process, welding slag is forbidden to fall.The welding of first layer canopy layer is completed Butt welding point weld seam position brush antirust paint twice afterwards, carry out preservative treatment.
After first layer canopy layer is installed, the second layer, third layer canopy layer are in kind installed.
In addition, before the panel installation steps, also having in the folded grade canopy installation method that the present embodiment is proposed Following steps:
Panel processing: canopy panel 2 uses 25mm thickness honeycomb copper sheet (2mm thickness copper sheet+22mm honeycomb core+1mm aluminium backboard) It is made by predetermined size bending, 1 meter of plate face spreading width, 4-6 meters of length are differed, according to specifically wanting for Deepen Design typesetting figure It asks and plate is processed to obtain panel 2, and carry out the corresponding number of every piece of panel 2 according to biochemical typesetting figure.
In addition, further including following after the canopy installation steps in the folded grade canopy installation method that the present embodiment is proposed Step:
Panel processing: because decoration panel is copper sheet production, copper sheet surface easy oxidation discoloration can be because of entire folded each layer of grade canopy Set-up time should carry out unified aoxidize at color there are span to which color has differences before removing scaffold to panel It manages, integral spray fluorine carbon finishing varnish is protected after the completion of color treatments.Finishing varnish spraying requires spraying, and uniformly glossiness is excellent, hand Sense is fine and smooth, falls phenomenon without holiday, stream.After finishing varnish is completely dried, glue trace is removed with degumming agent and with neutral cleaners cleaner plate Face, and pay attention to the protection to other components in canopy.
The action and effect of embodiment
A kind of folded grade canopy installation system and folded grade canopy installation method according to involved in the present embodiment are different from tradition Successively welded truss, then the method for every piece of panel is installed in high-altitude respectively, but folded grade awning is divided into according to structure more Layer structure is respectively welded each lattice girders layer of production, corresponding decoration panel is being sequentially arranged at each lattice girders layer On, so that each individual awning layer is obtained, then successively lifting is fixed in main body steel construction from top to bottom by each awning layer, To complete the integral installation of the folded grade awning.Color difference amendment is carried out to copper decoration panel after whole awning layers are all installed And brushing F-C paint protection comprehensively.Folded grade canopy in the present embodiment completes whole assembly on ground before upper air installing Work, in manufacturing process can quick assembling, industrialization degree is high, when awning layer is transported to erecting bed, then unified carries out Upper air installing.High altitude operation and welding capacity is greatly decreased in the integral hoisting scheme, not only contributes to reduce cost of labor, industrialization Degree is high, is also beneficial to the control of welding quality.In addition, the folded grade awning in the present embodiment carries out during integral hoisting Cross construction greatlys save the duration.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (8)

1. a kind of folded grade canopy installation system, is mounted on main steel construction characterized by comprising
First quantity lattice truss and muti-piece panel corresponding with each lattice truss,
Wherein, in the corresponding installation to each lattice truss of panel described in muti-piece, the first quantity canopy layer is formed,
From top to bottom successively installation is fixed on the main steel construction the first quantity canopy layer.
2. folded grade canopy installation system as described in claim 1, which is characterized in that each panel by mechanical connection or Structure glue is fixed on the lattice truss.
3. folded grade canopy installation system as claimed in claim 2, which is characterized in that the mechanical connection is tapping screw or machine One of screw-making or combination.
4. folded grade canopy installation system as described in claim 1, which is characterized in that the first quantity canopy layer by up to Under be successively welded on the main steel construction.
5. a kind of folded grade canopy installation method, which is characterized in that for installing folded grade canopy installation system described in claim 1-4 System, comprising the following steps:
Panel installation: every piece of panel installation is fixed on the corresponding lattice truss, it is described to obtain the first quantity Canopy layer;
Canopy installation: the first quantity canopy layer is from top to bottom successively fixed with the main Steel Structure Installation, institute is obtained State folded grade canopy.
6. folded grade canopy installation method as claimed in claim 5, which is characterized in that in the panel installation steps, each The panel is fixed on the lattice truss by mechanical connection or structure glue.
7. folded grade canopy installation method as claimed in claim 6, which is characterized in that the mechanical connection is tapping screw or machine One of screw-making or combination.
8. folded grade canopy installation method as claimed in claim 5, which is characterized in that in the awning installation steps, first The quantity canopy layer is from top to bottom successively welded on the main steel construction.
CN201910339135.3A 2019-04-25 2019-04-25 A kind of folded grade canopy mounting system and an mounting method thereof Pending CN109958244A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910339135.3A CN109958244A (en) 2019-04-25 2019-04-25 A kind of folded grade canopy mounting system and an mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910339135.3A CN109958244A (en) 2019-04-25 2019-04-25 A kind of folded grade canopy mounting system and an mounting method thereof

Publications (1)

Publication Number Publication Date
CN109958244A true CN109958244A (en) 2019-07-02

Family

ID=67026670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910339135.3A Pending CN109958244A (en) 2019-04-25 2019-04-25 A kind of folded grade canopy mounting system and an mounting method thereof

Country Status (1)

Country Link
CN (1) CN109958244A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152807A (en) * 2021-04-08 2021-07-23 中建铁路投资建设集团有限公司 Construction method of circular arch-shaped hyperbolic canopy structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201620318U (en) * 2010-04-09 2010-11-03 中铁第一勘察设计院集团有限公司 Railroad bed sunshade shed in permafrost region
CN202644872U (en) * 2012-06-15 2013-01-02 湖北弘毅钢结构工程有限公司 Rain cover of steel-structure factory building
CN203429935U (en) * 2013-07-15 2014-02-12 江西锦前金属建筑有限公司 Overhanging type awning
US20160340959A1 (en) * 2015-06-29 2016-11-24 Masoud Valinejadshoubi Adaptive ventilating window for different weather conditions
CN206693526U (en) * 2017-05-16 2017-12-01 金华金瓦片户外用品有限公司 A kind of integral type awning support
CN207761200U (en) * 2017-12-11 2018-08-24 美建建筑系统(中国)有限公司 A kind of modularization steel canopy convenient for assembly
CN208396176U (en) * 2018-05-11 2019-01-18 宝胜系统集成科技股份有限公司 The rain cover structure of steel building
CN209907771U (en) * 2019-04-25 2020-01-07 中建八局装饰工程有限公司 Stack-level awning installation system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201620318U (en) * 2010-04-09 2010-11-03 中铁第一勘察设计院集团有限公司 Railroad bed sunshade shed in permafrost region
CN202644872U (en) * 2012-06-15 2013-01-02 湖北弘毅钢结构工程有限公司 Rain cover of steel-structure factory building
CN203429935U (en) * 2013-07-15 2014-02-12 江西锦前金属建筑有限公司 Overhanging type awning
US20160340959A1 (en) * 2015-06-29 2016-11-24 Masoud Valinejadshoubi Adaptive ventilating window for different weather conditions
CN206693526U (en) * 2017-05-16 2017-12-01 金华金瓦片户外用品有限公司 A kind of integral type awning support
CN207761200U (en) * 2017-12-11 2018-08-24 美建建筑系统(中国)有限公司 A kind of modularization steel canopy convenient for assembly
CN208396176U (en) * 2018-05-11 2019-01-18 宝胜系统集成科技股份有限公司 The rain cover structure of steel building
CN209907771U (en) * 2019-04-25 2020-01-07 中建八局装饰工程有限公司 Stack-level awning installation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152807A (en) * 2021-04-08 2021-07-23 中建铁路投资建设集团有限公司 Construction method of circular arch-shaped hyperbolic canopy structure
CN113152807B (en) * 2021-04-08 2022-08-26 中建铁路投资建设集团有限公司 Construction method of circular arch-shaped hyperbolic canopy structure

Similar Documents

Publication Publication Date Title
CN106760560B (en) Complicated arc list construction of Pyramid engineering method
CN107489215A (en) A kind of construction technology of new network type glass curtain wall
CN107905536A (en) Glass curtain wall construction method
CN108915188B (en) Low-relief decorative wall and low-relief metal plate installation and construction method
CN106049766A (en) Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN103334593A (en) Construction technology of cable net dot-mode glass curtain wall
CN111335476A (en) Staggered floor steel mesh frame subsection lifting accumulative assembling construction method
CN109958244A (en) A kind of folded grade canopy mounting system and an mounting method thereof
CN104631650B (en) Screen plate outer wall with heat insulation layer and construction method
CN209907771U (en) Stack-level awning installation system
CN209163180U (en) A kind of extensive high-altitude suspended-cable structure aluminum veneer moulding furred ceiling
CN111119368A (en) Construction method for externally-hung metal rock wool sandwich board of autoclaved sand aerated concrete wallboard
CN103953197B (en) Glass curtain wall construction method
CN217924247U (en) Unit type clear water-imitating concrete skeleton partition wall structure
CN102839803A (en) Construction method for installing decorating and modeling concrete slab
CN203684562U (en) Anti-crack suspended ceiling structure
CN203334488U (en) Connection structure of glass plate of cable-net-type glass curtain wall and a steel cable
CN208518081U (en) A kind of folded grade type sets of brackets on top of the columns aluminium sheet connector system
CN106939699B (en) Construction method for galvanized steel sheet waterproof layer on inner side of open type ceramic plate curtain wall
CN108729580B (en) Wall manufacturing method
CN212358610U (en) Mounting structure of top surface spherical net rack
CN104018591B (en) Mechanized construction method for wall thermal insulation
KR101499751B1 (en) Urethane system board using the same roof waterproofing structure and construction methods
CN204983517U (en) Mounting structure of dalle
CN110820921A (en) Waterscape waterproof structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination