CN109949006A - A kind of project management method, device and relevant device - Google Patents

A kind of project management method, device and relevant device Download PDF

Info

Publication number
CN109949006A
CN109949006A CN201910189728.6A CN201910189728A CN109949006A CN 109949006 A CN109949006 A CN 109949006A CN 201910189728 A CN201910189728 A CN 201910189728A CN 109949006 A CN109949006 A CN 109949006A
Authority
CN
China
Prior art keywords
project
information
block chain
sub
progress information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910189728.6A
Other languages
Chinese (zh)
Inventor
刘新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Launch Technology Co Ltd
Original Assignee
Shenzhen Launch Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Launch Technology Co Ltd filed Critical Shenzhen Launch Technology Co Ltd
Priority to CN201910189728.6A priority Critical patent/CN109949006A/en
Publication of CN109949006A publication Critical patent/CN109949006A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present application discloses a kind of project management method and relevant device, is applied to block chain node device, the information this method comprises: receiving item purpose is set up the project, and by the project verification synchronizing information to block chain;The planning information of the project is received, and the planning information is synchronized to the block chain, the planning information includes the plan information and technical specification information of the project;The project is received in the progress information of implementation procedure, and the progress information is synchronized to the block chain;In the case where the project is settled accounts, by comparing the progress information and the planning information, the check and acceptance result of the project is determined.This process by means of block chain can not distort with the characteristics such as Fast synchronization, provide that the efficiency of management is high, transparency is high and can realize the Managed Solution for sourcing and calling to account for engineering project.

Description

A kind of project management method, device and relevant device
Technical field
This application involves technical field of data processing more particularly to a kind of project management methods, device and relevant device.
Background technique
In Larger Engineering Projects, the engineering project file being related to is more, the clear corresponding duty of engineering project corresponding document It lets people and preserving type needs to obtain associated documents to corresponding person liable when needing to check relevant file.But it is this The efficiency of management of file record mode is low, and link is more to be easy to cause confusion, loss, mistake, even file due to handling Being tampered can not all trace.
Summary of the invention
The embodiment of the present application provides a kind of project management method, and the efficiency of management of engineering project file can be improved, and guarantees work Journey item file it is true and reliable.
According to the application in a first aspect, the embodiment of the present application provides a kind of project management method, it is applied to block chain link Point device, comprising: receiving item purpose is set up the project information, and by the project verification synchronizing information to block chain;Receive the rule of the project Draw information, and the planning information be synchronized to the block chain, the planning information include the project plan information and Technical specification information;The project is received in the progress information of implementation procedure, and the progress information is synchronized to the block Chain;In the case where the project is settled accounts, by comparing the progress information and the planning information, the project is determined Check and acceptance result.
In some possible embodiments, the project includes multiple sub-projects, and the reception project was executing The progress information of journey, comprising: sequence is executed based on each sub-project in the multiple sub-project, successively receives multiple equipment section The progress information for each sub-project that each device node is sent in point, wherein the multiple device node with it is the multiple Sub-project corresponds.
In some possible embodiments, the project includes multiple sub-projects, and the reception project was executing The progress information of journey, comprising: receive the multiple sub-project that each device node is independently transmitted in multiple equipment node respectively In each sub-project progress information, wherein the multiple device node and the multiple sub-project correspond.
In some possible embodiments, the method also includes: in the case where the check and acceptance result is unacceptable situation, really Surely leading to the check and acceptance result is unacceptable target sub-project;Early warning is sent to the corresponding device node of the target sub-project Information.
In some possible embodiments, the method also includes: receive the described each of each device node transmission The identity information of the corresponding each user of the progress information of sub-project;Correspondingly, described be synchronized to institute for the progress information State block chain, specifically: in the successful situation of identity information for verifying each user, by each sub-project into Synchronizing information is opened up to the block chain.
In some possible embodiments, the method also includes: the modification information of the project is received, wherein the change More information is formulated according to the sub-project progress information;According to the modification information, change described in the block chain is updated The planning information of the corresponding project of more information.
In some possible embodiments, the method also includes: receive the described each of each device node transmission The project authority information of the corresponding each user of the progress information of sub-project;Correspondingly, described that the progress information is synchronous To the block chain, specifically: in the successful situation of project authority information for verifying each user, by each height The progress information of project is synchronized to the block chain.
According to the application second aspect, a kind of project management device is provided, is applied to block chain node device, comprising: connect Unit is received, comparing unit, the receiving unit is used for, and receiving item purpose is set up the project information, and by the project verification synchronizing information to area Block chain;The receiving unit is also used to, and receives the planning information of the project, and the planning information is synchronized to the block Chain, the planning information include the plan information and technical specification information of the project;The receiving unit is also used to, and receives institute Project is stated in the progress information of implementation procedure, and the progress information is synchronized to the block chain;The comparing unit is used for, In the case where the project is settled accounts, by comparing the progress information and the planning information, the project is determined Check and acceptance result.
In some possible embodiments, the project includes multiple sub-projects, and the receiving unit is also used to, and is based on institute That states each sub-project in multiple sub-projects executes sequence, successively receives the institute that each device node is sent in multiple equipment node The progress information of each sub-project is stated, wherein the multiple device node and the multiple sub-project correspond.
In some possible embodiments, the project includes multiple sub-projects, and the receiving unit is also used to, connects respectively The progress information of each sub-project in the multiple sub-project that each device node is independently transmitted in multiple equipment node is received, Described in multiple equipment node and the multiple sub-project correspond.
In some possible embodiments, described device further include: positioning unit, prewarning unit, the positioning unit are used In in the case where the check and acceptance result is unacceptable situation, determining causes the check and acceptance result to be unacceptable target sub-project;Institute It states prewarning unit to be used for, the corresponding device node of Xiang Suoshu target sub-project sends warning information.
In some possible embodiments, the receiving unit is also used to, and receives the institute that each device node is sent State the identity information of the corresponding each user of progress information of each sub-project;The identity information for verifying each user at In the case where function, the progress information of each sub-project is synchronized to the block chain.
In some possible embodiments, described device further includes updating unit, and the receiving unit is also used to, and receives institute The modification information of project is stated, wherein the modification information is formulated according to the sub-project progress information;The updating unit For updating the planning information of the corresponding project of modification information described in the block chain according to the modification information.
In some possible embodiments, the receiving unit is also used to, and receives the institute that each device node is sent State the project authority information of the corresponding each user of progress information of each sub-project;In the project power for verifying each user In the successful situation of limit information, the progress information of each sub-project is synchronized to the block chain.
According to the application third aspect, the embodiment of the present application provides a kind of block chain node device, which is characterized in that packet Include processor, input interface, output interface and memory, wherein the memory is for storing computer program, the calculating Machine program includes program instruction, and the processor executes any implementation of the application first aspect for calling described program to instruct Example.
Fourth aspect, the embodiment of the present application provide the computer storage medium and are stored with computer program, the meter Calculation machine program includes program instruction, and described program instruction makes the processor execute the application first party when being executed by a processor Face any embodiment.
In the embodiment of the present application, first, receiving item purpose is set up the project information, and by the project verification synchronizing information to block Chain;Second, the planning information of the project is received, and the planning information is synchronized to the block chain, the planning information Plan information and technical specification information including the project;Third receives the project in the progress information of implementation procedure, and The progress information is synchronized to the block chain;Finally, in the case where the project is settled accounts, by compare it is described into Information and the planning information are opened up, determines the check and acceptance result of the project.This process can not distort and fastly by means of block chain Speed such as synchronizes at the characteristics, provides that the efficiency of management is high, transparency is high and can realize the Managed Solution for sourcing and calling to account for engineering project.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in embodiment description Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is some embodiments of the present application, general for this field For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of schematic flow diagram of project management method provided by the embodiments of the present application;
Fig. 2 is a kind of sub-project progress of each device node of block chain node serial received provided by the embodiments of the present application Information schematic diagram;
Fig. 3 is the sub-project progress that a kind of block chain nodal parallel provided by the embodiments of the present application receives each device node Schematic diagram;
Fig. 4-6 is project management apparatus structure schematic diagram provided by the embodiments of the present application;
Fig. 7 is a kind of electronic equipment structural representation block diagram provided by the embodiments of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiment is some embodiments of the present application, instead of all the embodiments.Based on this Shen Please in embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall in the protection scope of this application.
It should be appreciated that ought use in this specification and in the appended claims, term " includes " and "comprising" instruction Described feature, entirety, step, operation, the presence of element and/or component, but one or more of the other feature, whole is not precluded Body, step, operation, the presence or addition of element, component and/or its set.
It is also understood that mesh of the term used in this present specification merely for the sake of description specific embodiment And be not intended to limit the application.As present specification and it is used in the attached claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singular, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in present specification and the appended claims is Refer to any combination and all possible combinations of one or more of associated item listed, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt Be construed to " when ... " or " once " or " in response to determination " or " in response to detecting ".Similarly, phrase " if it is determined that " or " if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
It should be noted that the block chain node in the embodiment of the present application, which can be, can undertake service and ensure service energy The conventional block chain link point server of power, is also possible to be registered in block chain, has processor, hard disk, memory and system total The terminal device that can be undertaken service and ensure service ability of cable architecture.The embodiment of the present application is not especially limited.
It is understood that block chain is a kind of distributed database from the perspective of data, it can be realized data The distributed recording of information (is recorded by multiple memory node collectives in system rather than is individually remembered by the mechanism of a centralization Record) (it can store in all memory nodes for participating in record data with distributed storage, rather than be centrally stored in centralization In agency node), from the point of view of time angle, block chain includes multiple blocks, the letter generated in each block storage a period of time Breath, and upper storage time is marked, the beginning of the page of each block includes a upper block so information, all block head and the tail phases Even, to form block chain.So block chain is that a kind of record time have successive, can not distorting, data trusty Library.
The Supply Item management method and device of the embodiment of the present application can be applied in multiple fields, for example, software is opened Hair project, construction-engineering project, logistics transportation project etc., are not especially limited herein.
For the ease of understanding hereafter, the executing subject of hereafter embodiment of the method is known as block chain node.
It is that the embodiment of the present application provides a kind of schematic flow diagram of project management method referring to Fig. 1, the item as shown in the figure Mesh management method can include:
S101, receiving item purpose are set up the project information, and by the project verification synchronizing information to block chain.
In some embodiments, block chain node receiving item purpose project verification information, the project verification information includes: entry name The information such as title, project number, project affiliated function, wherein each information in the project verification information is with key-value pair (Key- Value format) is sent to block chain node, and block chain node is after the data packet for receiving project verification information, by vertical The corresponding number (key value) of each information can be quickly obtained the corresponding information content of the number (Value) in information.Separately Outside, the project verification information is device node in the project preparation discussion stage, is sent to block chain node, wherein the equipment section Point can be cell phone, PC, wearable device etc., and the application is not construed as limiting this.
In some embodiments, after the project verification information for receiving the project, described in the block chain node also receives The authentication information for the project personnel that project is related to, the authentication information include the name of project personnel, position, affiliated company, institute The information such as category department, wherein each information in the authentication information is sent out using the format of key-value pair (Key-Value) Give block chain node.After block chain node receives the authentication information, in the database by authentication information storage, When block chain node receive to project carry out additions and deletions change the request such as look into after, block chain node in the database according to storing The permission for whether having the project of the user of the request is initiated in the authentication information for the project personnel that the project is related to, verifying, if The user does not have the permission of the project, refuses the access of the request.
S102, the planning information for receiving the project, and the planning information is synchronized to the block chain.
In some embodiments, block chain node receives the planning information of the project, and the planning information includes described The plan information and technical specification information of project.The plan information of the project include the project period planning and the item Purpose budget program, the technical specification information are each technical requirements of the project.
In some embodiments, the project includes multiple sub-projects, for each subitem in the multiple sub-project Mesh, correspondingly, block chain node also receive the planning information of each sub-project, and the planning information of each sub-project is equally wrapped Include the plan information of the sub-project and the technical specification information of the sub-project, the plan information of the sub-project and the son The particular content of the technical specification information of project sees above description.
Below by taking development project as an example, the planning information is specifically described.In development project, institute Stating the period planning that plan information includes can be the software version update period, and the budget program that the plan information includes can be with It is the cost budgeting that block chain node is rented in research and development of software cost budgeting and purchase, it is soft that the technical specification information can be this The concurrency of handling up of part, exception error rate, processing speed etc..It should be understood that above-mentioned be only served in citing, should not constitute specific It limits, the demand being actually needed accordingly based upon each project carries out make a plan information and technical specification information.
In some embodiments, block chain node can be in the project verification information in a data packet simultaneously receiving step S101 With planning information in step S102, the project verification in two or more data packet receiving step S101 can also believe respectively Breath is not construed as limiting this with planning information in step S102, the application.
S103, the project is received in the progress information of implementation procedure, and the progress information is synchronized to the block Chain.
In some embodiments, the project includes multiple sub-projects, it is described receive the project implementation procedure into Open up information, comprising: sequence is executed based on each sub-project in the multiple sub-project, is successively received in multiple equipment node respectively The progress information for each sub-project that a device node is sent, wherein the multiple device node and the multiple sub-project It corresponds.Wherein, each sub-project of the project is carried out sequentially in time with serial executive mode, that is to say, that after One sub-project just starts to execute after the completion of previous sub-project.Referring specifically to Fig. 2, project A is divided into 5 sub-projects, block Chain node just starts receiving device node 3 and sends out after having received that the progress information of sub-project 2 of the transmission of device node 2 The progress information for the sub-project 3 sent.Under the application scenarios that multiple sub-projects serially execute, pass through this serial recipient Formula enables the progress information of sub-project rapidly to synchronize to other block chain link points by block chain node, avoids Sub-project progress information causes midway to be lost without retaining in time.
In some embodiments, the project includes multiple sub-projects, it is described receive the project implementation procedure into Open up information, comprising: receive respectively each in the multiple sub-project that each device node is independently transmitted in multiple equipment node The progress information of sub-project, wherein the multiple device node and the multiple sub-project correspond.Wherein, each sub-project It is with parallel executive mode while to carry out, and the completion of each sub-project sequence is independent, that is to say, that each subitem The corresponding device node of mesh to block chain node send sub-project progress information be it is independent, it is corresponding not depend on other sub-projects The order of transmission of device node.For example, project B is equally divided into 5 sub-projects in Fig. 3, sub-project 1 to 5 is to be performed simultaneously , after the completion of any sub-project in sub-project 1 to 5 is performed, the corresponding device node of the sub-project can be to block chain link Point sends the progress information of the sub-project.The reception mode flexibility of the sub-project progress information of example description is high, is easy to expand Open up more business scenarios.
In some embodiments, the project includes the progress msg of project in the progress information of implementation procedure, and/or, The completion information of project, the progress msg describes the completed workload of the project, described to complete what information described Be the project in the completed, for the performance of every planning information of the project.If the project includes multiple sons Project, correspondingly the project the progress information of implementation procedure include include in the multiple sub-project each sub-project into Information is spent, and/or, the completion information of project.More specifically, the progress information of the project includes the project in implementation procedure In each step actual expenses expense and the practical time-consuming and described project in the process of implementation in technical specification information The performance of defined indices.
In some embodiments, the synchronizing information that will set up the project in step 101 is same by planning information into block chain, step 102 Walk in block chain and step 103 progress information to be synchronized to block chain to be all made of same mode and synchronize, below into Row is described collectively, and for ease of description, the project verification information, the planning information and the progress information is referred to as mesh Mark information.The target information is synchronized to block chain, comprising: block chain node utilizes the target information unidirectional irreversible The corresponding characteristic value of the target information is calculated in function, wherein it is described unidirectionally can not inverse function can be bright by any one section Text is converted to the characteristic value of regular length, but can not calculate the plaintext by the characteristic value.It is described unidirectionally can not inverse function Including but not limited to Message-Digest Algorithm 5 (Message Digest Algorithm 5, MD5), Secure Hash Algorithm (Secure Hash Algorithm, SHA), message authentication code (Message Authentication Code, MAC) function Deng.It should be understood that above-mentioned contrafunctional can not unidirectionally be only served in citing, specific restriction should not be constituted.
In some embodiments, the target information is synchronized to block chain, further includes: block chain node is according to the mesh It marks information and generates the target information index, then the target information is indexed into characteristic value corresponding with the target information, lead to Cross Encryption Algorithm and be calculated the first data, the process of the Encryption Algorithm be to the file of plaintext or data by certain algorithm into Row processing becomes a Duan Miwen, could be only reduced to the ciphertext in plain text using corresponding key.Wherein, described to add Close algorithm includes but is not limited to data encryption standards (Data Encryption Standard, DES), Digital Signature Algorithm (Digital Signature Algorithm, DSA), advanced encryption algorithm (Advanced Encryption Standard, AES), international data confidentiality algorithm (International Data Encryption Algorithm, IDES) etc..It should be understood that Above-mentioned Encryption Algorithm is only served in citing, should not constitute specific restriction.
S104, in the case where the project is settled accounts, by comparing the progress information and the planning information, really The check and acceptance result of the fixed project.
In some embodiments, the plan information for presetting in the planning information of the project (calculate in advance by period planning Draw) and technical specification information zone of reasonableness threshold value.The planning information of the progress information of the project and the project is carried out It compares one by one, if the numerical value of the indices in the progress information of the project, which exceeds, presets the reasonable of the planning information The affiliated device node of range threshold, Xiang Suoshu project sends warning information, wherein the warning information can be replacement institute It states the executor of project or adjusts the information of the implementation strategy of the project.
In some embodiments, the project includes multiple sub-projects, in the case where the check and acceptance result is unacceptable situation, Determining causes the check and acceptance result to be unacceptable target sub-project;It is sent to the corresponding device node of the target sub-project pre- Alert information.In the specific implementation, the planning information of the progress information of each sub-project and each sub-project is compared one by one, if The numerical value of indices in the progress information of the sub-project exceeds the zone of reasonableness threshold value for presetting the planning information, Warning information is sent to the affiliated device node of the sub-project, wherein the warning information can be the replacement sub-project Executor either adjust the sub-project implementation strategy information.
In some embodiments, the device node can be cell phone, the wearable device with communication function, meter Machine equipment etc. is calculated, correspondingly, the sending method of the warning information includes the modes such as phone, short message, mail, and the application is to equipment The concrete form of node and the sending method of warning information are not construed as limiting.
In some embodiments, the method also includes: the modification information of the project is received, wherein the modification information It is to be formulated according to the sub-project progress information;According to the modification information, modification information described in the block chain is updated The planning information of the corresponding project.In practical application, during the project implementation, the actual performance of each sub-project It tends not to completely the same with plan, it is generally the case that project needs in real time according to each sub-project currently completed Progress information, carry out the plan information of the subsequent each node of dynamic reconciling items.For example, such as before Fig. 2 project A Time used in three sub-project reality and actual budget are more than planned time and planned budget, in this case, The responsible person of project A can the plan information of two sub-project subsequent to project A change, such as shorten planned time and subtract Few planned budget.Block chain node is after having received project A change of plan information, and block chain node is according to the plan of project A Modification information indicates the plan information of subsequent two sub-project of block chain renewal item A.
In some embodiments, the method also includes: receive each subitem that each device node sends The identity information of the corresponding each user of purpose progress information;Correspondingly, described that the progress information is synchronized to the block Chain, specifically: in the successful situation of identity information for verifying each user, by the progress information of each sub-project It is synchronized to the block chain.In some applications, the identity information of user can be with sub-project progress information in the same data Bao Zhongxiang block chain node is sent, can also be before device node sends sub-project progress information to block chain node, in list It is sent in another only data packet to block chain node, the application does not limit this.Then, block chain node is to user's body After part information is confirmed, user as defined in the whether described sub-project of the identity information of the user is determined, if the user is described The sub-project progress information received is then synchronized in block chain by user as defined in sub-project.
In some embodiments, the method also includes: receive each subitem that each device node sends The project authority information of the corresponding each user of purpose progress information;Correspondingly, it is described the progress information is synchronized to it is described Block chain, specifically: in the successful situation of project authority information for verifying each user, by each sub-project Progress information is synchronized to the block chain.In some applications, the project authority information of user can be with sub-project progress information It is sent in the same data packet to block chain node, sub-project progress letter can also be sent to block chain node in device node Before breath, sent in another individual data packet to block chain node, the application does not limit this.Then, block chain Node verifies the project authority information of user, if the project permission of user is met the requirements, the sub-project that will be received Progress information is synchronized in block chain.In above-described embodiment, block chain node is by carrying out identity letter to sub- development of projects information Breath verifying and progress project authority information verifying, it is ensured that in the real reliability of block chain neutron development of projects information.
In the embodiment of the present application, first, receiving item purpose is set up the project information, and by the project verification synchronizing information to block Chain;Second, the planning information of the project is received, and the planning information is synchronized to the block chain, the planning information Plan information and technical specification information including the project;Third receives the project in the progress information of implementation procedure, and The progress information is synchronized to the block chain;Finally, in the case where the project is settled accounts, by compare it is described into Information and the planning information are opened up, determines the check and acceptance result of the project.This process can not distort and fastly by means of block chain Speed such as synchronizes at the characteristics, provides that the efficiency of management is high, transparency is high and can realize the Managed Solution for sourcing and calling to account for engineering project.
Referring to fig. 4, the embodiment of the present application also provides a kind of project management device 400, is applied to block chain node device, packet Include: receiving unit 401, comparing unit 402, the receiving unit 401 are used for, receiving item purpose project verification information, and will be described vertical Synchronizing information is to block chain;The receiving unit 401 is also used to, and receives the planning information of the project, and by the planning For synchronizing information to the block chain, the planning information includes the plan information and technical specification information of the project;It is described to connect It receives unit 401 to be also used to, receives the project in the progress information of implementation procedure, and the progress information is synchronized to the area Block chain;The comparing unit 402 is used for, in the case where the project is settled accounts, by comparing the progress information and institute Planning information is stated, determines the check and acceptance result of the project.
In some possible embodiments, the project includes multiple sub-projects, and the receiving unit 401 is also used to, base Each sub-project executes sequence in the multiple sub-project, successively receives each device node in multiple equipment node and sends Each sub-project progress information, wherein the multiple device node and the multiple sub-project correspond.
In some possible embodiments, the project includes multiple sub-projects, and the receiving unit 401 is also used to, point Not Jie Shou in multiple equipment node in the independently transmitted the multiple sub-project of each device node each sub-project progress letter Breath, wherein the multiple device node and the multiple sub-project correspond.
In some possible embodiments, referring to Fig. 5, described device further include: positioning unit 501, prewarning unit 502, The positioning unit 501 is used for, and in the case where the check and acceptance result is unacceptable situation, determining causes the check and acceptance result to be obstructed The target sub-project crossed;The prewarning unit 502 is used for, and the corresponding device node of Xiang Suoshu target sub-project sends early warning letter Breath.
In some possible embodiments, the receiving unit 401 is also used to, and receives what each device node was sent The identity information of the corresponding each user of the progress information of each sub-project;In the identity information for verifying each user In successful situation, the progress information of each sub-project is synchronized to the block chain.
In some possible embodiments, referring to Fig. 6, described device further includes updating unit 601, the receiving unit 401 are also used to, and receive the modification information of the project, wherein the modification information is formulated according to the sub-project progress information 's;The updating unit 601 is used for, and according to the modification information, updates the corresponding institute of modification information described in the block chain State the planning information of project.
In some possible embodiments, the receiving unit 401 is also used to, and receives what each device node was sent The project authority information of the corresponding each user of the progress information of each sub-project;In the project for verifying each user In the successful situation of authority information, the progress information of each sub-project is synchronized to the block chain.
In some embodiments, the embodiment of the present disclosure provides the function that has of device or comprising module can be used for holding The method of row embodiment of the method description above, specific implementation are referred to the description of embodiment of the method above, for sake of simplicity, this In repeat no more.
It is a kind of electronic equipment structural schematic block diagram that another embodiment of the application provides referring to Fig. 7, Fig. 7, the wherein electricity Sub- equipment can be the block chain node of figure 1 above embodiment of the method description.Electronic equipment in the present embodiment as shown in the figure It may include: one or more processors 701;One or more input interfaces 702, one or more output interfaces 703 and are deposited Reservoir 704.Above-mentioned processor 701, input interface 702, output interface 703 and memory 704 are connected by bus 705.Storage Device 702 includes program instruction for storing computer program, the computer program, and processor 701 is for executing memory 702 The program instruction of storage.Wherein, processor 701 is configured for calling described program instruction execution:
By input interface 702, receiving item purpose project verification information, and pass through output interface 703, the project verification information is same Walk block chain;
By input interface 702, the planning information of the project is received, and by output interface 703, the planning is believed Breath is synchronized to the block chain, and the planning information includes the plan information and technical specification information of the project;
By input interface 702, the project is received in the progress information of implementation procedure, and passes through output interface 703, it will The progress information is synchronized to the block chain;
In the case where the project is settled accounts, by comparing the progress information and the planning information, institute is determined State the check and acceptance result of project.
It should be appreciated that in the embodiment of the present application, alleged processor 701 can be central processing unit (Central Processing Unit, CPU), which can also be other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic Device, discrete gate or transistor logic, discrete hardware components etc..General processor can be microprocessor or this at Reason device is also possible to any conventional processor etc..
The memory 704 may include read-only memory and random access memory, and to processor 701 provide instruction and Data.The a part of of memory 704 can also include nonvolatile RAM.For example, memory 704 can also be deposited Store up the information of device type.
In the specific implementation, processor 701, input interface 702 described in the embodiment of the present application, output interface 703 can Implementation described in any embodiment of project management method provided by the embodiments of the present application is executed, this Shen also can be performed Please project management device modules described in embodiment function, details are not described herein.
A kind of computer readable storage medium, the computer-readable storage medium are provided in another embodiment of the application Matter is stored with computer program, and the computer program includes program instruction, and described program instructs realization when being executed by processor: Receiving item purpose is set up the project information, and by the project verification synchronizing information to block chain;Receive the planning information of the project, and by institute It states planning information and is synchronized to the block chain, the planning information includes the plan information and technical specification information of the project; The project is received in the progress information of implementation procedure, and the progress information is synchronized to the block chain;In the project In the case where being settled accounts, by comparing the progress information and the planning information, the check and acceptance result of the project is determined.
The computer readable storage medium can be the storage inside list of terminal device described in aforementioned any embodiment Member, such as the hard disk or memory of terminal device.The computer readable storage medium is also possible to the outside of the terminal device The plug-in type hard disk being equipped in storage equipment, such as the terminal device, intelligent memory card (Smart Media Card, SMC), Secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, described computer-readable to deposit Storage media can also both including the terminal device internal storage unit and also including External memory equipment.It is described computer-readable Storage medium is for other programs and data needed for storing the computer program and the terminal device.The computer Readable storage medium storing program for executing can be also used for temporarily storing the data that has exported or will export.
Those of ordinary skill in the art may be aware that list described in conjunction with the examples disclosed in the embodiments of the present disclosure Member and algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware With the interchangeability of software, each exemplary composition and step are generally described according to function in the above description.This A little functions are implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Specially Industry technical staff can use different methods to achieve the described function each specific application, but this realization is not It is considered as beyond scope of the present application.
It is apparent to those skilled in the art that for convenience of description and succinctly, the dress of foregoing description It sets, the specific work process of electronic equipment, can refer to corresponding processes in the foregoing method embodiment, details are not described herein.
In several embodiments provided herein, it should be understood that disclosed device and electronic equipment, Ke Yitong Other modes are crossed to realize.For example, the apparatus embodiments described above are merely exemplary, for example, the unit is drawn Point, only a kind of logical function partition, there may be another division manner in actual implementation, such as multiple units or components can To combine or be desirably integrated into another system, or some features can be ignored or not executed.In addition, shown or discussed Mutual coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING of device or unit or Communication connection is also possible to electricity, mechanical or other form connections.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.Some or all of unit therein can be selected to realize the embodiment of the present application scheme according to the actual needs Purpose.
It, can also be in addition, each functional unit in each embodiment of the application can integrate in one processing unit It is that each unit physically exists alone, is also possible to two or more units and is integrated in one unit.It is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, the technical solution of the application is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can be personal computer, block chain node or the network equipment etc.) executes each embodiment the method for the application All or part of the steps.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk etc. are various can store journey The medium of sequence code.
The above, the only specific embodiment of the application, but the protection scope of the application is not limited thereto, it is any Those familiar with the art within the technical scope of the present application, can readily occur in various equivalent modifications or replace It changes, these modifications or substitutions should all cover within the scope of protection of this application.Therefore, the protection scope of the application should be with right It is required that protection scope subject to.

Claims (10)

1. a kind of project management method, which is characterized in that be applied to block chain node device, comprising:
Receiving item purpose is set up the project information, and by the project verification synchronizing information to block chain;
The planning information of the project is received, and the planning information is synchronized to the block chain, the planning information includes The plan information and technical specification information of the project;
The project is received in the progress information of implementation procedure, and the progress information is synchronized to the block chain;
In the case where the project is settled accounts, by comparing the progress information and the planning information, the item is determined Purpose check and acceptance result.
2. the method according to claim 1, wherein the project includes multiple sub-projects, described in the reception Progress information of the project in implementation procedure, comprising:
Sequence is executed based on each sub-project in the multiple sub-project, successively receives each equipment section in multiple equipment node The progress information for each sub-project that point is sent, wherein the multiple device node and the multiple sub-project one are a pair of It answers.
3. the method according to claim 1, wherein the project includes multiple sub-projects, described in the reception Progress information of the project in implementation procedure, comprising:
Each sub-project in the multiple sub-project that each device node is independently transmitted in multiple equipment node is received respectively Progress information, wherein the multiple device node and the multiple sub-project correspond.
4. according to method described in claim 2-3, which is characterized in that the method also includes:
In the case where the check and acceptance result is unacceptable situation, determining causes the check and acceptance result to be unacceptable target sub-project;
Warning information is sent to the corresponding device node of the target sub-project.
5. according to method described in claim 2-3, which is characterized in that the method also includes:
Receive the identity letter of the corresponding each user of progress information for each sub-project that each device node is sent Breath;
Correspondingly, described be synchronized to the block chain for the progress information, specifically:
In the successful situation of identity information for verifying each user, the progress information of each sub-project is synchronized to The block chain.
6. according to method described in claim 2-3, which is characterized in that the method also includes:
The modification information of the project is received, wherein the modification information is formulated according to the sub-project progress information;
According to the modification information, the planning information of the corresponding project of modification information described in the block chain is updated.
7. according to method described in claim 2-3, which is characterized in that the method also includes:
Receive the project power of the corresponding each user of progress information for each sub-project that each device node is sent Limit information;
Correspondingly, described be synchronized to the block chain for the progress information, specifically:
It is in the successful situation of project authority information for verifying each user, the progress information of each sub-project is same Walk the block chain.
8. a kind of project management device, which is characterized in that be applied to block chain node device, comprising: receiving unit compares single Member,
The receiving unit is used for, and receiving item purpose is set up the project information, and by the project verification synchronizing information to block chain;
The receiving unit is also used to, and receives the planning information of the project, and the planning information is synchronized to the block Chain, the planning information include the plan information and technical specification information of the project;
The receiving unit is also used to, and receives the project in the progress information of implementation procedure, and the progress information is synchronous To the block chain;
The comparing unit is used for, in the case where the project is settled accounts, by comparing the progress information and the rule Information is drawn, determines the check and acceptance result of the project.
9. a kind of block chain node device, which is characterized in that including processor, input interface, output interface and memory, In, for the memory for storing computer program, the computer program includes program instruction, and the processor is for calling Described program instruction, executes the method according to claim 1 to 7.
10. a kind of computer readable storage medium, which is characterized in that the computer storage medium is stored with computer program, The computer program includes program instruction, and described program instruction makes the processor execute such as right when being executed by a processor It is required that the described in any item methods of 1-7.
CN201910189728.6A 2019-03-13 2019-03-13 A kind of project management method, device and relevant device Pending CN109949006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910189728.6A CN109949006A (en) 2019-03-13 2019-03-13 A kind of project management method, device and relevant device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910189728.6A CN109949006A (en) 2019-03-13 2019-03-13 A kind of project management method, device and relevant device

Publications (1)

Publication Number Publication Date
CN109949006A true CN109949006A (en) 2019-06-28

Family

ID=67008637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910189728.6A Pending CN109949006A (en) 2019-03-13 2019-03-13 A kind of project management method, device and relevant device

Country Status (1)

Country Link
CN (1) CN109949006A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111178762A (en) * 2019-12-30 2020-05-19 杭州产链数字科技有限公司 Block chain-based construction engineering quality acceptance system and method
CN111369150A (en) * 2020-03-06 2020-07-03 四川中宇建设工程有限公司 Intelligent management system for engineering construction projects
CN111798209A (en) * 2020-06-30 2020-10-20 远光软件股份有限公司 Engineering project management method based on block chain, electronic equipment and storage medium
CN113657858A (en) * 2021-08-11 2021-11-16 挂号网(杭州)科技有限公司 Demand information notification method and device, electronic equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106682877A (en) * 2016-12-29 2017-05-17 江西博瑞彤芸科技有限公司 Method of project management
CN108510275A (en) * 2018-04-08 2018-09-07 众安信息技术服务有限公司 The method and computer readable storage medium of progress for the public good project that follows up
CN108898289A (en) * 2018-06-13 2018-11-27 鹰投(上海)海洋科技发展有限公司 Project completion management system and its implementation based on block chain

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106682877A (en) * 2016-12-29 2017-05-17 江西博瑞彤芸科技有限公司 Method of project management
CN108510275A (en) * 2018-04-08 2018-09-07 众安信息技术服务有限公司 The method and computer readable storage medium of progress for the public good project that follows up
CN108898289A (en) * 2018-06-13 2018-11-27 鹰投(上海)海洋科技发展有限公司 Project completion management system and its implementation based on block chain

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111178762A (en) * 2019-12-30 2020-05-19 杭州产链数字科技有限公司 Block chain-based construction engineering quality acceptance system and method
CN111369150A (en) * 2020-03-06 2020-07-03 四川中宇建设工程有限公司 Intelligent management system for engineering construction projects
CN111798209A (en) * 2020-06-30 2020-10-20 远光软件股份有限公司 Engineering project management method based on block chain, electronic equipment and storage medium
CN113657858A (en) * 2021-08-11 2021-11-16 挂号网(杭州)科技有限公司 Demand information notification method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109949006A (en) A kind of project management method, device and relevant device
CN110442652B (en) Cross-chain data processing method and device based on block chain
CN110417502B (en) Block chain link point clock consensus method and device
CN112270550B (en) New energy power tracing method and system based on blockchain
CN110135860B (en) Crop seed safety traceability system based on block chain technology
EP3779760A1 (en) Blockchain-based data processing method and apparatus, and electronic device
CN109189379A (en) code generating method and device
CN109299335A (en) Control method, device, server and the readable storage medium storing program for executing of data storage
CN108696511A (en) A kind of public notification of information method, apparatus and relevant device based on block chain
CN102902812A (en) Method for realizing remote synchronization of database
CN110224984A (en) A kind of multi-party authorization method and device based on block chain technology
CN111488372A (en) Data processing method, device and storage medium
CN111429995A (en) Vaccine tracing method and system based on alliance chain
CN110246040A (en) Trade management method, electronic equipment and computer storage medium based on alliance's chain
CN111798254A (en) Tracing code generation method, device, equipment and readable storage medium
CN108418746A (en) A kind of mail synchronization method, device and computer readable storage medium
CN112711633B (en) Block chain-based BIM drawing multi-person collaborative creation method and system
CN113111125A (en) Business evidence storage method based on block chain
CN109559176A (en) A kind of bookkeeping methods and device of electronic invoice
CN111949634A (en) Method for synchronously migrating block chain data
CN116777631A (en) Transaction uplink method and device based on blockchain, equipment and medium
CN108882230B (en) Call record management method, device and system
CN116980105A (en) Bill binding method, medium and system based on blockchain
CN115701078B (en) Cross-chain transaction processing method, device, electronic equipment and storage medium
CN109816333A (en) Electron contract method, electronic device and readable storage medium storing program for executing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190628

RJ01 Rejection of invention patent application after publication