- CN109948832A CN109948832A CN201910112545.4A CN201910112545A CN109948832A CN 109948832 A CN109948832 A CN 109948832A CN 201910112545 A CN201910112545 A CN 201910112545A CN 109948832 A CN109948832 A CN 109948832A
- Authority
- CN
- China
- Prior art keywords
- stop
- parameter
- energy consumption
- time
- power generating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The present invention provides a kind of fired power generating unit start-stop supervision optimization method, pass through statistics, management, analysis, compare the parameter of Unit Commitment state, realize that the parameter trend of start and stop various stages under different conditions is shown, the statistics of the indexs such as comparison and energy consumption, guidance and analytic function are provided for start and stop operation, help the operation of the comprehensive understanding operations staff of power plant management personnel horizontal and the equipment degree of reliability, operations staff is helped to compare and analyze the start and stop process under same state, the problem of finding out start and stop process, improve the operation level and management level of Power Plant start and stop.
Description
Technical field
The invention belongs to thermal power plant Optimized-control Technique fields, and in particular to a kind of fired power generating unit start-stop supervision optimization
Method.
Technical background
The start and stop of fired power generating unit are a complicated thermal processions, and in the shutdown process of unit, there are a plays for equipment
The process of strong heating and cooling, the lot of accident of electricity generation system just occur during Unit Commitment, therefore in order to guarantee machine
Group safe and stable operation, needs that the shutdown process of unit is monitored and is operated, monitors each stage parameter status of start and stop,
So that unit realizes the system of the indexs such as parameter trend displaying, comparison and the energy consumption of start and stop various stages under different conditions
Meter provides guidance and analytic function for start and stop operation.
Summary of the invention
The present invention provides a kind of fired power generating unit start-stop supervision optimization method, helps the comprehensive understanding operation of power plant management personnel
The operation of personnel is horizontal, helps operations staff to compare and analyze the start and stop process under same state, improves the fortune of power plant
Row level and management level.
The technical scheme is that a kind of fired power generating unit start-stop supervision optimization method, including
1. maintenance personnel safeguards unit;
2. querying condition, which is arranged, carries out inquiry operation, user selects unit, period, process record, starting state/shutdown side
Formula, start operation, end operation and monitoring parameters are inquired;
3. backstage monitors the operations of configuration in real time, adjacent two operations meet Rule of judgment and dead time
It is required that then recording operation time of origin, energy consumption and optimal value (the different start and stop in nearest 2 years of adjacent two operation rooms are counted
The data that operation is complete and energy consumption is optimal are found out in the start and stop record of state);
4. the entire start and stop procedure parameter statistic of backstage programming count;
5. foreground shows the parameter trend of inquired start and stop various stages, support and design curve and all previous start and stop
Curve compares, and when selection is compared with design curve, parameter real value deviates standard value and touches institute to a certain degree
When the parameter alarm rule of setting, prompted in tendency chart top indicia red lines;
6. the parametric statistics result of foreground displaying start and stop process;
It is inquired 7. foreground according to the energy consumption and optimal value of adjacent two operation rooms of backstage statistics, calculates and shows
The energy consumption and optimal value in stage, energy consumption index include coal consumption, rate of water make-up and power consumption;
8. carrying out reason remarks on foreground when energy consumption actual value is than optimal value difference;
9. when the operating time of record is wrong, when can safeguard generation in foreground attended operation Rule of judgment or directly
Between, when attended operation Rule of judgment, benefit calculation task need to be established and recalculate operation time of origin;
10. safeguarding energy consumption statistic data on foreground, and store and arrive relational database when energy consumption statistic result is wrong.
Further, maintenance personnel safeguards that unit includes: to scheme in above-mentioned steps 1
1) maintenance personnel safeguards unit starting state Rule of judgment, the determination of unit starting state with high pressure when red switch outside
Cylinder lower flange temperature divides, and shares cold start, warm starting, four kinds of hot starting, hot start, very hot startup states;
2) maintenance personnel safeguards start and stop operations Rule of judgment and dead time;
3) when parameter is there are when standard curve, maintenance personnel safeguards parameter and standard curve and ginseng under different start and stop states
Number alarm rule is shut down standard curve and is determined by halt mode, including normal parameter shutdown, shutdown at sliding parameters, accidental shutdown;
4) when parameter needs to carry out data statistics, maintenance personnel safeguards statistical parameter and measurement type;
5) maintenance personnel safeguards energy consumption statistic index and superiority and inferiority direction, including is the bigger the better or the smaller the better.
Further, the dead time is operation duration to scheme, and unit min may be configured as 0.
Further, the operations Rule of judgment realizes that unit starting state is in pot by existing measuring point to scheme
Judged after furnace igniting operation.
Further, the benefit calculation task of establishing includes the feelings for service stopping or change operation judges condition to scheme
Condition is established and mends calculation task, can adopt number from real-time data base again, the calculating operation time, when it's the operating time pasts user maintenance, establishes
Calculation task is mended, the operating time of maintenance does not update.
Further, the parameter alarm rule can carry out regular configuration for absolute change or opposite variation to scheme.
Further, when online implementing, without the data of energy consumption optimal value, the later period is carried out scheme by the data of accumulation
It updates.
Further, in measurement process, measuring point leads to the record time anomaly that a certain operation occurs, user to scheme extremely
In the direct attended operation time of origin in foreground.
Further, after a certain operation occurs, the waiting time is more than that setting threshold value does not enter subsequent operation still to scheme, then
Terminate this start and stop record, and is identified as " open/shut down and is unsuccessful ".
The invention has the advantages that the present invention can be realized the parameter trend exhibition of start and stop various stages under different conditions
Show, compare and the statistics of the indexs such as energy consumption, provides guidance and analytic function for start and stop operation, help power plant management personnel complete
The operation that orientation understands operations staff is horizontal, and operations staff is helped to compare and analyze the start and stop process under same state,
The problem of finding out start and stop process improves the operation level and management level of Power Plant start and stop.
Detailed description of the invention
Fig. 1 is whole shutdown process schematic diagram of the invention;
Fig. 2,3,4 are that machine inquiry UI surface chart is opened in embodiment of the present invention;
Fig. 5,6,7 are that inquiry UI surface chart is shut down in embodiment of the present invention;
Specific embodiment
Clear and complete description is done to the present invention with reference to the accompanying drawing, so that those skilled in the art is not needing to make
Under conditions of creative work, it can sufficiently implement the present invention.
A specific embodiment of the invention is: as shown in Figure 1, a kind of fired power generating unit start-stop supervision optimization method, including
1. maintenance personnel safeguards unit;
2. setting querying condition inquired, user select unit, the period, process record, starting state/halt mode,
Start operation, end operation and monitoring parameters to be inquired;
3. backstage monitors the operations of configuration in real time, adjacent two operations meet Rule of judgment and dead time
It is required that then recording operation time of origin, energy consumption and optimal value (the different start and stop in nearest 2 years of adjacent two operation rooms are counted
The data that operation is complete and energy consumption is optimal are found out in the start and stop record of state);
4. the entire start and stop procedure parameter statistic of backstage programming count;
5. foreground shows the parameter trend of inquired start and stop various stages, support and design curve and all previous start and stop
Curve compares, and when selection is compared with design curve, parameter real value deviates standard value and touches institute to a certain degree
When the parameter alarm rule of setting, prompted in tendency chart top indicia red lines;
6. the parametric statistics result of foreground displaying start and stop process;
It is inquired 7. foreground according to the energy consumption and optimal value of adjacent two operation rooms of backstage statistics, calculates and shows
The energy consumption and optimal value in stage, energy consumption index include coal consumption, rate of water make-up and power consumption;
8. carrying out reason remarks on foreground when energy consumption actual value is than optimal value difference;
9. when the operating time of record is wrong, when can safeguard generation in foreground attended operation Rule of judgment or directly
Between, when attended operation Rule of judgment, benefit calculation task need to be established and recalculate operation time of origin;
10. safeguarding energy consumption statistic data on foreground, and store and arrive relational database when energy consumption statistic result is wrong.
Further, maintenance personnel safeguards that unit includes: in above-mentioned steps 1
1) maintenance personnel safeguards unit starting state Rule of judgment, the determination of unit starting state with high pressure when red switch outside
Cylinder lower flange temperature divides, and shares cold start, warm starting, four kinds of hot starting, hot start, very hot startup states;
2) maintenance personnel safeguards start and stop operations Rule of judgment and dead time;
3) when parameter is there are when standard curve, maintenance personnel safeguards parameter and standard curve and ginseng under different start and stop states
Number alarm rule is shut down standard curve and is determined by halt mode, including normal parameter shutdown, shutdown at sliding parameters, accidental shutdown;
4) when parameter needs to carry out data statistics, maintenance personnel safeguards statistical parameter and measurement type;
5) maintenance personnel safeguards energy consumption statistic index and superiority and inferiority direction, including is the bigger the better or the smaller the better.
Further, the dead time is operation duration, and unit min may be configured as 0.
Further, the operations Rule of judgment realizes that unit starting state is in boiler point by existing measuring point
Judged after fire operation.
Further, the foundation mends calculation task and includes the case where for service stopping or change operation judges condition, builds
It is vertical to mend calculation task, number can be adopted from real-time data base again, the calculating operation time, when it's the operating time pasts user maintenance, foundation, which is mended, is calculated
The operating time of task, maintenance does not update.
Further, the parameter alarm rule can carry out regular configuration for absolute change or opposite variation, such as: (|
Actual value-standard value |/standard value)≤10%.
Further, when online implementing, without the data of energy consumption optimal value, the later period is carried out more by the data of accumulation
Newly.
Machine inquiry is opened, querying condition: time (in real time/history is set;Historical query condition includes starting days, terminating year
Month, default show in real time, when there is no in real time record, then show the last time open machine record), unit (single unit), process
Record (" 2018/1/114:00-2018/1/1111:00 starts successfully ", single choice or multiselect), starting state (cold start, temperature
State starting, hot starting, hot start, very hot startup), step-length, parameter selection (single choice or multiselect), inquiry phase (start operate and terminate
Operation, is selected on flow chart).
The interface UI is as shown in Figure 2,3, 4, there is button on interface, and button has inquiry, opens machine trend analysis, opens machine parametric statistics
With open function consumption analysis, switched over TAB.
Further include explanatory note on interface: 1, the parameter trend for selecting any two operation rooms can be inquired and data are united
Meter, " starting to operate " cannot be identical with " end operation ";2, no selection criteria curve the case where, it could support up selection 5
Parameter carries out trend inquiry;3, can add identical starting state open machine record carry out parameter trend comparison, including starting at
Function and unsuccessful record also can choose and open machine recording parameters trend and compare with standard curve, identical parameters correlation curve
No more than 3;4, " starting to operate " and " end operation " query argument variation tendency are selected, time started and end time are inquired
It can freely be adjusted on tendency chart;5, when measuring point exception, cause the operating time to judge incorrectly, can modify on the operational node
Time of origin is operated, is controlled by permission.
It further include querying condition, monitoring parameters on interface, with running node is chosen in query process, with color identifier, 1#
For furnace main steam furnace side temperature as shown in curve in Fig. 2, querying condition is time 2017.6-2017.7,1# unit, step-length 60S, temperature
State starting, the vibration of 1#, 2#, 3# axis, axis temperature as shown in figure 3, difference energy consumption type power consumption, rate of water make-up, coal consumption amount as shown in figure 4,
The surface chart that different parameters are only shown in figure is referred to as operation, and specific figure and specific data are different according to the actual situation.
Inquiry is shut down, querying condition: time (in real time/history is set;Historical query condition includes starting days, terminating year
Month, default show in real time, when there is no in real time record, then show the last outage record), unit (single unit), process
Record (" shutdown of 2018/1/11-2018/1/12 normal parameter ", single choice or or multiselect), step-length, (single choice is more for parameter selection
Choosing).
The interface UI includes button on interface as shown in Fig. 5,6,7, and button includes inquiry, selects the change of history outage record
For normal parameter shutdown, shutdown at sliding parameters or accidental shutdown;Upper left side, which has, shuts down trend analysis, shuts down parametric statistics and shuts down energy
Consumption is shut down, and is switched over TAB.
Interface further includes explanation: 1, can inquire the parameter trend for selecting any two operation rooms and parametric statistics, " start
Operation " cannot be identical with " end operation ";2, no selection criteria curve the case where, 5 parameters of selection is could support up and carried out
Trend inquiry;3, outage record can be added and carry out parameter trend comparison, including started successfully with unsuccessful record, can also be selected
It selects and opens machine recording parameters trend and compared with standard curve, identical parameters correlation curve is no more than 3;4, selection " starts to grasp
Work " and " end operation " query argument variation tendency, inquiry time started can freely adjust with the end time on tendency chart;
5, operation time of origin can be modified on the operational node, controlled by permission.
It further include querying condition, monitoring parameters on interface, as shown in figure 5, querying condition is time 2017.6-2017.7,
1# unit, step-length 60S, halt mode, normal parameter are shut down, and the vibration of 1#, 2#, 3# axis, axis temperature are as shown in fig. 6, different energy consumption types
Power consumption, rate of water make-up, coal consumption amount are referred to as operation as shown in fig. 7, only show the surface chart of different parameters in figure, specific to scheme
Shape and specific data are different according to the actual situation.
Presently preferred embodiments of the present invention is described above, it should be pointed out that the invention is not limited to above-mentioned
Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field
It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, technology according to the present invention
Essence any simple modifications, equivalents, and modifications made to the above embodiment still fall within technical solution of the present invention protection
In the range of.
Claims (9)
1. a kind of fired power generating unit start-stop supervision optimization method, which is characterized in that including
1, maintenance personnel safeguards unit;
2, setting querying condition carry out inquiry operation, user select unit, the period, process record, starting state/halt mode,
Start operation, end operation and monitoring parameters to be inquired;
3, the operations of configuration are monitored in real time from the background, adjacent two operations meet Rule of judgment and dead time is wanted
It asks, then records operation time of origin, count the energy consumption and optimal value (nearest 2 years different start and stop shapes of adjacent two operation rooms
The data that operation is complete and energy consumption is optimal are found out in the start and stop record of state);
4, the entire start and stop procedure parameter statistic of backstage programming count;
5, foreground shows the parameter trend of inquired start and stop various stages, supports and design curve and all previous start and stop curve
It compares, when selection is compared with design curve, parameter real value deviation standard value is touched set to a certain degree
Parameter alarm rule when, prompted in tendency chart top indicia red lines;
6, foreground shows the parametric statistics result of start and stop process;
7, foreground calculates and shows institute's inquiry phase according to the energy consumption and optimal value of adjacent two operation rooms of backstage statistics
Energy consumption and optimal value, energy consumption index include coal consumption, rate of water make-up and power consumption;
8, when energy consumption actual value is than optimal value difference, reason remarks are carried out on foreground;
9, when the operating time of record is wrong, time of origin can be safeguarded in foreground attended operation Rule of judgment or directly, when
When attended operation Rule of judgment, benefit calculation task need to be established and recalculate operation time of origin;
10, when energy consumption statistic result is wrong, energy consumption statistic data are safeguarded on foreground, and store and arrive relational database.
2. a kind of fired power generating unit start-stop supervision optimization method according to claim 1, which is characterized in that in above-mentioned steps 1
Maintenance personnel safeguards that unit includes:
1) maintenance personnel safeguards unit starting state Rule of judgment, and the determination of unit starting state is under hp outer cylinder when red switch
Flange temperature divides, and shares cold start, warm starting, four kinds of hot starting, hot start, very hot startup states;
2) maintenance personnel safeguards start and stop operations Rule of judgment and dead time;
3) when parameter is there are when standard curve, maintenance personnel safeguards parameter and standard curve and parameter report under different start and stop states
Police regulations then, are shut down standard curve and are determined by halt mode, including normal parameter shutdown, shutdown at sliding parameters, accidental shutdown;
4) when parameter needs to carry out data statistics, maintenance personnel safeguards statistical parameter and measurement type;
5) maintenance personnel safeguards energy consumption statistic index and superiority and inferiority direction, including is the bigger the better or the smaller the better.
3. a kind of fired power generating unit start-stop supervision optimization method according to claim 2, which is characterized in that the dead time
For operation duration, unit min may be configured as 0.
4. a kind of fired power generating unit start-stop supervision optimization method according to claim 3, which is characterized in that the operations
Rule of judgment realizes that unit starting state is judged after ignition of the boiler operation by existing measuring point.
5. a kind of fired power generating unit start-stop supervision optimization method according to claim 4, which is characterized in that the foundation, which is mended, calculates
Task includes the case where for service stopping or changes operation judges condition, establishes and mends calculation task, can be again from real-time data base
Number is adopted, the calculating operation time, when it's the operating time pasts user maintenance, calculation task is mended in foundation, and the operating time of maintenance does not update.
6. a kind of fired power generating unit start-stop supervision optimization method according to claim 5, which is characterized in that the parameter alarm
Rule can carry out regular configuration for absolute change or opposite variation.
7. a kind of fired power generating unit start-stop supervision optimization method according to claim 6, which is characterized in that work as online implementing
When, without the data of energy consumption optimal value, the later period is updated by the data accumulated.
8. a kind of fired power generating unit start-stop supervision optimization method according to claim 7, which is characterized in that in measurement process
In, measuring point leads to the record time anomaly that a certain operation occurs extremely, and user is in the direct attended operation time of origin in foreground.
9. a kind of fired power generating unit start-stop supervision optimization method according to claim 8, which is characterized in that when a certain operation is sent out
After life, the waiting time is more than that setting threshold value does not enter subsequent operation still, then terminates this start and stop record, and be identified as and " open/stop
Machine is unsuccessful ".
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910112545.4A CN109948832A (en) | 2019-02-13 | 2019-02-13 | A kind of fired power generating unit start-stop supervision optimization method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910112545.4A CN109948832A (en) | 2019-02-13 | 2019-02-13 | A kind of fired power generating unit start-stop supervision optimization method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109948832A true CN109948832A (en) | 2019-06-28 |
Family
ID=67007550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910112545.4A Pending CN109948832A (en) | 2019-02-13 | 2019-02-13 | A kind of fired power generating unit start-stop supervision optimization method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109948832A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110596441A (en) * | 2019-09-19 | 2019-12-20 | 内蒙古鄂尔多斯电力冶金集团股份有限公司 | Voltage diagnostic instrument for movably detecting parameters of secondary power supply system of submerged arc furnace |
CN111426892A (en) * | 2020-03-10 | 2020-07-17 | 贵州电网有限责任公司 | Unit online state statistical method under complex condition |
CN113487237A (en) * | 2021-07-30 | 2021-10-08 | 西安西热电站信息技术有限公司 | Method for distinguishing and alarming operation state of thermal power generating unit or boiler |
CN113560026A (en) * | 2021-07-21 | 2021-10-29 | 山东日照发电有限公司 | One-key starting and stopping method for coal mill of thermal power generating unit |
WO2023279496A1 (en) * | 2021-07-05 | 2023-01-12 | 南方电网调峰调频发电有限公司 | Thermal power generation unit starting method and apparatus, computer device, and storage medium |
-
2019
- 2019-02-13 CN CN201910112545.4A patent/CN109948832A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110596441A (en) * | 2019-09-19 | 2019-12-20 | 内蒙古鄂尔多斯电力冶金集团股份有限公司 | Voltage diagnostic instrument for movably detecting parameters of secondary power supply system of submerged arc furnace |
CN111426892A (en) * | 2020-03-10 | 2020-07-17 | 贵州电网有限责任公司 | Unit online state statistical method under complex condition |
CN111426892B (en) * | 2020-03-10 | 2022-04-22 | 贵州电网有限责任公司 | Unit online state statistical method under complex condition |
WO2023279496A1 (en) * | 2021-07-05 | 2023-01-12 | 南方电网调峰调频发电有限公司 | Thermal power generation unit starting method and apparatus, computer device, and storage medium |
CN113560026A (en) * | 2021-07-21 | 2021-10-29 | 山东日照发电有限公司 | One-key starting and stopping method for coal mill of thermal power generating unit |
CN113487237A (en) * | 2021-07-30 | 2021-10-08 | 西安西热电站信息技术有限公司 | Method for distinguishing and alarming operation state of thermal power generating unit or boiler |
CN113487237B (en) * | 2021-07-30 | 2023-11-07 | 西安西热电站信息技术有限公司 | Method for judging and alarming running state of thermal power generating unit or boiler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109948832A (en) | A kind of fired power generating unit start-stop supervision optimization method | |
CN102193544B (en) | Intelligent building energy management system | |
CN105571063B (en) | A kind of shallow layer ground-temperature energy energy management system and its implementation | |
CN106576060B (en) | Method, device and apparatus for determining the operating state of a domestic fluid heating system | |
CN104364585A (en) | Refrigeration device management system | |
CN111343282A (en) | Remote heating furnace centralized control system and control method | |
CN105373092A (en) | Intelligent control system special for water plant and control method thereof | |
CN105066458A (en) | Energy-saving control system for centralized heating boiler | |
CN104678878A (en) | Automatic control system for water quality of industrial boiler | |
CN106224930A (en) | A kind of increasing temperature and pressure alarming method by monitoring of boiler | |
CN106322346B (en) | A kind of method of direct current cooker sliding parameter blowing out | |
CN204576232U (en) | A kind of pumping plant intelligent control management system | |
CN111427398A (en) | Self-protection method and system of tube bundle dust remover | |
WO2023103667A1 (en) | Design method for automatic nuclear power plant start-up and shutdown and intelligent monitoring system | |
CN204496243U (en) | The water quality automatic control system of Industrial Boiler | |
CN104199317B (en) | A kind of steam-electric power machine controller | |
CN106401930A (en) | Intelligent control system for air compressor | |
CN206095663U (en) | Coal -fired power unit open circulation cold junction equipment monitoring facilities | |
CN202092395U (en) | Low-pressure steam jet water absorption type refrigeration device with self-control function | |
CN104793602A (en) | Intelligent pump station control and management system | |
CN204331442U (en) | Dry coke quenching cogeneration load varitrol | |
CN112859798A (en) | Management and control integrated system based on intelligent controller | |
CN102287390A (en) | Safety monitoring method for air feeder | |
CN102734996B (en) | Low-pressure vapor injection water absorption type refrigerating plant with automatic control function | |
CN117055345A (en) | Intelligent coke oven energy consumption self-adaptive management optimizing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |