CN109944725A - A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly - Google Patents

A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly Download PDF

Info

Publication number
CN109944725A
CN109944725A CN201910297982.8A CN201910297982A CN109944725A CN 109944725 A CN109944725 A CN 109944725A CN 201910297982 A CN201910297982 A CN 201910297982A CN 109944725 A CN109944725 A CN 109944725A
Authority
CN
China
Prior art keywords
process equipment
machining tool
distribution
raw material
distribution pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910297982.8A
Other languages
Chinese (zh)
Inventor
肖松
黄陆鑫
康慧忠
亨宁·哈特曼
杨卫国
程水良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI WEIKEMAI LONGCHUAN AUTOMOTIVE ENGINE PARTS CO Ltd
Original Assignee
SHANGHAI WEIKEMAI LONGCHUAN AUTOMOTIVE ENGINE PARTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI WEIKEMAI LONGCHUAN AUTOMOTIVE ENGINE PARTS CO Ltd filed Critical SHANGHAI WEIKEMAI LONGCHUAN AUTOMOTIVE ENGINE PARTS CO Ltd
Publication of CN109944725A publication Critical patent/CN109944725A/en
Priority to PCT/CN2019/102731 priority Critical patent/WO2020119180A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M55/00Fuel-injection apparatus characterised by their fuel conduits or their venting means; Arrangements of conduits between fuel tank and pump F02M37/00
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02MSUPPLYING COMBUSTION ENGINES IN GENERAL WITH COMBUSTIBLE MIXTURES OR CONSTITUENTS THEREOF
    • F02M55/00Fuel-injection apparatus characterised by their fuel conduits or their venting means; Arrangements of conduits between fuel tank and pump F02M37/00
    • F02M55/02Conduits between injection pumps and injectors, e.g. conduits between pump and common-rail or conduits between common-rail and injectors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Fuel-Injection Apparatus (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Turning (AREA)
  • Drilling And Boring (AREA)

Abstract

The present invention provides a kind of distribution pipe and its processing technologys and engine high pressure oil rail assembly, the distribution pipe, including distributing tube body, pipe fitting, inner cavity is equipped in the distribution tube body, the first oil-through-hole is equipped in pipe fitting, it is characterized by: the inner cavity is open at one end, the distribution tube body and pipe fitting of the inner cavity other end form integrally formed sealing structure, the inside of the first oil-through-hole the connection inner cavity and pipe fitting of pipe fitting.The present invention solves the problems, such as how to avoid distribution tube body and pipe fitting junction gap leakage gasoline (especially in the case where distribution pipe internal high pressure) present in the prior art, can achieve the purpose that further to be promoted the sealing performance of distribution pipe by solving foregoing problems, pressure-resistant performance, reduce part, reduces assembly process, reduces the energy consumption in production process.

Description

A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly
Technical field
The present invention relates to a kind of component of engine more particularly to a kind of distribution pipe and its processing technology and engine are high Pressure oil rail assembly.
Background technique
The effect of oily rail: by taking petrol engine as an example, petrol engine has multiple cylinders, and each cylinder is independently equipped with For fuel injector to provide gasoline, all fuel injectors are connected on a common oil pipe (abbreviation fuel common-rail).Working principle is first Gasoline is delivered into oily rail from fuel tank by certain pressure by oil pump, has a constant operating pressure by gasoline inside oily rail It is sent into each fuel injector, gasoline is injected into cylinder by fuel injector as required by electric control gear to burn.Oily rail is independent Except petrol engine, remained unchanged during entire spray combustion.
High pressure oil rail: fuel oil is injected directly into cylinder, is atomized gasoline sufficiently using the high pressure draught in cylinder and is reached To the clean-burning purpose of gasoline.Since gasoline is sufficiently burned, so the economic performance of its fuel oil greatly improves, dioxy Change carbon emission to be substantially reduced, so that the performance of high pressure fuel engine has splendid performance, it is to be widely used in the world at present Gasoline engine technology.
Current international high pressure gasoline is started in order to energy-saving while improving performance, and main stream approach is constantly to mention The operating pressure and intensity of high entire engine, it is also higher and higher for the performance requirement of high pressure oil rail itself, particularly with Also higher and higher, available engine high pressure oil rail is required in the leakproofness and resistance to pressure of the distribution pipe of engine high pressure oil rail assembly Inner cavity 2 in assembly inside distribution pipe is usually through-hole (being detailed in Fig. 1, Fig. 2 and Fig. 3), and 2 through-hole one end of inner cavity is opening, inner cavity 2 The through-hole other end cooperates the first anaerobic copper ring 12 to carry out split type connection inside distribution tube body 1 with Separated pipe joint 11, But between Separated pipe joint 11 and distribution 1 inner wall of tube body, between the first anaerobic copper ring 12 and distribution 1 inner wall of tube body It is inevitably present gap (i.e. disclosure risk point 5), these gaps are also easy to produce gasoline leakage under high-pressure situations, lower vapour It may also result in the damage of automobile other component while oily utilization rate, therefore the seal face of distribution pipe how to be avoided to reveal gasoline (especially in the case where distribution pipe internal high pressure) becomes problem to be solved.
In addition, the traditional diamond-making technique manufacture craft of existing distribution pipe is (for example, hot rolling (squeezing seamless steel pipe): circle at present Pipe → heating → perforation → tri- rods are tiltedly pricked, tandem rolling or extruding → de- pipe → sizing (or tube reducing) → cooling → aligning → hydraulic pressure try Test (or flaw detection) → label → storage;Or seamless steel pipe (is rolled) in cold-drawn: circular pipe blank, and → heating →, which perforates, → taking the lead → anneals → acid Wash → oiling (copper facing) → multi-pass cold-drawn (cold rolling) → base pipe → heat treatment → aligning → water pressure test (flaw detection) → label → Storage) it is complicated, process energy consumption is high, less economical, waste recovery utilization rate is not high, and resource waste rate is high, while also needing chemistry Cleaning, environmental pollution degree are high.
Summary of the invention
The purpose of the present invention is to provide a kind of distribution pipe and its processing technologys and engine high pressure oil rail assembly, mainly It solves the problems, such as one present in the above-mentioned prior art: how to avoid distribution pipe and Separated pipe joint in engine high pressure oil rail assembly Fission connection forms gap leakage gasoline (the case where distribution pipe internal high pressure especially in engine high pressure oil rail assembly Under) become problem to be solved, reach further to be promoted in engine high pressure oil rail assembly by solution foregoing problems and distribute The sealing performance of pipe, the purpose pressure-resistant performance, reduce part, reduce assembly process, reducing energy consumption in production process.
The present invention also can solve problem two of the existing technology: distribution pipe is split type in engine high pressure oil rail assembly Pipe fitting fission connects the problem of forming gap leakage gasoline (especially in the case where distribution pipe internal high pressure), passes through solution Foregoing problems, which can reach, further to be promoted the sealing performance of distribution pipe and engine high pressure oil rail assembly, pressure-resistant performance, reduces Part, reduce assembly process, reduce production process in energy consumption purpose.
The present invention also can solve problem three of the existing technology: conventional distribution complex manufacturing technology, process energy consumption be high, Less economical, waste recovery utilization rate is not high, and resource waste rate is high, while also needing chemical cleaning, and environmental pollution degree is high to ask Topic, distribution pipe processing technique manufacture craft of the invention is simple, mature, easy to be promoted, and economy is high, the flexible structure of inner cavity, It can satisfy the different demand of user, waste recovery utilization rate is high, economizes on resources, and without chemical contamination, can be to environmental protection Play positive effect.
To achieve the goals above, the technical scheme adopted by the invention is that: a kind of distribution pipe, including distribution tube body, Pipe fitting, the distribution tube body is interior to be equipped with inner cavity, is equipped with the first oil-through-hole in pipe fitting, it is characterised in that: the inner cavity one End opening, the distribution tube body and pipe fitting of the inner cavity other end form integrally formed sealing structure, the logical oil of the first of pipe fitting The inside of hole connection inner cavity and pipe fitting.
Further, the distribution tube body is equipped at least one second oil-through-hole.
Further, the shape of the inner cavity other end is cylindrical or taper or spheric or W-shaped or chamfer or rounding Angle or the shape as made of at least two combination of shapes in cylinder, taper, spheric, W-shaped, chamfer, rounded corner.
Further, the cross sectional shape of the inner cavity is round or square or rectangular or ellipse is trapezoidal or positive five side Shape or regular hexagon or regular polygon or irregular polygon.
Further, the cross-sectional shape that the distribution tube body outer edge is formed is round or square or rectangular or ellipse Round or trapezoidal or regular pentagon or regular hexagon or regular polygon or irregular polygon.
It further, is arc transition at the dog-ear of the inner cavity other end.
Further, the angle R of the arc transition at the dog-ear is at least 0.1 millimeter.
Further, the central axes of the distribution tube body and the central axes of inner cavity are overlapped;The closeouts be capping and Second anaerobic copper ring, capping connect to form plugging structure after passing through the second anaerobic copper ring with lumen openings one end.
Further, the distribution tube body minimum thickness is at least 1 millimeter;The wall thickness of the pipe fitting is at least 1 millimeter; The depth of the inner cavity is 1~1000 millimeter.
Further, the pipe fitting and the cross sectional shape of the distribution integrally formed junction of tube body are round or square Or rectangle or ellipse is trapezoidal or quincunx or gear shape or regular pentagon or regular hexagon or regular polygon or irregular Polygon or by circle, square, rectangle, ellipse, trapezoidal, quincunx, gear shape, regular pentagon, regular hexagon, just more Shape made of at least two combination of shapes in side shape, irregular polygon.
A kind of processing technology of distribution pipe is related to weighing a kind of above-mentioned distribution pipe, and specific step is as follows for processing technology:
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;
(4), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment.
Further, the machining tool be lathe tool or drill bit or milling cutter or boring cutter or grinding wheel or planing tool or be lathe tool, drill bit, Milling cutter, boring cutter, grinding wheel, in planing tool at least two combination;The cutter head and knife bar of the machining tool are cutter head knife bar integral type Or cutter head knife bar is split type.
A kind of processing technology of distribution pipe is related to a kind of above-mentioned distribution pipe, and specific step is as follows for processing technology:
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;
(4), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing finishes pipe fitting at designated shape, using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;
(5), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside.
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom.
Further, the machining tool be lathe tool or drill bit or milling cutter or boring cutter or grinding wheel or planing tool or be lathe tool, drill bit, Milling cutter, boring cutter, grinding wheel, in planing tool at least two combination;The cutter head and knife bar of the machining tool are cutter head knife bar integral type Or cutter head knife bar is split type.
A kind of processing technology of distribution pipe is related to a kind of above-mentioned distribution pipe, and specific step is as follows for processing technology:
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;
(4), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;
(5), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom.
Further, the machining tool be lathe tool or drill bit or milling cutter or boring cutter or grinding wheel or planing tool or be lathe tool, drill bit, Milling cutter, boring cutter, grinding wheel, in planing tool at least two combination;The cutter head and knife bar of the machining tool are cutter head knife bar integral type Or cutter head knife bar is split type.
Further, the cutting tip quantity on the drill bit or cutter head is 1~100;The cutting of the cutting tip turns Speed is 1~10000 rev/min;The feed cutting output of the cutting tip is 1~1000 mm/min.
Further, with the use of lubricating cooling oil when the machining tool is processed.
Further, the distribution pipe raw material moulding process is cold-drawn or cold rolling or hot extrusion or casting or forging or cold-heading Cutting or be at least two combined techniques in cold-drawn, cold rolling, hot extrusion, casting, forging, cold-heading, cutting.
Further, distribution pipe raw material outer surface processing technology is vehicle or milling or plane or drawing or pressure or forging or mill or cuts It cuts or electric spark or laser or chemical attack or for vehicle, milling, plane, drawing, pressure, forging, mill, cutting, electric spark, laser, chemical attack In at least two combined techniques.
Further, the inner cavity of the distribution tube body carry out roughing technique be depth drill or drill gun or milling or plane or boring or Mill or electric spark or laser or chemical attack or in depth drill, rifle drilling and milling, plane, boring, mill, electric spark, laser, chemical attack At least two combined techniques.
Further, it is depth drill or mill or milling or plane or boring or electricity that the inner cavity of the distribution tube body, which carries out fine-processing technique, Spark or laser are at least two combined techniques in depth drill, mill, milling, plane, boring, electric spark, laser.
Further, the roughing technique of the pipe fitting be bore or vehicle or milling or plane or boring or mill or electric spark or laser or Chemical attack is at least two combined techniques in brill, vehicle, milling, plane, boring, mill, electric spark, laser, chemical attack.
Further, the fine-processing technique of the pipe fitting be bore or vehicle or milling or plane or boring or mill or electric spark or laser or Chemical attack is at least two combined techniques in brill, vehicle, milling, plane, boring, mill, electric spark, laser, chemical attack.
Further, the oil-through-hole processing technology is brill or milling or mill or electric spark or laser or is drilling and milling, mill, electrical fire At least two combined techniques in flower, laser.
A kind of engine high pressure oil rail assembly includes a kind of above-mentioned distribution pipe, closeouts, sensor connector, fuel injector Seat mounting bracket block, it is characterised in that: the distribution pipe main body is equipped at least one second oil-through-hole;The inner cavity is open at one end It is blocked by closeouts;The sensor connector is connected in distribution pipe main body, and the oil injector seat mounting bracket block is connected to point It is piped in main body, oil injector seat mounting bracket block position is corresponding with the second oil-through-hole position.
Further, the oil injector seat mounting bracket block is made of oil injector seat and mounting bracket block, oil injector seat installation Backbone block is integral type or split type.
A kind of engine high pressure oil rail assembly includes a kind of above-mentioned distribution pipe, closeouts, sensor connector, fuel injector Seat mounting bracket block, it is characterised in that: the inner cavity is open at one end to be blocked by closeouts;The sensor connector is connected to distribution In pipe main body, the oil injector seat mounting bracket block is connected in distribution pipe main body, oil injector seat mounting bracket block position and the Two-way oil-hole location is corresponding.
Further, the oil injector seat mounting bracket block is made of oil injector seat and mounting bracket block, oil injector seat installation Backbone block is integral type or split type.
A kind of engine high pressure oil rail assembly includes a kind of above-mentioned distribution pipe, closeouts, sensor connector, fuel injector Seat mounting bracket block, it is characterised in that: the inner cavity is open at one end to be blocked by closeouts;The sensor connector is connected to distribution On tube body, the oil injector seat mounting bracket block is connected on distribution tube body, oil injector seat mounting bracket block position and the Two-way oil-hole location is corresponding.
Further, the oil injector seat mounting bracket block is made of oil injector seat and mounting bracket block, oil injector seat installation Backbone block is integral type or split type.
Further, between distribution tube body and the capping, between distribution tube body and sensor connector, distribution pipe sheet It is first pre-installed using press fitting or riveting or Laser Welding or tack welding or electric resistance welding between body and oil injector seat mounting bracket block, Then it is attached again by high temperature brazing or high frequency induction welding or bridging agent adhesion.
A kind of engine high pressure oil rail assembly is used including the distribution pipe for dispensing fuel into different fueling injection equipments In realizing that fuel enters from oil pump the pipe joint arrangement of distribution pipe, for realizing installation fuel injector function and with the company of engine The oil injector seat mounting device connect, for realizing the sensor connector device of installation pressure transducer functionality, for blocking distribution Far from the plugging device open at one end of pipe joint arrangement on pipe, it is characterised in that: be equipped with inner cavity, inner cavity one in the distribution pipe It end opening and being blocked by plugging device, the distribution pipe and pipe joint arrangement of the inner cavity other end form integrally formed sealing structure, Pipe joint arrangement connection distribution tube cavity and outside;The oil injector seat mounting device is connect with distribution pipe, and the sensor connects Head device is connect with distribution pipe.
In view of above-mentioned technical characteristic, the invention has the following beneficial effects:
In the present invention, a kind of distribution pipe and its processing technology, a kind of distribution pipe are used for engine high pressure oil rail assembly, can be with Start suitable for petrol engine, diesel engine, combustion gas, the engine of other types of engine fuel and other energy, These engines can apply in the engine of the big machineries such as motor vehicle, automobile, ship, aircraft.
Distribution pipe of the invention is integrally formed the design of connection by distribution tube body and pipe fitting, can be improved and start The sealing performance of the distribution pipe of integral type pipe seal, pressure-resistant performance, mechanical strength in machine high pressure oil rail assembly;Simultaneously as The unitary design of the distribution pipe of integral type pipe seal in engine high pressure oil rail assembly, rather than it is split type, it can reduce Part needed for product reduces assembly process (equipment as required for assembling, fixture, artificial and time;As required for quality inspection Equipment, tool, artificial and time), reduce energy consumption in production process, integral type pipe fitting in engine high pressure oil rail assembly The distribution pipe of sealing can be realized good seal performance, pressure-resistant performance is high, structure is simple and reliable, practical, the processing is simple and High-efficient purpose.
In the present invention, a kind of processing technology of distribution pipe is simple with manufacture craft, easily promotes, and economy is higher;Inner cavity Depth is flexible, can meet the needs of different;Waste recovery utilization rate is high, can economize on resources;Without chemical treatment, to environmental protection There are positive effect advantage and effect.
Technical solution provided by the invention can design different sizes according to the actual situation, to meet different engines pair The demand of high pressure oil rail assembly.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of engine high pressure oil rail assembly in the prior art;
Fig. 2 is the sectional view of distribution pipe in engine high pressure oil rail assembly in the prior art;
Fig. 3 is the pipe fitting of engine high pressure oil rail assembly, the first anaerobic copper ring, distribution tube cavity connection in the prior art Structural schematic diagram (i.e. the enlarged drawing at the position M in Fig. 2);
Fig. 4 is a kind of structural schematic diagram of engine high pressure oil rail assembly in embodiment 1;
Fig. 5 is a kind of structural schematic diagram of the distribution pipe of engine high pressure oil rail assembly in embodiment 1;
Fig. 6 is a kind of sectional view of the distribution pipe of engine high pressure oil rail assembly in embodiment 1;
Fig. 7 is distribution tube body and pipe fitting one in a kind of distribution pipe of engine high pressure oil rail assembly in embodiment 1 Form the structural schematic diagram (i.e. the enlarged drawing at the position N in Fig. 6) of connection;
Fig. 8 is the sectional view 1 (circle) at the position A-A in Fig. 7;
Fig. 9 is the sectional view 2 (square) at the position A-A in Fig. 7;
Figure 10 is the sectional view 3 (rectangle) at the position A-A in Fig. 7;
Figure 11 is the sectional view 4 (ellipse) at the position A-A in Fig. 7;
Figure 12 is the sectional view 5 (pentagon) at the position A-A in Fig. 7;
Figure 13 is the sectional view 6 (quincunx) at the position A-A in Fig. 7;
Figure 14 is the sectional view 7 (gear shape) at the position A-A in Fig. 7;
Figure 15 is a kind of distribution pipe and the second anaerobic copper ring, capping company of engine high pressure oil rail assembly in embodiment 1 The structural schematic diagram connect;
Figure 16 is a kind of distribution pipe and the second anaerobic copper ring, capping, spray of engine high pressure oil rail assembly in embodiment 1 The structural schematic diagram of oily device seat mounting bracket block in the pre-connection;
Figure 17 is a kind of distribution pipe and the second anaerobic copper ring, capping, spray of engine high pressure oil rail assembly in embodiment 1 The structural schematic diagram of oily device seat mounting bracket block upon connection;
Figure 18 is a kind of knot of the integral type of the oil injector seat mounting bracket block of engine high pressure oil rail assembly in embodiment 1 Structure schematic diagram;
Figure 19 is a kind of two-piece unit formula of the oil injector seat mounting bracket block of engine high pressure oil rail assembly in embodiment 1 Structural schematic diagram;
Figure 20 is a kind of split left and right formula of the oil injector seat mounting bracket block of engine high pressure oil rail assembly in embodiment 1 Structural schematic diagram;
Figure 21 is a kind of structural representation of cutter (cutter head knife bar integral type) in the processing technology of distribution pipe in embodiment 1 Figure;
Figure 22 is a kind of structural representation of cutter (cutter head knife bar is split type) in the processing technology of distribution pipe in embodiment 1 Figure;
Figure 23 is a kind of processing technology chinese raw materials ontology machining sketch chart of distribution pipe in embodiment 1;
Figure 24 is to distribute the rough machined machining sketch chart of tube cavity in embodiment 1 in a kind of processing technology of distribution pipe;
Figure 25 is a kind of machining sketch chart of distribution tube cavity finishing in the processing technology of distribution pipe in embodiment 1;
Figure 26 is rough machined with the integrally formed pipe fitting of distribution pipe in a kind of processing technology of distribution pipe in embodiment 1 Machining sketch chart;
Figure 27 is finished in a kind of processing technology of distribution pipe with the integrally formed pipe fitting of distribution pipe in embodiment 1 Machining sketch chart;
Figure 28 is the processing signal for distributing the second oil-through-hole on tube body in embodiment 1 in a kind of processing technology of distribution pipe Figure;
Figure 29 is a kind of flow chart of the processing technology of distribution pipe in embodiment 1;
Figure 30 is a kind of structural schematic diagram of the distribution pipe intracavity bottom of engine high pressure oil rail assembly in embodiment 2;
Figure 31 is a kind of structural schematic diagram of the distribution pipe intracavity bottom of engine high pressure oil rail assembly in embodiment 3;
Figure 32 is a kind of structural schematic diagram of the distribution pipe intracavity bottom of engine high pressure oil rail assembly in embodiment 4;
Figure 33 is a kind of structural schematic diagram of the distribution pipe intracavity bottom of engine high pressure oil rail assembly in embodiment 5.
In figure: 1 is distributes tube body in the prior art, and 1-1 is the oil-through-hole distributed on tube body in the prior art, and 2 are Tube cavity is distributed in the prior art, and 3 be the capping for distribution pipe in the prior art, and 4 is for distribution pipes in the prior art The second anaerobic copper ring, 5 for distribution pipe in the prior art disclosure risk point, 6 be distribution tube body, and 6-1 is distribution tube body The second oil-through-hole, 7 be distribution tube cavity, and 7-1 is distribution pipe intracavity bottom, and 7-2 is rough machined distribution tube cavity, and 7-3 is The distribution tube cavity of finishing, 8 be pipe fitting, and 8-1 is the first oil-through-hole of pipe fitting, and 8-2 is the inside of pipe fitting, and 9 be folding At angle, 10 be sensor connector, and 11 be Separated pipe joint in the prior art, and 12 be first for distribution pipe in the prior art Anaerobic copper ring, 13 be oil injector seat mounting bracket block;13-1 is fixed block, and 13-1-1 is the first part after fixed block is split, Second part after the fractionation of 13-1-2 fixed block, 13-2 are mounting bracket block, and 13-3 is oil injector seat, and 13-4 is on fixed block Through hole, 14 be machining tool, and 14-1 is cutting tip, and 14-2 is cutter head, and 14-3 is knife bar, and 15 be lubricating cooling oil, and 16 are Raw material, 16-1 are the left side of raw material, and 16-2 is the right side of raw material, and 16-3 is the outer surface of raw material, and 17 be point With the rough machined cutter of tube cavity, 18 be the cutter for distributing tube cavity finishing, and 19 cutters processed for the second oil-through-hole, 20 are Pipe fitting roughing tool, 21 be pipe fitting finishing tool, and M is to correspond to distribution pipe intracavity bottom in distribution pipe in the prior art Position, N is that the position of distribution pipe intracavity bottom is corresponded in distribution pipe.
Specific embodiment
The invention will be further elucidated with reference to specific embodiments.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
Referring to fig. 4 to Figure 29, embodiment 1, a kind of distribution pipe provided by the invention, including distribution tube body 6 and pipe fitting 8, pipe fitting 8 is interior to be equipped with the first oil-through-hole 8-1, it is characterised in that: is equipped with inner cavity 7 in distribution tube body 6,7 one end of inner cavity is opened Mouthful, which is the technique opening formed after being processed by the distribution pipe of integral type pipe seal, can use capping 3 and second Anaerobic copper ring 4 blocks this opening of inner cavity 7, the distribution tube body 6 of 7 other end of inner cavity (i.e. intracavity bottom 7-1) with Pipe fitting 8 formed integrally formed sealing structure (i.e. pipe fitting 8 and distribution 6 integrated sealing of tube body, it is seamless, herein Disclosure risk point is just not present, i.e. distribution tube cavity 7 is non through hole, improves the sealing performance and resistance to pressure of product of the present invention Can), which makes pipe fitting 8 and distributes the integral type plugging structure that tube body 6 is integrally formed, is seamlessly connected, can be effective It avoids that disclosure risk point occurs in the junction of pipe fitting 8 and distribution tube body 6, and then promotes the sealing performance, resistance to of distribution pipe Performance and mechanical strength are pressed, part, reduction assembly and inspection process is saved, reduces the energy consumption in production process.Pipe fitting The inside 8-2 of first oil-through-hole 8-1 connection distribution tube cavity 7 inside and pipe fitting, i.e. the inside 8-2 of pipe fitting are by external fuel (such as gasoline, diesel oil) is imported inside distribution tube cavity 7 by the first oil-through-hole 8-1 of pipe fitting.Distribution tube body 6 is equipped with At least one the second oil-through-hole 6-1 (it can be multiple for one or two or three or three or more, in the light of actual conditions it is distributed Distribution tube body 6 on, such as can linearly be distributed and the straight line with distribution 6 axis of tube body it is parallel, can also be in do not advise Then it is distributed), distribution pipe is for gasoline to be assigned in different fuel injectors.Second oil-through-hole 6-1 is four in the present embodiment 1, Inner cavity 7 and oil injector seat mounting bracket block 13 are connected, for the gasoline (or other fuel oils) of distribution pipe body lumen 7 to be passed through the Two oil-through-hole 6-1 enter inside oil injector seat mounting bracket block 13, and the high pressure of distribution pipe body lumen 7 is recycled to pass through fuel injector Seat mounting bracket block 13 spurts into gasoline (or other fuel oils) in cylinder.
7 other end of inner cavity (i.e. intracavity bottom 7-1, that is, distribution tube cavity is close to the bottom of pipe fitting one end, interior bottom of chamber The inside 8-2 that portion 7-1 passes through the first oil-through-hole 8-1 connecting pipe joint of pipe fitting) shape be that cone (belongs to the one of taper Kind situation), it more can effectively improve the stress concentration of intracavity bottom 7-1, cylinder can also be designed as according to the actual situation Or spheric or W-shaped or chamfer or rounded corner or by cylinder, taper, spheric, W-shaped, chamfer, rounded corner at least two The combination of shape made of a combination of shapes and aforementioned at least two shape, meets needed for different situations.Distribute tube cavity 7 9 be arc transition (such as the angle R or the angle C) at the dog-ear of the other end (i.e. intracavity bottom 7-1), and arc transition can help effectively to subtract The concentration of few stress, is effectively protected intracavity bottom 7-1, extends the service life of distribution pipe;9 circular arc mistake at dog-ear The angle R crossed is at least 0.1 millimeter, and the angle R of 9 arc transition is 2 millimeters at dog-ear in the present embodiment 1.
The cross sectional shape of inner cavity 7 is circle, can also be designed as square or rectangular or ellipse according to the actual situation Or the group of trapezoidal or regular pentagon or regular hexagon or regular polygon or irregular polygon and aforementioned at least two shape It closes, meets needed for different situations.
Distributing the cross-sectional shape that 6 outer edge of tube body is formed is circle, can also be designed as pros according to the actual situation Shape or rectangle or ellipse or trapezoidal or regular pentagon or regular hexagon or regular polygon or irregular polygon and aforementioned The combination of at least two shapes, meets needed for different situations.
The central axes of the central axes and inner cavity 7 of distributing tube body 6 are overlapped, and inner cavity 7 can be helped to be in distribution tube body Heart position, it is structurally reasonable, it is ensured that each position of distribution tube body 6 is able to bear pressure in inner cavity 7.
Distributing 6 minimum thickness of tube body is at least 1 millimeter, and the wall thickness of pipe fitting is at least 1 millimeter;The depth of inner cavity 7 is 1 ~1000 millimeters.Cross sectional shape in view of inner cavity 7 is that cross-sectional shape that is round and distributing the formation of 6 outer edge of tube body is round Shape, therefore distribution pipe body thickness is 4.5 millimeters in the present embodiment 1, the wall thickness of pipe fitting is 9 millimeters, and depth of inner cavity is 329 millis Rice.
Pipe fitting 8 and the cross sectional shape of the distribution integrally formed junction of tube body 6 (i.e. the position A-A) are circle (see figure 8), can also design than circular processing be square (see Fig. 9) or rectangle (see Figure 10) or oval (see Figure 11) or Trapezoidal or quincunx (see Figure 13) or gear shape (see Figure 14) or regular pentagon (see Figure 12) or regular hexagon or regular polygon or Irregular polygon or by circle, square, rectangle, ellipse, trapezoidal, quincunx, gear shape, regular pentagon, positive six side Shape, regular polygon, shape made of at least two combination of shapes in irregular polygon.The design convenient for assembly on pipe fitting, Dismantle other parts.
Distribution tube body 6 can select the stainless steel plate of following model using material, by cold rolling and/or hot extrusion and/ Or casting and/or forging and/or cold-heading and other techniques for manufacturing blank material are made:
Chinese GB--06Cr19Ni10,022Cr19Ni10, Y12Cr18Ni9,022Cr17Ni12Mo2, 06Cr18Ni11Ti、12Cr17Mn6Ni5N、12Cr18Mn9Ni5N、12Cr17Ni7、06Cr19Ni10N、06Cr19Ni9NbN、 022Cr19Ni10N、10Cr18Ni12、06C23Ni13、06Cr25Ni20、06Cr17Ni12Mo2、06Cr17Ni12Mo2Ti、 06Cr17Ni12Mo2N、022Cr17Ni13Mo2N、06Cr18Ni12MoCu2、022Cr18Ni14Mo2Cu2、 06Cr19Ni13Mo3、022Cr19Ni13Mo3、06Cr18Ni11Nb、Y12、Y15、Y12、Y15、Y20、Y30、Y35、Y40Mn、 Y45CaS、Y100Pb、Y100Bi。
Japanese JIS--SUS304, SUS304L, SUS316, SUS316L, SUS321, SUS201, SUS202, SUS301, SUS304N1、SUS304N2、SUS304LN、SUS305、SUS309S、SUS310、SUS310S、SUS316Ti、SUS316N、 SUS316J1、SUS316J1L、SUS317、SUS317L、SUS347。
U.S. ASTM--304,304L, 316,316L, 321,201,202,301,304N, XM21,304LN, 305,306, 309S、310S、316Ti、316N、316LN、317、317L、347。
U.S. UNS-S30400, S30403, S31603, S32100, S20100, S20200, S30100, S30451, S30452、S30453、S30500、S30908、S31008、S31600、S31635、S31651、S31653、S31700、S31703、 S34700。
European EN -1.4301,1.4302,1.4303,1.4304,1.4305,1.4306,1.4307,1.4308, 1.4309、1.4310、1.4401、1.4402、1.4403、1.4404、1.4405、1.4406、1.4407、1.4408、1.4409、 1.4410、1.4372、1.4373、1.4319、1.4315、1.4833、1.4845、1.4571、1.4429、1.4438、1.4541、 1.455。
German DIN-X5CrNi18-10, X2CrNi19-11, X2CrNiMo17-12-2, X6CrNiTi18-10, X12CrMnNiN17-8-5、X12CrMnNiN18-9-5、X5rNi17-7、X5CrNiN19-9、X2CrNiN18-10、 X4CrNi18-12、X12CrNi23-13、X8CrNi25-21、X5CrNiMo17-12-2、X6CrNiMoTi17-12-2、 X2CrNiMoN17-13-3、X2CrNiMo18-15-4、X6CrNiNb18-10。
South Korea KS-STS304, STS304L, STS316L, STS321, STS201, STS202, STS301, STS304N1, STS304N2、STS304LN、STS305、STS309S、STS310S、STS316、STS316N、STS316LN、STS316J1、 STS317L、STS347。
The specific advantage of product of the present invention (i.e. a kind of distribution pipe) pair embodies as follows:
(in upper table, Y is illustrated as;N is expressed as no)
(in upper table, MPa is megapascal;Cc/min is that milliliter is per minute)
(in upper table, MPa is megapascal)
The hardness test and comparison of distribution pipe in the present invention, See Figure, to distribution tube components (i.e. distribution pipe sheet of the invention Body, pipe fitting, sensor connector) carry out hardness determination (vickers hardness hv).Distribution tube components equal portions are cut into 10 sections of detections Exemplar is put into hardness tester and is detected.Hardness data and the hardness of traditional seamless pipe are compared, distribution pipe of the invention is hard Degree is slightly better than the hardness of conventional distribution.
The detection and comparison of the material grains degree of distribution pipe in the present invention, See Figure carry out distribution pipe of the invention micro- See the inspection (100x, 500x) of grain size.Distribution tube components are cut open, outer surface, inner surface is detected with instrument respectively, uses The grade inspection of 100x, 500x.The microcosmic grain size that picture and traditional seamless pipe is imaged is compared, distribution pipe of the invention Grain size it is more tiny, finer and close, metal strength, hardness are higher, plasticity, wilful more preferable.
The test and comparison of the pressure fluctuation test of distribution pipe, See Figure carry out distribution pipe of the invention in the present invention Pressure fluctuation test.Distribution tube components are mounted in pressure fluctuation equipment, are tested respectively using the pressure of 2 grades.It will Data and the data of traditional seamless pipe compare, and distribution pipe pressure resistance performance of the invention, anti-fatigue performance are more excellent.
Referring to fig. 21 to 29, the present invention provides a kind of processing technology of distribution pipe, is related to a kind of above-mentioned distribution pipe, processes Specific step is as follows for technique:
(1), suitable distribution pipe raw material 16 are selected, in process equipment by 16 clamping of at least one raw material;Processing Equipment has the function of while the multiple raw material 16 of synchronous processing, and can guarantee processing effect, promotes processing efficiency.
(2), designated shape is processed into 16 outer surface of distribution pipe raw material using the machining tool of process equipment 14 (to divide It is round or square or rectangular or ellipse or trapezoidal or regular pentagon with the cross-sectional shape that tube body outer edge is formed Or regular hexagon or regular polygon or irregular polygon), circle is processed into 16 outer surface of distribution pipe raw material in the present embodiment 1 Shape;
(3), using the machining tool of process equipment (i.e. the distribution rough machined cutter 17 of tube cavity) to distribution tube body 6 Inner cavity 7 carries out roughing, will distribution 7 preparatory processing of tube cavity at designated shape (forming rough machined distribution tube cavity 7-2), The designated shape refer to the cross sectional shape of inner cavity for round or square or rectangular or ellipse or trapezoidal or regular pentagon or The cross sectional shape for distributing tube cavity is circle in the present embodiment 1 by regular hexagon or regular polygon or irregular polygon;
(4), using the machining tool of process equipment (i.e. the cutter 18 of distribution tube cavity finishing) to distribution tube body 6 Inner cavity 7 is finished, and distribution tube cavity 7 is processed into satisfactory 7 wall of inner cavity, intracavity bottom 7-1, that is, forms finishing Distribution tube cavity 7-3;At this point, the shape of the inner cavity other end (i.e. intracavity bottom 7-1) be cylindrical or taper or spheric or Chamfer or rounded corner or the shape as made of at least two combination of shapes in cylinder, taper, spheric, chamfer, rounded corner Shape, the shape processing that the tube cavity other end (i.e. intracavity bottom 7-1) will be distributed in the present embodiment 1 become cone.
The roughing of above-mentioned (3) step and the finishing of (4) step, the two working depth need to be less than distribution tube body 6 length, it is ensured that the distribution tube body 6 of the inner cavity other end (i.e. intracavity bottom 7-1) is used to be processed into integrally formed pipe fitting 8, Pipe fitting 8 is also made to meet the requirement of minimum thickness simultaneously, it is ensured that the sealing performance of distribution pipe.
(5), using the machining tool of process equipment (i.e. the rough machined cutter 20 of pipe fitting) to distribution pipe raw material 16 The other end carries out the roughing of pipe fitting 8, by 8 preparatory processing of pipe fitting at designated shape (i.e. conical), while by pipe fitting 8 With distribution 6 junction of tube body (i.e. the position A-A) shape processing at designated shape (i.e. round);
(6), finishing is carried out to pipe fitting 8 using the machining tool of process equipment (i.e. the cutter 21 of pipe fitting finishing) Work processes satisfactory first oil-through-hole 8-1 and inside 8-2 inside pipe fitting 8;Can also according to actual needs, 8 outer surface of pipe fitting processes satisfactory screw thread (in not showing in attached drawing), this is threadedly engaged nut and is used to manage together Connector 8 and opponent's part (such as by the bulb for playing sealing function and play with effective pipe and by pipe, bulb and The nut that pipe fitting 8 is tightly secured together) closely connection, entered in distribution pipe convenient for fuel by opponent's part and pipe fitting 8 Chamber 7.
(7), using the machining tool of process equipment (cutter 19 for being suitble to the processing of the second oil-through-hole) in distribution tube body 6 On process several second oil-through-hole 6-1.Second oil-through-hole 6-1 is general linearly evenly distributed, and in the straight line and distribution pipe The advantages of axis is parallel, the arrangement mode is that structure is simple, regular, and performance is more preferable, easy to process, strong applicability;While the Two oil-through-hole 6-1 processing simple, at low cost, the easy popularization of equipment used.
Above-mentioned processing technology step (2) to (7) can adjust successive process sequence according to the actual situation, i.e. distribution tube cavity 7 roughing and finishing, the roughing of pipe fitting 8 and finishing can 16 outer surface of distribution pipe raw material process before, Can also be after oil-through-hole 6-1 processing etc., the various adjustment of process sequence have no effect on the formation of processing technology of the present invention Last distribution pipe product, thus the various processing technologys adjusted of process sequence also belong to protection scope of the present invention it It is interior.
The process equipment referred in the present invention can be a total system, be also possible to by each device and/component group At the respective function of completion the specific equipment of correspondence (including but not limited to machining tool, realize the various techniques that the present invention refers to Device required and existing in the prior art etc., so it will not be repeated), as long as can satisfy the system of distribution pipe in the present invention Making can (i.e. in completion distribution pipe manufacturing process technique used in each step or link and reach distribution pipe production purpose).
Machining tool 14 (machining tool of raw material is including but not limited to processed, the rough machined cutter 17 of tube cavity is distributed, It is the cutter 19 of the second oil-through-hole processing, pipe fitting roughing tool 20, pipe fitting for the cutter 18 of distribution tube cavity finishing Finishing tool 21) it is lathe tool or drill bit or milling cutter or boring cutter or grinding wheel or planing tool or is lathe tool, drill bit, milling cutter, boring cutter, sand At least two combination in wheel, planing tool;The cutter head 14-2 and knife bar 14-3 of machining tool 14 are cutter head 14-2 knife bar 14-3 one The advantages of formula, integral type, is that stress is stronger, and cutting rotational speeds are higher, process part when it is high-efficient;Or cutter head 14-2 knife bar 14- 3 is split type, and split type advantage is only to need to dismount cutting tip 14-1 and cutter head 14-2, convenient for safeguarding, maintenance processing work Tool 14 and at low cost.
Cutting tip 14-1 quantity on drill bit or cutter head 14-2 is 1~100;The cutting rotational speeds of cutting tip 14-1 are 1~10000 rev/min;The feed cutting output of cutting tip 14-1 is 1~1000 mm/min.Wherein process the brill of inner cavity Head, blade material are preferably hard alloy steel;The material of knife bar is preferably high-speed alloy steel.
A variety of machining tools (are including but not limited to process tool 14, the distribution rough machined cutter 17 of tube cavity, for distribution The cutter 18 of tube cavity finishing, for the cutter 19 of the second oil-through-hole processing, pipe fitting roughing tool 20, pipe fitting finishing Cutter 21) it is processed for 16 outer surface of distribution pipe raw material, roughing and finishing is carried out to the inner cavity 7 of distribution tube body 6 Work processes the distribution tube cavity other end (i.e. intracavity bottom 7-1), is several to be process on distribution tube body 6 Second oil-through-hole 6-1.Wherein to 16 outer surface of distribution pipe raw material processing use Vehicle Processing, to distribution tube body 6 inner cavity 7 into Row roughing uses depth drill, carries out finishing using depth drill, to the inner cavity other end (in i.e. to the inner cavity 7 of distribution tube body 6 Bottom of chamber portion 7-1) processing is carried out using depth drill,It is adopted to when carrying out on distribution tube body 6 and be process several second oil-through-hole 6-1 With drilling.
Various machining tools (are including but not limited to process tool 14, rough machined cutter 17, for the cutter of finishing 18, for the cutter 19 of oil-through-hole processing, pipe fitting roughing tool 20, pipe fitting finishing tool 21) cooperation when being processed Using lubricating cooling oil 15, in cutting, mill process, lubricating cooling oil 15 is used to cool down and lubricate cutter and workpiece (i.e. distribution pipe raw material, the distribution tube cavity other end (i.e. intracavity bottom 7-1), distribution tube body 6), i.e., lubricating cooling oil 15 is matched Close machining tool used simultaneously in cutting, mill process (including but not limited to the processing of 16 outer surface of raw material, in distribution pipe 7 roughing of chamber and finishing, the roughing of pipe fitting 8 and finishing, distribute tube body the second oil-through-hole 6-1 processing).Profit The sliding cooling oil trade mark is preferably but not limited to: 15#, 20#, 22#, 30#, 32#, 40#, 46#, 60#, 68#, 100#, 50#, 70#, 90#、150#、120#、220#、250#、320#、350#、460#、680#。
16 moulding process of distribution pipe raw material be cold-drawn or cold rolling or hot extrusion or casting or forging or cold-heading or cutting or For at least two combined techniques in cold-drawn, cold rolling, hot extrusion, casting, forging, cold-heading, cutting;In the present embodiment 1, distribution pipe 16 moulding process of raw material is cold-drawn.
16 outer surface processing technology of distribution pipe raw material is vehicle or milling or plane or drawing or pressure or forging or mill or cutting or electrical fire Colored or laser or chemical attack are in vehicle, milling, plane, drawing, pressure, forging, mill, cutting, electric spark, laser, chemical attack at least two The combined technique of kind;In the present embodiment 1,16 outer surface processing technology of distribution pipe raw material is Vehicle Processing.
It is depth drill or drill gun or milling or plane or boring or mill or electrical fire that the inner cavity 7 for distributing tube body 6, which carries out roughing technique, Colored or laser or chemical attack are in depth drill, rifle drilling and milling, plane, boring, mill, electric spark, laser, chemical attack at least two Combined technique;In the present embodiment 1, it is depth drill that the inner cavity 7 of distribution tube body 6, which carries out roughing technique,.
The inner cavity 7 of distribution tube body 6 carry out fine-processing technique be mill or milling or plane or boring or electric spark or laser or for for Depth drill or mill or milling or plane or boring or electric spark or laser or for depth drill, mill, milling, plane, boring, electric spark, in laser at least The technique of two kinds of combinations;In the present embodiment 1, it is depth drill that the inner cavity 7 of distribution tube body 6, which carries out fine-processing technique,.
The roughing technique of pipe fitting 8 be bore or vehicle or milling or plane or boring or mill or electric spark or laser or chemical attack or For at least two combined techniques in brill, vehicle, milling, plane, boring, mill, electric spark, laser, chemical attack.
The fine-processing technique of pipe fitting 8 be bore or vehicle or milling or plane or boring or mill or electric spark or laser or chemical attack or For at least two combined techniques in brill, vehicle, milling, plane, boring, mill, electric spark, laser, chemical attack.
Second oil-through-hole 6-1 processing technology is brill or milling or mill or electric spark or laser or is drilling and milling, mill, electric spark, swashs At least two combined technique in light;In the present embodiment 1, the second oil-through-hole 6-1 processing technology is drilling.
Referring to fig. 4 to Figure 16, a kind of engine high pressure oil rail assembly provided by the invention includes a kind of above-mentioned distribution pipe (i.e. distribution pipe main body 6), closeouts (i.e. capping 3 and the second anaerobic copper ring 4), sensor connector 10, oil injector seat installation branch Frame block 13, it is characterised in that: inner cavity 7 is open at one end to be blocked by closeouts, is used with the distribution integrally formed pipe fitting 8 of tube body 6 In gasoline (or other fuel oils) enter distribution tube cavity 7 (i.e. gasoline or other fuel oils from the first through hole 8-1 of pipe fitting 8 into Enter to distribute tube cavity 7), the second anaerobic copper ring 4 is used for welding material (being blocked with capping 3 is open at one end to inner cavity). Sensor connector 10 is connected on distribution tube body 6, and sensor connector 10 is for realizing the function of installing pressure sensor.Oil spout Device seat mounting bracket block 13 is connected on distribution tube body 6,13 position of oil injector seat mounting bracket block and the second oil-through-hole 6-1 Set correspondence, oil injector seat mounting bracket block 13 for realizing installation gasoline ejector function and with the connection of petrol engine.
Oil injector seat mounting bracket block 13 is made of oil injector seat 13-3 and mounting bracket block 13-2, oil injector seat installation branch Frame block 13 integral type or split type, i.e. oil injector seat mounting bracket block 13 include for connecting distribution pipe main body 6, mounting bracket block The fixed block 13-1 of 13-2, oil injector seat 13-3, for by lock screw by product (i.e. engine high pressure oil rail assembly or comprising The oily rail of engine high pressure oil rail assembly) the mounting bracket block 13-2 of fixation on the engine, for installing the oil spout of fuel injector Through hole 13-4 on device seat 13-3, the fixed block 13-1 in the hole for wearing screw, wherein oil injector seat mounting bracket block 13 1 Body formula connection type is that mounting bracket block 13-2 and oil injector seat 13-3 can be fixedly connected with fixed block 13-1 integral type, should Kind structural strength is fine, is usually used in the high product of performance requirement, but its difficulty of processing is also high, at high cost;
13 two-piece unit formula connection type of oil injector seat mounting bracket block is that mounting bracket block 13-2 and fixed block 13-1 can It connecting seperatedly, oil injector seat 13-3 can be fixedly connected with fixed block 13-1, this kind of structure is used for the product of custom requirements, Single part structure is simple;
13 split left and right formula connection type of oil injector seat mounting bracket block is that fixed block 13-1 is split, and is divided into two (can also according to circumstances carry out three even three or more to split) forms the first part 13-1-1 after fixed block 13-1 is split Through hole 13-4 on second part 13-1-2 after splitting with fixed block 13-1, fixed block 13-1 is located at fixed block 13-1 fractionation First part 13-1-1 and the fixed company of mounting bracket block 13-2 on first part 13-1-1 afterwards, and after fixed block 13-1 fractionation It connects, the second part 13-1-2 after oil injector seat 13-3 is split with fixed block 13-1 is fixedly connected, this kind of structure is wanted for conventional The product asked, single part structure are simple;
It distributes between tube body 6 and capping 3, distribute between tube body 6 and sensor connector 10, distribution 6 and of tube body It is first pre-installed between oil injector seat mounting bracket block 13, prepackage mode includes but is not limited to be pressed and/or rivet and/or swash Then flush weld and/or tack welding and/or electric resistance welding carry out molding welding again, molding welding manner includes but is not limited to high temperature pricker Weldering and/or HFI welding and/or bridging agent adhesion, such as: copper cream and high temperature brazing technique.In the present embodiment 1, distributing Second anaerobic copper ring 4, capping 3 are mounted in designated position by press-fit approach by 7 open end of inner cavity of pipe main body 6 in advance;It is distributing In pipe main body 6, oil injector seat mounting bracket block 13, sensor connector 10 are mounted in designated position in advance by modes such as welding;It is logical It crosses in each assembly seam crossing using copper cream and high temperature brazing technique, by linking together for each part secure.A kind of engine is high Preferably 1000 degrees Celsius to 1200 degrees Celsius of the assembly environment of each component in pressure oil rail assembly, which is in liquid completely State, trickling, absorption property are outstanding.
Gasoline (or other fuel oils) enters distribution pipe by oil pump by the first oil-through-hole 8-1 of pipe fitting 8, presses in distribution pipe Power rises, and distribution bottom of the tube (i.e. distribution pipe intracavity bottom 7-1 forms sealing structure with the integrated molding of pipe fitting 8) is seamless, no It has a risk of leakage a little, gasoline reduces loss.The gasoline pressure of distribution tube cavity 7 is known by sensor and sensor connector 10 Power, and control distribution tube cavity 7 and flow into gasoline speed to control distribution 7 internal petrol pressure of tube cavity;Distribute the vapour of tube cavity 7 Oil under the effect of the pressure, enters oil injector seat mounting bracket block 13 and fuel injector by the second oil-through-hole 6-1 in distribution pipe, And then gasoline is spurted into petrol engine by fuel injector.
Referring to Figure 30, embodiment 2, a kind of distribution pipe provided by the invention, the present embodiment 2 is substantially the same manner as Example 1, no Be with place: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is cylinder;Inner cavity 7 other end (i.e. intracavity bottom 7- 1) 9 be arc transition (such as the angle R or the angle C) at dog-ear, and arc transition can help to effectively reduce the concentration of stress, to inner cavity Bottom 7-1 is effectively protected, and the service life of distribution pipe is extended;The angle R of 9 arc transition is at least 0.1 milli at dog-ear Meter, the angle R of 9 arc transition is 2 millimeters at dog-ear in the present embodiment 2.
Pipe fitting 8 and the cross sectional shape of the distribution integrally formed junction of tube body 6 (i.e. the position B-B) are circle simultaneously (see Fig. 8), can also design than circular processing be square (see Fig. 9) rectangle (see Figure 10) or ellipse (see figure 11) trapezoidal or quincunx (see Figure 13) or gear shape (see Figure 14) or regular pentagon (see Figure 12) or regular hexagon or just polygon Shape or irregular polygon or by circle, square, rectangle, ellipse, trapezoidal, quincunx, gear shape, regular pentagon, just Hexagon, regular polygon, shape made of at least two combination of shapes in irregular polygon.The design is convenient for filling on pipe fitting Match, dismantle other parts.
A kind of processing technology of above-mentioned distribution pipe, it is substantially the same manner as Example 1, the difference is that selecting different processing works The shape processing of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is cylindrical and does arc transition processing at dog-ear by tool, more can It is effectively improved the stress concentration of intracavity bottom 7-1.
A kind of engine high pressure oil rail assembly comprising above-mentioned distribution pipe, substantially the same manner as Example 1, difference exists In: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is cylinder, and the stress that more can effectively improve intracavity bottom 7-1 is concentrated Situation.
Referring to Figure 31, embodiment 3, a kind of distribution pipe provided by the invention, the present embodiment 3 is substantially the same manner as Example 1, no Be with place: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is spheric, more can effectively improve intracavity bottom 7-1's Stress concentration.
Pipe fitting 8 and the cross sectional shape of the distribution integrally formed junction of tube body 6 (i.e. the position C-C) are circle simultaneously (see Fig. 8), can also design than circular processing be square (see Fig. 9) rectangle (see Figure 10) or ellipse (see figure 11) trapezoidal or quincunx (see Figure 13) or gear shape (see Figure 14) or regular pentagon (see Figure 12) or regular hexagon or just polygon Shape or irregular polygon or by circle, square, rectangle, ellipse, trapezoidal, quincunx, gear shape, regular pentagon, just Hexagon, regular polygon, shape made of at least two combination of shapes in irregular polygon.The design is convenient for filling on pipe fitting Match, dismantle other parts.
A kind of processing technology of above-mentioned distribution pipe, it is substantially the same manner as Example 1, the difference is that selecting different processing works The shape processing of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is spheric by tool.
A kind of engine high pressure oil rail assembly comprising above-mentioned distribution pipe, substantially the same manner as Example 1, difference exists In: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is spheric, and the stress that more can effectively improve intracavity bottom 7-1 is concentrated Situation.
Referring to Figure 32, embodiment 4, a kind of distribution pipe provided by the invention, the present embodiment 4 is substantially the same manner as Example 1, no Be with place: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is W-shaped (i.e. in the mistake distribution pipe ontology 6 of intracavity bottom The cross sectional shape of axis, or for the structure of intracavity bottom 7-1 be W-shaped), the stress that more can effectively improve intracavity bottom 7-1 is concentrated Situation.9 be arc transition at the dog-ear of 7 other end of inner cavity (i.e. intracavity bottom 7-1), and arc transition can help to effectively reduce to answer Intracavity bottom 7-1 is effectively protected in the concentration of power, extends the service life of distribution pipe;9 arc transition at dog-ear The angle R is at least 0.1 millimeter, and the angle R of 9 arc transition is 2 millimeters at dog-ear in the present embodiment 2.
Pipe fitting 8 and the cross sectional shape of the distribution integrally formed junction of tube body 6 (i.e. the position D-D) are circle simultaneously (see Fig. 8), can also design than circular processing be square (see Fig. 9) rectangle (see Figure 10) or ellipse (see figure 11) trapezoidal or quincunx (see Figure 13) or gear shape (see Figure 14) or regular pentagon (see Figure 12) or regular hexagon or just polygon Shape or irregular polygon or by circle, square, rectangle, ellipse, trapezoidal, quincunx, gear shape, regular pentagon, just Hexagon, regular polygon, shape made of at least two combination of shapes in irregular polygon.The design is convenient for filling on pipe fitting Match, dismantle other parts.
A kind of processing technology of above-mentioned distribution pipe, it is substantially the same manner as Example 1, the difference is that selecting different processing works The shape processing of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is W-shaped (i.e. 6 central axes of mistake distribution pipe ontology of intracavity bottom by tool Cross sectional shape, or for the structure of intracavity bottom 7-1 be W-shaped) and do arc transition processing at dog-ear, more can effectively improve interior The stress concentration of bottom of chamber portion 7-1.
A kind of engine high pressure oil rail assembly comprising above-mentioned distribution pipe, substantially the same manner as Example 1, difference exists In: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is W-shaped (i.e. section of 6 central axes of mistake distribution pipe ontology of intracavity bottom Face shape, or for the structure of intracavity bottom 7-1 be W-shaped), it more can effectively improve the stress concentration of intracavity bottom 7-1.
Referring to Figure 33, embodiment 5, a kind of distribution pipe provided by the invention, the present embodiment 5 is substantially the same manner as Example 1, no Be with place: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is that knockdown 7 structure of inner cavity (can be by cylinder Shape, taper, spheric, straight chamfering, the shape that at least two combination of shapes are formed and communicated in rounded corner), it adopts in the present embodiment 5 It is combined into 7 structure of inner cavity with cylindrical and spherical, spheric is located at cylinder-shaped top and closer to pipe fitting 8 at this time, more It can effectively improve the stress concentration of intracavity bottom 7-1.9 be circular arc at the dog-ear of 7 other end of inner cavity (i.e. intracavity bottom 7-1) Transition, arc transition can help to effectively reduce the concentration of stress, intracavity bottom 7-1 are effectively protected, and extend distribution The service life of pipe;The angle R of 9 arc transition is at least 0.1 millimeter at dog-ear, in the present embodiment 2 at dog-ear 9 arc transition The angle R be 2 millimeters.
Pipe fitting 8 and the cross sectional shape of the distribution integrally formed junction of tube body 6 (i.e. the position E-E) are circle simultaneously (see Fig. 8), can also design than circular processing be square (see Fig. 9) rectangle (see Figure 10) or ellipse (see figure 11) trapezoidal or quincunx (see Figure 13) or gear shape (see Figure 14) or regular pentagon (see Figure 12) or regular hexagon or just polygon Shape or irregular polygon or by circle, square, rectangle, ellipse, trapezoidal, quincunx, gear shape, regular pentagon, just Hexagon, regular polygon, shape made of at least two combination of shapes in irregular polygon.The design is convenient for filling on pipe fitting Match, dismantle other parts.
A kind of processing technology of above-mentioned distribution pipe, it is substantially the same manner as Example 1, the difference is that selecting different processing works The shape processing of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is knockdown 7 structure of inner cavity (i.e. using cylindrical and ball by tool Face type is combined into 7 structure of inner cavity, and spheric is located at cylinder-shaped top and closer to pipe fitting 8 at this time) and do at dog-ear circle Arc transition processing.
A kind of engine high pressure oil rail assembly comprising above-mentioned distribution pipe, substantially the same manner as Example 1, difference exists In: the shape of 7 other end of inner cavity (i.e. intracavity bottom 7-1) is knockdown 7 structure of inner cavity (i.e. using cylindrical and spherical group 7 structure of inner cavity is synthesized, spheric is located at cylinder-shaped top and closer to pipe fitting 8 at this time), 7 other end of inner cavity (bottom of chamber in i.e. Portion 7-1) dog-ear at 9 be arc transition, arc transition can help to effectively reduce the concentration of stress, to intracavity bottom 7-1 into Row is effectively protected, and extends the service life of distribution pipe;The angle R of 9 arc transition is at least 0.1 millimeter at dog-ear, this implementation The angle R of 9 arc transition is 2 millimeters at dog-ear in example 2.
A kind of distribution pipe and a kind of engine high pressure oil rail assembly comprising the distribution pipe can be adapted in the present invention Petrol engine, diesel engine, combustion gas start, the engine of other types of engine fuel and other energy, these hairs Send machine that can apply in the engine of the big machineries such as motor vehicle, automobile, ship, aircraft.
The processing technology of distribution pipe is broadly divided into and is processed to raw material outer surface (including roughing and essence in the present invention Processing), to distribution tube body inner cavity carry out roughing, to distribution tube body inner cavity finish, to pipe fitting carry out Roughing finishes pipe fitting, and to processing several second oil-through-holes on distribution tube body, procedure of processing can be according to Needs of production is adjusted, if can be made distribution pipe in the present invention (include the second oil-through-hole distribution pipe and/or Distribution pipe without the second oil-through-hole), that is, it belongs to the scope of protection of the present invention.Specific processing technology step further includes but unlimited In following several schemes:
Scheme one: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;
(4), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
Scheme two: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Scheme three: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
Scheme four: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
Scheme five: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment.
Scheme six: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;
(4), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme seven: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing finishes pipe fitting at designated shape, using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme eight: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;
(5), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme nine: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme ten: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Scheme 11: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Scheme 12: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Scheme 13: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Scheme 14: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside.
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme 15: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Scheme 16: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Scheme 17: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
Scheme 18: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, in pipe fitting Portion processes satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, it will be at the beginning of distribution tube cavity Step is processed into designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, by distribution pipe Embedded SMA actuators are at satisfactory internal chamber wall, intracavity bottom.
Scheme 19: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme 20: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;
(5), it is finished using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is added Work is at satisfactory internal chamber wall, intracavity bottom;
(6), pipe fitting is finished using the machining tool of process equipment, processes and conforms to inside pipe fitting The first oil-through-hole asked and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme 21: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme 22: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Scheme 23: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Scheme 24: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Scheme 25: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Scheme 26: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Scheme 27: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Scheme 28: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Scheme 29: (1) suitable distribution pipe raw material are selected, by least one raw material clamping in process equipment In;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
Scheme 30: (1) suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of pipe fitting is carried out to the other end of distribution pipe raw material using the machining tool of process equipment, it will Pipe fitting preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Benefit Pipe fitting is finished with the machining tool of process equipment, satisfactory first oil-through-hole is processed inside pipe fitting The inside and;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the thick of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material Processing, by distribution tube cavity preparatory processing at designated shape;Using the machining tool of process equipment to the inner cavity for distributing tube body It is finished, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all utilizations Equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content is applied directly or indirectly in other correlations Technical field, be included within the scope of the present invention.

Claims (33)

1. a kind of distribution pipe, including distribution tube body, pipe fitting, the distribution tube body is interior to be equipped with inner cavity, it is equipped in pipe fitting First oil-through-hole, it is characterised in that: the inner cavity is open at one end, and the distribution tube body and pipe fitting of the inner cavity other end form one Molding sealing structure, the inside of the first oil-through-hole the connection inner cavity and pipe fitting of pipe fitting.
2. a kind of distribution pipe according to claim 1, it is characterised in that: the distribution tube body be equipped at least one the Two oil-through-holes.
3. a kind of distribution pipe according to claim 2, it is characterised in that: the shape of the inner cavity other end be it is cylindrical or Taper or spheric or W-shaped or chamfer or rounded corner or by cylinder, taper, spheric, W-shaped, chamfer, rounded corner extremely Shape made of few two combination of shapes.
4. a kind of distribution pipe according to claim 3, it is characterised in that: the cross sectional shape of the inner cavity is round or square Shape or rectangle or ellipse or trapezoidal or regular pentagon or regular hexagon or regular polygon or irregular polygon.
5. a kind of distribution pipe according to claim 4, it is characterised in that: the distribution tube body outer edge forms transversal Face shape is for round or square or rectangular or ellipse or trapezoidal or regular pentagon or regular hexagon or regular polygon or not Regular polygon.
6. a kind of distribution pipe according to claim 5, it is characterised in that: be circular arc mistake at the dog-ear of the inner cavity other end It crosses.
7. a kind of distribution pipe according to claim 6, it is characterised in that: the angle R of the arc transition at the dog-ear is at least It is 0.1 millimeter.
8. a kind of distribution pipe according to claim 7, it is characterised in that: the central axes and inner cavity of the distribution tube body Central axes are overlapped;The closeouts are capping and the second anaerobic copper ring, and capping is opened after passing through the second anaerobic copper ring with inner cavity Mouth one end connects to form plugging structure.
9. a kind of distribution pipe according to claim 8, it is characterised in that: the distribution tube body minimum thickness is at least 1 Millimeter;The wall thickness of the pipe fitting is at least 1 millimeter;The depth of the inner cavity is 1~1000 millimeter.
10. according to claim 1 to a kind of distribution pipe described in 9 any one, it is characterised in that: the pipe fitting and distribution pipe The cross sectional shape of the integrally formed junction of ontology be round or square or rectangular or ellipse it is trapezoidal or quincunx or Gear shape or regular pentagon or regular hexagon or regular polygon or irregular polygon or by circle, square, rectangle, ellipse Shape, trapezoidal, quincunx, gear shape, regular pentagon, regular hexagon, regular polygon, at least two shape groups in irregular polygon Shape made of conjunction.
11. a kind of processing technology of distribution pipe is related to a kind of distribution pipe described in claim 1, processing technology specific steps are such as Under:
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;
(4), using the machining tool of process equipment to distribution tube body inner cavity finish, by distribution pipe embedded SMA actuators at Satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, is processed inside pipe fitting satisfactory First oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment.
12. a kind of processing technology of distribution pipe according to claim 11, it is characterised in that: the machining tool is lathe tool Drill bit or milling cutter or boring cutter or grinding wheel or planing tool or in lathe tool, drill bit, milling cutter, boring cutter, grinding wheel, planing tool at least two group It closes;The cutter head and knife bar of the machining tool are that cutter head knife bar integral type or cutter head knife bar are split type.
13. a kind of processing technology of distribution pipe is related to a kind of distribution pipe, processing technology described in claim 2 to 9 any one Specific step is as follows:
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;
(4), using the machining tool of process equipment to distribution tube body inner cavity finish, by distribution pipe embedded SMA actuators at Satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, is processed inside pipe fitting satisfactory First oil-through-hole and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing finishes pipe fitting at designated shape, using the machining tool of process equipment, adds inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;
(4), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;
(5), using the machining tool of process equipment to distribution tube body inner cavity finish, by distribution pipe embedded SMA actuators at Satisfactory internal chamber wall, intracavity bottom;
(6), pipe fitting is finished using the machining tool of process equipment, is processed inside pipe fitting satisfactory First oil-through-hole and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(4), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing is at designated shape;Pipe fitting is finished using the machining tool of process equipment, is added inside pipe fitting Work goes out satisfactory first oil-through-hole and inside;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), roughing is carried out using inner cavity of the machining tool of process equipment to distribution tube body, distribution tube cavity is tentatively added Work is at designated shape;The inner cavity of distribution tube body is finished using the machining tool of process equipment, tube cavity will be distributed It is processed into satisfactory internal chamber wall, intracavity bottom.
14. a kind of processing technology of distribution pipe according to claim 13, it is characterised in that: the machining tool is lathe tool Drill bit or milling cutter or boring cutter or grinding wheel or planing tool or in lathe tool, drill bit, milling cutter, boring cutter, grinding wheel, planing tool at least two group It closes;The cutter head and knife bar of the machining tool are that cutter head knife bar integral type or cutter head knife bar are split type.
15. a kind of processing technology of distribution pipe is related to a kind of distribution pipe described in any one of claim 10, processing technology specific steps are such as Under:
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;
(4), using the machining tool of process equipment to distribution tube body inner cavity finish, by distribution pipe embedded SMA actuators at Satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;
(6), pipe fitting is finished using the machining tool of process equipment, is processed inside pipe fitting satisfactory First oil-through-hole and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;
(4), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;
(5), using the machining tool of process equipment to distribution tube body inner cavity finish, by distribution pipe embedded SMA actuators at Satisfactory internal chamber wall, intracavity bottom;
(6), pipe fitting is finished using the machining tool of process equipment, is processed inside pipe fitting satisfactory First oil-through-hole and inside;
(7), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(3), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
(3), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(4), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(5), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
Or
(1), suitable distribution pipe raw material are selected, in process equipment by least one raw material clamping;
(2), several second oil-through-holes are processed on distribution tube body using the machining tool of process equipment;
(3), the roughing for being carried out pipe fitting to the other end of distribution pipe raw material using the machining tool of process equipment, pipe is connect Head preparatory processing by pipe fitting and distributes tube body junction shape processing into designated shape at designated shape;Using adding The machining tool of construction equipment finishes pipe fitting, and satisfactory first oil-through-hole and interior is processed inside pipe fitting Portion;
(4), designated shape is processed into distribution pipe raw material outer surface using the machining tool of process equipment;
(5), the roughing of tube body inner cavity is allocated using the one end of the machining tool of process equipment to distribution pipe raw material, Tube cavity preparatory processing will be distributed into designated shape;Essence is carried out to the inner cavity of distribution tube body using the machining tool of process equipment Processing, by distribution pipe embedded SMA actuators at satisfactory internal chamber wall, intracavity bottom.
16. a kind of processing technology of distribution pipe according to claim 15, it is characterised in that: the machining tool is lathe tool Drill bit or milling cutter or boring cutter or grinding wheel or planing tool or in lathe tool, drill bit, milling cutter, boring cutter, grinding wheel, planing tool at least two group It closes;The cutter head and knife bar of the machining tool are that cutter head knife bar integral type or cutter head knife bar are split type.
17. a kind of processing technology of distribution pipe described in 2 or 14 or 16 according to claim 1, it is characterised in that: the drill bit or Cutting tip quantity on cutter head is 1~100;The cutting rotational speeds of the cutting tip are 1~10000 rev/min;It is described to cut The feed cutting output of paring blade is 1~1000 mm/min.
18. a kind of processing technology of distribution pipe according to claim 17, it is characterised in that: the machining tool is added Working hour is used cooperatively lubricating cooling oil.
19. a kind of processing technology of distribution pipe according to claim 18, it is characterised in that: the distribution pipe raw material at Type technique be cold-drawn or cold rolling or hot extrusion or casting or forging or cold-heading or cutting or be cold-drawn, cold rolling, hot extrusion, casting, Forging, cold-heading, at least two combined techniques in cutting.
20. a kind of processing technology of distribution pipe according to claim 19, it is characterised in that: outside the distribution pipe raw material Surface processing technique be vehicle or milling or plane or drawing or pressure or forging or mill or cutting or electric spark or laser or chemical attack or be vehicle, Milling, plane, drawing, pressure, forging, mill, cutting, electric spark, laser, at least two combined techniques in chemical attack.
21. a kind of processing technology of distribution pipe according to claim 20, it is characterised in that: described to distribute the interior of tube body Chamber carries out roughing technique and is depth drill or drill gun or milling or plane or boring or mill or electric spark or laser or chemical attack or is deep Hole drill, rifle drilling and milling, plane, boring, mill, electric spark, laser, at least two combined techniques in chemical attack.
22. a kind of processing technology of distribution pipe according to claim 21, it is characterised in that: described to distribute the interior of tube body Chamber carry out fine-processing technique be depth drill or mill or milling or plane or boring or electric spark or laser or be depth drill, mill, milling, plane, boring, At least two combined technique in electric spark, laser.
23. a kind of processing technology of distribution pipe according to claim 22, it is characterised in that: the roughing of the pipe fitting Technique is brill or vehicle or milling or plane or boring or mill or electric spark or laser or chemical attack or is brill, vehicle, milling, plane, boring, mill, electricity Spark, laser, at least two combined techniques in chemical attack.
24. a kind of processing technology of distribution pipe according to claim 23, it is characterised in that: the finishing of the pipe fitting Technique is brill or vehicle or milling or plane or boring or mill or electric spark or laser or chemical attack or is brill, vehicle, milling, plane, boring, mill, electricity Spark, laser, at least two combined techniques in chemical attack.
25. a kind of processing technology of distribution pipe according to claim 24, it is characterised in that: the oil-through-hole processing technology To bore or milling or grind or electric spark or laser or be drilling and milling, mill, electric spark, at least two combined techniques in laser.
26. a kind of engine high pressure oil rail assembly, connect comprising a kind of distribution pipe described in claim 1, closeouts, sensor Head, oil injector seat mounting bracket block, it is characterised in that: the distribution pipe main body is equipped at least one second oil-through-hole;In described Chamber is open at one end to be blocked by closeouts;The sensor connector is connected in distribution pipe main body, the oil injector seat mounting bracket Block is connected in distribution pipe main body, and oil injector seat mounting bracket block position is corresponding with the second oil-through-hole position.
27. a kind of engine high pressure oil rail assembly according to claim 26, it is characterised in that: the oil injector seat installation Backbone block is made of oil injector seat and mounting bracket block, and oil injector seat mounting bracket block is integral type or split type.
28. a kind of engine high pressure oil rail assembly includes a kind of distribution pipe, closure described in claim 2 to 9 any one Part, sensor connector, oil injector seat mounting bracket block, it is characterised in that: the inner cavity is open at one end to be blocked by closeouts;It is described Sensor connector is connected in distribution pipe main body, and the oil injector seat mounting bracket block is connected in distribution pipe main body, fuel injector Seat mounting bracket block position is corresponding with the second oil-through-hole position.
29. a kind of engine high pressure oil rail assembly according to claim 28, it is characterised in that: the oil injector seat installation Backbone block is made of oil injector seat and mounting bracket block, and oil injector seat mounting bracket block is integral type or split type.
30. a kind of engine high pressure oil rail assembly, connect comprising a kind of distribution pipe described in any one of claim 10, closeouts, sensor Head, oil injector seat mounting bracket block, it is characterised in that: the inner cavity is open at one end to be blocked by closeouts;The sensor connector It is connected on distribution tube body, the oil injector seat mounting bracket block is connected on distribution tube body, oil injector seat mounting bracket Block position is corresponding with the second oil-through-hole position.
31. a kind of engine high pressure oil rail assembly according to claim 30, it is characterised in that: the oil injector seat installation Backbone block is made of oil injector seat and mounting bracket block, and oil injector seat mounting bracket block is integral type or split type.
32. a kind of engine high pressure oil rail assembly according to claim 27 or 29 or 31, it is characterised in that: the distribution Between tube body and capping, distributes between tube body and sensor connector, distributes tube body and oil injector seat mounting bracket block Between first pre-installed using press fitting or riveting or Laser Welding or tack welding or electric resistance welding, then pass through high temperature brazing or height again Frequency induction welding or bridging agent adhesion are attached.
33. a kind of engine high pressure oil rail assembly is used for including the distribution pipe for dispensing fuel into different fueling injection equipments Realize that fuel enters the pipe joint arrangement of distribution pipe from oil pump, for realizing installation fuel injector function and with the connection of engine Oil injector seat mounting device, for realizing installation pressure transducer functionality sensor connector device, for blocking distribution pipe The upper plugging device open at one end far from pipe joint arrangement, it is characterised in that: inner cavity, inner cavity one end are equipped in the distribution pipe It is open and is blocked by plugging device, the distribution pipe and pipe joint arrangement of the inner cavity other end form integrally formed sealing structure, manage Piecing devices connection distribution tube cavity and outside;The oil injector seat mounting device is connect with distribution pipe, the sensor connector Device is connect with distribution pipe.
CN201910297982.8A 2018-12-11 2019-04-15 A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly Pending CN109944725A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2019/102731 WO2020119180A1 (en) 2018-12-11 2019-08-27 Distribution pipe and machining process therefor, and engine high-pressure fuel rail assembly

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018115076656 2018-12-11
CN201811507665 2018-12-11

Publications (1)

Publication Number Publication Date
CN109944725A true CN109944725A (en) 2019-06-28

Family

ID=67015157

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201920502123.3U Active CN210141179U (en) 2018-12-11 2019-04-15 High-pressure oil rail assembly of engine
CN201910297982.8A Pending CN109944725A (en) 2018-12-11 2019-04-15 A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly
CN201920502099.3U Active CN209942989U (en) 2018-12-11 2019-04-15 Distributing pipe with integrated pipe joint seal

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201920502123.3U Active CN210141179U (en) 2018-12-11 2019-04-15 High-pressure oil rail assembly of engine

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201920502099.3U Active CN209942989U (en) 2018-12-11 2019-04-15 Distributing pipe with integrated pipe joint seal

Country Status (2)

Country Link
CN (3) CN210141179U (en)
WO (1) WO2020119180A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020119180A1 (en) * 2018-12-11 2020-06-18 上海威克迈龙川汽车发动机零件有限公司 Distribution pipe and machining process therefor, and engine high-pressure fuel rail assembly
CN113231585A (en) * 2021-04-29 2021-08-10 上海众源燃油分配器制造有限公司 500bar high-pressure oil rail forging process for stainless steel gasoline
CN113960974A (en) * 2021-12-22 2022-01-21 南京尚景智造科技有限公司 Press-fitting control method and system for engine cylinder block plug

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002180926A (en) * 2000-12-08 2002-06-26 Denso Corp Fuel injection system and method of regulating the same
DE102010051004A1 (en) * 2010-11-10 2012-05-10 Poppe & Potthoff Gmbh Fuel rail for fuel rail assembly, for use in fuel injection system, has cross hole, which guides from inside of fuel rail through its wall to its outer side
CN102848143A (en) * 2012-08-29 2013-01-02 苏州市意可机电有限公司 Processing technology of round pipe connector
CN203285591U (en) * 2013-04-30 2013-11-13 成都威特电喷有限责任公司 Gasoline direct injection fuel machine high pressure fuel rail
CN203499881U (en) * 2013-09-26 2014-03-26 长城汽车股份有限公司 Fuel guide rail, engine comprising fuel guide rail and vehicle comprising fuel guide rail
CN204921225U (en) * 2015-09-06 2015-12-30 重庆科杰实业有限责任公司 Plastics fuel distributing pipe assembly
CN108397324A (en) * 2018-04-27 2018-08-14 上海众源燃油分配器制造有限公司 A kind of gasoline high pressure oil rail and its processing technology
CN209942989U (en) * 2018-12-11 2020-01-14 上海威克迈龙川汽车发动机零件有限公司 Distributing pipe with integrated pipe joint seal

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1741923B1 (en) * 2005-07-08 2009-09-02 C.R.F. Societa Consortile per Azioni A connection system of a tubular rail for high-pressure fuel
KR20130138610A (en) * 2012-06-11 2013-12-19 현대자동차주식회사 High pressure fuel rail apparatus for gdi engine and manufacturing method for the same
US10473075B2 (en) * 2015-01-30 2019-11-12 Hitachi Automotive Systems, Ltd. Fuel rail and method of manufacturing same

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002180926A (en) * 2000-12-08 2002-06-26 Denso Corp Fuel injection system and method of regulating the same
DE102010051004A1 (en) * 2010-11-10 2012-05-10 Poppe & Potthoff Gmbh Fuel rail for fuel rail assembly, for use in fuel injection system, has cross hole, which guides from inside of fuel rail through its wall to its outer side
CN102848143A (en) * 2012-08-29 2013-01-02 苏州市意可机电有限公司 Processing technology of round pipe connector
CN203285591U (en) * 2013-04-30 2013-11-13 成都威特电喷有限责任公司 Gasoline direct injection fuel machine high pressure fuel rail
CN203499881U (en) * 2013-09-26 2014-03-26 长城汽车股份有限公司 Fuel guide rail, engine comprising fuel guide rail and vehicle comprising fuel guide rail
CN204921225U (en) * 2015-09-06 2015-12-30 重庆科杰实业有限责任公司 Plastics fuel distributing pipe assembly
CN108397324A (en) * 2018-04-27 2018-08-14 上海众源燃油分配器制造有限公司 A kind of gasoline high pressure oil rail and its processing technology
CN209942989U (en) * 2018-12-11 2020-01-14 上海威克迈龙川汽车发动机零件有限公司 Distributing pipe with integrated pipe joint seal

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020119180A1 (en) * 2018-12-11 2020-06-18 上海威克迈龙川汽车发动机零件有限公司 Distribution pipe and machining process therefor, and engine high-pressure fuel rail assembly
CN113231585A (en) * 2021-04-29 2021-08-10 上海众源燃油分配器制造有限公司 500bar high-pressure oil rail forging process for stainless steel gasoline
CN113960974A (en) * 2021-12-22 2022-01-21 南京尚景智造科技有限公司 Press-fitting control method and system for engine cylinder block plug
CN113960974B (en) * 2021-12-22 2022-03-22 南京尚景智造科技有限公司 Press-fitting control method and system for engine cylinder block plug

Also Published As

Publication number Publication date
CN209942989U (en) 2020-01-14
WO2020119180A1 (en) 2020-06-18
CN210141179U (en) 2020-03-13

Similar Documents

Publication Publication Date Title
CN109973269A (en) A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly
CN109944725A (en) A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly
JP5510992B2 (en) Fuel rail for high pressure direct injection internal combustion engine and method for manufacturing the same
CN106695248B (en) The manufacturing method of cylinder cover for diesel engine
CN203285591U (en) Gasoline direct injection fuel machine high pressure fuel rail
US6886537B2 (en) Accumulation type fuel injection system for engine
CN107335969A (en) Cylinder cap produces and processes system and method
CN109869253A (en) A kind of distribution pipe and its processing technology and engine high pressure oil rail assembly
CN209163980U (en) A kind of High Pressure Common-Rail Fuel Inject high-pressure fuel injection pump assembly
CN105666070B (en) The processing technology of rotary blade type hydraulic steering gear
CN208595127U (en) A kind of nut connecting component with high locking self-locking property
US7963298B2 (en) Spherical tube end form for a fluid connection system
CN107917016B (en) Head shell structure of high-pressure-bearing precombustion chamber
CN101332556A (en) Production method of diamond compound tool for processing shoulder hole
CN108772470B (en) A kind of processing method of depth cylinder sheet metal component
CN215113360U (en) Barrel and separator with same
EP3214299A2 (en) Method to manufacture a high pressure fuel reservoir
CN215033448U (en) Crystallizer with graphite ring
CN112207378B (en) Manufacturing method of oil injector seat positioning hole and high-pressure fuel oil distribution pipe
CN211248595U (en) Internal cooling forming reamer for processing inner hole of stainless steel oil sprayer seat
CN210289913U (en) Engine degassing system
CN102182579A (en) Forming method of steel piston internally-cooled oil channel
CN217121893U (en) Adjustable composite milling cutter for machining deep hole sealing groove
CN209414026U (en) A kind of marine low speed diesel engine test fuel injector sealing structure
CN202250453U (en) Piston of construction machinery engine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 201112 No. 96, Jiangchao Road, Minhang District, Shanghai

Applicant after: Saiwo Zhizao (Shanghai) Technology Co.,Ltd.

Address before: No.20196 minchao Road, Pujiang Town, Shanghai

Applicant before: SHANGHAI WINKELMANN LONGCHUAN (SWL) MOTORCOMPONENTS Co.,Ltd.