CN109944423A - A kind of building construction of lift well scaffold - Google Patents
A kind of building construction of lift well scaffold Download PDFInfo
- Publication number
- CN109944423A CN109944423A CN201711397079.6A CN201711397079A CN109944423A CN 109944423 A CN109944423 A CN 109944423A CN 201711397079 A CN201711397079 A CN 201711397079A CN 109944423 A CN109944423 A CN 109944423A
- Authority
- CN
- China
- Prior art keywords
- upright bar
- plate
- pedestal
- fixedly connected
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Ladders (AREA)
Abstract
A kind of building construction of lift well scaffold of the present invention, a kind of building construction of lift well scaffold, including protective fence, walking plate, creeping ladder, supporting cross bearer, upright bar, pedestal, supporting plate, the protective fence bottom is equipped with walking plate, protective fence is fixedly connected by welding with walking plate, the walking board bottom portion is equipped with supporting plate, supporting plate is fixedly connected with walking plate by welding, the walking board bottom portion is equipped with upright bar, walking plate is connect with upright bar by supporting plate, supporting cross bearer is equipped among the upright bar, the supporting cross bearer bottom is equipped with block, the supporting cross bearer both ends are equipped with creeping ladder, supporting cross bearer is fixedly connected by welding with creeping ladder, held in the palm bottom of upright rod is equipped with pedestal, pedestal is fixedly connected by way of inlaying with upright bar.A kind of building construction of lift well scaffold mainly solves that existing construction of lift well scaffolding structure is single, and stability is poor, and the utility model has the advantages of simple structure and easy realization for protecting mobile phone.
Description
Technical field
The present invention relates to Construction Formwork & Scaffold Technology field, specially a kind of building construction of lift well scaffold.
Background technique
Scaffold is divided by the position set up outer to guarantee each work progress is gone on smoothly and is set up workbench
Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference, be divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
Frame, for elevator when construction, scaffold is commonly to equip, but existing construction of lift well scaffolding structure is single, surely
Qualitative difference.
Summary of the invention
The purpose of the present invention is to provide a kind of building construction of lift well scaffolds, solve proposed in background technique
The problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of building construction of lift well scaffold, including
Protective fence, walking plate, creeping ladder, supporting cross bearer, upright bar, pedestal, supporting plate, the protective fence bottom are equipped with walking plate, protective fence
Be fixedly connected by welding with walking plate, the walking board bottom portion equipped with supporting plate, supporting plate by welding with row
Limp is fixedly connected, and the walking board bottom portion is equipped with upright bar, and walking plate is connect by supporting plate with upright bar, is equipped among the upright bar
Supporting cross bearer, the supporting cross bearer bottom are equipped with block, and the supporting cross bearer both ends are equipped with creeping ladder, supporting cross bearer and creeping ladder
It is fixedly connected by welding, held in the palm bottom of upright rod is equipped with pedestal, and pedestal is fixedly connected by way of inlaying with upright bar.
As a kind of preferred embodiment of the invention, be equipped with sliding rail in the upright bar, sliding rail by welding with
Upright bar is fixedly connected.
As a kind of preferred embodiment of the invention, the pedestal top side is equipped with motor, and motor is by way of screw thread
It is connect with pedestal.
As a kind of preferred embodiment of the invention, the supporting plate bottom is equipped with gear, and deck internal is equipped with driving dress
It sets, driving device and motor are connected by way of electrical.
As a kind of preferred embodiment of the invention, the pedestal is equipped with inserted link, and inserted link is by way of inlaying and bottom
Seat is fixedly connected.
Compared with prior art, beneficial effects of the present invention: a kind of building construction of lift well scaffold is used for elevator
Well construction enables driving device to connect motor, the gear controlled in supporting plate exists by being equipped with gear and driving device in supporting plate
It is gone up and down in sliding rail in upright bar, realizes that various structures multiplexing can act on, while limp of being expert at is being supported equipped with protective fence
Horizontal version bottom is equipped with block, can improve the protective of feeling at ease of equipment, is equipped with inserted link in base bottom, can improve the stabilization of equipment
Property, it prevents equipment when being gone up and down, shakes.
Detailed description of the invention
Fig. 1 is a kind of building construction of lift well scaffolding structure schematic diagram of the present invention;
Fig. 2 is a kind of building construction of lift well scaffold upright rod of the present invention and support board structure schematic diagram;
In figure: 1 protective fence, 2 walking plates, 3 creeping ladders, 4 supporting cross bearers, 5 blocks, 6 upright bars, 7 sliding rails, 8 motors, 9 pedestals, 10 are inserted
Bar, 11 supporting plates, 12 gears, 13 driving devices.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of building construction of lift well scaffold, including anti-
Guardrail 1, walking plate 2, creeping ladder 3, supporting cross bearer 4, upright bar 6, pedestal 9, supporting plate 11,1 bottom of protective fence are equipped with walking plate
2, protective fence 1 is fixedly connected by welding with walking plate 2, and 2 bottom of walking plate is equipped with supporting plate 11, and supporting plate 11 passes through
The mode of welding is fixedly connected with walking plate 2, and 2 bottom of walking plate is equipped with upright bar 6, and walking plate 2 and upright bar 6 pass through supporting plate 11
It connects, supporting cross bearer 4 is equipped among the upright bar 6,4 bottom of supporting cross bearer is equipped with block 5,4 both ends of supporting cross bearer
Equipped with creeping ladder 3, supporting cross bearer 4 is fixedly connected by welding with creeping ladder 3, and 6 bottom of upright bar is equipped with pedestal 9,
Pedestal 9 is fixedly connected by way of inlaying with upright bar 6.
As a preferred technical solution in the present embodiment, sliding rail 7 is equipped in the upright bar 6, sliding rail 7 passes through welding
Mode is fixedly connected with upright bar 6, and 9 top side of pedestal is equipped with motor 8, and motor 8 is connect by way of screw thread with pedestal 9, is led to
The lifting of 8 driving device of motor is crossed, 11 bottom of supporting plate is equipped with gear 12, and driving device 13, driving dress are equipped with inside supporting plate 11
It sets 13 to connect by way of electrical with motor 8, is connect by driving device 13 with motor 8, driving device can be made to control gear
12 are gone up and down in sliding rail 7, and the pedestal 9 is equipped with inserted link 10, and inserted link 10 is fixedly connected by way of inlaying with pedestal 9,
Inserted link 10 can be inserted into underground, the stability of fixed the utility model.
Improvement of the invention is: by being equipped with gear 12 and driving device 13 in supporting plate 11, making driving device 13
Motor 8 can be connected, the gear 12 controlled in supporting plate 11 is gone up and down in the sliding rail 7 in upright bar 6, realizes various structures multiplexing energy
Effect, while limp 2 of being expert at is supporting horizontal 4 bottom of version to be equipped with block 5 equipped with protective fence 1 can improve equipment and feel at ease to protect
Property, it is equipped with inserted link 10 in 9 bottom of pedestal, the stability of equipment can be improved, prevent equipment when being gone up and down, shaken.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.
Claims (5)
1. a kind of building construction of lift well scaffold, including protective fence (1), walking plate (2), creeping ladder (3), supporting cross bearer
(4), upright bar (6), pedestal (9), supporting plate (11), it is characterised in that: protective fence (1) bottom is equipped with walking plate (2), protective fence
(1) it is fixedly connected by welding with walking plate (2), the walking plate (2) bottom is equipped with supporting plate (11), and supporting plate (11) is logical
The mode for crossing welding is fixedly connected with walking plate (2), and the walking plate (2) bottom is equipped with upright bar (6), walk plate (2) and upright bar
(6) it is connected by supporting plate (11), is equipped with supporting cross bearer (4) among the upright bar (6), supporting cross bearer (4) bottom is equipped with and blocks
Net (5), supporting cross bearer (4) both ends are equipped with creeping ladder (3), and supporting cross bearer (4) and creeping ladder (3) are solid by welding
Fixed connection, upright bar (6) bottom are equipped with pedestal (9), and pedestal (9) is fixedly connected by way of inlaying with upright bar (6).
2. a kind of building construction of lift well scaffold according to claim 1, it is characterised in that: in the upright bar (6)
Equipped with sliding rail (7), sliding rail (7) is fixedly connected with upright bar (6) by welding.
3. a kind of building construction of lift well scaffold according to claim 1, it is characterised in that: pedestal (9) top
Side is equipped with motor (8), and motor (8) is connect by way of screw thread with pedestal (9).
4. a kind of building construction of lift well scaffold according to claim 1, it is characterised in that: supporting plate (11) bottom
Portion is equipped with gear (12), is equipped with driving device (13) inside supporting plate (11), and driving device (13) and motor (8) pass through electrical side
Formula connection.
5. a kind of building construction of lift well scaffold according to claim 1, it is characterised in that: the pedestal (9) sets
Have inserted link (10), inserted link (10) is fixedly connected by way of inlaying with pedestal (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711397079.6A CN109944423A (en) | 2017-12-21 | 2017-12-21 | A kind of building construction of lift well scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711397079.6A CN109944423A (en) | 2017-12-21 | 2017-12-21 | A kind of building construction of lift well scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109944423A true CN109944423A (en) | 2019-06-28 |
Family
ID=67006264
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711397079.6A Pending CN109944423A (en) | 2017-12-21 | 2017-12-21 | A kind of building construction of lift well scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109944423A (en) |
-
2017
- 2017-12-21 CN CN201711397079.6A patent/CN109944423A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2531461A1 (en) | Scaffold frame section with integral guard rail post | |
CN201334769Y (en) | Attached type lifting scaffold with double guide rails | |
CN205822747U (en) | Architectural engineering scaffold | |
CN107178213A (en) | The safeguard protection screen system of Steel Structure Installation | |
CN114645614A (en) | Rapid moving aerial work platform based on rail device | |
CN219280494U (en) | Tower beam temporary consolidation supporting structure for bridge tower stability control | |
CN105019657A (en) | Building construction system | |
CN202731276U (en) | Independent discharge platform capable of synchronously lifting with external lifting scaffold | |
CN108005373A (en) | Integrated lifting platform system and assembling method thereof | |
CN109944423A (en) | A kind of building construction of lift well scaffold | |
CN204876577U (en) | Building construction system | |
CN207047702U (en) | A kind of bridge construction scaoffold | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN208363560U (en) | A kind of suspension platform for skybridge construction | |
CN207144527U (en) | The safeguard protection screen system of Steel Structure Installation | |
CN211447761U (en) | Electric creeping formwork device for building construction | |
CN204876579U (en) | Building construction system | |
CN204876575U (en) | Building construction system | |
CN205100543U (en) | Novel construction system of commercial mansion | |
CN210419022U (en) | Tower crane standard knot with safety performance | |
CN207812359U (en) | On across existing bridge safety device | |
CN207348787U (en) | One kind maintenance cat ladder platform | |
CN214195456U (en) | Construction foot rest for highway bridge | |
CN206220484U (en) | A kind of template suspension centre spandrel girder of steel platform | |
CN105178602A (en) | Building construction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190628 |