CN109944364A - Long several shaped steels and threaded sleeve combined steel concrete compound tube T-type node - Google Patents

Long several shaped steels and threaded sleeve combined steel concrete compound tube T-type node Download PDF

Info

Publication number
CN109944364A
CN109944364A CN201910278386.5A CN201910278386A CN109944364A CN 109944364 A CN109944364 A CN 109944364A CN 201910278386 A CN201910278386 A CN 201910278386A CN 109944364 A CN109944364 A CN 109944364A
Authority
CN
China
Prior art keywords
compound tube
steel
concrete compound
steel concrete
threaded sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910278386.5A
Other languages
Chinese (zh)
Other versions
CN109944364B (en
Inventor
杨文超
师国良
雷红兵
何志强
何慧贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Lyujian Building Technology Co Ltd
Original Assignee
Henan Lyujian Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Lyujian Building Technology Co Ltd filed Critical Henan Lyujian Building Technology Co Ltd
Priority to CN201910278386.5A priority Critical patent/CN109944364B/en
Publication of CN109944364A publication Critical patent/CN109944364A/en
Application granted granted Critical
Publication of CN109944364B publication Critical patent/CN109944364B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Panels For Use In Building Construction (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Long several shaped steels and threaded sleeve combined steel concrete compound tube T-type node, including the first steel concrete compound tube and the second steel concrete compound tube, the rear end of second rectangular steel plates structure exposes end steel plate, internally threaded sleeve is embedded on front side of first steel concrete compound tube, the front half section of internally threaded sleeve is threaded with connecting screw, end steel plate trailing flank is welded with several shaped steels, the left and right side of several shaped steels offers mounting hole transparent back and forth respectively, mounting hole and internally threaded sleeve correspond, connecting screw front end passes through mounting hole and is threaded with attaching nut, attaching nut will be crimped on the first steel concrete compound tube leading flank on rear side of several shaped steels.The present invention is greatly improved the bonding strength between two steel concrete compound tubes at T-type node, and the reliability for ensuring to connect, it is cast-in-place to be combined with prefabricated, convenient for construction, construction efficiency is high, construction quality can be guaranteed, and fully meet the requirements such as the whole stress of modern assembled architecture, energy conservation, antidetonation.

Description

Long several shaped steels and threaded sleeve combined steel concrete compound tube T-type node
Technical field
The invention belongs to assembled architecture technical field of construction, and in particular to a kind of several shaped steels of length are combined with threaded sleeve Formula steel concrete compound tube T-type node.
Background technique
Single-unit steel concrete compound tube is integrally in rectangular cylindrical structure used by assembled architecture, is transported to after factory's production Construction site is assembled, and existing assembled architecture, which promotes and applies maximum problem, can not exactly form stable unified system, This key to the issue be that the node between steel concrete compound tube connect, T-type node be the most common node of assembled architecture it One, the construction of existing T-type node mostly has structural integrity not strong, and shock resistance is poor, be easy to cause assembled deformation of wall, The shortcomings that generating crack, type of attachment is also unable to satisfy the use function of assembled architecture requirements at the higher level.
Summary of the invention
The present invention provides a kind of compact-sized reasonable, stress equalization, stabilization to solve shortcoming in the prior art Property strong, a few shaped steels of length and threaded sleeve combined steel concrete compound tube T-type node that wind resistance shock resistance is strong.
In order to solve the above technical problems, the present invention adopts the following technical scheme: long several shaped steels and threaded sleeve combined type Steel concrete compound tube T-type node, including the first steel concrete compound tube and the second steel concrete compound tube being arranged in a mutually vertical manner, the first steel concrete group The trailing flank of pipe is closed adjacent to the front end of the second steel concrete compound tube, the first steel concrete compound tube includes the first rectangular steel plates structure and pours Build the first concrete layer in the first rectangular steel plates structure outside portion, the second steel concrete compound tube include the second rectangular steel plates structure and Be cast in the second concrete layer of the second rectangular steel plates structure outside portion, the front side board and back side panel of the first rectangular steel plates structure it Between be equipped with several the first screw rod tension ribs, the rear and front end of the first screw rod tension rib is embedded in the first concrete layer, Several the second screw rod tension ribs are equipped between the left plate and right side plate of two rectangular steel plates structures, the second screw rod tension rib Rear and front end is embedded in the second concrete layer, and the rear end of the second rectangular steel plates structure exposes end steel plate, the first steel concrete Difference correspondence is embedded in the first concrete layer on front side of compound tube in the second concrete layer left side and right side Threaded sleeve, the nose threads of the first screw rod tension rib corresponding with internally threaded sleeve are connected to later half inside internally threaded sleeve Section, the front half section of internally threaded sleeve are threaded with connecting screw, and end steel plate trailing flank is welded with several shaped steels, several shaped steels Left and right side offer mounting hole transparent back and forth respectively, mounting hole and internally threaded sleeve correspond, before connecting screw End is across mounting hole and is threaded with attaching nut, before attaching nut will be crimped on the first steel concrete compound tube on rear side of several shaped steels Side.
Several spaced preceding open-works are offered along short transverse is corresponding with end steel plate on front side of several shaped steels.
A few shaped steel left and right sides offer several left open-works and right open-work along short transverse respectively.
The the first drawknot cracking resistance mesh sheet for being connected to the first screw rod tension rib rear and front end is embedded in first concrete layer, the The second drawknot cracking resistance mesh sheet is embedded in two concrete layers, the back side edge of the second drawknot cracking resistance mesh sheet reaches neighbouring first steel concrete group Close the outside of pipe leading flank and the connecting screw of the left and right sides.
It has poured in rectangular cylindrical space on rear side of the steel plate of end between the first steel concrete compound tube by several shaped steels, connection Screw rod and the second exposed drawknot cracking resistance mesh sheet are embedded in interior concrete block, and the lateral surface of concrete block is mixed with second respectively The corresponding linking in the left and right side of solidifying soil layer and keep flushing, poured inner concrete in the second steel concrete compound tube, concrete block and Inner concrete is connected as one by preceding open-work.
By adopting the above technical scheme, the first concrete layer and pre-buried outside the first steel concrete compound tube in the present invention The second concrete layer outside first drawknot cracking resistance mesh sheet, the first screw rod tension rib, internally threaded sleeve and the second steel concrete compound tube And pre-buried the second drawknot cracking resistance mesh sheet, the second screw rod tension rib is prefabricated in the factory forms.Second when being prefabricated in the factory The rear end of the end steel plate of steel concrete compound tube and the second drawknot cracking resistance mesh sheet it is exposed outside, a few shaped steel left and right sides Left open-work and right open-work are opened up respectively, and correspondence opens up preceding open-work between several shaped steels and end steel plate.
First steel concrete compound tube, the second steel concrete compound tube are assembled after being transported to construction site, make the first steel concrete Compound tube and the second steel concrete compound tube are vertically arranged, on rear side of the steel plate of end and on front side of the first steel concrete compound tube between rectangular column Shape is equipped with connecting screw in space, installs several shaped steels, screws on attaching nut, then several shaped steels front sides and end steel plate It is welded as a whole, finally in rectangular cylindrical space left and right side support template, casting concrete is solidified as concrete block, several words Fashioned iron is inside and outside to be connected by left open-work with right open-work, thus securely connects the first steel concrete compound tube, the second steel concrete compound tube It is connected in one.Second drawknot cracking resistance mesh sheet is also poured into concrete block, in this way the second concrete layer of guarantee and concrete block Appearance in junction does not crack.Inner concrete is poured in the inside of the second steel concrete compound tube while casting concrete block, Concrete block is connected as one with the inner concrete inside the second steel concrete compound tube by several preceding open-works, and T-type is further promoted Bonding strength at node.
Since the second steel concrete compound tube is generally as the interior wall of assembled architecture, the first steel concrete compound tube is built as assembled The exterior wall built, therefore the structure that the first steel concrete compound tube is whole using factory's manufacture, are combined the first steel concrete by joint connection in site Pipe is connected as one with the second steel concrete compound tube, and the second steel concrete compound tube also functions to the effect of the first steel concrete compound tube of support.
In conclusion the present invention is greatly improved the bonding strength between two steel concrete compound tubes at T-type node, and ensure The reliability of connection, cast-in-place to combine with prefabricated, convenient for construction, construction efficiency is high, and construction quality can be guaranteed, completely full The requirements such as the whole stress of sufficient modern assembled architecture, energy conservation, antidetonation.
Detailed description of the invention
Fig. 1 is plan view of the present invention.
Specific embodiment
As shown in Figure 1, several shaped steels of length of the invention and threaded sleeve combined steel concrete compound tube T-type node, including phase Mutual vertically disposed first steel concrete compound tube and the second steel concrete compound tube, the trailing flank of the first steel concrete compound tube is adjacent to the second steel concrete The front end of compound tube, the first steel concrete compound tube include the first rectangular steel plates structure 1 and are cast in outside the first rectangular steel plates structure 1 First concrete layer 2 of side, the second steel concrete compound tube includes the second rectangular steel plates structure 3 and to be cast in the second rectangle steel hardened Second concrete layer 4 of 3 outside portion of structure is equipped with several articles between the front side board and back side panel of the first rectangular steel plates structure 1 One screw rod tension rib 5, the rear and front end of the first screw rod tension rib 5 are embedded in the first concrete layer 2, the second rectangular steel plates structure Several the second screw rod tension ribs 6 are equipped between 3 left plate and right side plate, the rear and front end of the second screw rod tension rib 6 is pre- It is embedded in the second concrete layer 4, the rear end of the second rectangular steel plates structure 3 exposes end steel plate 7, before the first steel concrete compound tube Difference correspondence is embedded in first concrete layer 2 of side in the inner screw sheath of the second concrete layer 4 left side and right side Pipe 8, the nose threads of first screw rod tension rib 5 corresponding with internally threaded sleeve 8 are connected to later half inside internally threaded sleeve 8 Section, the front half section of internally threaded sleeve 8 are threaded with connecting screw 9, and steel plate 7 trailing flank in end is welded with several shaped steels 10, several The left and right side of shaped steel 10 offers mounting hole transparent back and forth respectively, and mounting hole and internally threaded sleeve 8 correspond, even 9 front end of screw rod is connect across mounting hole and is threaded with attaching nut 11, attaching nut 11 will be crimped on rear side of several shaped steels 10 First steel concrete compound tube leading flank.
10 front side of several shaped steels and end steel plate 7 offer several spaced preceding open-works along short transverse is corresponding 12。
A few 10 left and right sides of shaped steel offer several left open-works 13 and right open-work 14 along short transverse respectively.
The the first drawknot cracking resistance mesh sheet for being connected to 5 rear and front end of the first screw rod tension rib is embedded in first concrete layer 2 15, the second drawknot cracking resistance mesh sheet 16 is embedded in the second concrete layer 4, and the back side edge of the second drawknot cracking resistance mesh sheet 16 reaches neighbouring The outside of first steel concrete compound tube leading flank and the connecting screw 9 of the left and right sides.
It has poured in rectangular cylindrical space 17 between 7 rear side of end steel plate and the first steel concrete compound tube by several shaped steels 10, connecting screw 9 and the second exposed drawknot cracking resistance mesh sheet 16 are embedded in interior concrete block, the lateral surface point of concrete block It is not corresponding with the left and right side of the second concrete layer 4 to be connected and keep flushing, inner concrete has been poured in the second steel concrete compound tube, Concrete block and inner concrete are connected as one by preceding open-work 12.
The first concrete layer 2 outside the first steel concrete compound tube and the first pre-buried drawknot cracking resistance mesh sheet in the present invention 15, the second concrete layer 4 outside the first screw rod tension rib 5, internally threaded sleeve 8 and the second steel concrete compound tube and pre-buried Two drawknot cracking resistance mesh sheet 16, the second screw rod tension rib 6 are prefabricated in the factory to be formed.Second steel concrete compound tube when being prefabricated in the factory End steel plate 7 and the second drawknot cracking resistance mesh sheet 16 rear end it is exposed outside, a few 10 left and right sides of shaped steel difference Left open-work 13 and right open-work 14 are opened up, it is corresponding between several shaped steels 10 and end steel plate 7 to open up preceding open-work 12.
First steel concrete compound tube, the second steel concrete compound tube are assembled after being transported to construction site, make the first steel concrete Compound tube and the second steel concrete compound tube are vertically arranged, on front side of the rear side of end steel plate 7 and the first steel concrete compound tube between rectangle It is equipped with connecting screw 9 in cylindrical space 17, installs several shaped steels 10, screws on attaching nut 11, then before several shaped steels 10 Side is welded as a whole with end steel plate 7, finally in 17 left and right side support template of rectangular cylindrical space, casting concrete solidification For concrete block, several shaped steels 10 are inside and outside to be connected by left open-work 13 and right open-work 14, thus by the first steel concrete compound tube, the Two steel concrete compound tubes are securely connected as one.Second drawknot cracking resistance mesh sheet 16 is also poured into concrete block, is guaranteed in this way The appearance of second concrete layer 4 and concrete block in junction does not crack.In the second steel concrete group while casting concrete block The inside for closing pipe pours inner concrete, and the inner concrete inside concrete block and the second steel concrete compound tube passes through several preceding open-works 12 It is connected as one, further promotes the bonding strength at T-type node.
Since the second steel concrete compound tube is generally as the interior wall of assembled architecture, the first steel concrete compound tube is built as assembled The exterior wall built, therefore the structure that the first steel concrete compound tube is whole using factory's manufacture, are combined the first steel concrete by joint connection in site Pipe is connected as one with the second steel concrete compound tube, and the second steel concrete compound tube also functions to the effect of the first steel concrete compound tube of support.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (5)

1. long several shaped steels and threaded sleeve combined steel concrete compound tube T-type node, including the first steel concrete being arranged in a mutually vertical manner Compound tube and the second steel concrete compound tube, the trailing flank of the first steel concrete compound tube is adjacent to the front end of the second steel concrete compound tube, and first Steel concrete compound tube includes the first rectangular steel plates structure and the first concrete layer for being cast in the first rectangular steel plates structure outside portion, and Two steel concrete compound tubes include the second rectangular steel plates structure and the second concrete layer for being cast in the second rectangular steel plates structure outside portion, Several the first screw rod tension ribs, the first screw rod tension rib are equipped between the front side board and back side panel of first rectangular steel plates structure Rear and front end be embedded in the first concrete layer, be equipped between the left plate and right side plate of the second rectangular steel plates structure several Item the second screw rod tension rib, the rear and front end of the second screw rod tension rib are embedded in the second concrete layer, it is characterised in that: second The rear end of rectangular steel plates structure exposes end steel plate, is embedded in the first concrete layer on front side of the first steel concrete compound tube point Other correspondence is in the internally threaded sleeve of the second concrete layer left side and right side, the first screw rod corresponding with internally threaded sleeve The nose threads of tension rib are connected to the second half section inside internally threaded sleeve, and the front half section of internally threaded sleeve is threaded with connection Screw rod, end steel plate trailing flank are welded with several shaped steels, and the left and right side of several shaped steels offers peace transparent back and forth respectively Hole is filled, mounting hole and internally threaded sleeve correspond, and connecting screw front end passes through mounting hole and is threaded with attaching nut, even Connected nut will be crimped on the first steel concrete compound tube leading flank on rear side of several shaped steels.
2. several shaped steels of length according to claim 1 and threaded sleeve combined steel concrete compound tube T-type node, feature exist In: several spaced preceding open-works are offered along short transverse is corresponding with end steel plate on front side of several shaped steels.
3. several shaped steels of length according to claim 1 or 2 and threaded sleeve combined steel concrete compound tube T-type node, special Sign is: a few shaped steel left and right sides offer several left open-works and right open-work along short transverse respectively.
4. several shaped steels of length according to claim 3 and threaded sleeve combined steel concrete compound tube T-type node, feature exist In: the first drawknot cracking resistance mesh sheet for being connected to the first screw rod tension rib rear and front end is embedded in the first concrete layer, second is mixed The second drawknot cracking resistance mesh sheet is embedded in solidifying soil layer, the back side edge of the second drawknot cracking resistance mesh sheet reaches neighbouring first steel concrete compound tube The outside of leading flank and the connecting screw of the left and right sides.
5. several shaped steels of length according to claim 2 and threaded sleeve combined steel concrete compound tube T-type node, feature exist In: it has poured in the rectangular cylindrical space on rear side of the steel plate of end between the first steel concrete compound tube by several shaped steels, connecting screw And the second exposed drawknot cracking resistance mesh sheet is embedded in interior concrete block, the lateral surface of concrete block respectively with the second concrete It the corresponding linking in the left and right side of layer and keeps flushing, has poured inner concrete in the second steel concrete compound tube, concrete block and interior mixed Solidifying soil is connected as one by preceding open-work.
CN201910278386.5A 2019-04-09 2019-04-09 T-shaped node of long-T-shaped steel and threaded sleeve combined steel-concrete combined pipe Active CN109944364B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910278386.5A CN109944364B (en) 2019-04-09 2019-04-09 T-shaped node of long-T-shaped steel and threaded sleeve combined steel-concrete combined pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910278386.5A CN109944364B (en) 2019-04-09 2019-04-09 T-shaped node of long-T-shaped steel and threaded sleeve combined steel-concrete combined pipe

Publications (2)

Publication Number Publication Date
CN109944364A true CN109944364A (en) 2019-06-28
CN109944364B CN109944364B (en) 2024-05-03

Family

ID=67013966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910278386.5A Active CN109944364B (en) 2019-04-09 2019-04-09 T-shaped node of long-T-shaped steel and threaded sleeve combined steel-concrete combined pipe

Country Status (1)

Country Link
CN (1) CN109944364B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0685608A1 (en) * 1994-05-31 1995-12-06 Pfeifer Seil- und Hebetechnik GmbH & Co. Prefabricated construction element of reinforced concrete
CN108487476A (en) * 2018-06-14 2018-09-04 河南绿建建筑科技有限公司 Prefabrication steel concrete compound tube site operation shear wall T-type horizontal connection structure
CN208518116U (en) * 2018-06-15 2019-02-19 河南绿建建筑科技有限公司 Prefabrication steel concrete overlapped shear wall assembled arthitecutral structure
CN210049443U (en) * 2019-04-09 2020-02-11 河南绿建建筑科技有限公司 T-shaped node of long-shaped steel and threaded sleeve combined type steel concrete combined pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0685608A1 (en) * 1994-05-31 1995-12-06 Pfeifer Seil- und Hebetechnik GmbH & Co. Prefabricated construction element of reinforced concrete
CN108487476A (en) * 2018-06-14 2018-09-04 河南绿建建筑科技有限公司 Prefabrication steel concrete compound tube site operation shear wall T-type horizontal connection structure
CN208518116U (en) * 2018-06-15 2019-02-19 河南绿建建筑科技有限公司 Prefabrication steel concrete overlapped shear wall assembled arthitecutral structure
CN210049443U (en) * 2019-04-09 2020-02-11 河南绿建建筑科技有限公司 T-shaped node of long-shaped steel and threaded sleeve combined type steel concrete combined pipe

Also Published As

Publication number Publication date
CN109944364B (en) 2024-05-03

Similar Documents

Publication Publication Date Title
CN206646642U (en) A kind of assembled architecture post and column connected node
CN105780923A (en) Assembly structure of prefabricated concrete beam and concrete-filled steel tube column
CN108385871A (en) The precast wall body of fabricated structure
CN207436254U (en) Assembly of shear wall structure
CN109944364A (en) Long several shaped steels and threaded sleeve combined steel concrete compound tube T-type node
CN206591532U (en) A kind of anchor lattice beam bank protection
CN109944362A (en) T-steel and threaded sleeve assembly and connection formula steel concrete compound tube T-type node
CN205637120U (en) Assembly structure of precast concrete beam and steel core concrete column
CN105113701B (en) The precast wall body of fabricated structure
CN103243664B (en) The assembled steel reinforced concrete culvert component in large aperture
CN210049443U (en) T-shaped node of long-shaped steel and threaded sleeve combined type steel concrete combined pipe
CN210104549U (en) Anti-impact composite heat-insulation template
CN209163167U (en) A kind of precast floor slab connecting node construction
CN109944363A (en) Threaded sleeve and short a few shaped steel linking steel concrete compound tube T-type nodes
CN109944360A (en) Framework of steel reinforcement, screw rod and C-type steel combined steel concrete compound tube T-type node
CN109944361A (en) The high steel concrete compound tube T-type node of shearing strength
CN210049442U (en) T-shaped node of threaded sleeve and short U-shaped steel connecting type steel concrete combined pipe
CN103590427A (en) Foundation slab post-cast concrete strip structure
CN210049428U (en) Sandwich heat-insulating steel concrete composite pipe structure
CN209686682U (en) The concrete prefabricated board of fast and easy dismounting
CN109944349B (en) Sandwich heat-insulating steel concrete combined pipe structure and processing and manufacturing method thereof
CN210049435U (en) T-shaped node of upper punch type steel concrete combined pipe of channel steel
CN209353518U (en) Assembled architecture wall T-type node connecting structure
CN207846658U (en) The modularization node of prefabricated buildings
CN109488016A (en) A kind of aluminium alloy inner corner trim composite shuttering of size adjustable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant