CN109934432A CN201711349883.7A CN201711349883A CN109934432A CN 109934432 A CN109934432 A CN 109934432A CN 201711349883 A CN201711349883 A CN 201711349883A CN 109934432 A CN109934432 A CN 109934432A
Authority
CN
China
Prior art keywords
product production
wine product
planning chart
production procedure
feedback form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711349883.7A
Other languages
Chinese (zh)
Inventor
张金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Drunken Happy Wine Industry Co Ltd
Original Assignee
Jiangsu Drunken Happy Wine Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Drunken Happy Wine Industry Co Ltd filed Critical Jiangsu Drunken Happy Wine Industry Co Ltd
Priority to CN201711349883.7A priority Critical patent/CN109934432A/en
Publication of CN109934432A publication Critical patent/CN109934432A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The present invention is by providing a kind of wine product production procedure monitoring and managing method and device, so that wine product production procedure process of supervision realizes automation and intelligent.In the present invention the second planning chart can be automatically derived from a planning chart according to preset rules, and progress feedback form is automatically updated according to the second planning chart and actual process of supervision, and can go wrong be it is timely generate warning message, to promote the automaticity of wine product production procedure process of supervision and intelligent.Further, the directly push that result is supervised in wine product production procedure enables to leader is more convenient and fast to grasp supervising as a result, to promote wine product production procedure supervisory efficiency.

Description

A kind of wine product production procedure monitoring and managing method and device
Technical field
The present invention relates to wine product manufacturing field more particularly to a kind of wine product production procedure monitoring and managing methods and device.
Background technique
Management link is very important for the supervision of alcohol product enterprise, especially manufacturing enterprise, and traditional prison In pipe ring section, supervision can only be by manually implementing, and supervisory efficiency is low, and timeliness is poor, to affect supervision effect.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of wine product production procedure monitoring and managing method and devices.
The present invention is realized with following technical solution:
A kind of wine product production procedure monitoring and managing method, the method includes the following steps:
Obtain the first planning chart;
The second planning chart is obtained according to first planning chart and default report output rule;
Supervision data are obtained in real time, and according to supervision data real-time update progress feedback form, the progress feedback form and institute State the second planning chart data item having the same;
The progress feedback form is pushed into foreground application so that the foreground application can show it is described Progress feedback form.
Further, first planning chart is wine product production task monthly plan table, all planning charts or yearly plan Table.
Further, second planning chart is wine product production task day planner, half day planner or customized Timing node planning chart.
Further, the progress feedback form includes real-time performance and it is expected that performance;The estimated performance according to The variation of the real-time performance synchronizes update.
Further, the foreground application is wechat or other third party applications.
Further, further includes:
Warning output is obtained according to second planning chart;
If the estimated performance is lower than the warning output, warning message is generated.
Further, further includes:
If generating warning message, by the warning message, estimated performance and the warning output in the progress It is highlighted in feedback form, and the progress feedback form is transmitted to foreground application.
A kind of wine product production procedure maintenance device, described device include:
First planning chart obtains module, for obtaining the first planning chart;
Second planning chart output module, by being obtained based on second according to first planning chart and default report output rule Draw table;
Progress feedback form update module supervises data for obtaining in real time, and anti-according to supervision data real-time update progress Present table, the progress feedback form and the second planning chart data item having the same;
Pushing module, for the progress feedback form to be pushed to foreground application so that the foreground application It can show the progress feedback form.
Further, further includes:
Warning output obtains module, for obtaining warning output according to second planning chart;
Warning message generation module generates alarm signal if being lower than the warning output for the estimated performance Breath.
Further, further includes:
Alarm information processing module, if for generating warning message, by the warning message, estimated performance and described Warning output highlights in the progress feedback form, and the progress feedback form is transmitted to foreground application.
The beneficial effects of the present invention are:
By providing a kind of wine product production procedure monitoring and managing method and device, so that wine product production procedure process of supervision is real Now automation and intelligence.In the present invention the second planning chart can be automatically derived from a planning chart according to preset rules, and according to Second planning chart and actual process of supervision automatically update progress feedback form, and can be timely generation alarm signals going wrong Breath, to promote the automaticity of wine product production procedure process of supervision and intelligent.Further, wine product production procedure is supervised As a result direct push enables to leader is more convenient and fast to grasp supervising as a result, supervising to promote wine product production procedure Efficiency.
Detailed description of the invention
Fig. 1 is a kind of wine product production procedure monitoring and managing method flow chart provided in an embodiment of the present invention;
Fig. 2 is a kind of wine product production procedure maintenance device block diagram provided in an embodiment of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with attached drawing Step ground detailed description.
Embodiment 1:
A kind of wine product production procedure monitoring and managing method, as shown in Figure 1, the method includes the following steps:
S1. the first planning chart is obtained;
S2. the second planning chart is obtained according to first planning chart and default report output rule;
S3. in real time obtain supervision data, and according to supervision data real-time update progress feedback form, the progress feedback form with The second planning chart data item having the same;
S4. the progress feedback form is pushed into foreground application so that the foreground application can show institute State progress feedback form.
Specifically, first planning chart is wine product production task monthly plan table, all planning charts or yearly plan table.
Specifically, second planning chart be wine product production task day planner, half day planner or it is customized when Intermediate node planning chart.
Specifically, the progress feedback form includes real-time performance and it is expected that performance;The estimated performance is according to institute The variation for stating real-time performance synchronizes update.
Specifically, the foreground application is wechat or other third party applications.
Specifically, further includes:
Warning output is obtained according to second planning chart;
If the estimated performance is lower than the warning output, warning message is generated.
Specifically, further includes:
If generating warning message, by the warning message, estimated performance and the warning output in the progress It is highlighted in feedback form, and the progress feedback form is transmitted to foreground application.
Embodiment 2:
The embodiment of the present invention provides a kind of wine product production procedure maintenance device, as shown in Fig. 2, described device includes:
First planning chart obtains module, for obtaining the first planning chart;
Second planning chart output module, by being obtained based on second according to first planning chart and default report output rule Draw table;
Progress feedback form update module supervises data for obtaining in real time, and anti-according to supervision data real-time update progress Present table, the progress feedback form and the second planning chart data item having the same;
Pushing module, for the progress feedback form to be pushed to foreground application so that the foreground application It can show the progress feedback form.
Specifically, further includes:
Warning output obtains module, for obtaining warning output according to second planning chart;
Warning message generation module generates alarm signal if being lower than the warning output for the estimated performance Breath.
Specifically, further includes:
Alarm information processing module, if for generating warning message, by the warning message, estimated performance and described Warning output highlights in the progress feedback form, and the progress feedback form is transmitted to foreground application.
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.

Claims (10)

1. a kind of wine product production procedure monitoring and managing method, which is characterized in that the method includes the following steps:
Obtain the first planning chart;
The second planning chart is obtained according to first planning chart and default report output rule;
Supervision data are obtained in real time, and according to supervision data real-time update progress feedback form, the progress feedback form and described the Two planning charts data item having the same;
The progress feedback form is pushed into foreground application so that the foreground application can show the progress Feedback form.
2. a kind of wine product production procedure monitoring and managing method according to claim 1, it is characterised in that: first planning chart For wine product production task monthly plan table, all planning charts or yearly plan table.
3. a kind of wine product production procedure monitoring and managing method according to claim 1, it is characterised in that: second planning chart For wine product production task day planner, half day planner or self defined time node planning chart.
4. a kind of wine product production procedure monitoring and managing method according to claim 1, it is characterised in that: the progress feedback form Including real-time performance and it is expected that performance;The estimated performance synchronizes more according to the variation of the real-time performance Newly.
5. a kind of wine product production procedure monitoring and managing method according to claim 1, which is characterized in that the foreground application journey Sequence is wechat or other third party applications.
6. a kind of wine product production procedure monitoring and managing method according to claim 4, which is characterized in that further include:
Warning output is obtained according to second planning chart;
If the estimated performance is lower than the warning output, warning message is generated.
7. a kind of wine product production procedure monitoring and managing method according to claim 6, which is characterized in that further include:
If generating warning message, the warning message, estimated performance and the warning output are fed back in the progress It is highlighted in table, and the progress feedback form is transmitted to foreground application.
8. a kind of wine product production procedure maintenance device, which is characterized in that described device includes:
First planning chart obtains module, for obtaining the first planning chart;
Second planning chart output module, for obtaining the second plan according to first planning chart and default report output rule Table;
Progress feedback form update module, in real time obtain supervise data, and according to supervision data real-time update progress feedback form, The progress feedback form and the second planning chart data item having the same;
Pushing module, for the progress feedback form to be pushed to foreground application so that the foreground application can Show the progress feedback form.
9. a kind of wine product production procedure maintenance device according to claim 8, which is characterized in that further include:
Warning output obtains module, for obtaining warning output according to second planning chart;
Warning message generation module generates warning message if being lower than the warning output for the estimated performance.
10. a kind of wine product production procedure maintenance device according to claim 9, which is characterized in that further include:
Alarm information processing module, if for generating warning message, by the warning message, estimated performance and the warning Output highlights in the progress feedback form, and the progress feedback form is transmitted to foreground application.
CN201711349883.7A 2017-12-15 2017-12-15 A kind of wine product production procedure monitoring and managing method and device Pending CN109934432A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711349883.7A CN109934432A (en) 2017-12-15 2017-12-15 A kind of wine product production procedure monitoring and managing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711349883.7A CN109934432A (en) 2017-12-15 2017-12-15 A kind of wine product production procedure monitoring and managing method and device

Publications (1)

Publication Number Publication Date
CN109934432A true CN109934432A (en) 2019-06-25

Family

ID=66979949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711349883.7A Pending CN109934432A (en) 2017-12-15 2017-12-15 A kind of wine product production procedure monitoring and managing method and device

Country Status (1)

Country Link
CN (1) CN109934432A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006053908A1 (en) * 2004-11-19 2006-05-26 Siemens Aktiengesellschaft Scheduling system and work order scheduling protocol for such a system
CN105760992A (en) * 2015-02-09 2016-07-13 北京合众伟奇科技有限公司 Automatic planning and distribution method for measurement, verification and distribution plans
CN106447168A (en) * 2016-08-31 2017-02-22 广州亿澳斯软件股份有限公司 Intelligent reminding system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006053908A1 (en) * 2004-11-19 2006-05-26 Siemens Aktiengesellschaft Scheduling system and work order scheduling protocol for such a system
CN105760992A (en) * 2015-02-09 2016-07-13 北京合众伟奇科技有限公司 Automatic planning and distribution method for measurement, verification and distribution plans
CN106447168A (en) * 2016-08-31 2017-02-22 广州亿澳斯软件股份有限公司 Intelligent reminding system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
卢礼瑾: "啤酒灌装线信息管理系统设计与开发", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 *

Similar Documents

Publication Publication Date Title
US11720087B1 (en) Systems and methods for dynamic manufacturing line monitoring
US11558449B1 (en) Industrial controller system and interactive graphical user interfaces related thereto
US10282071B2 (en) Asset-driven dynamically composed visualization system
CN103716202B (en) A kind of intelligent maintenance strategy management method for power communication
CN109995546B (en) Intelligent factory automation system with edge computing and cloud computing cooperating
US20170083175A1 (en) Simplified entity lifecycle management
CN104156822A (en) SOA-based comprehensive enterprise level information system operation and maintenance management method
CN109461090A (en) A kind of integrated framework of EMPS
Lojka et al. Service-oriented architecture and cloud manufacturing
CN109495290B (en) Operation and maintenance system main station and sub station interaction method and system
TWI751387B (en) Software defined driven ict service provider system based on end to end orchestration
CN105743870A (en) Design method of intelligent substation integrated business platform service interfaces
CN112241401A (en) Knowledge graph-based digital quality management system and method
White Now is the right time for real-time BI
CN109934432A (en) A kind of wine product production procedure monitoring and managing method and device
CN117493452A (en) Manufacturing site full-flow data management system
WO2023093207A1 (en) Intelligent webpage operation feedback method, system and apparatus, and readable storage medium
US11443467B2 (en) Server systems and methods for utilizing a namespace property to correlate process tag values to corresponding events
CN108919742A (en) Cloud service platform and its control method suitable for PLC
Kuhn et al. Track and Trace: Integrating static and dynamic data in a hybrid graph-based traceability model
Magnotta et al. Momis dashboard: A powerful data analytics tool for industry 4.0
CN103413249A (en) Transformer substation equipment state assessment method based on computational formula
Chernov et al. Intelligent decision support by means of dynamic description logic
SA520412376B1 (en) Integrated Alarm Management System (ALMS) KPIS With Plant Information System
CN105335464A (en) Method for previewing financial statement in real time based on XBRL statement link library

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190625