CN109926849A - Output shaft boring grab - Google Patents

Output shaft boring grab Download PDF

Info

Publication number
CN109926849A
CN109926849A CN201811455286.7A CN201811455286A CN109926849A CN 109926849 A CN109926849 A CN 109926849A CN 201811455286 A CN201811455286 A CN 201811455286A CN 109926849 A CN109926849 A CN 109926849A
Authority
CN
China
Prior art keywords
hole
output shaft
fixing seat
supporting table
intermediate fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811455286.7A
Other languages
Chinese (zh)
Inventor
宋银生
张骏
朱彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DAYANG PF Co Ltd
Original Assignee
JIANGSU DAYANG PF Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DAYANG PF Co Ltd filed Critical JIANGSU DAYANG PF Co Ltd
Priority to CN201811455286.7A priority Critical patent/CN109926849A/en
Publication of CN109926849A publication Critical patent/CN109926849A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of output shaft boring grabs, comprising: supporting table is equipped with first through hole, and supporting table is equipped with U-type groove;One end of intermediate fixing seat is connect with supporting table, intermediate fixing seat is equipped with the second through-hole, intermediate fixing seat is equipped with groove, the end of output shaft is against on the end face in supporting table, when facing the part drilling and tapping that output shaft is located above U-type groove, iron filings are discharged via U-type groove from groove, and the mounting groove of the fixed block for installation is offered on the side wall of intermediate fixing seat, and fixed block is removably mounted in mounting groove;The other end of intermediate fixing seat is connect with pedestal, pedestal is equipped with perforative third through-hole, first through hole, the second through-hole are connected with third through-hole, first through hole and the second through-hole constitute the internal output shaft mounting hole for being equipped with multiple installation steps, and output shaft is located in supporting table and intermediate fixing seat by installation step.Fixture through the invention can be such that the iron filings of drilling are discharged by U-type groove and groove.

Description

Output shaft boring grab
Technical field
The invention belongs to field of fixtures, are more particularly to a kind of output shaft boring grab.
Background technique
When existing output shaft boring grab has the following deficiencies: the drilling and tapping at the top of workpiece at work, iron filings are not Easily exclude;The positioning of workpiece and fixture is inaccurate, and is not fixed easily;Bracket is grabbed when taking workpiece at the top of workpiece, due to top thickness Thin, easy skidding causes workpiece to collide with, thus defective work piece.
Summary of the invention
The object of the present invention is to provide a kind of output shaft boring grabs of avoidable output shaft damage.
According to an aspect of the invention, there is provided a kind of output shaft boring grab, including supporting table, the supporting table are prolonged It is axially penetrated through equipped with first through hole, and the supporting table offers U-type groove in heart direction thereto by its outer edge;
Intermediate fixing seat, one end are connect with the supporting table, and the intermediate fixing seat is prolonged it and axially penetrated through equipped with second Through-hole, one end that the intermediate fixing seat is connected with the supporting table is equipped with the groove being connected with the U-type groove, described defeated The end of shaft is supported on end face on the supporting table, is faced the part that the output shaft is located above the U-type groove and is bored When the tapping of hole, iron filings are discharged via U-type groove from groove, and the fixed block for installation is offered on the side wall of the intermediate fixing seat Mounting groove, the fixed block is removably mounted in the mounting groove;
The other end of pedestal, the intermediate fixing seat is connect with the pedestal, the pedestal prolong its be radially provided with it is perforative Third through-hole,
The first through hole, the second through-hole are connected with the third through-hole, and the first through hole and the second through-hole are constituted Inside is equipped with the output shaft mounting hole of multiple installation steps, and the output shaft is located in the supporting table and institute by installation step It states in intermediate fixing seat.
In some embodiments, it at two shoulders of the fixed block to be step-like, is opened respectively at two shoulders of the fixed block Equipped with the first threaded hole, the bottom of the groove of the intermediate fixing seat offers the second spiral shell corresponding with first threaded hole Pit, bolt be successively threaded in first threaded hole and second threaded hole with by the fixed block removably It is mounted in the mounting groove, when picking and placing workpiece, dismantles the bolt at a wherein shoulder.
In some embodiments, the diameter of the pedestal be greater than the intermediate fixing seat diameter, make briquetting from up to Under the periphery of the pedestal is fixed.
In some embodiments, the inner surface of the mounting hole is matched with the outer surface of the output shaft.
In some embodiments, being jacked up the output shaft from bottom by the third through-hole keeps its top prominent For the supporting table.
It has the advantage that: fixture through the invention can be such that the iron filings of drilling are discharged by U-type groove and groove;Output shaft Bottom go deep into fixture from first through hole, by installation step positioning it is fixed after processed, after processing is completed, pass through third Through-hole is jacked up from the bottom of output shaft makes to protrude from fixture at the top of output shaft, then grabs the top of output shaft, prevents straight The damage of workpiece is easily caused so that output shaft is scrapped when connecing at the top of grabbing workpiece.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the output shaft boring grab of an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the supporting table of the output shaft boring grab of an embodiment of the present invention;
Fig. 3 is the fixed block of the output shaft boring grab of an embodiment of the present invention and the connection signal of intermediate fixing seat Figure;
Fig. 4 is the schematic cross-sectional view of the output shaft boring grab of an embodiment of the present invention.
Specific embodiment
Fig. 1-Fig. 4 schematically shows the output shaft boring grab of one embodiment of the present invention.Such as Fig. 1-Fig. 4 institute Show, the output shaft boring grab, when drilling on output shaft for clamping output shaft, including supporting table 1,2 and of intermediate fixing seat Pedestal 313.
Supporting table 1 is prolonged it and is axially penetrated through equipped with first through hole.Supporting table 1 offers U in heart direction thereto by its outer edge Type groove 11.One end of intermediate fixing seat 2 is connect with supporting table 1.Intermediate fixing seat 2 is prolonged it and is axially penetrated through equipped with the second through-hole.In Between the one end that is connected with supporting table 1 of fixing seat 2 be equipped with the groove 5 being connected with U-type groove 11.The end of output shaft is against support On end face on platform 1.When facing output shaft and being located at the part drilling and tapping of the top of U-type groove 11, iron filings are via U-type groove 11 from recessed Slot 5 is discharged.The mounting groove of the fixed block 21 for installation is offered on the side wall of intermediate fixing seat 2, fixed block 21 is removably It is mounted in mounting groove.Specifically, at two shoulders of fixed block 21 to be step-like, first is offered respectively at two shoulders of fixed block 21 Threaded hole 22, the bottom of intermediate 2 mounting groove of fixing seat offer second threaded hole 23 corresponding with the first threaded hole 22, bolt 6 are successively threaded in the first threaded hole 22 and the second threaded hole 23 so that fixed block 21 is removably mounted on mounting groove In, when picking and placing workpiece, dismantle the bolt at a wherein shoulder.The other end of intermediate fixing seat 2 is connect with pedestal 313, pedestal 313 Diameter is greater than the diameter of intermediate fixing seat 2, is fixed briquetting to the periphery of pedestal 313 from top to bottom.Pedestal 313 prolongs It is radially provided with perforative third through-hole 32.Being jacked up the output shaft from bottom by the third through-hole 32 makes its top Portion protrudes from the supporting table.First through hole is connected with the second through-hole, and first through hole and the second through-hole constitute inside equipped with more The output shaft mounting hole 4 of a installation step, output shaft are located in supporting table 1, intermediate fixing seat 2 and pedestal by installation step In 313.The inner surface of mounting hole 4 is matched with the outer surface of output shaft.Output shaft is set tively firm to be mounted on mounting hole 4 In.The bottom of output shaft is goed deep into fixture from first through hole, is processed, is completed the process after being fixed by installation step positioning Afterwards, being jacked up by third through-hole 32 from the bottom of output shaft makes to protrude from fixture at the top of output shaft, then grabs output shaft Top, easily cause the damage of workpiece so that output shaft is scrapped when preventing at the top of direct grabbing workpiece.
Above-described is only some embodiments of the present invention.For those of ordinary skill in the art, it is not taking off Under the premise of from the invention design, various modifications and improvements can be made, and these are all within the scope of protection of the present invention.

Claims (5)

1. a kind of output shaft boring grab, when drilling on output shaft for clamping the output shaft characterized by comprising
Supporting table, the supporting table are prolonged it and are axially penetrated through equipped with first through hole, and the supporting table is by its outer edge heart side thereto To offering U-type groove;
Intermediate fixing seat, one end are connect with the supporting table, and the intermediate fixing seat is prolonged it and axially penetrated through equipped with the second through-hole, One end that the intermediate fixing seat is connected with the supporting table is equipped with the groove being connected with the U-type groove, the output shaft End support on end face on the supporting table, face the part that the output shaft is located above the U-type groove and drill and attack When silk, iron filings are discharged via U-type groove from groove, and the peace of the fixed block for installation is offered on the side wall of the intermediate fixing seat Tankage, the fixed block are removably mounted in the mounting groove;
The other end of pedestal, the intermediate fixing seat is connect with the pedestal, and the pedestal prolongs it and is radially provided with perforative third Through-hole,
The first through hole, the second through-hole are connected with the third through-hole, and the first through hole and second through-hole are constituted Inside is equipped with the output shaft mounting hole of multiple installation steps, and the output shaft is located in the supporting table and institute by installation step It states in intermediate fixing seat.
2. output shaft boring grab according to claim 1, which is characterized in that be step at two shoulders of the fixed block Shape, offers the first threaded hole at two shoulders of the fixed block respectively, the bottom of the groove of the intermediate fixing seat offer with Corresponding second threaded hole of first threaded hole, bolt are successively threaded in first threaded hole and second spiral shell The fixed block to be removably mounted in the mounting groove in pit, when picking and placing workpiece, the spiral shell at a wherein shoulder is dismantled Bolt.
3. output shaft boring grab according to claim 1, which is characterized in that the diameter of the pedestal is greater than the centre The diameter of fixing seat is fixed briquetting to the periphery of the pedestal from top to bottom.
4. output shaft boring grab according to claim 1, which is characterized in that the inner surface of the mounting hole with it is described defeated The outer surface of shaft matches.
5. output shaft boring grab according to claim 1, which is characterized in that by the third through-hole by the output Axis is jacked up from bottom makes its top protrude from the supporting table.
CN201811455286.7A 2018-11-30 2018-11-30 Output shaft boring grab Pending CN109926849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811455286.7A CN109926849A (en) 2018-11-30 2018-11-30 Output shaft boring grab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811455286.7A CN109926849A (en) 2018-11-30 2018-11-30 Output shaft boring grab

Publications (1)

Publication Number Publication Date
CN109926849A true CN109926849A (en) 2019-06-25

Family

ID=66984667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811455286.7A Pending CN109926849A (en) 2018-11-30 2018-11-30 Output shaft boring grab

Country Status (1)

Country Link
CN (1) CN109926849A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010000807A (en) * 2000-10-20 2001-01-05 오현수 A working apparatus of thread relief of a tap
WO2010095249A1 (en) * 2009-02-20 2010-08-26 オーエスジー株式会社 Tap with drill
CN202668169U (en) * 2012-06-05 2013-01-16 河南航天精工制造有限公司 Tapping tool for slotted round nut
CN104400496A (en) * 2014-11-26 2015-03-11 河南航天精工制造有限公司 Flange nut tapping tool
CN205520617U (en) * 2016-04-16 2016-08-31 绍兴利安电气有限公司 Positioning fixture and set up drilling and tapping equipment of this kind of positioning fixture
CN206748011U (en) * 2017-04-16 2017-12-15 安徽合力股份有限公司 It is a kind of to be used for the vertical Simple clamp plus the drilling of milling face
CN108772608A (en) * 2018-08-02 2018-11-09 戴世伟 A kind of multiple thread tapping machine
CN209207006U (en) * 2018-11-30 2019-08-06 江苏大洋精锻有限公司 Output shaft boring grab

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010000807A (en) * 2000-10-20 2001-01-05 오현수 A working apparatus of thread relief of a tap
WO2010095249A1 (en) * 2009-02-20 2010-08-26 オーエスジー株式会社 Tap with drill
CN202668169U (en) * 2012-06-05 2013-01-16 河南航天精工制造有限公司 Tapping tool for slotted round nut
CN104400496A (en) * 2014-11-26 2015-03-11 河南航天精工制造有限公司 Flange nut tapping tool
CN205520617U (en) * 2016-04-16 2016-08-31 绍兴利安电气有限公司 Positioning fixture and set up drilling and tapping equipment of this kind of positioning fixture
CN206748011U (en) * 2017-04-16 2017-12-15 安徽合力股份有限公司 It is a kind of to be used for the vertical Simple clamp plus the drilling of milling face
CN108772608A (en) * 2018-08-02 2018-11-09 戴世伟 A kind of multiple thread tapping machine
CN209207006U (en) * 2018-11-30 2019-08-06 江苏大洋精锻有限公司 Output shaft boring grab

Similar Documents

Publication Publication Date Title
CN109014286B (en) Metal washer drilling processingequipment
CN209207006U (en) Output shaft boring grab
CN109926849A (en) Output shaft boring grab
CN204075323U (en) Composite drill bit
CN208083759U (en) A kind of inlet casing weld assembly welding jigs and fixtures
CN208471340U (en) A kind of bridge traction machine
CN202490986U (en) Positioning structure for processing spiral bevel gear
CN107574399A (en) Reinforced screw connected sinking roller
CN209835404U (en) Flange turnover device for large-diameter Yankee dryer
CN204254042U (en) Double-hook Rapid-dismounted pipe clamp
CN203401166U (en) Quick-change clamp for sleeve type insertion spline
CN103940665B (en) Bridge zinc-coated wire makees the clamping device of high frequency fatigue test
CN206869509U (en) A kind of car pipe fitting fixture
CN207771711U (en) A kind of blind hole bearing outer ring disassembling fixture
CN202696092U (en) Quick aluminum alloy strain clamp
CN105196092B (en) The clamping fixer of thin-walled tube kind part
CN111706724A (en) Metal ceramic wear-resistant composite pipe
CN204148575U (en) A kind of coverplate parts radial hole fixture for processing
CN206054520U (en) A kind of combination pin of fast changeable
CN203488573U (en) Positioning block for easily mounting and overhauling bearing
CN109227461A (en) The installation method and method for dismounting of positioning pin
CN210723387U (en) Special grounding module for oil field cold region
CN208684213U (en) Mine hoist main shaft and reel-splicing device
CN210889544U (en) Piston anti-loosening structure of hydraulic oil cylinder
CN210965761U (en) Lining protection device for antenna housing coating

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination