CN109918372A - A kind of parking lot monitoring and warning facility information collection and analysis system and analysis method - Google Patents
A kind of parking lot monitoring and warning facility information collection and analysis system and analysis method Download PDFInfo
- Publication number
- CN109918372A CN109918372A CN201910092672.2A CN201910092672A CN109918372A CN 109918372 A CN109918372 A CN 109918372A CN 201910092672 A CN201910092672 A CN 201910092672A CN 109918372 A CN109918372 A CN 109918372A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- parking lot
- equipment
- facility information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Abstract
The invention discloses a kind of parking lot monitoring and warning facility informations to collect and survey system, including control panel, data import modul, data collection module, identification module, computing module, grading forewarning system module and database, data import modul is used for importing device information, data collection module is used for real-time collecting operation data, identification module corresponding equipment and corresponding facility information for identification, computing module is used to be carried out according to the parking operation data of real-time collecting and the device data of importing to calculate equipment operation condition data, grading forewarning system module is used to generate grading forewarning system data according to the result of computing module, database is used to store the data of calculated result and importing.The invention also discloses its based on method, pass through and import the collection and analysis that cluster tool information Step and data processing step realize information.Advantages of the present invention: avoiding because service life of equipment and failure cause equipment can not normal use, greatly enhance the safety of mechanical vehicle parking system.
Description
Technical field
The present invention relates to parking lot plant maintenance, in particular to a kind of parking lot monitoring and warning is collected and surveyed with facility information
System and analysis method.
Background technique
The advantages of mechanical vehicle parking system has occupied area small, parks cars more, vehicle centralized management, more specification, still
Mechanical parking equipment all has that, using life cycle, equipment often will cause irremediable property after generating failure
Loss, threatens safely to human life.Also the operation for influencing whether subsequent parking and pick-up, based on to life period of equipment
The purpose of real-time monitoring reaches equipment early warning effect, in the prior art often through a set of equipment monitoring and warning system at
Manage simultaneously early warning.However in the prior art in lack the data of effective analytical equipment and collecting device.
Summary of the invention
The technical problem to be solved in the present invention is to provide one kind effectively to carry out to mechanical vehicle parking system device data
The parking lot monitoring and warning facility information collected and analyzed collects and surveys system.
In order to solve the above-mentioned technical problem, the technical solution of the present invention is as follows: a kind of parking lot monitoring and warning facility information
Collection and analysis system, including control panel, data import modul, data collection module, identification module, computing module, classification are in advance
Alert module and database, the control panel are imported for showing to import data classification information and carry out control data, the number
The facility information imported in parking lot is used for according to import modul, the data collection module to be used for the operation in real-time collecting parking lot
Data, corresponding equipment and corresponding facility information, the computing module are used for according in real time the identification module for identification
The parking operation data of collection and the device data of importing carry out calculating equipment operation condition data, and the grading forewarning system module is used
In generating grading forewarning system data according to the result of computing module, the database is used to store the data of calculated result and importing.
Further, the calculated result of the computing module is that life cycle can be used in equipment.
Further, the information that the data import modul imports includes id information, title, model, period, equipment operation
When the minimum value that generates when running of the maximum value that generates and equipment.
It is collected and is divided with facility information it is a further object to provide a kind of foregoing parking lot monitoring and warning
The collection and analysis method of analysis system, including import cluster tool information Step and data processing step.
Wherein, the cluster tool information Step is that the device data classification of inner part of parking lot is imported into database.
Further, the data processing step further includes following steps:
(1) data: the equipment operating data of real-time collecting inner part of parking lot are collected;
(2) it identifies facility information: identifying the corresponding equipment of the data being collected into, and carried out with the facility information imported in advance
It is corresponding;
(3) it calculates in real time: according to the data of real-time collecting equipment corresponding with the data progress calculating in real time imported in advance
Life cycle then enters step (5) if it is normal value, then enters step if it is outlier (4);
(4) grading forewarning system: according to grading forewarning system data pre-set in database, by what is be calculated in step (3)
Outlier is classified;
(5) data record: by step (3) or step (4) calculated result or classification data result carry out storage record.
By adopting the above technical scheme, due to by being imported in advance to device data, and pass through real-time collecting equipment
Data are avoided by carrying out grading forewarning system to outlier because of equipment by calculating corresponding equipment in real time using data
Service life and failure cause equipment can not normal use, greatly enhance the safety of mechanical vehicle parking system.
Detailed description of the invention
Fig. 1 is the systematic functional structrue schematic diagram in the present invention;
Fig. 2 is the method flow diagram in the present invention.
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing.It should be noted that for
The explanation of these embodiments is used to help understand the present invention, but and does not constitute a limitation of the invention.In addition, disclosed below
The each embodiment of the present invention involved in technical characteristic can be combined with each other as long as they do not conflict with each other.
Referring to Fig. 1 and Fig. 2, present embodiment discloses a kind of parking lot monitoring and warning and is collected and surveyed with facility information
System, including control panel, data import modul, data collection module, identification module, computing module, grading forewarning system module and
Database, the control panel are imported for showing to import data classification information and carry out control data, and the data import mould
Block is used for the facility information imported in parking lot, and the data collection module is used for the operation data in real-time collecting parking lot, institute
Identification module corresponding equipment and corresponding facility information for identification are stated, the computing module according to real-time collecting for stopping
Vehicle operation data and the device data of importing carry out calculating equipment operation condition data, and the grading forewarning system module is by based on
The result for calculating module generates grading forewarning system data, and the database is used to store the data of calculated result and importing.
Feasible, the calculated result of the computing module is that life cycle can be used in equipment.
Wherein, the production when information that the data import modul imports includes id information, title, model, period, equipment operation
The minimum value that raw maximum value and equipment generate when running, these data can be inputted by control panel, can also by
The upper database generated is imported on other computers.
The following are above-mentioned parking lot monitoring and warnings to collect and survey the collection and analysis method of system with facility information, including imports
Cluster tool information Step and data processing step.
Wherein, the cluster tool information Step is that the device data classification of inner part of parking lot is imported into database.
Feasible, the data processing step further includes following steps:
(1) data: the equipment operating data of real-time collecting inner part of parking lot are collected;
(2) it identifies facility information: identifying the corresponding equipment of the data being collected into, and carried out with the facility information imported in advance
It is corresponding;
(3) it calculates in real time: according to the data of real-time collecting equipment corresponding with the data progress calculating in real time imported in advance
Life cycle then enters step (5) if it is normal value, then enters step if it is outlier (4);
(4) grading forewarning system: according to grading forewarning system data pre-set in database, by what is be calculated in step (3)
Outlier is classified;
(5) data record: by step (3) or step (4) calculated result or classification data result carry out storage record.
It crosses and device data is imported in advance, and is corresponding by calculating in real time by real-time collecting device data
Equipment uses data, by carrying out grading forewarning system to outlier, avoids because service life of equipment and failure lead to equipment
Can not normal use, greatly enhance the safety of mechanical vehicle parking system.
In conjunction with attached drawing, the embodiments of the present invention are described in detail above, but the present invention is not limited to described implementations
Mode.For a person skilled in the art, in the case where not departing from the principle of the invention and spirit, to these embodiments
A variety of change, modification, replacement and modification are carried out, are still fallen in protection scope of the present invention.
Claims (6)
1. a kind of parking lot monitoring and warning collects and surveys system with facility information, it is characterised in that: led including control panel, data
Enter module, data collection module, identification module, computing module, grading forewarning system module and database, the control panel is for showing
Show to import data classification information and carry out control data and import, the equipment letter that the data import modul is used to import in parking lot
Breath, the data collection module are used for the operation data in real-time collecting parking lot, and the identification module is corresponding for identification to be set
Standby and corresponding facility information, the computing module are used for according to the parking operation data of real-time collecting and the device data of importing
It carries out calculating equipment operation condition data, the grading forewarning system module is used to generate grading forewarning system number according to the result of computing module
According to the database is used to store the data of calculated result and importing.
2. a kind of parking lot monitoring and warning according to claim 1 collects and surveys system with facility information, it is characterised in that:
The calculated result of the computing module is that life cycle can be used in equipment.
3. a kind of parking lot monitoring and warning according to claim 1 collects and surveys system with facility information, it is characterised in that:
The information that the data import modul imports include the maximum value generated when id information, title, model, period, equipment operation and
The minimum value that equipment generates when running.
4. the collection and analysis side that a kind of parking lot monitoring and warning as described in claim 1 collects and surveys system with facility information
Method, it is characterised in that: including importing cluster tool information Step and data processing step.
5. a kind of parking lot monitoring and warning collects and surveys the collection and analysis side of system with facility information according to claim 4
Method, it is characterised in that: the cluster tool information Step is that the device data classification of inner part of parking lot is imported into database
It is interior.
6. a kind of parking lot monitoring and warning collects and surveys the collection and analysis side of system with facility information according to claim 4
Method, it is characterised in that: the data processing step further includes following steps:
(1) data: the equipment operating data of real-time collecting inner part of parking lot are collected;
(2) it identifies facility information: identifying the corresponding equipment of the data being collected into, and carry out with the facility information imported in advance pair
It answers;
(3) it calculates in real time: according to the life of the data of real-time collecting equipment corresponding with the data progress calculating in real time imported in advance
Period then enters step (5) if it is normal value, then enters step if it is outlier (4);
(4) grading forewarning system: according to grading forewarning system data pre-set in database, by be calculated in step (3) it is non-just
Constant value is classified;
(5) data record: by step (3) or step (4) calculated result or classification data result carry out storage record.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910092672.2A CN109918372A (en) | 2019-01-30 | 2019-01-30 | A kind of parking lot monitoring and warning facility information collection and analysis system and analysis method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910092672.2A CN109918372A (en) | 2019-01-30 | 2019-01-30 | A kind of parking lot monitoring and warning facility information collection and analysis system and analysis method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109918372A true CN109918372A (en) | 2019-06-21 |
Family
ID=66961135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910092672.2A Withdrawn CN109918372A (en) | 2019-01-30 | 2019-01-30 | A kind of parking lot monitoring and warning facility information collection and analysis system and analysis method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109918372A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113011606A (en) * | 2021-01-30 | 2021-06-22 | 河南帅臣停车设备科技有限公司 | Operation and maintenance management method and system for mechanical parking equipment |
-
2019
- 2019-01-30 CN CN201910092672.2A patent/CN109918372A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113011606A (en) * | 2021-01-30 | 2021-06-22 | 河南帅臣停车设备科技有限公司 | Operation and maintenance management method and system for mechanical parking equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105045256A (en) | Rail traffic real-time fault diagnosis method and system based on data comparative analysis | |
CN104091070A (en) | Rail transit fault diagnosis method and system based on time series analysis | |
CN103745229A (en) | Method and system of fault diagnosis of rail transit based on SVM (Support Vector Machine) | |
CN108398934B (en) | equipment fault monitoring system for rail transit | |
CN109191842B (en) | Congestion regulation strategy recommendation method and system based on real-time traffic capacity | |
CN107885642A (en) | Business monitoring method and system based on machine learning | |
CN103150900A (en) | Traffic jam event automatic detecting method based on videos | |
CN105354616A (en) | Processing device and on-line processing method for electric power measurement asset data | |
CN107968483A (en) | A kind of dispatching automation main station system visual intelligent monitors method | |
CN111806516A (en) | Health management device and method for intelligent train monitoring and operation and maintenance | |
CN112561352B (en) | Rail transit signal system health assessment method and device | |
CN115762169B (en) | Unmanned intelligent control system and method for sanitation vehicle | |
CN113269142A (en) | Method for identifying sleeping behaviors of person on duty in field of inspection | |
CN111273626A (en) | Global supervision system for equipment and workers | |
CN114997709A (en) | Road waste water recycling governing system | |
CN114118463B (en) | After-sales market service management system for automobile | |
CN109918372A (en) | A kind of parking lot monitoring and warning facility information collection and analysis system and analysis method | |
CN116976865B (en) | Ship maintenance device allocation management system based on big data analysis | |
CN110263622A (en) | Train fire monitoring method, apparatus, terminal and storage medium | |
CN111555908A (en) | Power grid complex fault event identification method, device and system based on expert experience rule | |
CN116562437A (en) | Track circuit compensation capacitor fault prediction method and device | |
CN116448234A (en) | Power transformer running state voiceprint monitoring method and system | |
CN114113487B (en) | Volatile organic compound online monitoring system and method | |
CN115471135A (en) | Environment-friendly service analysis system | |
CN113901026A (en) | Sulfur hexafluoride material management and control method and system based on big data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190621 |
|
WW01 | Invention patent application withdrawn after publication |