CN109916751A - 一种大坡道有砟道床长期稳定性试验装置与试验方法 - Google Patents

一种大坡道有砟道床长期稳定性试验装置与试验方法 Download PDF

Info

Publication number
CN109916751A
CN109916751A CN201910203545.5A CN201910203545A CN109916751A CN 109916751 A CN109916751 A CN 109916751A CN 201910203545 A CN201910203545 A CN 201910203545A CN 109916751 A CN109916751 A CN 109916751A
Authority
CN
China
Prior art keywords
ballast
sleeper
test
track bed
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910203545.5A
Other languages
English (en)
Other versions
CN109916751B (zh
Inventor
韩义涛
田春香
李粮余
韦凯
王平
刘在庆
张凯
潘自立
熊维
莫宏愿
汪盈盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201910203545.5A priority Critical patent/CN109916751B/zh
Publication of CN109916751A publication Critical patent/CN109916751A/zh
Application granted granted Critical
Publication of CN109916751B publication Critical patent/CN109916751B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种大坡道有砟道床长期稳定性试验装置与试验方法,以通过对长期列车荷载作用下大坡道有砟道床系统稳定性进行原比例疲劳试验,使试验结果更加符合工程实际,有效验证理论设计方法的正确性,继而实现初步参数的优化设计。试验装置包括:混凝土基座,安装于疲劳试验加载池内,疲劳试验加载池的后侧设置将混凝土基座顶面调节至试验坡度的升降装置;原比例有砟道床系统,构建于混凝土基座顶面上,由有砟道床、轨枕、钢轨和扣件系统;加载横梁,固定安装在钢轨上,与轨枕相平行且其顶面为水平面;加载系统,作用于加载横梁顶面上,对原比例有砟道床系统施加循环荷载;轨枕位移测量装置,包括测量支架、位移传感器,测量支架固定安装在疲劳试验加载池的前端,其上等距间隔设置用于测量最下侧轨枕位移量的位移传感器;道床阻力测试组件,用于测试道床纵向阻力或道床横向阻力。

Description

一种大坡道有砟道床长期稳定性试验装置与试验方法
技术领域
本发明涉及轨道交通,特别涉及一种大坡道有砟道床长期稳定性试验装置与试验方法。
背景技术
我国修建的铁路大都沿线地形平坦,无突出的搞成控制问题,因此,目前中国既有的铁路基本没有采用大坡度。除了博林铁路(最大坡度42.5‰),其余铁路最大坡度均小于40‰。因此,目前暂无对大坡道有砟道床结构长期稳定性的研究的先例,也尚未进行相应的试验研究。但随着一些山区旅游铁路的筹建(如都江堰至四姑娘山、川主寺至九寨沟旅游观光等重点项目),铁路线路不可避免地会经过许多坡度超过40‰的大坡道地段,在国外已有过坡度250‰甚至480‰的有砟轨道铺设案例,所以有必要分析大坡道有砟道床结构在复杂艰险山区条件下的长期稳定性。
在公告号CN106874649A的发明专利说明书中公开了一种均质边坡稳定性强度折减法失稳判据方法,通过有限差分数值分析方法判别边坡临界滑动面。而在公告号CN108595878 A的发明专利说明书训公开了一种边坡失稳机制判定方法,即基于强度折减法与边坡渐进破坏理论分析得到边坡的失稳机制。
上述两种方法均属理论设计方法,而且均属于连续介质力学理论,并不符合真实道床的散粒体特征,也非试验方法,它们是否适用于大坡道有砟道床稳定性设计,尚需试验或实践验证,只能分析瞬时荷载作用下有砟道床稳定性问题。而实际情况中有砟道床具有散粒体特征,理论结果难以模拟真实大坡道有砟道床的长期稳定性,且目前暂无相关规范去验证大坡道铁路有砟道床理论设计方法的可靠性。因此,亟需一种大坡道铁路有砟道床长期稳定性的现场试验装置与方法,继而优化设计其稳定性参数。
发明内容
本发明所要解决的技术问题是提供一种大坡道有砟道床长期稳定性试验装置,以通过对长期列车荷载作用下大坡道有砟道床系统稳定性进行原比例疲劳试验,使试验结果更加符合工程实际,有效验证理论设计方法的正确性,继而实现初步参数的优化设计。
本发明解决其技术问题所采用的技术方案如下:
本发明的一种大坡道有砟道床长期稳定性试验装置,其特征是包括:混凝土基座,安装于疲劳试验加载池内,疲劳试验加载池的后侧设置将混凝土基座顶面调节至试验坡度的升降装置;原比例有砟道床系统,构建于混凝土基座顶面上,由有砟道床、轨枕、钢轨和扣件系统;加载横梁,固定安装在钢轨上,与轨枕相平行且其顶面为水平面;加载系统,作用于加载横梁顶面上,对原比例有砟道床系统施加循环荷载;轨枕位移测量装置,包括测量支架、位移传感器,测量支架固定安装在疲劳试验加载池的前端,其上等距间隔设置用于测量最下侧轨枕位移量的位移传感器;道床阻力测试组件,用于测试道床纵向阻力或道床横向阻力。
本发明所要解决的另一技术问题是提供采用上述一种大坡道有砟道床长期稳定性试验装置的试验方法,该方法包括如下步骤:
①通过升降装置将混凝土基座顶面调节至试验坡度,在混凝土基座顶面上构建原比例有砟道床系统;
②单根轨枕道床纵、横向阻力测试,其以一末安装扣件系统的轨枕为测试轨枕,通过道床纵向阻力测试组件和分级加载获得道床纵向阻力值,通过道床横向阻力测试组件和分级加载获得道床横向阻力值;
③安装测试轨枕的扣件系统,在钢轨上安装固定加载横梁;
④疲劳加载,由加载系统通过加载横梁对原比例有砟道床系统施加循环荷载,加载值为实际荷载,每加载一定次数,记录位移传感器测量值,若轨排结构保持稳定,则进行下一组疲劳加载,测得各组疲劳加载情况下最下侧轨枕的位移量;
⑤疲劳试验后单根轨枕道床纵、横向阻力测试,拆除测试轨枕扣件系统,通过道床纵向阻力测试组件和分级加载获得道床纵向阻力值,通过道床横向阻力测试组件和分级加载获得道床横向阻力值;
⑥分析大坡道铁路有砟道床的长期稳定性。
本发明的有益效果是,通过对长期列车荷载作用下大坡道有砟道床系统稳定性进行原比例疲劳试验,使试验结果更加符合工程实际,可有效验证理论设计方法的正确性,继而实现初步参数的优化设计。
附图说明
本说明书包括如下五幅附图:
图1是本发明一种大坡道有砟道床长期稳定性试验装置的结构示意图;
图2是本发明一种大坡道有砟道床长期稳定性试验装置的立体图;
图3是本发明一种大坡道有砟道床长期稳定性试验装置的俯视图;
图4是本发明一种大坡道有砟道床长期稳定性试验装置中道床纵向阻力测试组件的设置方式示意图;
图5是本发明一种大坡道有砟道床长期稳定性试验装置中道床横向阻力测试组件的设置方式示意图。
图中示出构件和对应的标记:疲劳试验加载池10、混凝土基座11、升降装置12、有砟道床21、轨枕22、钢轨23、扣件系统24、加载横梁30、测量支架31、位移传感器32、千斤顶33、第二位移传感器33、反力架34。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
参照图1、图2和图3,本发明的一种大坡道有砟道床长期稳定性试验装置包括:混凝土基座11,安装于疲劳试验加载池10内,疲劳试验加载池10的后侧设置将混凝土基座11顶面调节至试验坡度的升降装置12;原比例有砟道床系统,构建于混凝土基座11顶面上,由有砟道床21、轨枕22、钢轨23和扣件系统24;加载横梁30,固定安装在钢轨23上,与轨枕22相平行且其顶面为水平面;加载系统,作用于加载横梁30顶面上,对原比例有砟道床系统施加循环荷载;轨枕位移测量装置,包括测量支架31、位移传感器32,测量支架31固定安装在疲劳试验加载池10的前端,其上等距间隔设置用于测量最下侧轨枕22位移量的位移传感器32;道床阻力测试组件,用于测试道床纵向阻力或道床横向阻力。
参照图4,所述阻力测试组件包括由千斤顶33和两个第二位移传感器33组成的道床纵向阻力测试组件,以一末安装扣件系统24的轨枕22为测试轨枕,以相邻轨枕22为千斤顶33的反力座,千斤顶33前端分级加载于测试轨枕的纵向中点上。两个第二位移传感器33对称安装于测试轨枕的纵向两侧。参照图5,所述阻力测试组件包括由千斤顶33、第二位移传感器33和反力架34组成的道床横向阻力测试组件,以一末安装扣件系统24的轨枕22为测试轨枕,测试轨枕上固定安装可拆除反力架34,千斤顶33设置于反力架34与同侧钢轨23之间,千斤顶33前端分级加载于钢轨23上;第二位移传感器33安装于测试轨枕的另一侧纵向端面上。测试轨枕一般选择位于轨排中间轨枕。
参照图2,为避免加载横梁30发生位移,所述加载横梁30宜与两侧钢轨23焊接,加载系统作用于加载横梁30纵向中点的顶面上。所述加载系统为最大激振力为500kN、分辨率为500N的疲劳加载试验机。
参照图2至图4,本发明一种大坡道有砟道床长期稳定性试验装置的试验方法,包括如下步骤:
①通过升降装置12将混凝土基座11顶面调节至试验坡度,在混凝土基座11顶面上构建原比例有砟道床系统;
②单根轨枕道床纵、横向阻力测试,其以一末安装扣件系统24的轨枕22为测试轨枕,通过道床纵向阻力测试组件和分级加载获得道床纵向阻力值,通过道床横向阻力测试组件和分级加载获得道床横向阻力值;
③安装测试轨枕的扣件系统24,在钢轨23上安装固定加载横梁30;
④疲劳加载,由加载系统通过加载横梁30对原比例有砟道床系统施加循环荷载,加载值为实际荷载,每加载一定次数,记录位移传感器32测量值,若轨排结构保持稳定,则进行下一组疲劳加载,测得各组疲劳加载情况下最下侧轨枕22的位移量;
⑤疲劳试验后单根轨枕道床纵、横向阻力测试,拆除测试轨枕扣件系统24,通过道床纵向阻力测试组件和分级加载获得道床纵向阻力值,通过道床横向阻力测试组件和分级加载获得道床横向阻力值;
⑥分析大坡道铁路有砟道床的长期稳定性。
参照图4,所述步骤②、步骤⑤中,首先安装道床纵向阻力测试组件,对测试轨枕进行分级加载,测得每级加载时测试轨枕的纵向位移量,对测量数据进行拟合得到轨枕纵向阻力拟合曲线,道床纵向阻力值取轨枕纵向位移量为2mm时对应的荷载。参照图5,在拆除道床纵向阻力测试组件后再安装道床横向阻力测试组件,对测试轨枕进行分级加载,测得每级加载时测试轨枕的横向位移量,对测量数据进行拟合得到轨枕横向阻力拟合曲线,道床横向阻力值取轨枕横向位移量为2mm时对应的荷载。
所述步骤④中,加载次数为500万次,加载值取列车一个转向架的总轴重。
本发明根据相关设计规范还提出了大坡道铁路有砟道床长期稳定性的评介准则,即所述步骤⑥中,如步骤④测得各组疲劳加载情况下最下侧轨枕22的位移量均小于2mm,且步骤②单根轨枕道床纵、横向阻力测试、步骤⑤疲劳试验后单根轨枕道床纵、横向阻力测试所获得的道床纵向阻力值、道床横向阻力值的变化小于15%,则该有砟道床在长期荷载作用下稳定性良好。
实施例:
坡度为30%的米轨铁路有砟道床长期稳定性试验,按如下步骤进行:
①通过升降装置12将混凝土基座11顶面调节至试验坡度(30%),在混凝土基座11顶面上构建原比例有砟道床系统。
疲劳试验加载池10长4.8m,宽4.1m。按要求铺设轨道结构,其中,钢轨23采用50轨,轨距为1000mm。扣件系统24采用弹条I型扣件。轨枕22采用长度为2m的混凝土枕,轨枕间距为600mm,轨枕22的数量为6根。有砟道床21底面宽度为3.9m,枕下道床厚度为300mm,道床边坡为1:1.75,采用一级道砟填筑。
②单根轨枕道床纵、横向阻力测试。
对测试轨枕的道床纵向阻力值、道床横向阻力值进行测试,试验测得其道床纵向阻力值为14.2kN/枕,道床横向阻力值为12.3kN/枕。
③安装测试轨枕的扣件系统24,在钢轨23上安装固定加载横梁30。
④疲劳加载,由于列车转向架间距较大,本试验钢轨长度仅能容纳一个转向架。因此,疲劳加载值取一个转向架的总轴重,为24t。根据列车轴重情况,利用计算机控制疲劳试验机对轨道系统施加240kN~280kN的周期荷载,加载频率为(5±1)Hz。每组试验(一组加载次数定为为100万次)完成后读取并记录坡底处位移传感器32的位移读数,若轨排结构稳定,则进行下一组疲劳加载,直至总疲劳次数达到500万次。本试验5组疲劳加载试验后读取的最下侧轨枕22的位移量分别为0.33mm、0.59mm、0.82mm、1.02mm和1.21mm。
⑤疲劳试验后单根轨枕道床纵、横向阻力测试。
疲劳加载试验完成后,再次对测试轨枕的道床纵向阻力值、道床横向阻力值进行测试,试验测得其道床纵向阻力值为13.3kN/枕,道床横向阻力值11.9kN枕。
⑥大坡道铁路有砟道床长期稳定性分析
500万次疲劳加载试验完成后,轨枕与实验前相比产生了1.21mm,小于2mm,此时,需要比较道床阻力来评价有砟道床的稳定性。对比实验前后单根轨枕的道床纵阻力值、道床横向阻力值,发现循环加载500万次之后,道床纵阻力值、道床横向阻力值分别变化了6.3%和2.5%,均小于15%,因此,本试验所采用的有砟道床在长期荷载作用下的稳定性良好。
以上所述只是用图解说明本发明一种大坡道有砟道床长期稳定性试验装置与试验方法的一些原理,并非是要将本发明局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。

Claims (9)

1.一种大坡道有砟道床长期稳定性试验装置,其特征是包括:混凝土基座(11),安装于疲劳试验加载池(10)内,疲劳试验加载池(10)的后侧设置将混凝土基座(11)顶面调节至试验坡度的升降装置(12);原比例有砟道床系统,构建于混凝土基座(11)顶面上,由有砟道床(21)、轨枕(22)、钢轨(23)和扣件系统(24);加载横梁(30),固定安装在钢轨(23)上,与轨枕(22)相平行且其顶面为水平面;加载系统,作用于加载横梁(30)顶面上,对原比例有砟道床系统施加循环荷载;轨枕位移测量装置,包括测量支架(31)、位移传感器(32),测量支架(31)固定安装在疲劳试验加载池(10)的前端,其上等距间隔设置用于测量最下侧轨枕(22)位移量的位移传感器(32);道床阻力测试组件,用于测试道床纵向阻力或道床横向阻力。
2.如权利要求1所述的一种大坡道有砟道床长期稳定性试验装置,其特征是:所述阻力测试组件包括由千斤顶(33)和两个第二位移传感器(33)组成的道床纵向阻力测试组件,以一末安装扣件系统(24)的轨枕(22)为测试轨枕,以相邻轨枕(22)为千斤顶(33)的反力座,千斤顶(33)前端分级加载于测试轨枕的纵向中点上;两个第二位移传感器(33)对称安装于测试轨枕的纵向两侧。
3.如权利要求1所述的一种大坡道有砟道床长期稳定性试验装置,其特征是:所述阻力测试组件包括由千斤顶(33)、第二位移传感器(33)和反力架(34)组成的道床横向阻力测试组件,以一末安装扣件系统(24)的轨枕(22)为测试轨枕,测试轨枕上固定安装可拆除反力架(34),千斤顶(33)设置于反力架(34)与同侧钢轨(23)之间,千斤顶(33)前端分级加载于钢轨(23)上;第二位移传感器(33)安装于测试轨枕的另一侧纵向端面上。
4.如权利要求1所述的一种大坡道有砟道床长期稳定性试验装置,其特征是:所述加载横梁(30)与两侧钢轨(23)焊接,加载系统作用于加载横梁(30)纵向中点的顶面上。
5.如权利要求1所述的一种大坡道有砟道床长期稳定性试验装置,其特征是:所述加载系统为最大激振力为500kN、分辨率为500N的疲劳加载试验机。
6.采用如权利要求1至5任意一项所述一种大坡道有砟道床长期稳定性试验装置的试验方法,包括如下步骤:
①通过升降装置(12)将混凝土基座(11)顶面调节至试验坡度,在混凝土基座(11)顶面上构建原比例有砟道床系统;
②单根轨枕道床纵、横向阻力测试,其以一末安装扣件系统(24)的轨枕(22)为测试轨枕,通过道床纵向阻力测试组件和分级加载获得道床纵向阻力值,通过道床横向阻力测试组件和分级加载获得道床横向阻力值;
③安装测试轨枕的扣件系统(24),在钢轨(23)上安装固定加载横梁(30);
④疲劳加载,由加载系统通过加载横梁(30)对原比例有砟道床系统施加循环荷载,加载值为实际荷载,每加载一定次数,记录位移传感器(32)测量值,若轨排结构保持稳定,则进行下一组疲劳加载,测得各组疲劳加载情况下最下侧轨枕(22)的位移量;
⑤疲劳试验后单根轨枕道床纵、横向阻力测试,拆除测试轨枕扣件系统(24),通过道床纵向阻力测试组件和分级加载获得道床纵向阻力值,通过道床横向阻力测试组件和分级加载获得道床横向阻力值;
⑥分析大坡道铁路有砟道床的长期稳定性。
7.如权利要求6所述一种大坡道有砟道床长期稳定性试验装置的试验方法,其特征是:所述步骤②、步骤⑤中,首先安装道床纵向阻力测试组件,对测试轨枕进行分级加载,测得每级加载时测试轨枕的纵向位移量,对测量数据进行拟合得到轨枕纵向阻力拟合曲线,道床纵向阻力值取轨枕纵向位移量为2mm时对应的荷载;拆除道床纵向阻力测试组件后再安装道床横向阻力测试组件,对测试轨枕进行分级加载,测得每级加载时测试轨枕的横向位移量,对测量数据进行拟合得到轨枕横向阻力拟合曲线,道床横向阻力值取轨枕横向位移量为2mm时对应的荷载。
8.如权利要求6所述一种大坡道有砟道床长期稳定性试验装置的试验方法,其特征是:所述步骤④中,加载次数为500万次,加载值取列车一个转向架的总轴重。
9.如权利要求6所述一种大坡道有砟道床长期稳定性试验装置的试验方法,其特征是:所述步骤⑥中,如步骤④测得各组疲劳加载情况下最下侧轨枕(22)的位移量均小于2mm,且步骤②单根轨枕道床纵、横向阻力测试、步骤⑤疲劳试验后单根轨枕道床纵、横向阻力测试所获得的道床纵向阻力值、道床横向阻力值的变化小于15%,则该有砟道床在长期荷载作用下稳定性良好。
CN201910203545.5A 2019-03-18 2019-03-18 一种大坡道有砟道床长期稳定性试验装置与试验方法 Active CN109916751B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910203545.5A CN109916751B (zh) 2019-03-18 2019-03-18 一种大坡道有砟道床长期稳定性试验装置与试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910203545.5A CN109916751B (zh) 2019-03-18 2019-03-18 一种大坡道有砟道床长期稳定性试验装置与试验方法

Publications (2)

Publication Number Publication Date
CN109916751A true CN109916751A (zh) 2019-06-21
CN109916751B CN109916751B (zh) 2023-11-17

Family

ID=66965328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910203545.5A Active CN109916751B (zh) 2019-03-18 2019-03-18 一种大坡道有砟道床长期稳定性试验装置与试验方法

Country Status (1)

Country Link
CN (1) CN109916751B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110389081A (zh) * 2019-07-23 2019-10-29 中国铁道科学研究院集团有限公司铁道建筑研究所 一种基于高分子材料的道床密实度测试装置及方法
CN115326441A (zh) * 2022-10-14 2022-11-11 西南交通大学 齿轨交通模型测试装置

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331143A (ja) * 1997-06-02 1998-12-15 Railway Technical Res Inst 地盤支持力試験方法
CN201364212Y (zh) * 2009-02-23 2009-12-16 北京交通大学 铁路有砟轨道道床横向阻力测试设备
KR20120000682A (ko) * 2010-06-28 2012-01-04 한국철도기술연구원 공격각 부여기를 구비한 철도차량의 휠과 레일 시험장치
CN102564333A (zh) * 2010-12-29 2012-07-11 中国铁道科学研究院铁道建筑研究所 铁路路基动态弯沉测试方法
CN102621059A (zh) * 2012-03-31 2012-08-01 中铁第五勘察设计院集团有限公司 既有路基密实状态检测仪
CN202543880U (zh) * 2012-03-31 2012-11-21 中铁第五勘察设计院集团有限公司 既有路基密实状态检测仪
CN203249745U (zh) * 2013-05-21 2013-10-23 中南大学 可调式有砟铁路枕下道床竖向刚度检测设备
CN203274993U (zh) * 2013-05-21 2013-11-06 中南大学 可调式有砟铁路枕下道床横向阻力检测设备
CN203546532U (zh) * 2013-09-30 2014-04-16 中铁二院工程集团有限责任公司 高速铁路有砟轨道钢轨扣件系统
CN204287066U (zh) * 2014-11-20 2015-04-22 中南大学 一种基于结构光的扣件缺失检测装置
CN204286930U (zh) * 2014-12-19 2015-04-22 上海振华重工(集团)股份有限公司 用于轨道疲劳测试的加载夹具
CN104977212A (zh) * 2015-07-23 2015-10-14 中铁第五勘察设计院集团有限公司 轨枕下弹性垫板静刚度自动检测装置
CN204718892U (zh) * 2015-05-07 2015-10-21 北京交通大学 一种测试铁路碎石道砟抗压强度的装置
CN105133440A (zh) * 2015-08-10 2015-12-09 北京交通大学 一种防飞砟的铁路轨枕装置和道砟颗粒状态判断方法
JP2016148221A (ja) * 2015-02-13 2016-08-18 公益財団法人鉄道総合技術研究所 多段載荷方式による軌道支持剛性評価装置
KR101764194B1 (ko) * 2016-05-18 2017-08-03 한국철도기술연구원 엘리베이터용 레일 틸팅 시험장치
CN107036883A (zh) * 2017-05-15 2017-08-11 西南交通大学 道床纵向阻力滞回性能测试模型建立装置、方法及系统
CN206504963U (zh) * 2017-03-02 2017-09-19 柳州铁路工程质量检测中心有限公司 铁轨扣件疲劳试验装置
CN107201716A (zh) * 2017-06-30 2017-09-26 中铁二院工程集团有限责任公司 高墩大跨混凝土连续梁桥的纵向刚度控制方法及桥梁
CN108867201A (zh) * 2018-08-04 2018-11-23 中铁二院工程集团有限责任公司 一种用于大坡度齿轨交通系统的无砟轨道构造
CN210487509U (zh) * 2019-03-18 2020-05-08 中铁二院工程集团有限责任公司 一种大坡道有砟道床长期稳定性试验装置

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331143A (ja) * 1997-06-02 1998-12-15 Railway Technical Res Inst 地盤支持力試験方法
CN201364212Y (zh) * 2009-02-23 2009-12-16 北京交通大学 铁路有砟轨道道床横向阻力测试设备
KR20120000682A (ko) * 2010-06-28 2012-01-04 한국철도기술연구원 공격각 부여기를 구비한 철도차량의 휠과 레일 시험장치
CN102564333A (zh) * 2010-12-29 2012-07-11 中国铁道科学研究院铁道建筑研究所 铁路路基动态弯沉测试方法
CN102621059A (zh) * 2012-03-31 2012-08-01 中铁第五勘察设计院集团有限公司 既有路基密实状态检测仪
CN202543880U (zh) * 2012-03-31 2012-11-21 中铁第五勘察设计院集团有限公司 既有路基密实状态检测仪
CN203249745U (zh) * 2013-05-21 2013-10-23 中南大学 可调式有砟铁路枕下道床竖向刚度检测设备
CN203274993U (zh) * 2013-05-21 2013-11-06 中南大学 可调式有砟铁路枕下道床横向阻力检测设备
CN203546532U (zh) * 2013-09-30 2014-04-16 中铁二院工程集团有限责任公司 高速铁路有砟轨道钢轨扣件系统
CN204287066U (zh) * 2014-11-20 2015-04-22 中南大学 一种基于结构光的扣件缺失检测装置
CN204286930U (zh) * 2014-12-19 2015-04-22 上海振华重工(集团)股份有限公司 用于轨道疲劳测试的加载夹具
JP2016148221A (ja) * 2015-02-13 2016-08-18 公益財団法人鉄道総合技術研究所 多段載荷方式による軌道支持剛性評価装置
CN204718892U (zh) * 2015-05-07 2015-10-21 北京交通大学 一种测试铁路碎石道砟抗压强度的装置
CN104977212A (zh) * 2015-07-23 2015-10-14 中铁第五勘察设计院集团有限公司 轨枕下弹性垫板静刚度自动检测装置
CN105133440A (zh) * 2015-08-10 2015-12-09 北京交通大学 一种防飞砟的铁路轨枕装置和道砟颗粒状态判断方法
KR101764194B1 (ko) * 2016-05-18 2017-08-03 한국철도기술연구원 엘리베이터용 레일 틸팅 시험장치
CN206504963U (zh) * 2017-03-02 2017-09-19 柳州铁路工程质量检测中心有限公司 铁轨扣件疲劳试验装置
CN107036883A (zh) * 2017-05-15 2017-08-11 西南交通大学 道床纵向阻力滞回性能测试模型建立装置、方法及系统
CN107201716A (zh) * 2017-06-30 2017-09-26 中铁二院工程集团有限责任公司 高墩大跨混凝土连续梁桥的纵向刚度控制方法及桥梁
CN108867201A (zh) * 2018-08-04 2018-11-23 中铁二院工程集团有限责任公司 一种用于大坡度齿轨交通系统的无砟轨道构造
CN210487509U (zh) * 2019-03-18 2020-05-08 中铁二院工程集团有限责任公司 一种大坡道有砟道床长期稳定性试验装置

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
TAUFAN ABADI ET AL.: "Improving the performance of railway tracks through ballast interventions", 《PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT》, vol. 232, no. 2, pages 337 - 355 *
刘永俊: "轨道工程大坡度地段轨料运输算法解析与优化", 《铁路工程技术与经济》, vol. 32, no. 6, pages 5 - 19 *
李粮余等: "山地米轨铁路有砟轨道结构稳定性研究", 《铁道工程学报》, vol. 36, no. 12, pages 23 - 28 *
田春香: "坡度对连续梁桥梁端扣件上拔力的影响研究", 《铁道工程学报》, vol. 32, no. 11, pages 62 - 67 *
颜乐等: "坡度对长大坡道桥上无缝道岔的影响分析", 《铁道标准设计》, no. 9, pages 33 - 36 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110389081A (zh) * 2019-07-23 2019-10-29 中国铁道科学研究院集团有限公司铁道建筑研究所 一种基于高分子材料的道床密实度测试装置及方法
CN110389081B (zh) * 2019-07-23 2024-04-02 中国铁道科学研究院集团有限公司铁道建筑研究所 一种基于高分子材料的道床密实度测试装置及方法
CN115326441A (zh) * 2022-10-14 2022-11-11 西南交通大学 齿轨交通模型测试装置

Also Published As

Publication number Publication date
CN109916751B (zh) 2023-11-17

Similar Documents

Publication Publication Date Title
Edwards et al. Quantification of concrete railway sleeper bending moments using surface strain gauges
Mishra et al. An integrated approach to dynamic analysis of railroad track transitions behavior
Zakeri et al. Field investigation of variation of loading pattern of concrete sleeper due to ballast sandy contamination in sandy desert areas
KR101154489B1 (ko) 철도교의 재하실험 장치와 이를 이용한 철도교의 내하력 산출방법 및 철도교의 처짐 측정방법
Karoumi et al. Monitoring traffic loads and dynamic effects using an instrumented railway bridge
CN109916751A (zh) 一种大坡道有砟道床长期稳定性试验装置与试验方法
Ashebo et al. Evaluation of dynamic loads on a skew box girder continuous bridge Part I: Field test and modal analysis
Sadeghi et al. Effect of unsupported sleepers on rail track dynamic behaviour
Van Der Kooi et al. Monitoring an in-service railway bridge with a distributed fiber optic strain sensing system
CN210487509U (zh) 一种大坡道有砟道床长期稳定性试验装置
Jover et al. Investigation of tramway line no. 1, in Budapest, Based on Dynamic Measurements
CN102350996A (zh) 一种重载列车运行危险状态的地面监测方法
Esmaeili et al. Investigating seismic behavior of ballasted railway track in earthquake excitation using finite-element model in three-dimensional space
Nobakht et al. Investigation on longitudinal resistance of the ballasted railway track under vertical load
Wilk Mitigation of differential movements at railroad bridge transition zones
Zhang et al. Experimental investigation on dynamic performance evolution of double-block ballastless track under high-cycle train loads
Cortis et al. Development of a wayside measurement system for the evaluation of wheel-rail lateral contact force
Zong et al. Service condition of railroad corridors around the insulated rail joints
CN105651502A (zh) 城市轨道交通用预制板式减振轨道结构综合检测方法
Zhang et al. Response analysis and effect evaluation of dynamic stabilization for ballasted track
CN113624319B (zh) 一种轨道交通环形振动模拟试验装置
Shi et al. A critical review on the vertical stiffness irregularity of railway ballasted track
CN209400174U (zh) 桥梁横向地震碰撞试验装置
Rakoczy et al. Railroad bridge condition evaluation using onboard systems
Rose et al. Design and monitoring of well-performing bridge transitions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant