CN109916373A - A kind of control net measurement of high-speed railway rail and data mobile process system and method - Google Patents

A kind of control net measurement of high-speed railway rail and data mobile process system and method Download PDF

Info

Publication number
CN109916373A
CN109916373A CN201910054345.8A CN201910054345A CN109916373A CN 109916373 A CN109916373 A CN 109916373A CN 201910054345 A CN201910054345 A CN 201910054345A CN 109916373 A CN109916373 A CN 109916373A
Authority
CN
China
Prior art keywords
measurement
data
intelligent terminal
speed railway
android intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910054345.8A
Other languages
Chinese (zh)
Inventor
闵阳
曹成度
夏艳军
滕焕乐
吴玄
陶灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910054345.8A priority Critical patent/CN109916373A/en
Publication of CN109916373A publication Critical patent/CN109916373A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to a kind of high-speed railway rails to control net measurement and data mobile process system and method, the system comprises robot measurement, bluetooth serial ports communication module and Android intelligent terminals, the robot measurement is electrically connected with the bluetooth serial ports communication module by RS232 serial ports, and the bluetooth serial ports communication module and the Android intelligent terminal pass through bluetooth connection;The Android intelligent terminal is used to send pre-set measurement instruction to the robot measurement by the bluetooth serial ports communication module, the robot measurement according to the measurement instruction for measuring, acquisition meets the measurement data of high-speed railway rail control net or other types corner control net, and sends the measurement data to Android intelligent terminal by bluetooth serial ports communication module;The finally measurement data that the Android intelligent terminal storage robot measurement returns, and carry out checking judge whether measurement data qualified with compensating computation by field operation technical indicator in pre-set items.

Description

A kind of control net measurement of high-speed railway rail and data mobile process system and method
Technical field
Net measurement is controlled the present invention relates to high-speed railway rail or corner controls net fields of measurement, and in particular to a kind of high-speed railway rail The measurement and data mobile process system and method for all kinds of corner control nets such as control net.
Background technique
High-speed rail industry in China's has the measurement of the needs such as a large amount of rail control network, Traverse Network or repetition measurement every year at present, existing There is solution mainly to sight function using servo motor possessed by robot measurement itself and automatically, is gone here and there by RS232 Mouth line is built in robot measurement, completes automatic measurement by software control instrument, sends the behaviour such as data, data early warning automatically Make.There are mainly two types of the methods for realizing similar functions at present:
1 exploitation onboard program, is built in total station, so that controlling robot measurement by embedded software completes measurement data Collecting work.
2 using profession measurement handbook organized data acquisition control program, complete by RS232 serial ports line traffic control robot measurement At the collecting work of data.
The above method there are the problem of have interior field operation independent because by robot measurement or special measurement handbook operational capability Limited restriction is unable to satisfy the data processing demand for needing a large amount of operations, reaches and refers in interior field operation items technology acuracy The purpose of mark timely early warning when transfiniting.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of high-speed railway rails to control net measurement and the mobile processing system of data System and method.This method sends ASCII to robot measurement using Android intelligent terminal and instructs and receive measured value, combination wire It is the characteristics of controls net measurements such as net, triangulated height, high-speed railway rail control net, complete by more survey time according to domestic specifications of surveys requirement Circle survey time method completes the acquisition and interior field operation quality examination of field data.The invention greatly reduces field work amount, shortens Field operation measurement period is completed to implement adjustment and is calculated and precision index inspection, has significant economic benefit and society's effect Benefit, technical scheme is as follows:
As the first aspect of the present invention, a kind of control net measurement of high-speed railway rail and data mobile process system, packet are provided Robot measurement, bluetooth serial ports communication module and Android intelligent terminal are included, the robot measurement and the bluetooth serial ports communicate Module is electrically connected by RS232 serial ports, and the bluetooth serial ports communication module and the Android intelligent terminal are connected by bluetooth It connects;
The Android intelligent terminal is used to send by the bluetooth serial ports communication module to the robot measurement preparatory The measurement instruction of setting, for the robot measurement for being measured according to the measurement instruction, acquisition high-speed railway rail controls net The measurement data of every field operation technical indicator, and the measurement data is sent to Android intelligence by bluetooth serial ports communication module Terminal;The measurement data that the last Android intelligent terminal storage robot measurement returns, and by pre-set every outer Whether industry technical indicator critical field judges the measurement data of every field operation technical indicator in critical field.
Further, the Android intelligent terminal carries man-machine interface, and the man-machine interface is for showing high-speed railway rail control System nets the measurement data of every field operation technical indicator and carries out warning note when measurement data is exceeded.
Further, the Android intelligent terminal is Android smartphone terminal or Android Intelligent flat terminal.
As another aspect of the present invention, another high-speed railway rail control net measurement and data mobile process system are provided, The system comprises robot measurement and Android intelligent terminal, the robot measurement has bluetooth module, the measurement machine People and the Android intelligent terminal pass through bluetooth connection;
The Android intelligent terminal, which is used to send pre-set measurement to the robot measurement by bluetooth module, to be referred to It enables, for being measured according to the measurement instruction, acquisition meets high-speed railway rail control and nets every field operation the robot measurement The measurement data of technical indicator, and the measurement data is sent to Android intelligent terminal by bluetooth module;The last peace The measurement data that tall and erect intelligent terminal storage robot measurement returns, and pass through pre-set every field operation technical indicator standard model The measurement data for judging every field operation technical indicator is enclosed whether in critical field.
As yet another aspect of the invention, a kind of high-speed railway rail control net measurement and data moving processing method are provided, It the described method comprises the following steps:
Step 1, a survey station of certain section of high-speed railway rail control net is selected;
Step 2, one of them unmeasured measurement point of the survey station is selected, instrument height is set and prism is high, manually adjusts survey Amount robot tentatively sights measurement point;
Step 3, Android intelligent terminal is set by the bluetooth serial ports communication module to robot measurement transmission in advance The measurement instruction set;
Step 4, robot measurement carries out the measurement of every field operation technical indicator according to the measurement instruction to the measurement point, And measurement data is sent to Android intelligent terminal by bluetooth serial ports communication module;
Step 5, step 2 is repeated to step 4, until completing the measurement of measurement point described in the survey station;
Step 6, the measurement data for all measurement points that Android intelligent terminal storage robot measurement returns, and by preparatory The every field operation technical indicator critical field for each measurement point being arranged judges every field operation technical indicator of each measurement point of the survey station Measurement data whether in critical field.
Further, the method also includes: according to project survey grade grassroot project, each survey of each survey station is set Limit is poor between measuring the position number of point, limiting difference the survey time in the survey time, each measurement point according to the position number of setting, in the survey time limit it is poor and Difference is limited between survey time completes measurement.
Further, the method also includes: pre-establish measurement instruction collection, the measurement instruction collection includes according to high-speed rail The measurement instruction that every fieldwork observation technical requirements of each measurement point of rail control network are formulated, it is preliminary to manually adjust robot measurement After sighting measurement point, Android intelligent terminal sends corresponding survey to the robot measurement by the bluetooth serial ports communication module Amount instruction.
Further, the Android intelligent terminal carries man-machine interface, and the Android intelligent terminal passes through the man-machine boundary Face shows every field operation technical indicator measurement data of each measurement point and carries out warning note when measurement data is exceeded.
Further, the method also includes: when the measurement data acquisition that all survey stations are netted in the control of certain section of high-speed railway rail is complete Cheng Hou, Android intelligent terminal according to the measurement data combination adjustment of Free Networks, constraint net adjusted data, mis-tie misclosure, back and forth survey it is poor Computing Principle, complete in industry index checking.
Beneficial effects of the present invention:
1. the present invention has given full play to the speed advantage of Android intelligent terminal, the connection side of serial port data line is avoided Formula simplifies the operating procedure of surveyor, is greatly improved measurement efficiency.
2. comparing compared with traditional scheme, the present invention can complete interior field operation index checking in real time, surveyor can be instructed to do over again in time, Avoiding needs to return to office's export data after field data acquisition is complete carries out office work management.Otherwise for complicated project, can will also measure Data are sent to interior industry group by the mobile network that Android intelligent terminal uses.
3. the present invention is versatile, using the present invention, the measurement work of the achievable all kinds of total stations of surveyor, such as high rail Road controls net, Traverse Network, trigonometric levelling, deformation monitoring etc..
Detailed description of the invention
Fig. 1 is the structural representation of high-speed railway rail provided in an embodiment of the present invention control net measurement and data mobile process system Figure;
Fig. 2 is another structure of high-speed railway rail provided in an embodiment of the present invention control net measurement and data mobile process system Schematic diagram;
Fig. 3 is high-speed railway rail provided in an embodiment of the present invention control net measurement and data moving processing method flow chart.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only present invention a part, instead of all the embodiments.Based on the present invention In embodiment, all other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
As shown in Figure 1, a kind of high-speed railway rail control net measurement provided by the invention and data mobile process system, including survey Measure robot, bluetooth serial ports communication module and Android intelligent terminal, the robot measurement and the bluetooth serial ports communication module It is electrically connected by RS232 serial ports, the bluetooth serial ports communication module and the Android intelligent terminal pass through bluetooth connection;
The Android intelligent terminal is used to send by the bluetooth serial ports communication module to the robot measurement preparatory The measurement instruction of setting, for the robot measurement for being measured according to the measurement instruction, acquisition high-speed railway rail controls net The measurement data of every field operation technical indicator, and the measurement data is sent to Android intelligence by bluetooth serial ports communication module Terminal;The measurement data that the last Android intelligent terminal storage robot measurement returns, and by pre-set every outer Whether industry technical indicator critical field judges the measurement data of every field operation technical indicator in critical field.
Wherein, the Android intelligent terminal is Android smartphone terminal or Android Intelligent flat terminal, the Android intelligence Energy terminal carries man-machine interface, can show that high-speed railway rail control nets the measurement data of every field operation technical indicator and measuring number There is data exception alert interface according to when exceeding critical field, so that warning note is carried out, by closing alert interface, Ke Yiguan Close alarm.
In addition, as shown in Fig. 2, the present invention also provides another high-speed railway rails to control net measurement and the mobile processing system of data System, the system comprises robot measurement and Android intelligent terminal, the robot measurement has bluetooth module, the measuring machine Device people and the Android intelligent terminal pass through bluetooth connection;
The Android intelligent terminal, which is used to send pre-set measurement to the robot measurement by bluetooth module, to be referred to It enables, for being measured according to the measurement instruction, acquisition meets high-speed railway rail control and nets every field operation the robot measurement The measurement data of technical indicator, and the measurement data is sent to Android intelligent terminal by bluetooth module;The last peace The measurement data that tall and erect intelligent terminal storage robot measurement returns, and pass through pre-set every field operation technical indicator standard model The measurement data for judging every field operation technical indicator is enclosed whether in critical field.
As shown in figure 3, as yet another aspect of the invention, a kind of high-speed railway rail control net measurement is provided and data are mobile Processing method the described method comprises the following steps:
Step 1, a survey station of certain section of high-speed railway rail control net is selected;
Step 2, one of them the unmeasured measurement point for selecting the survey station, requires according to specifications of surveys, setting instrument height and Prism is high, manually adjusts robot measurement and tentatively sights measurement point;
Step 3, Android intelligent terminal is set by the bluetooth serial ports communication module to robot measurement transmission in advance The measurement instruction set;
Step 4, robot measurement carries out the measurement of every field operation technical indicator according to the measurement instruction to the measurement point, And measurement data is sent to Android intelligent terminal by bluetooth serial ports communication module;
Step 5, step 2 is repeated to step 4, until completing the measurement of measurement point described in the survey station;
Step 6, the measurement data for all measurement points that Android intelligent terminal storage robot measurement returns, and by preparatory The every field operation technical indicator critical field for each measurement point being arranged judges every field operation technical indicator of each measurement point of the survey station Measurement data whether in critical field.
Preferably, the method also includes: according to project survey grade grassroot project, each measurement of each survey station is set The position number of point, limit is poor poor limit between the survey time in the survey time, in each measurement point according to the position number of setting, limit difference and survey in the survey time Difference is limited between returning completes measurement.
Preferably, the method also includes: pre-establish measurement instruction collection, the measurement instruction collection includes according to high rail The measurement instruction that every fieldwork observation technical requirements of each measurement point are formulated is netted in road control, is manually adjusted robot measurement and is tentatively shone After locating tab assembly point, Android intelligent terminal sends corresponding measurement to the robot measurement by the bluetooth serial ports communication module Instruction.
Preferably, the Android intelligent terminal carries man-machine interface, and the Android intelligent terminal passes through the man-machine interface It shows every field operation technical indicator measurement data of each measurement point and carries out warning note when measurement data is exceeded.
Preferably, the method also includes: when the measurement data acquisition completion of all survey stations is netted in the control of certain section of high-speed railway rail Afterwards, Android intelligent terminal according to the measurement data combination adjustment of Free Networks, constraint net adjusted data, mis-tie misclosure, back and forth survey it is poor Computing Principle completes interior industry index checking.
Compared with prior art, the present invention having the advantage that
(1) high-efficient: the present invention has given full play to the speed advantage of Android intelligent terminal, avoids serial port data line Connection type, simplify the operating procedure of surveyor, be greatly improved measurement efficiency.
(2) interior field operation combines: comparing compared with traditional scheme, the present invention can complete interior field operation index checking in real time, can refer in time It leads surveyor to do over again, avoiding needs to return to office's export data after field data acquisition is complete carries out office work management.Otherwise for complicated item Data can be sent to interior industry group by the mobile network that Android intelligent terminal uses by mesh, this system.
(3) powerful: the present invention also has other than the data acquisition function with existing system and utilizes original achievement Point Learning Scheme, control net unconstrined minimization and the constraint adjustment of optimization, survey the function such as poor calculating at mis-tie misclosure calculating back and forth Energy.
(4) versatile: using the measurement work of the achievable all kinds of total stations of the method for the present invention surveyor, such as high-speed railway rail Control net, Traverse Network, trigonometric levelling, deformation monitoring etc..
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of high-speed railway rail control net measurement and data mobile process system, which is characterized in that the system comprises measuring machines Device people, bluetooth serial ports communication module and Android intelligent terminal, the robot measurement pass through with the bluetooth serial ports communication module RS232 serial ports is electrically connected, and the bluetooth serial ports communication module and the Android intelligent terminal pass through bluetooth connection;
The Android intelligent terminal is used to preset by the bluetooth serial ports communication module to robot measurement transmission Measurement instruction, for the robot measurement for being measured according to the measurement instruction, acquisition meets high-speed railway rail control net The measurement data of every field operation technical indicator, and the measurement data is sent to Android intelligence by bluetooth serial ports communication module Terminal;The measurement data that the last Android intelligent terminal storage robot measurement returns, and by pre-set every outer Whether industry technical indicator critical field judges the measurement data of every field operation technical indicator in critical field.
2. high-speed railway rail control net measurement according to claim 1 and data mobile process system, which is characterized in that described Android intelligent terminal carries man-machine interface, and the man-machine interface is used to show that every field operation technical indicator to be netted in high-speed railway rail control Measurement data simultaneously carries out warning note when measurement data is exceeded.
3. high-speed railway rail control net measurement according to claim 1 and data mobile process system, which is characterized in that described Android intelligent terminal is Android smartphone terminal or Android Intelligent flat terminal.
4. a kind of high-speed railway rail control net measurement and data mobile process system, which is characterized in that the system comprises measuring machines Device people and Android intelligent terminal, the robot measurement have bluetooth module, and the robot measurement and Android intelligence are eventually End passes through bluetooth connection;
The Android intelligent terminal is used to send pre-set measurement instruction, institute to the robot measurement by bluetooth module Robot measurement is stated for measuring according to the measurement instruction, acquisition meets the every field operation technology of high-speed railway rail control net and refers to Target measurement data, and the measurement data is sent to Android intelligent terminal by bluetooth module;The last Android intelligence The measurement data that terminal storage robot measurement returns, and judged by pre-set every field operation technical indicator critical field Whether the measurement data of every field operation technical indicator is in critical field.
5. a kind of high-speed railway rail control net measurement and data moving processing method, which is characterized in that the method includes following steps It is rapid:
Step 1, a survey station of certain section of high-speed railway rail control net is selected;
Step 2, one of them unmeasured measurement point of the survey station is selected, instrument height is set and prism is high, manually adjusts measuring machine Device people tentatively sights measurement point;
Step 3, Android intelligent terminal is sent by the bluetooth serial ports communication module to the robot measurement pre-set Measurement instruction;
Step 4, robot measurement carries out the measurement of every field operation technical indicator according to the measurement instruction to the measurement point, and will Measurement data sends Android intelligent terminal to by bluetooth serial ports communication module;
Step 5, step 2 is repeated to step 4, until completing the measurement of measurement point described in the survey station;
Step 6, the measurement data for all measurement points that Android intelligent terminal storage robot measurement returns, and by presetting Each measurement point every field operation technical indicator critical field judge each measurement point of the survey station every field operation technical indicator survey Data are measured whether in critical field.
6. high-speed railway rail control net measurement according to claim 5 and data moving processing method, which is characterized in that described Method further include: according to project survey grade grassroot project, the position number of each measurement point of each survey station is set, is limited in the survey time Limit is poor between difference and survey time, each measurement point according to the position number of setting, limit difference the survey time in the survey time between limit difference and complete to measure.
7. high-speed railway rail control net measurement according to claim 5 and data moving processing method, which is characterized in that described Method further include: pre-establish measurement instruction collection, the measurement instruction collection includes netting each measurement point according to high-speed railway rail control The measurement instruction that every fieldwork observation technical requirements are formulated manually adjusts after robot measurement tentatively sights measurement point, Android intelligence Energy terminal sends corresponding measurement instruction to the robot measurement by the bluetooth serial ports communication module.
8. high-speed railway rail control net measurement according to claim 5 and data moving processing method, which is characterized in that described Android intelligent terminal carries man-machine interface, and the Android intelligent terminal shows that the items of each measurement point are outer by the man-machine interface Industry technical indicator measurement data simultaneously carries out warning note when measurement data is exceeded.
9. high-speed railway rail control net measurement according to claim 5 and data moving processing method, which is characterized in that described Method further include: after the completion of the measurement data acquisition of all survey stations is netted in the control of certain section of high-speed railway rail, Android intelligent terminal according to The measurement data combination adjustment of Free Networks, surveys poor Computing Principle at constraint net adjusted data, mis-tie misclosure back and forth, completes interior industry and refers to Mark checks.
CN201910054345.8A 2019-01-21 2019-01-21 A kind of control net measurement of high-speed railway rail and data mobile process system and method Pending CN109916373A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910054345.8A CN109916373A (en) 2019-01-21 2019-01-21 A kind of control net measurement of high-speed railway rail and data mobile process system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910054345.8A CN109916373A (en) 2019-01-21 2019-01-21 A kind of control net measurement of high-speed railway rail and data mobile process system and method

Publications (1)

Publication Number Publication Date
CN109916373A true CN109916373A (en) 2019-06-21

Family

ID=66960647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910054345.8A Pending CN109916373A (en) 2019-01-21 2019-01-21 A kind of control net measurement of high-speed railway rail and data mobile process system and method

Country Status (1)

Country Link
CN (1) CN109916373A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112212842A (en) * 2020-10-16 2021-01-12 中铁上海设计院集团有限公司 High-speed railway straightway multimode AI precision measurement robot

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120133918A1 (en) * 2010-11-30 2012-05-31 Kabushiki Kaisha Topcon Surveying device and communication system for the same
CN105716575A (en) * 2015-12-31 2016-06-29 山西天昇测绘工程有限公司 Method for rapid measurement of horizontal control network in engineering tunnel
CN106992840A (en) * 2017-03-09 2017-07-28 广东南方数码科技股份有限公司 A kind of method and device of remotely connected total powerstation
CN107228657A (en) * 2017-07-25 2017-10-03 中铁电气化局集团有限公司 Pillar of electrification rail contacting net assembly parameter measuring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120133918A1 (en) * 2010-11-30 2012-05-31 Kabushiki Kaisha Topcon Surveying device and communication system for the same
CN105716575A (en) * 2015-12-31 2016-06-29 山西天昇测绘工程有限公司 Method for rapid measurement of horizontal control network in engineering tunnel
CN106992840A (en) * 2017-03-09 2017-07-28 广东南方数码科技股份有限公司 A kind of method and device of remotely connected total powerstation
CN107228657A (en) * 2017-07-25 2017-10-03 中铁电气化局集团有限公司 Pillar of electrification rail contacting net assembly parameter measuring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112212842A (en) * 2020-10-16 2021-01-12 中铁上海设计院集团有限公司 High-speed railway straightway multimode AI precision measurement robot

Similar Documents

Publication Publication Date Title
CN103324177B (en) Cement concrete production run dynamic quality remote monitoring system and method thereof
CN108490382B (en) Remote online verification method and system for high-voltage electric energy meter measuring plate
CN108063493A (en) A kind of method and system of quick positioning low-voltage platform area line loss
CN107894254A (en) A kind of alignment control intelligent management system and its method for Construction of continuous beam
CN107700280B (en) Existing double railway lines line position reconstructing method
CN202066499U (en) Antenna azimuth angle device for remotely monitoring base station in real time
CN105574593A (en) Track state static-state detection and control system and method based on cloud computing and big data
CN203011344U (en) Remote automatic monitor apparatus for surface displacement of road slope
CN108844744A (en) A kind of automotive test driving intelligent guidance monitor supervision platform and method
CN109784840A (en) A kind of construction survey automatic data collection processing method being associated with engineering structure task
CN109916373A (en) A kind of control net measurement of high-speed railway rail and data mobile process system and method
CN116518945A (en) Subway tunnel structure safety monitoring method based on measuring robot
CN103412867B (en) A kind of filtering method of filter based on 3 σ rules
CN202077190U (en) Downtilt angle device of remote real-time monitoring base station antenna
CN106441199A (en) Ditcher work quality monitoring system and method
CN113434619A (en) 4g intelligent highway traffic road condition monitoring system
CN206021004U (en) A kind of device for monitoring armored vehicle power drive system
CN106408936A (en) Mobile-phone-data-based real-time detection method for abnormal event of highway
CN102868745A (en) Uploading method of GPS (Global Positioning System) data of vehicle-mounted monitoring terminal
CN107292987A (en) A kind of line inspection system
CN112097666A (en) Automatic monitoring system and method for deformation of railway equipment facilities
CN106952460A (en) Intelligent electric meter long-distance meter-reading system
CN115049798A (en) Metal roof health monitoring system and method based on BIM
CN207753732U (en) A kind of wireless meter-reading module networking test device
CN209280496U (en) Geology electronic map display systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621