CN109914786A - A kind of concrete walls exempt from plastering and masonry wall interface processing structure and construction method - Google Patents
A kind of concrete walls exempt from plastering and masonry wall interface processing structure and construction method Download PDFInfo
- Publication number
- CN109914786A CN109914786A CN201910231010.9A CN201910231010A CN109914786A CN 109914786 A CN109914786 A CN 109914786A CN 201910231010 A CN201910231010 A CN 201910231010A CN 109914786 A CN109914786 A CN 109914786A
- Authority
- CN
- China
- Prior art keywords
- wall
- concrete
- plastering
- forming
- forming wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention provides a kind of concrete walls to exempt from plastering and masonry wall interface processing structure and construction method, belongs to and exempts from plastering construction technology field, including wall aluminium film, bound edge aluminium film, positioning lockset and edge sealing tool;Wall aluminium film forms the first forming wall and the second forming wall, forms concrete wall between the first forming wall and the second forming wall and pours section, the first forming wall and the second forming wall are relatively fixed by multiple positioning locksets;The side of the first forming wall of bound edge aluminium film block and the second forming wall, is provided with the first heavy platform for edge sealing in a wherein bound edge aluminium film.The concrete walls provided through the invention exempt from plastering and masonry wall interface processing structure, may be implemented to exempt to plaster the connection problem of the connecting portion between concrete wall and masonry wall, avoid crack occur in junction, or the problem of the plastering for occurring on masonry wall gradually falls off along junction.
Description
Technical field
The present invention relates to plastering construction technology field is exempted from, exempt from plastering and masonry wall in particular to a kind of concrete walls
Interface processing structure and construction method.
Background technique
In recent years as the raising of construction level, construction quality standard are also continuously improved, exempt from plastering construction technique in frame
Using more and more extensive in shear structure, screed-coat or cement mortar coat of plaster, ceiling and wall are no longer done on cast-in-place concrete face
Facing is also no longer plastered, and only in surface layer batch Puttying.Batch Puttying directly in coagulation scholar's surface layer of plastering construction technique, makes to apply
Work process greatly reduces, and operates fairly simple.
But it still needs to plaster to realize subsequent extraneous adornment in the outside of masonry wall, and extend making for masonry wall
Use the service life.In the prior art, it usually plasters to when plastering on the masonry wall being connect with the concrete wall for exempting from plastering
Unevenly, with the plastering not hanging of concrete wall cohesive position, lead to crack occur.
Summary of the invention
The present invention provides a kind of concrete walls to exempt from plastering and masonry wall interface processing structure and construction method, it is intended to solve
Concrete walls exempt from plastering and the above problem existing for masonry wall interface processing structure and construction method in the prior art.
The present invention is implemented as follows:
A kind of concrete walls exempt from plastering and masonry wall interface processing structure, including wall aluminium film, bound edge aluminium film, positioning lockset
With edge sealing tool;
The wall aluminium film forms the first forming wall and the second forming wall, the first forming wall and the second forming wall
Between form concrete wall and pour section, the first forming wall and the second forming wall pass through multiple positioning locksets
It is relatively fixed;
The bound edge aluminium film is used to connect the side of the first forming wall and the side of the second forming wall;
The bound edge aluminium film includes the first comer membrane connecting with the first forming wall, is connect with the second forming wall
The second comer membrane, and the plate membrane of connection first comer membrane and second comer membrane;
It is in blunt that first comer membrane, which includes with the first forming wall parallel first flat section and with described first flat section,
The oblique section of the first of angle;
It is in blunt that second comer membrane, which includes with the second forming wall parallel second flat section and with described second flat section,
The oblique section of the second of angle;
First comer membrane and second comer membrane are relatively fixed by the positioning lockset;
The plate membrane blocks the opening that the described first oblique section and the second oblique section are formed.
In an embodiment of the present invention, it is heavy to form first for described first flat section of position connected with the described second oblique section
Platform, first heavy platform pour the 4-7mm that sinks inside section to the concrete wall.
In an embodiment of the present invention, it is heavy to form second for described second flat section of position connected with the described second oblique section
Platform, second heavy platform pour the 4-7mm that sinks inside section to the concrete wall.
In an embodiment of the present invention, the positioning lockset includes screw rod and tapered end;
The screw rod passes through the corresponding two pieces wall aluminium films or two pieces of bound edge aluminium films, at the both ends of the screw rod
The tapered end is set and makes that two pieces of wall aluminium films are fixed or two pieces of bound edge aluminium films are fixed.
In an embodiment of the present invention, masonry is set in the side that the bound edge aluminium film was arranged in concrete wall
Wall, including the first sheet metal press strip, the second sheet metal press strip and zinc-coated wire;
The zinc-coated wire covers the metope that the concrete wall corresponds to the described first oblique section, the second oblique section, with
And the masonry wall is close to the side of the concrete wall;
The coagulation that first heavy platform is formed after pouring on the outside of the zinc-coated wire is arranged in the first sheet metal press strip
In cob wall body heavy platform;
The coagulation that second heavy platform is formed after pouring on the outside of the zinc-coated wire is arranged in the second sheet metal press strip
In cob wall body heavy platform.
In an embodiment of the present invention, mortar plastering layer is provided on the outside of the zinc-coated wire.
A kind of concrete walls exempt from plastering and masonry wall interface construction method, and above-mentioned concrete walls has been used to exempt from plastering and build
Body wall interface processing structure, comprising steps of
The wall aluminium film is uprightly formed into the first forming wall and the second forming wall;
Screw rod passes through the first forming wall and the second forming wall, passes through the fixed first forming wall of the tapered end
With the relative position of the second forming wall;
In the side of the first forming wall, first comer membrane is set, described first flat section of first comer membrane
Parallel with the first forming wall, the direction of the first oblique section towards the second forming wall extends;
In the side of the second forming wall, second comer membrane is set, described second flat section of second comer membrane
Parallel with the second forming wall, the direction of the second oblique section towards the first forming wall extends;
The fixed plate membrane and the described first oblique section and the second oblique section, block the first oblique section and described second
The opening that oblique section is formed;
Pouring molding concrete wall in section is poured in the concrete wall;
Remove the wall aluminium film and the bound edge aluminium film;
Brick setting is built in the side that the plate membrane is arranged in the concrete wall;
The described first oblique section, the metope of the second oblique section and the masonry wall is corresponded in the concrete wall to lean on
The side of the nearly concrete wall covers zinc-coated wire;
It is arranged in by the first sheet metal press strip and is formed after first heavy platform pours on the outside of the zinc-coated wire
In concrete wall heavy platform, it is compacted the end of the zinc-coated wire;
The cracking resistance cement slurry edge sealing with the concrete wall same intensity is used in the outside of first sheet metal;
It is arranged in by the second sheet metal press strip and is formed after second heavy platform pours on the outside of the zinc-coated wire
In concrete wall heavy platform, it is compacted the end of the zinc-coated wire;
The cracking resistance cement slurry edge sealing with the concrete wall same intensity is used in the outside of second sheet metal;
In the outside mortar plastering of the zinc-coated wire.
In an embodiment of the present invention, which is characterized in that the brick setting is built by aerated blocks.
The beneficial effects of the present invention are: the concrete walls that the present invention obtains by above-mentioned design exempt from plastering and masonry wall interface
The connection problem for exempting from the connecting portion between plastering concrete wall and masonry wall may be implemented in processing structure and construction method,
Avoid crack occur in junction, or the problem of the plastering for occurring on masonry wall gradually falls off along junction.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention
Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as
It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with root
Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is that the concrete walls that embodiment of the present invention provides exempt from plastering with masonry wall interface processing structure in not dismantling
Structural schematic diagram when aluminium film;
Fig. 2 is that the concrete walls that embodiment of the present invention provides exempt from plastering with masonry wall interface processing structure in having dismantled
Structural schematic diagram when aluminium film;
Fig. 3 is the partial enlarged view of a-quadrant in Fig. 2;
Fig. 4 is the partial enlarged view of B area in Fig. 2.
Icon: 100- first shapes wall;200- second shapes wall;The first comer membrane of 300-;The second comer membrane of 400-;
500- plate membrane;First flat section of 310-;The oblique section of 330- first;Second flat section of 410-;The oblique section of 430- second;The first heavy platform of 350-;
The second heavy platform of 450-;600- positions lockset;610- screw rod;630- tapered end;010- concrete wall;030- masonry wall;050- sand
Starch coat of plaster;The first sheet metal of 710-;The second sheet metal of 730-;750- zinc-coated wire.
Specific embodiment
To keep the purposes, technical schemes and advantages of embodiment of the present invention clearer, implement below in conjunction with the present invention
The technical solution in embodiment of the present invention is clearly and completely described in attached drawing in mode, it is clear that described reality
The mode of applying is some embodiments of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ability
Domain those of ordinary skill every other embodiment obtained without creative efforts, belongs to the present invention
The range of protection.Therefore, the detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit below and is wanted
The scope of the present invention of protection is sought, but is merely representative of selected embodiment of the invention.Based on the embodiment in the present invention,
Every other embodiment obtained by those of ordinary skill in the art without making creative efforts belongs to this
Invent the range of protection.
In the description of the present invention, it is to be understood that, indicating position or the term of positional relationship are based on shown in attached drawing
Orientation or positional relationship, be merely for convenience of description of the present invention and simplification of the description, rather than the equipment of indication or suggestion meaning
Or element must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc.
Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect
It connects, is also possible to be electrically connected;It can be directly connected, can also can be in two elements indirectly connected through an intermediary
The interaction relationship of the connection in portion or two elements.It for the ordinary skill in the art, can be according to specific feelings
Condition understands the concrete meaning of above-mentioned term in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature can be on or below second feature
Directly contacted including the first and second features, also may include the first and second features be not direct contact but by them it
Between other characterisation contact.Moreover, fisrt feature is on second feature, top and above include fisrt feature second spy
Right above sign and oblique upper, or first feature horizontal height is merely representative of higher than second feature.Fisrt feature second feature it
Under, lower section and fisrt feature included below be directly below and diagonally below the second feature, or be merely representative of first feature horizontal height
Less than second feature.
Embodiment one
It present embodiments provides a kind of concrete walls and exempts from plastering and masonry wall interface processing structure, please refer to Fig. 1 and Fig. 2,
This concrete walls exempt from plastering and masonry wall interface processing structure, including wall aluminium film, bound edge aluminium film, positioning lockset 600 and envelope
Side tool;
Wall aluminium film forms the first forming wall 100 and the second forming wall 200, the first forming wall 100 and the second forming wall
Concrete wall 010 is formed between 200 and pours section, and the first forming wall 100 and the second forming wall 200 pass through multiple positioning locks
It is relatively fixed to have 600;
Bound edge aluminium film is used to connect the side of the first forming wall 100 and the side of the second forming wall 200;Bound edge aluminium film includes
The first comer membrane 300 being connect with the first forming wall 100, the second comer membrane 400, Yi Jilian being connect with the second forming wall 200
Connect the plate membrane 500 of the first comer membrane 300 and the second comer membrane 400;
It is in blunt that first comer membrane 300, which includes with the first forming wall 100 parallel first flat section 310 and with first flat section 310,
The oblique section 330 of the first of angle;Second comer membrane 400 include with the second forming wall 200 parallel second flat section 410 and with it is second flat
The the second oblique section 430 of section 410 in obtuse angle;First comer membrane 300 and the second comer membrane 400 are relatively fixed by positioning lockset 600.
The opening that the oblique section 330 of the block of plate membrane 500 first and the second oblique section 430 are formed, specifically, the one of plate membrane 500
Side is fixedly connected with the first oblique section 330, and the other side is fixedly connected with the second oblique section 430.
Wall 200, the first comer membrane 300, the second comer membrane 400 and plate membrane are shaped by the first forming wall 100, second
500 surround, and the concrete wall 010 of formation, which pours section and can directly pour, builds up concrete wall 010.
In order to which the subsequent interface with masonry wall 030 is connected, position that first flat section 310 and the second oblique section 430 connect
The first heavy platform 350 is formed, the first heavy platform 350 pours the 4-7mm that sinks inside section to concrete wall 010.Second flat section of 410 He
The position that second oblique section 430 connects forms the second heavy platform 450, under the second heavy platform 450 pours inside section to concrete wall 010
Heavy 4-7mm.The steel wire of edge sealing component progress dust can be set by the first heavy platform 350 of setting and the second heavy platform 450
Edge sealing.
In the present embodiment, positioning lockset 600 includes screw rod 610 and tapered end 630;Screw rod 610 passes through corresponding two pieces of walls
Body aluminium film or two pieces of bound edge aluminium films, screw rod 610 both ends setting tapered end 630 make two pieces of wall aluminium films fix or two pieces packet
Side aluminium film is fixed.In the present embodiment, tapered end 630 is nut and steel plate, and screw rod 610 passes through steel plate, and steel plate is arranged in nut
Outside is threadedly coupled with screw rod 610.
In the present embodiment, masonry wall 030, including the are set in the side that bound edge aluminium film was arranged in concrete wall 010
One sheet metal, 710 press strip, 730 press strip of the second sheet metal and zinc-coated wire 750;
Please refer to Fig. 3 and Fig. 4,750 oversite concrete wall 010 of zinc-coated wire corresponding first oblique section 330, the second oblique section
430 metope and masonry wall 030 is close to the side of concrete wall 010;First sheet metal, 710 press strip is arranged in galvanized steel
In 010 heavy platform of concrete wall that 750 the first heavy platform 350 of outside of silk is formed after pouring;The setting of second sheet metal, 730 press strip is being plated
In 010 heavy platform of concrete wall that 750 the second heavy platform 450 of outside of zinc steel wire is formed after pouring.
Specifically, the outside of zinc-coated wire 750 is provided with mortar plastering layer 050, after coat of plaster setting with concrete wall
010 flushes.
The concrete walls provided through the invention exempt from plastering and masonry wall interface processing structure, may be implemented to exempt from coagulation of plastering
The connection problem of connecting portion between cob wall body 010 and masonry wall 030 avoids crack occur in junction, or occurs
The problem of plastering on masonry wall 030 gradually falls off along junction.
Embodiment two
It present embodiments provides a kind of concrete walls and exempts from plastering and masonry wall interface construction method, this concrete walls exempt to smear
Ash and masonry wall interface construction method, have used the concrete walls in embodiment one to exempt from plastering and masonry wall interface processing structure,
Comprising steps of
Wall aluminium film is uprightly formed into the first forming wall 100 and the second forming wall 200;
Screw rod 610 passes through the first forming wall 100 and the second forming wall 200, fixes the first forming wall 100 by tapered end 630
With the relative position of the second forming wall 200;
In the side of the first forming wall 100, the first comer membrane 300 is set, first flat section 310 of the first comer membrane 300 and the
One forming wall 100 is parallel, and the direction of the first oblique section 330 towards the second forming wall 200 extends;
In the side of the second forming wall 200, the second comer membrane 400 is set, second flat section 410 of the second comer membrane 400 and the
Two forming walls 200 are parallel, and the direction of the second oblique section 430 towards the first forming wall 100 extends;
Fixed plate membrane 500 and the first oblique section 330 and the second oblique section 430, block the first oblique section 330 and the second oblique section 430
The opening of formation;
Pouring molding concrete wall 010 in section is poured in concrete wall 010;
Remove wall aluminium film and bound edge aluminium film;
It is built in the side that plate membrane 500 is arranged in concrete wall 010 by aerated blocks and forms brick setting;
In the corresponding first oblique section 330 of concrete wall 010, the metope of the second oblique section 430 and masonry wall 030 close to mixed
The side of solidifying cob wall body 010 covers zinc-coated wire 750;
By 710 press strip of the first sheet metal, the coagulation formed after 750 the first heavy platform 350 of outside of zinc-coated wire pours is set
In 010 heavy platform of cob wall body, it is compacted the end of zinc-coated wire 750;
The cracking resistance cement slurry edge sealing with 010 same intensity of concrete wall is used in the outside of the first sheet metal 710;
By 730 press strip of the second sheet metal, the coagulation formed after 750 the second heavy platform 450 of outside of zinc-coated wire pours is set
In the heavy platform of cob wall body 010, it is compacted the end of zinc-coated wire 750;
The cracking resistance cement slurry edge sealing with 010 same intensity of concrete wall is used in the outside of the second sheet metal 730;
In the outside mortar plastering of zinc-coated wire 750.
The concrete walls provided through the invention exempt from plastering and masonry wall interface construction method, may be implemented to exempt from coagulation of plastering
The connection problem of connecting portion between cob wall body 010 and masonry wall 030 avoids crack occur in junction, or occurs
The problem of plastering on masonry wall 030 gradually falls off along junction.
The above is only the preferred embodiment of the present invention, are not intended to restrict the invention, for the technology of this field
For personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (7)
1. a kind of concrete walls exempt from plastering and masonry wall interface processing structure, which is characterized in that including wall aluminium film, bound edge aluminium
Film, positioning lockset and edge sealing tool;
The wall aluminium film forms the first forming wall and the second forming wall, between the first forming wall and the second forming wall
It forms concrete wall and pours section, the first forming wall and the second forming wall are opposite by multiple positioning locksets
It is fixed;
The bound edge aluminium film is used to connect the side of the first forming wall and the side of the second forming wall;
The bound edge aluminium film include with first comer membrane that connect of the first forming wall, with described second shape that wall connect the
Two comer membranes, and the plate membrane of connection first comer membrane and second comer membrane;
First comer membrane include with the first forming wall parallel first flat section and with described first flat section in obtuse angle
First oblique section;
Second comer membrane include with the second forming wall parallel second flat section and with described second flat section in obtuse angle
Second oblique section;
First comer membrane and second comer membrane are relatively fixed by the positioning lockset;
The plate membrane blocks the opening that the described first oblique section and the second oblique section are formed;
The described first flat section position that connects with the described second oblique section forms the first heavy platform, and first heavy platform is to the concrete
Wall pours sinking 4-7mm inside section.
2. concrete walls according to claim 1 exempt from plastering and masonry wall interface processing structure, which is characterized in that described the
Two flat sections of positions for connecting with the described second oblique section form the second heavy platforms, and second heavy platform is to the concrete wall pouring area
Between internal sinking 4-7mm.
3. concrete walls according to claim 2 exempt from plastering and masonry wall interface processing structure, which is characterized in that described fixed
Position lockset includes screw rod and tapered end;
The screw rod passes through the corresponding two pieces wall aluminium films or two pieces of bound edge aluminium films, is arranged at the both ends of the screw rod
The tapered end makes that two pieces of wall aluminium films are fixed or two pieces of bound edge aluminium films are fixed.
4. concrete walls according to claim 3 exempt from plastering and masonry wall interface processing structure, which is characterized in that in coagulation
Cob wall body be arranged the bound edge aluminium film side setting masonry wall, including the first sheet metal press strip, the second sheet metal press strip and
Zinc-coated wire;
The zinc-coated wire covers the metope that the concrete wall corresponds to the described first oblique section, the second oblique section, Yi Jisuo
Masonry wall is stated close to the side of the concrete wall;
The concrete walls that first heavy platform is formed after pouring on the outside of the zinc-coated wire are arranged in the first sheet metal press strip
In body heavy platform;
The concrete walls that second heavy platform is formed after pouring on the outside of the zinc-coated wire are arranged in the second sheet metal press strip
In body heavy platform.
5. concrete walls according to claim 4 exempt from plastering and masonry wall interface processing structure, which is characterized in that the plating
Mortar plastering layer is provided on the outside of zinc steel wire.
6. a kind of concrete walls exempt from plastering and masonry wall interface construction method, which is characterized in that used as claimed in claim 4
Concrete walls exempt from plastering with masonry wall interface processing structure, comprising steps of
The wall aluminium film is uprightly formed into the first forming wall and the second forming wall;
Screw rod passes through the first forming wall and the second forming wall, passes through the fixed first forming wall of the tapered end and institute
State the relative position of the second forming wall;
In the side of the first forming wall, first comer membrane, described first flat section and institute of first comer membrane are set
State the direction extension that the first forming wall is parallel, and the first oblique section shapes wall towards described second;
In the side of the second forming wall, second comer membrane, described second flat section and institute of second comer membrane are set
State the direction extension that the second forming wall is parallel, and the second oblique section shapes wall towards described first;
The fixed plate membrane and the described first oblique section and the second oblique section, block the first oblique section and the second oblique section
The opening of formation;
Pouring molding concrete wall in section is poured in the concrete wall;
Remove the wall aluminium film and the bound edge aluminium film;
Brick setting is built in the side that the plate membrane is arranged in the concrete wall;
The described first oblique section, the metope of the second oblique section and the masonry wall are corresponded to close to institute in the concrete wall
State the side covering zinc-coated wire of concrete wall;
By the first sheet metal press strip, the coagulation formed after first heavy platform pours on the outside of the zinc-coated wire is set
In cob wall body heavy platform, it is compacted the end of the zinc-coated wire;
The cracking resistance cement slurry edge sealing with the concrete wall same intensity is used in the outside of first sheet metal;
By the second sheet metal press strip, the coagulation formed after second heavy platform pours on the outside of the zinc-coated wire is set
In cob wall body heavy platform, it is compacted the end of the zinc-coated wire;
The cracking resistance cement slurry edge sealing with the concrete wall same intensity is used in the outside of second sheet metal;
In the outside mortar plastering of the zinc-coated wire.
7. concrete walls according to claim 6 exempt from plastering and masonry wall interface construction method, which is characterized in that the brick
Masonry is built by aerated blocks.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910231010.9A CN109914786A (en) | 2019-03-26 | 2019-03-26 | A kind of concrete walls exempt from plastering and masonry wall interface processing structure and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910231010.9A CN109914786A (en) | 2019-03-26 | 2019-03-26 | A kind of concrete walls exempt from plastering and masonry wall interface processing structure and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109914786A true CN109914786A (en) | 2019-06-21 |
Family
ID=66966798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910231010.9A Pending CN109914786A (en) | 2019-03-26 | 2019-03-26 | A kind of concrete walls exempt from plastering and masonry wall interface processing structure and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109914786A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112900846A (en) * | 2021-01-28 | 2021-06-04 | 晟通科技集团有限公司 | Template piece and template combination |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005009210A (en) * | 2003-06-20 | 2005-01-13 | Railway Technical Res Inst | Reinforced structure of masonry wall and its reinforcing method |
CN205224582U (en) * | 2015-11-05 | 2016-05-11 | 中国建筑第四工程局有限公司 | Quick detach, ready -package shear force wall be aluminium membrane instrument in flakes |
CN106760535A (en) * | 2017-03-23 | 2017-05-31 | 中冶建工集团有限公司 | One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete interior wall |
CN107012971A (en) * | 2017-06-02 | 2017-08-04 | 甘肃省建筑科学研究院 | A kind of metope structure and its construction method for rock wool external thermal insulation wall |
CN108286341A (en) * | 2017-12-11 | 2018-07-17 | 新疆苏中建设工程有限公司 | A kind of method different base material interface anticracking steel net template structure and constructed using it |
CN207672763U (en) * | 2017-11-06 | 2018-07-31 | 珠海华发建筑设计咨询有限公司 | Aluminium film board concrete joins structure with brick wall |
-
2019
- 2019-03-26 CN CN201910231010.9A patent/CN109914786A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005009210A (en) * | 2003-06-20 | 2005-01-13 | Railway Technical Res Inst | Reinforced structure of masonry wall and its reinforcing method |
CN205224582U (en) * | 2015-11-05 | 2016-05-11 | 中国建筑第四工程局有限公司 | Quick detach, ready -package shear force wall be aluminium membrane instrument in flakes |
CN106760535A (en) * | 2017-03-23 | 2017-05-31 | 中冶建工集团有限公司 | One kind exempts from plastering construction method using aluminum alloy mould plate casting concrete interior wall |
CN107012971A (en) * | 2017-06-02 | 2017-08-04 | 甘肃省建筑科学研究院 | A kind of metope structure and its construction method for rock wool external thermal insulation wall |
CN207672763U (en) * | 2017-11-06 | 2018-07-31 | 珠海华发建筑设计咨询有限公司 | Aluminium film board concrete joins structure with brick wall |
CN108286341A (en) * | 2017-12-11 | 2018-07-17 | 新疆苏中建设工程有限公司 | A kind of method different base material interface anticracking steel net template structure and constructed using it |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112900846A (en) * | 2021-01-28 | 2021-06-04 | 晟通科技集团有限公司 | Template piece and template combination |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102358693B (en) | Levelling mortar and ground construction process based on the same | |
CN108374566B (en) | Repairing process for leakage water on back water surface | |
CN102225872A (en) | Micropore sealant of aerated concrete blocks and preparation method thereof | |
CN109914786A (en) | A kind of concrete walls exempt from plastering and masonry wall interface processing structure and construction method | |
CN103572931A (en) | Building ceramic thin plate hanging and cementing structure and construction method thereof | |
CN111501510A (en) | Microcrack repairing process for bridge deck | |
CN1012475B (en) | The flashboard of fire-resistant moulded parts, especially sliding gate | |
CN110206278A (en) | A kind of quick leveling method of wall plastering | |
CN210002863U (en) | interface processing structure of plastering-free concrete wall and masonry wall | |
CN213014960U (en) | Anti-seepage aerated concrete block | |
CN106522746A (en) | Sill structure and construction method | |
CN210127554U (en) | Fire-proof plugging construction structure for large-hole electric well bridge | |
CN113323314A (en) | External wall paving construction method for sintered ceramic tiles in freeze-thaw environment | |
CN210767837U (en) | Cross constructional column cement template group | |
CN208518524U (en) | The closing-in structure and door-window opening structure of door-window opening | |
CN211341283U (en) | Joint structure of wall, beam and masonry in construction of building aluminum formwork | |
CN209990152U (en) | Opening-closing type pouring opening structure | |
CN208137333U (en) | A kind of ceramic tile metope dry hanging article mounting structure | |
CN205839953U (en) | A kind of masonry and girder steel, the outer concordant connection node of steel column | |
CN112647619A (en) | Construction method of assembled large-span internal partition wall | |
CN206503365U (en) | A kind of shear wall and filling wall junction aluminum alloy pattern plate erecting device | |
CN218176423U (en) | Stone plate dry hanging structure | |
CN205857460U (en) | A kind of insulated wall light steel combined frame | |
CN205917889U (en) | Building is bullet strip that rises for subsiding crack | |
CN205777234U (en) | A kind of decorating outer wall of building insulation hanging slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |