CN109914721A - A kind of arc railing glass Exact Location Method - Google Patents
A kind of arc railing glass Exact Location Method Download PDFInfo
- Publication number
- CN109914721A CN109914721A CN201910310581.1A CN201910310581A CN109914721A CN 109914721 A CN109914721 A CN 109914721A CN 201910310581 A CN201910310581 A CN 201910310581A CN 109914721 A CN109914721 A CN 109914721A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- glass
- arc railing
- exact location
- location method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to arc railing glass field of locating technology, and disclose a kind of arc railing glass Exact Location Method, comprising the following steps: S1, carry out field survey unwrapping wire using measuring tool at the scene and record data;S2, the consistent limit ruler of Bian Youyu railing width dimensions is stayed at arc railing, and by the elongated placement of channel steel;S3, by inside and outside steel plate welding after and position be arranged in channel steel;S4, one block of steel plate is welded again in the side of interior steel plate, and be bolted after being provided with wear-resisting offset plate on the outside;S5, it is finally finely received side with expansion bolt fixed lateral steel plate every trade of going forward side by side on flooring the accurate positionin of arc railing glass can be realized.The arc railing glass Exact Location Method keeps positioning more accurate in the fixed position of glass using welding, and scale is processed, and in-site installation is quick, and glass base uses the fixed form of steel plate and bolt, and safety coefficient is higher.
Description
Technical field
The present invention relates to arc railing glass field of locating technology, specially a kind of arc railing glass accurate positionin side
Method.
Background technique
Attached finishing project of the glass balustrade as hotel or market, share accounting is not high in entire interior dress, but not
It can make us ignoring;It is to allow people to see first or people can be allowed to touch because the position of accommodation rail is typically in Zhongting and balcony
Object, position determines its importance;Glass hand banisters not only will be as the barrier of security protection, the hotel Geng Yaowei or quotient
Field is hyperchromic to add coloured silk, contacts because the trick with people has, cannot all ignore to sense of touch and vision, so type selecting of the proprietor in railing
Aspect is even more to do one's utmost;With the promotion of technique, the role of railing is also converted to decoration point by the function of safety protection of early period
Sew;But there is precision deficiency when installing and positioning in current arc railing glass, cause the glass of installation to influence whole
The aesthetic feeling of body.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of arc railing glass Exact Location Method, have accurate positionin,
Make column and glass seam accurate contraposition, the advantages that convenient for processing glass in advance, shortening the construction period, solves current arc railing
Glass precision deficiency when installing positioning leads to the problem of influencing whole aesthetic feeling.
(2) technical solution
To realize above-mentioned accurate positionin, makes column and glass seam accurate contraposition, convenient for processing glass in advance, shorten the construction period and wait mesh
, the invention provides the following technical scheme: a kind of arc railing glass Exact Location Method, comprising the following steps:
S1, field survey unwrapping wire is carried out using measuring tool at the scene and records data;
S2, the consistent limit ruler of Bian Youyu railing width dimensions is stayed at arc railing, and by the elongated placement of channel steel;
S3, by inside and outside steel plate welding after and position be arranged in channel steel;
S4, one block of steel plate is welded again in the side of interior steel plate, and be bolted after being provided with wear-resisting offset plate on the outside;
S5, it is finally finely received side with expansion bolt fixed lateral steel plate every trade of going forward side by side on flooring arc railing glass can be realized
The accurate positionin of glass.
Preferably, it offers the through-hole of rectangle on the lateral steel plate, is provided in through-hole and is fixedly connected with flooring
Expansion bolt.
Preferably, the flooring upper layer is provided with basal layer, and basal layer is adopted as wall brick layer, and is arranged on the base layer
There is architectural surface.
According to a kind of above-mentioned arc railing glass Exact Location Method, it is proposed that a kind of arc railing glass accurate positionin
Structure, including flooring are fixedly installed with lateral steel plate by expansion bolt on the flooring, solid in one end of lateral steel plate
Dingan County is equipped with steel plate one, and steel plate one and channel steel weld, and the steel plate two welded together and interior is fixedly installed in the channel steel
Steel plate is welded with outer steel plate in the side of interior steel plate, and steel plate one, steel plate two, interior steel plate and outer steel plate are fixed by bolt.
Preferably, bottom is provided with wear-resisting offset plate in the outside and channel steel of the steel plate one and outer steel plate.
Preferably, it is provided with basal layer on the flooring, is equipped with decorative cover on the base layer.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of arc railing glass Exact Location Method, have it is following the utility model has the advantages that
1, the arc railing glass Exact Location Method keeps positioning more accurate in the fixed position of glass using welding, and fixed
Ruler processing, in-site installation is quick, and glass base uses the fixed form of steel plate and bolt, and safety coefficient is higher.
2, the arc railing glass Exact Location Method makes column and glass seam accurate contraposition, just by being accurately positioned
It in processing glass in advance, shortens the construction period, while being easily installed glass, it is more safe and efficient.
Detailed description of the invention
Fig. 1 is that structural schematic diagram is accurately positioned in a kind of arc railing glass proposed by the present invention.
In figure: 1- flooring;2- expansion bolt;3- transverse direction steel plate;4- basal layer;5- decorative cover;6- steel plate one;7,10,
The wear-resisting offset plate of 13-;8- steel plate two;Steel plate in 9-;The outer steel plate of 11-;12- channel steel;14- bolt.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
A kind of arc railing glass Exact Location Method, comprising the following steps:
S1, field survey unwrapping wire is carried out using measuring tool at the scene and records data;
S2, the consistent limit ruler of Bian Youyu railing width dimensions is stayed at arc railing, and by the elongated placement of channel steel;
S3, by inside and outside steel plate welding after and position be arranged in channel steel;
S4, one block of steel plate is welded again in the side of interior steel plate, and be bolted after being provided with wear-resisting offset plate on the outside;
S5, it is finally finely received side with expansion bolt fixed lateral steel plate every trade of going forward side by side on flooring arc railing glass can be realized
The accurate positionin of glass.
In the present invention, the through-hole of rectangle is offered on the transverse direction steel plate, is provided in through-hole and is fixedly connected with flooring
Expansion bolt.
In the present invention, the flooring upper layer is provided with basal layer, and basal layer is adopted as wall brick layer, and sets on the base layer
It is equipped with architectural surface.
Referring to Fig. 1, according to a kind of above-mentioned arc railing glass Exact Location Method, it is proposed that a kind of arc railing glass
Structure, including flooring 1 is accurately positioned in glass, and bottom is respectively provided in the outside and channel steel 12 of the steel plate 1 and outer steel plate 11
There is wear-resisting offset plate 7,10,13;Lateral steel plate 3 is fixedly installed with by expansion bolt 2 on the flooring 1, in lateral steel plate 3
One end is fixedly installed with steel plate 1, and steel plate 1 and channel steel 12 weld, and are fixedly installed with and weld together in the channel steel 12
Steel plate 28 and interior steel plate 9, be welded with outer steel plate 11, and steel plate 1, steel plate 28, interior steel plate 9 in the side of interior steel plate 9
It is fixed by bolt 14 with outer steel plate 11, bottom is provided in the outside and channel steel 12 of the steel plate 1 and outer steel plate 11
Wear-resisting offset plate 7,10,13.
Specific construction process:
(1) in-site measurement unwrapping wire, eye width direction carries out positioned parallel setting-out on flooring and architectural surface, selectes positioning
Point;
(2) the elongated placement of 5# channel steel is carried out;
(3) positioning welding is carried out after placing inside and outside steel plate;
(4) 8*100*170 steel plate is fixed with expansion bolt on flooring;
(5) finally 8*100*170 steel plate and 8*175*250 steel plate are welded, increases stability.
In conclusion the arc railing glass Exact Location Method makes positioning more in the fixed position of glass using welding
It is accurate to add, and scale is processed, and in-site installation is quick, and glass base uses the fixed form of steel plate and bolt, and safety coefficient is higher.
The arc railing glass Exact Location Method makes column and glass seam accurate contraposition, is convenient for by being accurately positioned
Glass is processed in advance, is shortened the construction period, while being easily installed glass, it is more safe and efficient, solve current arc railing glass
When installing positioning, precision deficiency leads to the problem of influencing whole aesthetic feeling.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of arc railing glass Exact Location Method, which comprises the following steps:
S1, field survey unwrapping wire is carried out using measuring tool at the scene and records data;
S2, the consistent limit ruler of Bian Youyu railing width dimensions is stayed at arc railing, and by the elongated placement of channel steel;
S3, by inside and outside steel plate welding after and position be arranged in channel steel;
S4, one block of steel plate is welded again in the side of interior steel plate, and be bolted after being provided with wear-resisting offset plate on the outside;
S5, it is finally finely received side with expansion bolt fixed lateral steel plate every trade of going forward side by side on flooring arc railing glass can be realized
The accurate positionin of glass.
2. a kind of arc railing glass Exact Location Method according to claim 1, it is characterised in that: the transverse direction steel plate
On offer the through-hole of rectangle, be provided with the expansion bolt being fixedly connected with flooring in through-hole.
3. a kind of arc railing glass Exact Location Method according to claim 1, it is characterised in that: on the flooring
Layer is provided with basal layer, and basal layer is adopted as wall brick layer, and is provided with architectural surface on the base layer.
4. a kind of arc railing glass Exact Location Method according to claim 1, it is proposed that a kind of arc railing glass
Structure is accurately positioned, which is characterized in that including flooring (1), be fixedly mounted on the flooring (1) by expansion bolt (2)
There are lateral steel plate (3), is fixedly installed with steel plate one (6) in one end of lateral steel plate (3), and steel plate one (6) and channel steel (12) are welded
It connects, the steel plate two (8) welded together and interior steel plate (9) is fixedly installed in the channel steel (12), in the side of interior steel plate (9)
It is welded with outer steel plate (11), and steel plate one (6), steel plate two (8), interior steel plate (9) and outer steel plate (11) are solid by bolt (14)
It is fixed.
5. a kind of arc railing glass Exact Location Method according to claim 4, it is characterised in that: the steel plate one
(6) and the outside of outer steel plate (11) and channel steel (12) interior bottom are provided with wear-resisting offset plate (7,10,13).
6. a kind of arc railing glass Exact Location Method according to claim 4, it is characterised in that: the flooring
(1) it is provided with basal layer (4) on, decorative cover (5) are equipped on basal layer (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910310581.1A CN109914721A (en) | 2019-04-17 | 2019-04-17 | A kind of arc railing glass Exact Location Method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910310581.1A CN109914721A (en) | 2019-04-17 | 2019-04-17 | A kind of arc railing glass Exact Location Method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109914721A true CN109914721A (en) | 2019-06-21 |
Family
ID=66977608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910310581.1A Pending CN109914721A (en) | 2019-04-17 | 2019-04-17 | A kind of arc railing glass Exact Location Method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109914721A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114856104A (en) * | 2022-05-12 | 2022-08-05 | 中建八局总承包建设有限公司 | Structure and mounting method of super-large arc-shaped curved surface glass anti-collision railing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006028766A1 (en) * | 2006-06-23 | 2007-12-27 | Bernhard Feigl | Holder for plate, especially glass plate placed on floor to form balustrade barrier has floating bearing(s) between parallel sides of holding profile, supporting rail that supports holding profile in horizontal direction on sides of rail |
CN202577814U (en) * | 2012-05-04 | 2012-12-05 | 孙玉良 | Novel stainless steel glass railing |
CN104060784A (en) * | 2014-06-23 | 2014-09-24 | 苏州金螳螂建筑装饰股份有限公司 | Non-column all-glass floor type handrail base |
CN206971598U (en) * | 2017-06-19 | 2018-02-06 | 江西腾翔科技有限公司 | A kind of floor guard rail support |
CN207032717U (en) * | 2017-05-11 | 2018-02-23 | 深圳市华加日西林实业有限公司 | A kind of balcony glass railing structure |
CN207228506U (en) * | 2017-07-31 | 2018-04-13 | 烟台百盛建材科技有限公司 | A kind of arc glass guardrail fixator |
-
2019
- 2019-04-17 CN CN201910310581.1A patent/CN109914721A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006028766A1 (en) * | 2006-06-23 | 2007-12-27 | Bernhard Feigl | Holder for plate, especially glass plate placed on floor to form balustrade barrier has floating bearing(s) between parallel sides of holding profile, supporting rail that supports holding profile in horizontal direction on sides of rail |
CN202577814U (en) * | 2012-05-04 | 2012-12-05 | 孙玉良 | Novel stainless steel glass railing |
CN104060784A (en) * | 2014-06-23 | 2014-09-24 | 苏州金螳螂建筑装饰股份有限公司 | Non-column all-glass floor type handrail base |
CN207032717U (en) * | 2017-05-11 | 2018-02-23 | 深圳市华加日西林实业有限公司 | A kind of balcony glass railing structure |
CN206971598U (en) * | 2017-06-19 | 2018-02-06 | 江西腾翔科技有限公司 | A kind of floor guard rail support |
CN207228506U (en) * | 2017-07-31 | 2018-04-13 | 烟台百盛建材科技有限公司 | A kind of arc glass guardrail fixator |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114856104A (en) * | 2022-05-12 | 2022-08-05 | 中建八局总承包建设有限公司 | Structure and mounting method of super-large arc-shaped curved surface glass anti-collision railing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109914721A (en) | A kind of arc railing glass Exact Location Method | |
CN103410328A (en) | Method for constructing large-area concrete surface | |
CN206440206U (en) | A kind of pre-buried copper tip of railway roadbed highly controls chi | |
BR112015018326A2 (en) | seam welding method and system | |
CN106568583A (en) | Foldable strut flexibility measurement device and method for airplane main undercarriage | |
CN110359485A (en) | A kind of pre-buried trough fixation device of steel form and its construction method | |
CN103147564A (en) | Intelligent tiling machine | |
CN104313984A (en) | Kerbstone mechanical-hoisting and seam-spacing method-based construction method, hoisting tool and seam-spacing tool | |
CN203083515U (en) | Multifunctional automatic measuring instrument | |
CN105089216A (en) | Three-dimensional positioning decoration construction method for spiral staircase stone facing | |
CN209946043U (en) | Road and bridge concrete structure real-time detection device | |
CN105222689B (en) | The method that cake is coaxially bonded measurement apparatus and makes cake coaxially be bonded | |
WO2017092577A1 (en) | Method for monitoring pre-backfilling roof subsidence for use in fully mechanized solid-backfilling coal mining | |
CN209326499U (en) | A kind of rail die mould section processing dimension measuring scale | |
CN204491939U (en) | A kind of curtain wall mounting structure | |
CN106320612B (en) | A kind of spacer bar calibration soldering appliance and its application method | |
CN210483749U (en) | Visible two-lining mold building system | |
CN210482936U (en) | Decorate wall brick leveling device for engineering | |
CN202452976U (en) | Precise substrate capable of rapidly adjusting position | |
CN203475858U (en) | Wall-building line-hanging support | |
CN206158120U (en) | Multi -functional floating screed ware | |
CN207017665U (en) | Installation of embedded parts positioning rule | |
CN204963849U (en) | Lump material ground is spread and is pasted height detection chi | |
CN105625721B (en) | The boring and coring method and its servicing unit in concrete lamp hole | |
CN205012559U (en) | Stable form distortion combination steel -pipe column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190621 |
|
RJ01 | Rejection of invention patent application after publication |