CN109909051A CN201910184788.9A CN201910184788A CN109909051A CN 109909051 A CN109909051 A CN 109909051A CN 201910184788 A CN201910184788 A CN 201910184788A CN 109909051 A CN109909051 A CN 109909051A
Authority
CN
China
Prior art keywords
raw material
kiln
bucket
material grinding
numerical value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910184788.9A
Other languages
Chinese (zh)
Other versions
CN109909051B (en
Inventor
李群峰
王恒兵
赵波
王书信
陆小松
陈开志
王松华
胡义宏
陆兴风
郭玉龙
余志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Conch Information Technology Engineering Co Ltd
Anhui Conch Holdings Co Ltd
Quanjiao Conch Cement Co Ltd
Original Assignee
Anhui Conch Information Technology Engineering Co Ltd
Anhui Conch Holdings Co Ltd
Quanjiao Conch Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Conch Information Technology Engineering Co Ltd, Anhui Conch Holdings Co Ltd, Quanjiao Conch Cement Co Ltd filed Critical Anhui Conch Information Technology Engineering Co Ltd
Priority to CN201910184788.9A priority Critical patent/CN109909051B/en
Publication of CN109909051A publication Critical patent/CN109909051A/en
Application granted granted Critical
Publication of CN109909051B publication Critical patent/CN109909051B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Grinding (AREA)
  • Disintegrating Or Milling (AREA)
  • Muffle Furnaces And Rotary Kilns (AREA)

Abstract

The present invention provides a kind of cement factory raw material grinding system kiln system control method applied to clinker production of intelligent control technology field, the kiln system of the cement factory raw material grinding system kiln system control method stops the set-up procedure of feeding amount adjustment method when mill are as follows: enters lag setting delay numerical value after kiln bucket mentions returning ash, control unit, which is controlled, reduces by practical time grey numerical quantity into kiln feeding capacity, control unit, which monitors bucket again and mentions before whether electric current shuts down with raw material grinding system, to maintain an equal level, before if bucket proposes electric current actual numerical value lower than the shutdown of raw material grinding system, then reduce correction factor, maintain an equal level before bucket proposes electric current actual numerical value and raw material grinding system is shut down, cement factory raw material grinding system kiln system control method of the present invention, feeding capacity when can stop mill to kiln system is adjusted, to realize automation, intelligent operation, effectively drop The manual intervention of low operator, and by the automatically-monitored of system itself, meet feeding capacity adjust automatically.

Description

A kind of cement factory raw material grinding system kiln system control method
Technical field
The invention belongs to clinker production of intelligent control technology fields, are to be related to a kind of cement factory more specifically Raw material grinding system kiln system control method.
Background technique
Raw material grinding is the master operation of clinker production raw material preparation, and production capacity configuration is generally big compared with kiln production capacity, There is certain production capacity more than needed.Each cement production enterprise can be reasonable to arrange according to the warehouse compartment of homogenizing storehouse and the difference of time-of-use tariffs Raw material mill keeps away peak production, reaches energy-efficient purpose.Shut down since raw material is ground, grey temperature that kiln tail was gathered dust return is higher, can accelerate into Library bucket proposes adhesive tape aging, therefore, when raw material grinds shutdown, mentions adhesive tape for protection storage bucket, can be delivered to time ash and mention into kiln bucket, It just needs to be adjusted kiln feeding capacity when stopping mill in this way.At the same time, because of raw material grinding system fan parking, to kiln Systematic air flow has large effect, needs high-temperature blower adjustment revolving speed to increase absorbing quantity, it is ensured that outlet pressure is stablized.Raw material mill When system opens mill sequence of movement again in turn, in this way, needing operator timely to kiln system when raw material grinding system start-stop is ground Feeding capacity and be adjusted with air quantity.In this way, start-stop mill operator will expend a large amount of energy to carry out system tune every time Whole, simultaneously because operator's adjustment is substantially according to the experience of oneself, everyone strategy and adjustment amplitude is variant, will lead to System has biggish fluctuation.Therefore, the operation of start-stop mill is the main bottleneck for restricting the online rate of expert system.
Summary of the invention
The technical problems to be solved by the present invention are: it is simple to provide a kind of step, operator's labor intensity can be reduced, is increased Adding system adjustment and running stability reduce the fluctuation in system operation procedure caused by operator judges according to personal experience, Manipulation accuracy is improved, the cement factory raw material grinding system kiln system control of cement factory raw material grinding system operational reliability is met Method.
Solve the problems, such as techniques discussed above, the technical scheme adopted by the invention is as follows:
The present invention is a kind of cement factory raw material grinding system kiln system control method, the cement factory raw material grinding system Kiln system control method includes that kiln system stops feeding amount adjustment method when mill, and the kiln system stops feeding amount adjustment method when mill Set-up procedure are as follows: the shutdown of raw material grinding system finishes, and operator prepares to stop storage bucket when mentioning, and library bucket is mentioned pneumatic operated valve and closed by operator It closes, library bucket mentions pneumatic operated valve to control unit feedback signal, and control unit triggers back ash and enters the judgement of kiln condition, by returning grey machine for zipper Current values are calculated reality and return grey numerical quantity, enter kiln bucket according to time ash and mention delay numerical value, enter kiln bucket in time ash Lag setting delay numerical value after mentioning, control unit, which is controlled, returns grey numerical quantity into kiln feeding capacity reduction reality, and control unit monitors again Whether bucket mentions electric current preceding fair with the shutdown of raw material grinding system, if before bucket proposes electric current actual numerical value lower than the shutdown of raw material grinding system, Correction factor is then reduced, is maintained an equal level before bucket proposes electric current actual numerical value and raw material grinding system is shut down;If bucket mentions electric current actual number Before value is higher than the shutdown of raw material grinding system, then increase correction factor, before bucket proposes electric current actual numerical value and raw material grinding system is shut down Maintain an equal level.
The cement factory raw material grinding system kiln system control method further includes that raw material grinding system kiln system is fed when opening mill Doses method of adjustment, the set-up procedure of feeding amount adjustment method when the raw material grinding system kiln system opens mill are as follows: raw material mill behaviour Make personnel and start homogenizing storehouse top and storage conveying equipment, starting raw material grinds auxiliary system, starts circulating fan, and starting raw material mill is outer The circulatory system, starting raw material grind main motor, start feed system, while adjust valve opening, grinding pressure, powder concentrator revolving speed and For feeding capacity to the state that sets, raw material mill operator and kiln operator, which link up, at this time carries out back ash switching, former after obtaining answer Material mill operator, which will return ash and be put in storage pneumatic flashboard, to open, return it is grey be put in storage, system receives after pneumatic operated valve opens limit, trigger It executes, is Xt/h by returning grey machine for zipper electric current flow is calculated, kiln feeding capacity is increased Xt/h automatically, monitored into kiln by system Bucket proposes current conditions, after bucket mentions operation lap time, if bucket mentions electric current than low YA before switching, before illustrating feeding capacity than switching Low, being calculated from the formula correction value is Zt/h, then feeding capacity need to be further added by Zt/h, until bucket is held before proposing current values and switching It is flat, into normal manipulation mode.Step operation in the prior art is manually completed by operator, and automatic behaviour is realized in the present invention Make.For above-mentioned steps, be exemplified below: system receives after pneumatic operated valve opens limit, and trigger executes, and returns ash for example, passing through It is 11.5t/h that flow, which is calculated, in machine for zipper electric current, and kiln feeding capacity is increased 11.5t/h automatically, monitors and mention electricity into kiln bucket by system Situation is flowed, bucket, which mentions, runs a time general 4m enclosed, if bucket mentions electric current than low 1A before switching after 2m, illustrates that feeding capacity ratio is cut Low before changing, being calculated from the formula correction value is 3.5t/h, then feeding capacity need to be further added by 3.5t/h, until bucket mention current values with It remains basically stable before switching, into normal manipulation mode.In this way, mill air quantity is opened in convenient and reliable realization adjusts control.
The cement factory raw material grinding system kiln system control method further includes that raw material grinding system kiln system stops wind when mill Amount adjustment method, the raw material grinding system kiln system stop the set-up procedure of air flow adjusting method when mill are as follows: when operator is controlled When the grinding roller of raw material mill processed rises, control unit controls kiln system blower valve and closes to 5% hereinafter, system fan electric current is lower than System fan current standard numerical value triggers high-temperature blower air quantity regularization condition at this time, if after kiln system blower valve is closed High-temperature blower inlet pressure rolls average value numerical value before high-temperature blower inlet pressure actual numerical value is triggered lower than regularization condition, then controls Component controls processed increase high-temperature blower revolving speed, the high-temperature blower inlet pressure actual numerical value after the closing of kiln system blower valve Reach before regularization condition triggers until high-temperature blower inlet pressure rolling average value numberical range, if kiln system blower valve closes High-temperature blower inlet pressure actual numerical value after closing is higher than high-temperature blower inlet pressure before regularization condition triggers and rolls average value number Value, then control unit control reduce high-temperature blower revolving speed, the high-temperature blower inlet pressure after the closing of kiln system blower valve Actual numerical value reaches before regularization condition triggers until high-temperature blower inlet pressure rolling average value numberical range.
The cement factory raw material grinding system kiln system control method further includes wind when raw material grinding system kiln system opens mill Amount adjustment method, the set-up procedure of air flow adjusting method when the raw material grinding system kiln system opens mill are as follows: raw material grinds operator Member starting homogenizing storehouse top and storage conveying equipment, starting raw material grind auxiliary system, start circulating fan, and starting raw material grinds outer circulation System, starting raw material grind main motor, start feed system, adjust circulating fan inlet valve aperture, work as valve opening > 50% and When circulating fan electric current is greater than 200A, trigger is executed, and judges high-temperature blower outlet pressure and the variation of preheater outlet pressure, Reduce high-temperature blower revolving speed 5rpm, if the pressure is higher, then 5rpm drops, until the pressure and open grind before remain basically stable, simultaneously Minimum speed limitation is set, rotation speed of fan is not less than the revolving speed when reducing, after adjustment, into normal operating state.
When practical time grey numerical quantity is calculated by returning grey machine for zipper electric current, the practical calculation formula for returning grey numerical quantity Are as follows: practical to return ash numerical quantity=10+ (returning ash machine for zipper current values -20) * 2.5+ correction factor, correction factor is according to entering kiln bucket Electric current is mentioned to be modified.
Returning ash to enter kiln bucket to mention delay numerical value is 2S, after time ash enters and lags 2S after kiln bucket mentions, control unit control It makes and reduces by practical time grey numerical quantity into kiln feeding capacity, after time ash enters and lags 2S after kiln bucket mentions, control unit monitors bucket and mentions Whether electric current actual numerical value maintains an equal level before shutting down with raw material grinding system.
When control unit control reduces high-temperature blower revolving speed, 5rpm is adjusted every time, after the closing of kiln system blower valve High-temperature blower inlet pressure actual numerical value reach regularization condition trigger before high-temperature blower inlet pressure roll average value numerical value model Until enclosing;When control unit control improves high-temperature blower revolving speed, 5rpm is adjusted every time, after the closing of kiln system blower valve High-temperature blower inlet pressure actual numerical value reaches high-temperature blower inlet pressure before regularization condition triggers and rolls average value numberical range Until.
General cement factory kiln feeding scale configuration is impact flow meter, and flow is a reference, and each factory can basis Enter the practical feeding capacity of height judgement that kiln bucket mentions electric current, the bucket of 1A mentions electric current and probably corresponds to the flow of 3.5t/h (because of device configuration Difference, can be variant).Therefore, in control method of the present invention, correction factor=(enter kiln bucket before time ash switching and mention electricity Enter kiln bucket after fluxion value-time ash switching and propose current values) * 3.5.In this way, being calculated convenient for reliable.
Using technical solution of the present invention, can obtain it is below the utility model has the advantages that
Cement factory raw material grinding system kiln system control method of the present invention, in view of the problems of the existing technology, The rate-determining steps of the control method through the invention, feeding capacity when can stop mill to kiln system are adjusted, thus real The manual intervention of operator is effectively reduced in now automation, intelligent operation, and by the automatically-monitored of system itself, meet Feeding capacity adjust automatically.In this way, set-up procedure is simple, operator's labor intensity can be reduced, increases system call interception and operation is flat Stability reduces the fluctuation in system operation procedure caused by operator judges according to personal experience, improves manipulation accuracy, meets Cement factory raw material grinding system operational reliability.
Detailed description of the invention
Brief description is made to content expressed by each attached drawing of this specification and the label in figure below:
Fig. 1 is the structural schematic diagram of cement factory raw material grinding system kiln system of the present invention;
Attached drawing acceptance of the bid note is respectively as follows: 1, system fan;2, kiln tail electricity dust collection device;3, conditioning Tower;4, chain-linked conveyer;5, Circulating fan;6, screw conveyor;7, grey machine for zipper is returned;8, pneumatic operated valve;9, it is put in storage bucket elevator;10, enter kiln bucket elevator.
Specific embodiment
Below against attached drawing, by the description of the embodiment, to for example related each structure of a specific embodiment of the invention The works such as the shape of part, construction, the mutual alignment between each section and connection relationship, the effect of each section and working principle are further Detailed description:
As shown in Fig. 1, the present invention is a kind of cement factory raw material grinding system kiln system control method, the cement work Factory's raw material grinding system kiln system control method includes that kiln system stops feeding amount adjustment method when mill, and the kiln system stops feeding when mill The set-up procedure of doses method of adjustment are as follows: the shutdown of raw material grinding system finishes, and operator prepares to stop storage bucket when mentioning, and operator is by library Bucket proposes pneumatic operated valve closing, and library bucket mentions pneumatic operated valve to control unit feedback signal, and control unit triggers back ash and enters the judgement of kiln condition, leads to It crosses back grey machine for zipper current values and practical time grey numerical quantity is calculated, kiln bucket is entered according to time ash and mentions delay numerical value, is being returned Ash enters to lag setting delay numerical value after kiln bucket mentions, and control unit, which is controlled, reduces practical time grey numerical quantity, control into kiln feeding capacity Component processed, which monitors bucket again and mentions before whether electric current shuts down with raw material grinding system, to maintain an equal level, if bucket proposes electric current actual numerical value and grinds lower than raw material Before system-down, then correction factor is reduced, maintained an equal level before bucket proposes electric current actual numerical value and raw material grinding system is shut down;If bucket mentions Before electric current actual numerical value is higher than the shutdown of raw material grinding system, then increase correction factor, until bucket proposes electric current actual numerical value and raw material mill Maintain an equal level before system-down.In view of the problems of the existing technology, by above-mentioned set-up procedure, when effectively can stop mill to kiln system Feeding capacity be adjusted, to realize automation, intelligent operation, the manual intervention of operator is effectively reduced, and passes through and is It unites the automatically-monitored of itself, meets feeding capacity adjust automatically.In this way, set-up procedure is simple, it is strong that operator's labour can be reduced Degree increases system call interception and running stability, reduces in system operation procedure caused by operator judges according to personal experience Fluctuation improves manipulation accuracy, meets cement factory raw material grinding system operational reliability.
Cement factory raw material grinding system kiln system control method of the present invention, is not required to change to situ hardware It makes, carries out program processing using the existing signal measuring point of DCS system.Mainly there is the switch limit signal of pneumatic operated valve, return grey zipper The operation of the current signal, raw material grinding system blower of machine and current signal, raw material grinding system fans entrance valve opening amount signal, Raw material grinds grinding roller position signal, high-temperature blower outlet pressure signal.Manually adjusted for operator and expert system adjust mistake Cheng Jinhang combing, control method of the invention sum up where controlling difficulties: when 1. start-stops are ground, kiln system feeding and air quantity are automatic How adjusting opportunity judges.2. start-stop, which grinds back ash, enters the how many judgement of kiln amount.3. the start-stop mill kiln system air quantity amplitude of accommodation is sentenced It is disconnected.On the basis of analyzing above-mentioned controlling difficulties, the present invention proposes effective reply solution.
The cement factory raw material grinding system kiln system control method further includes that raw material grinding system kiln system is fed when opening mill Doses method of adjustment, the set-up procedure of feeding amount adjustment method when the raw material grinding system kiln system opens mill are as follows: raw material mill behaviour Make personnel and start homogenizing storehouse top and storage conveying equipment, starting raw material grinds auxiliary system, starts circulating fan, and starting raw material mill is outer The circulatory system, starting raw material grind main motor, start feed system, while adjust valve opening, grinding pressure, powder concentrator revolving speed and For feeding capacity to the state that sets, raw material mill operator and kiln operator, which link up, at this time carries out back ash switching, former after obtaining answer Material mill operator, which will return ash and be put in storage pneumatic flashboard, to open, return it is grey be put in storage, system receives after pneumatic operated valve opens limit, trigger It executes, is Xt/h by returning grey machine for zipper electric current flow is calculated, kiln feeding capacity is increased Xt/h automatically, monitored into kiln by system Bucket proposes current conditions, after bucket mentions operation lap time, if bucket mentions electric current than low YA before switching, before illustrating feeding capacity than switching Low, being calculated from the formula correction value is Zt/h, then feeding capacity need to be further added by Zt/h, until bucket is held before proposing current values and switching It is flat, into normal manipulation mode.Step operation in the prior art is manually completed by operator, and automatic behaviour is realized in the present invention Make.For above-mentioned steps, be exemplified below: system receives after pneumatic operated valve opens limit, and trigger executes, and returns ash for example, passing through It is 11.5t/h that flow, which is calculated, in machine for zipper electric current, and kiln feeding capacity is increased 11.5t/h automatically, monitors and mention electricity into kiln bucket by system Situation is flowed, bucket, which mentions, runs a time general 4m enclosed, if bucket mentions electric current than low 1A before switching after 2m, illustrates that feeding capacity ratio is cut Low before changing, being calculated from the formula correction value is 3.5t/h, then feeding capacity need to be further added by 3.5t/h, until bucket mention current values with It remains basically stable before switching, into normal manipulation mode.In this way, mill air quantity is opened in convenient and reliable realization adjusts control.
The cement factory raw material grinding system kiln system control method further includes that raw material grinding system kiln system stops wind when mill Amount adjustment method, the raw material grinding system kiln system stop the set-up procedure of air flow adjusting method when mill are as follows: when operator is controlled When the grinding roller of raw material mill processed rises, control unit controls kiln system blower valve and closes to 5% hereinafter, system fan electric current is lower than System fan current standard numerical value triggers high-temperature blower air quantity regularization condition at this time, if after kiln system blower valve is closed High-temperature blower inlet pressure rolls average value numerical value before high-temperature blower inlet pressure actual numerical value is triggered lower than regularization condition, then controls Component controls processed increase high-temperature blower revolving speed, the high-temperature blower inlet pressure actual numerical value after the closing of kiln system blower valve Reach before regularization condition triggers until high-temperature blower inlet pressure rolling average value numberical range, if kiln system blower valve closes High-temperature blower inlet pressure actual numerical value after closing is higher than high-temperature blower inlet pressure before regularization condition triggers and rolls average value number Value, then control unit control reduce high-temperature blower revolving speed, the high-temperature blower inlet pressure after the closing of kiln system blower valve Actual numerical value reaches before regularization condition triggers until high-temperature blower inlet pressure rolling average value numberical range.
The cement factory raw material grinding system kiln system control method further includes wind when raw material grinding system kiln system opens mill Amount adjustment method, the set-up procedure of air flow adjusting method when the raw material grinding system kiln system opens mill are as follows: raw material grinds operator Member starting homogenizing storehouse top and storage conveying equipment, starting raw material grind auxiliary system, start circulating fan, and starting raw material grinds outer circulation System, starting raw material grind main motor, start feed system, adjust circulating fan inlet valve aperture, work as valve opening > 50% and When circulating fan electric current is greater than 200A, trigger is executed, and judges high-temperature blower outlet pressure and the variation of preheater outlet pressure, Reduce high-temperature blower revolving speed 5rpm, if the pressure is higher, then 5rpm drops, until the pressure and open grind before remain basically stable, simultaneously Minimum speed limitation is set, rotation speed of fan is not less than the revolving speed when reducing, after adjustment, into normal operating state.
When practical time grey numerical quantity is calculated by returning grey machine for zipper electric current, the practical calculation formula for returning grey numerical quantity Are as follows: practical to return ash numerical quantity=10+ (returning ash machine for zipper current values -20) * 2.5+ correction factor, correction factor is according to entering kiln bucket Electric current is mentioned to be modified.
Returning ash to enter kiln bucket to mention delay numerical value is 2S, after time ash enters and lags 2S after kiln bucket mentions, control unit control It makes and reduces by practical time grey numerical quantity into kiln feeding capacity, after time ash enters and lags 2S after kiln bucket mentions, control unit monitors bucket and mentions Whether electric current actual numerical value maintains an equal level before shutting down with raw material grinding system.
When control unit control reduces high-temperature blower revolving speed, 5rpm is adjusted every time, after the closing of kiln system blower valve High-temperature blower inlet pressure actual numerical value reach regularization condition trigger before high-temperature blower inlet pressure roll average value numerical value model Until enclosing;When control unit control improves high-temperature blower revolving speed, 5rpm is adjusted every time, after the closing of kiln system blower valve High-temperature blower inlet pressure actual numerical value reaches high-temperature blower inlet pressure before regularization condition triggers and rolls average value numberical range Until.
General cement factory kiln feeding scale configuration is impact flow meter, and flow is a reference, and each factory can basis Enter the practical feeding capacity of height judgement that kiln bucket mentions electric current, the bucket of 1A mentions electric current and probably corresponds to the flow of 3.5t/h (because of device configuration Difference, can be variant).Therefore, in control method of the present invention, correction factor=(enter kiln bucket before time ash switching and mention electricity Enter kiln bucket after fluxion value-time ash switching and propose current values) * 3.5.In this way, being calculated convenient for reliable.
Feeding capacity set-up procedure embodiment, by taking certain raw material grinding system as an example: by taking raw material grinding system stops mill as an example, working as raw material Grinding system shutdown finishes, and operator prepares to stop storage bucket when mentioning, and can will enter homogenizing storehouse bucket and propose pneumatic operated valve closing, can trigger back at this time Ash enters the judgement of kiln condition, and ash quantity such as is calculated back in 13t/h by returning grey machine for zipper electric current, enters kiln bucket according to time ash and mentions The delay of general 2S will then enter kiln feeding capacity and reduce 13t/h after 2S, after 2m monitoring bucket mention electric current whether with maintain an equal level before switching, if It is low, then reduce correction factor;Such as height, then increase correction factor.
Air quantity set-up procedure embodiment, by taking certain raw material grinding system as an example: by taking raw material grinding system stops mill as an example, when raw material is ground Roller rises, and system fan valve is closed to 5% hereinafter, system fan electric current can trigger high-temperature blower air quantity lower than 200A at this time Adjustable strategies, high-temperature blower inlet pressure rolls average value before being triggered according to the condition, such as current generally probably in -1800Pa Value is -2000Pa, then needs to increase high-temperature blower revolving speed, because the adjustment of high-temperature blower revolving speed is larger to systematic influence, while being required again System quick response, therefore the limitation of every successive step 5rpm is set, the high-temperature blower after the closing of kiln system blower valve enters Mouth pressure actual numerical value reaches target value -1800Pa or so, carries out speed control by the O2 content target of original setting.
Cement factory raw material grinding system kiln system control method of the present invention, start-stop grind kiln system feeding and adjust opportunity Judgement, according to enter homogenizing storehouse bucket mention pneumatic operated valve switch limit plus material conveying delay time judged;Kiln system Air quantity adjusts the judgement on opportunity, according to raw material grinding system blower electric current and inlet baffle aperture, carries out in conjunction with raw material grinding roller position Comprehensive descision.Start-stop grinds back the calculating of ash quantity, calculates according to grey machine for zipper electric current is returned, and set interval increases correction factor and carries out Correction, calculates back ash quantity, proposes current value progress comprehensively control in combination with kiln bucket is entered before switching.For example, normal operating current Low value is 20A, and normal operating current high level is 22A, combined kiln feeding capacity and enters kiln bucket and proposes the analysis of current history data, returns ash Amount returns grey machine for zipper 1A electric current and corresponds to the ash that returns of 2.5t/h between 10-15t/h, therefore returns ash quantity=10+ and (return grey zipper Machine present current value -20) * 2.5+ correction factor.Correction factor is according to entering kiln bucket and mention electric current to be modified.The adjustment of kiln system air quantity The calculating of amplitude rolls average value according to high-temperature blower outlet pressure, as target value, sentences in conjunction with preheater outlet O2 content The disconnected kiln system air quantity amplitude of accommodation, controls high-temperature blower revolving speed, it is ensured that high-temperature blower outlet pressure is stablized, and kiln system operating condition is reduced Fluctuation, to effectively improve the intelligentized control method of kiln system.
Cement factory raw material grinding system kiln system control method of the present invention, in view of the problems of the existing technology, The rate-determining steps of the control method through the invention, feeding capacity when can stop mill to kiln system are adjusted, thus real The manual intervention of operator is effectively reduced in now automation, intelligent operation, and by the automatically-monitored of system itself, meet Feeding capacity adjust automatically.In this way, set-up procedure is simple, operator's labor intensity can be reduced, increases system call interception and operation is flat Stability reduces the fluctuation in system operation procedure caused by operator judges according to personal experience, improves manipulation accuracy, meets Cement factory raw material grinding system operational reliability.
Above in conjunction with attached drawing, an exemplary description of the invention, it is clear that concrete implementation of the present invention is not by above-mentioned The limitation of mode, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved by this The conception and technical scheme of invention directly apply to other occasions, are within the scope of the invention.

Claims (8)

1. a kind of cement factory raw material grinding system kiln system control method, it is characterised in that: the cement factory raw material grinds system System kiln system control method includes that kiln system stops feeding amount adjustment method when mill, and the kiln system stops feeding capacity adjustment side when mill The set-up procedure of method are as follows: the shutdown of raw material grinding system finishes, and operator prepares to stop storage bucket when mentioning, and library bucket is mentioned pneumatic operated valve by operator It closes, library bucket mentions pneumatic operated valve to control unit feedback signal, and control unit triggers back ash and enters the judgement of kiln condition, by returning grey zipper Machine current values are calculated reality and return grey numerical quantity, enter kiln bucket according to time ash and mention delay numerical value, enter kiln in time ash Bucket lags setting delay numerical value after mentioning, control unit, which is controlled, reduces by practical time grey numerical quantity into kiln feeding capacity, and control unit is supervised again Control bucket, which mentions before whether electric current shuts down with raw material grinding system, to maintain an equal level, if bucket proposes electric current actual numerical value and shuts down lower than raw material grinding system Before, then correction factor is reduced, is maintained an equal level before bucket proposes electric current actual numerical value and raw material grinding system is shut down;If bucket proposes electric current reality Before numerical value is higher than the shutdown of raw material grinding system, then increase correction factor, until bucket proposes electric current actual numerical value and the shutdown of raw material grinding system It is preceding to maintain an equal level.
2. cement factory raw material grinding system kiln system control method according to claim 1, it is characterised in that: the water Mud factories grinding system kiln system control method further includes feeding amount adjustment method when raw material grinding system kiln system opens mill, described Raw material grinding system kiln system feeding amount adjustment method when opening mill set-up procedure are as follows: raw material grinds operator and starts homogenizing storehouse top And storage conveying equipment, starting raw material grind auxiliary system, start circulating fan, starting raw material grinds external circulating system, starts raw material Main motor is ground, feed system is started, while adjusting valve opening, grinding pressure, powder concentrator revolving speed and feeding capacity to setting state, Raw material mill operator and kiln operator, which link up, at this time carries out back ash switching, and after obtaining answer, raw material mill operator will be returned Ash is put in storage pneumatic flashboard and opens, and returns ash storage, and system receives after pneumatic operated valve opens limit, and trigger executes, and passes through and returns ash and draw It is X t/h that chain electromechanics stream calculation, which obtains outflow, and kiln feeding capacity is increased X t/h automatically, monitors and propose current conditions into kiln bucket by system, After bucket mentions operation lap time, if bucket mentions electric current than low Y A before switching, illustrate that feeding capacity is lower than before switching, according to formula Calculating correction value is Z t/h, then feeding capacity need to be further added by Z t/h, until bucket maintains an equal level before proposing current values and switching, into just Normal operation mode.
3. cement factory raw material grinding system kiln system control method according to claim 1 or 2, it is characterised in that: described Cement factory raw material grinding system kiln system control method further include raw material grinding system kiln system stop mill when air flow adjusting method, institute The raw material grinding system kiln system stated stops the set-up procedure of air flow adjusting method when mill are as follows: when operator controls the grinding roller of raw material mill When rise, control unit controls kiln system blower valve and closes to 5% hereinafter, system fan electric current is lower than system fan electric current mark Quasi- numerical value triggers high-temperature blower air quantity regularization condition at this time, if the high-temperature blower entrance pressure after the closing of kiln system blower valve High-temperature blower inlet pressure rolls average value numerical value before power actual numerical value is triggered lower than regularization condition, then control unit control increases High-temperature blower revolving speed, the high-temperature blower inlet pressure actual numerical value after the closing of kiln system blower valve reach regularization condition touching Until high-temperature blower inlet pressure rolls average value numberical range before sending out, if the high-temperature blower after the closing of kiln system blower valve Inlet pressure actual numerical value is higher than high-temperature blower inlet pressure before regularization condition triggers and rolls average value numerical value, then control unit control System reduces high-temperature blower revolving speed, and the high-temperature blower inlet pressure actual numerical value after the closing of kiln system blower valve reaches adjustment Until high-temperature blower inlet pressure rolls average value numberical range before condition triggers.
4. cement factory raw material grinding system kiln system control method according to claim 1 or 2, it is characterised in that: described Cement factory raw material grinding system kiln system control method further include air flow adjusting method when raw material grinding system kiln system opens mill, institute The set-up procedure of air flow adjusting method when the raw material grinding system kiln system stated opens mill are as follows: raw material grinds operator and starts homogenizing storehouse top And storage conveying equipment, starting raw material grind auxiliary system, start circulating fan, starting raw material grinds external circulating system, starts raw material Main motor is ground, feed system is started, circulating fan inlet valve aperture is adjusted, works as valve opening > 50% and circulating fan electric current When greater than 200A, trigger is executed, and is judged high-temperature blower outlet pressure and the variation of preheater outlet pressure, is reduced high-temperature blower Revolving speed 5rpm if the pressure is higher, then drops 5rpm, until the pressure with open mill before remain basically stable, concurrently set minimum speed Limitation, after adjustment, into normal operating state.
5. cement factory raw material grinding system kiln system control method according to claim 1 or 2, it is characterised in that: pass through It returns grey machine for zipper electric current and practical when returning grey numerical quantity, the practical calculation formula for returning grey numerical quantity are as follows: practical to return ash quantity is calculated Numerical value=10+ (return grey machine for zipper current values -20) * 2.5+ correction factor, correction factor is according to entering kiln bucket and mention electric current to be repaired Just.
6. cement factory raw material grinding system kiln system control method according to claim 1 or 2, it is characterised in that: return ash It is 2S into entering kiln bucket to mention delay numerical value, enters after kiln bucket mentions after lag 2S returning ash, control unit is controlled into kiln feeding capacity Reduce by practical time grey numerical quantity, after time ash enters and lags 2S after kiln bucket mentions, control unit monitors bucket and proposes electric current actual numerical value Maintain an equal level before whether being shut down with raw material grinding system.
7. cement factory raw material grinding system kiln system control method according to claim 4, it is characterised in that: control unit When control reduces high-temperature blower revolving speed, 5rpm is adjusted every time, the high-temperature blower entrance pressure after the closing of kiln system blower valve Power actual numerical value reaches before regularization condition triggers until high-temperature blower inlet pressure rolling average value numberical range;Control unit control When system improves high-temperature blower revolving speed, 5rpm is adjusted every time, the high-temperature blower inlet pressure after the closing of kiln system blower valve Actual numerical value reaches before regularization condition triggers until high-temperature blower inlet pressure rolling average value numberical range.
8. cement factory raw material grinding system kiln system control method according to claim 5, it is characterised in that: correction factor =(return ash switching before enter kiln bucket mention after current values-return ash switching entering kiln bucket and proposing current values) * 3.5.
CN201910184788.9A 2019-03-12 2019-03-12 Kiln system control method of cement factory raw material mill system Active CN109909051B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910184788.9A CN109909051B (en) 2019-03-12 2019-03-12 Kiln system control method of cement factory raw material mill system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910184788.9A CN109909051B (en) 2019-03-12 2019-03-12 Kiln system control method of cement factory raw material mill system

Publications (2)

Publication Number Publication Date
CN109909051A true CN109909051A (en) 2019-06-21
CN109909051B CN109909051B (en) 2020-08-18

Family

ID=66964383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910184788.9A Active CN109909051B (en) 2019-03-12 2019-03-12 Kiln system control method of cement factory raw material mill system

Country Status (1)

Country Link
CN (1) CN109909051B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3565349A (en) * 1968-05-10 1971-02-23 Creusot Forges Ateliers Installation for pulverizing and drying crude quarry products
CN102319612A (en) * 2011-07-05 2012-01-18 中国科学院沈阳自动化研究所 Method for intelligently controlling pressure difference of cement raw meal vertical mill
CN103149887A (en) * 2011-12-30 2013-06-12 中国科学院沈阳自动化研究所 Intelligent control method applied to central discharge type cement raw mill system
CN104384009A (en) * 2014-09-29 2015-03-04 济南大学 Cement combined-grinding prediction control method based on Bang-Bang control
CN205008089U (en) * 2015-07-01 2016-02-03 华润水泥技术研发有限公司 Cement material grinding circulation system
CN108080123A (en) * 2017-11-17 2018-05-29 邯郸金隅太行水泥有限责任公司 A kind of cement grinding mill machine washing mill method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3565349A (en) * 1968-05-10 1971-02-23 Creusot Forges Ateliers Installation for pulverizing and drying crude quarry products
CN102319612A (en) * 2011-07-05 2012-01-18 中国科学院沈阳自动化研究所 Method for intelligently controlling pressure difference of cement raw meal vertical mill
CN103149887A (en) * 2011-12-30 2013-06-12 中国科学院沈阳自动化研究所 Intelligent control method applied to central discharge type cement raw mill system
CN104384009A (en) * 2014-09-29 2015-03-04 济南大学 Cement combined-grinding prediction control method based on Bang-Bang control
CN205008089U (en) * 2015-07-01 2016-02-03 华润水泥技术研发有限公司 Cement material grinding circulation system
CN108080123A (en) * 2017-11-17 2018-05-29 邯郸金隅太行水泥有限责任公司 A kind of cement grinding mill machine washing mill method

Also Published As

Publication number Publication date
CN109909051B (en) 2020-08-18

Similar Documents

Publication Publication Date Title
CN103030313B (en) Cement production and optimization system
CN102151605A (en) Advanced control method and system for vertical mill based on model identification and predictive control
CN103028480B (en) Intelligent control system for vertical mill based on fuzzy PID (proportion integration differentiation) algorithm
CN103092171B (en) Cement digital management and control system
CN202097023U (en) Advanced vertical mill control system based on model identification and predictive control
CN103331204B (en) Control method of medium-speed mill of blast furnace coal injection
CN106979148B (en) A kind of control method of step-less adjustment high powered water pump or fan operation
CN109603525A (en) A kind of denitration subregion spray ammonia control method based on unevenness judgement
CN102644585A (en) Air compressor hybrid control system and method
CN105736434B (en) The method for monitoring performance and system of a kind of power plant fans
CN107883553A (en) A kind of frequency-changeable compressor frequency reducing control method and device
CN201582945U (en) FFU (Fan Filter Unit) centralized regulating and control system capable of regulating and controlling according to cleanliness
CN111338409A (en) Universal desulfurization dust removal energy-saving optimization control system
CN109909051A (en) A kind of cement factory raw material grinding system kiln system control method
CN205550362U (en) Rice polishing machine intelligence control system
CN210610874U (en) Tea processing device equipment based on accurate moisture control
CN110260431B (en) Control method of air conditioning system of textile workshop
CN111452220A (en) Environment-friendly fine-quality sand making building control system
CN207634361U (en) A kind of dedusting fan energy-saving control system of multisensor
CN115437294A (en) Magnetic suspension accurate coal feeding system for rotary kiln and control method
CN204357744U (en) The regulation and control of deduster air quantity, intelligent wind pressure and energy conserving system
CN205176610U (en) Building gypsum production is with air chute autonomous system
CN108344107A (en) Automatically cleaning control method for air conditioner
CN209386786U (en) A kind of rotary hearth furnace automatic combustion control device
CN114218701A (en) Kiln tail exhaust fan optimization method, device, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant