CN109899609A CN201910289665.1A CN201910289665A CN109899609A CN 109899609 A CN109899609 A CN 109899609A CN 201910289665 A CN201910289665 A CN 201910289665A CN 109899609 A CN109899609 A CN 109899609A
Authority
CN
China
Prior art keywords
pump line
flange
pipe
annular
internal diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910289665.1A
Other languages
Chinese (zh)
Other versions
CN109899609B (en
Inventor
张莉莉
李素霞
张帅
翟巍
陈婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co Ltd
Original Assignee
Beijing Fourth Construction & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co Ltd filed Critical Beijing Fourth Construction & Engineering Co Ltd
Priority to CN201910289665.1A priority Critical patent/CN109899609B/en
Publication of CN109899609A publication Critical patent/CN109899609A/en
Application granted granted Critical
Publication of CN109899609B publication Critical patent/CN109899609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reciprocating Pumps (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

A kind of concrete delivery pump pipe connection transformational structure and its construction method, the compound pump line being connected to including original pump line and by converting pump line with original pump line, pump line is converted as steel pipe, the connecting pin of side is to snap connection end, the connecting pin of the other side is ring flange connecting pin, compound pump line is double-layer composite pipe, including outer tube and inner tube, outer tube is steel pipe, inner tube is made of ultra high molecular polyethylene, and the annular flange dish of compound pump line is bolted by the annular flange dish of flange bolt and ring flange connecting pin through flange bolt hole to be connected.The present invention solves traditional delivery pump pipe buckle and can not connect directly between compound pump line and the overscale problems of tradition delivery pump pipe caliber and compound pump line caliber.The present invention is completely embedded, and caliber is excessively straight unobstructed, and delivering concrete works well.

Description

A kind of concrete delivery pump pipe connection transformational structure and its construction method
Technical field
The invention belongs to concrete transportation construction field, combination connection knot between especially a kind of variety classes delivery pump pipe Structure and its concrete pumping method.
Background technique
The concrete pumping pipe material of construction industry concrete structure is mainly steel pump line, and steel pump line is passed through in concrete pump Cheng Zhonghui generates various problems, such as the problems such as plugging or concrete performance variation.Especially in super high-rise pumping operation, due to Pumping height is high, strong concrete performance is unstable, and these problems are more common.Construction production efficiency seriously is reduced, is located Reason is also easy to quality problems occur not in time.
Meanwhile it there is problems for the connection method of concrete delivery pump pipe:
One, traditional concrete delivery pump pipe snaps connection imprecision, in concrete delivery service using mode is snapped connection It is easy snapping connection position spillage, the discharge pressure of pump truck will will lead to pump line vibration, pump line in concrete delivery service Between weak connection will will lead to quality and safety accident occurs, flanged joint as safer and secure attachment mode, It is widely used by pump line producer and unit in charge of construction.
Two, traditional buckle mouth and the flange bolt mouth of special concrete delivery pump pipe can not be directly connected to, in concrete Extreme difficulties are brought during delivery pump pipe connection construction.Conventional construction method can not solve the problems, such as such.
With regard to current technique, there are no the connectivity problems that a kind of method can solve different connection type pump lines, therefore, mesh It is preceding to need a kind of connectivity problem for solving conventional concrete delivery pump pipe and special concrete delivery pump pipe, it is connected for pump line in future Offer convenience condition.
Summary of the invention
The object of the present invention is to provide a kind of concrete delivery pump pipe connection transformational structure and its construction methods, to solve Certainly there are pluggings, the serious reduction construction production efficiency of concrete performance variation, processing easily to occur matter not in time for concrete steel pump line Bad technical problem is measured, also to solve that existing tradition snaps connection pump line and the concrete delivery pump pipe of special shape can not be straight The connection connect, connection imprecision are easy spillage and are easy to happen safety accident in interface weakness because pump truck discharge pressure shakes, And concrete pouring quality control such as is difficult to ensure at the technical problems.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of concrete delivery pump pipe connection transformational structure, including original pump line, original pump line are steel pipe, original pump line It is provided with the annular groove for snap lock on the outer wall of both ends, further include conversion pump line and is connected by conversion pump line and original pump line Logical compound pump line,
For the pump line of converting into steel pipe, the connecting pin including converting tube body and two sides, the connecting pin of side is to snap connection end, institute State the annular groove being also provided on the conversion tube wall for snap connection end for snap lock, the connecting pin of original pump line with The annular groove snapped connection on end locks connection by being lined with the buckle of rubber washer together,
The connecting pin of the other side is ring flange connecting pin, is fixedly connected between two parties on the conversion tube wall of the ring flange connecting pin There is steel annular ring flange, the edge circumferential direction uniform intervals of the annular flange dish are provided with one group of flange bolt hole, the annular The outer surface of ring flange is concordant with the end face of ring flange connecting pin,
The compound pump line is double-layer composite pipe, including composite pipe body, further includes distinguishing on the end face outer wall of composite pipe body two sides It is fixedly connected with the annular flange dish of steel between two parties, the edge circumferential direction uniform intervals of the annular flange dish are also provided with one group of flange spiral shell Keyhole, the composite pipe body include outer tube and inner tube, and the outer tube is steel pipe, and said inner tube is made of ultra high molecular polyethylene, The outer wall surface of said inner tube is close to the inner wall surface of outer tube, and the both ends of inner tube pass through the flange anti-package of hot melt to the two of outer tube End, the outer surface for being close to annular flange dish, the width of the flange, which is subject to, does not block flange bolt hole,
The annular that the annular flange dish of the compound pump line passes through flange bolt and ring flange connecting pin through flange bolt hole Ring flange bolt connection.
Original pump line and compound pump line are the constant cross-section pipe of internal diameter, and the internal diameter of original pump line is less than combination pump The internal diameter of pipe, for the tube body of converting into the varying cross-section duct of internal diameter even transition, the internal diameter for snapping connection end is equal to original pump line Internal diameter, the internal diameter of ring flange connecting pin are equal to the internal diameter of compound pump line.
The ring flange connecting pin is connected with the annular steel plate washer of the outer end face evagination of opposed annular flanges disk between two parties, described The internal diameter of annular steel plate washer is identical as the internal diameter of ring flange connecting pin.
The outer diameter of the annular steel plate washer is not more than the width of flange.
The width of the flange is 30mm-40mm.
At least eight flange bolt holes are provided in each annular flange dish, the length for converting pump line is 500mm- 600mm。
The internal diameter of the outer tube is 125mm-175mm, wall thickness 4.5mm-5mm, the length of outer tube be 3m, 2m, 1m or 0.5m;
The internal diameter of said inner tube is 100mm-150mm, and wall thickness 8mm, the length of inner tube is 3m, 2m, 1m or 0.5m.
The compound pump line includes straight tube and bend pipe, and the bend pipe includes four kinds of forms, bending angle is respectively 90 degree, 45 degree, 30 degree or 15 degree, corresponding turning radius is respectively 1000mm, 750mm, 500mm or 350mm.
The construction method of this concrete delivery pump pipe connection transformational structure, construction procedure are as follows:
Step 1 processes compound pump line:
A, the internal diameter of type selecting outer tube, wall thickness, length, bend pipe angle, the size of turning radius and annular flange dish, by annular flange Disk is welded in place;
B, the internal diameter, wall thickness of type selecting inner tube, length, bend pipe angle, the size of turning radius,
C, outer tube is directly sleeved on to the outside of inner tube, inner tube reserves the length of flange and by hot melt anti-package to annular flange dish Outer surface, flange ensure it is smooth, flatness be not more than 1mm;
Step 2, processing conversion pump line:
A, the internal diameter of original pump line and the internal diameter of compound pump line are determined;
B, according to the prefabricated production processing conversion pump line of the size of two sides pump line to be connected, loop method is socketed in ring flange connecting pin Blue disk is snapping connection end open loop connected in star;
The annular groove of step 3, the annular groove for snapping connection end and original pump line of converting pump line is embedded in rubber washer, Then be connected by a snap and connect two pipes, will convert the annular flange dish of the ring flange connecting pin of pump line by flange bolt with The annular flange dish of compound pump line bolts connection;
Step 4 carries out concreting experiment after conversion pump line connection, verifies it and connect tightness and fastness;
Step 5 is required according to site operation, and different length and the compound pump line of bend pipe angle is selected to carry out on-site assembly;It is compound It is all made of annular flange dish between pump line to connect by flange bolt, firmly installs, it is ensured that pipeline is seamless, not spillage;
Step 6, concrete pumping with pour: after compound pump line installs, carry out concrete according to regulation and code requirement Pumping with pour, concrete material performance and pouring construction method are consistent with original pump line;
Step 7 washes pipe:
Using rotating wash bowl air purge;
Rotating wash bowl needs to impregnate in water in advance 30 minutes or more when in use, after concrete pumping, rotating wash bowl is put into multiple Pump line end is closed, with pulsometer by rotating wash bowl reverse ejection to feed inlet;
Hopper inner concrete rise speed is observed when cleaning, beats pipeline, when sound becomes hollow sound, pipeline cleaning is finished.
During the step 2 is connected with the ring flange in step 3, using interval jump point connection type, flange bolt and ring Spring shim is added between shape ring flange.
Compared with prior art the invention has the characteristics that and the utility model has the advantages that
The present invention discloses a kind of compound pump line can substitute steel pump line completely, suitable for low layer and Super High concrete structure Pumpdown, the pumping of particularly suitable strong concrete and high-rise pumpdown, have apparent superiority:
One, using superhigh molecular weight polyethylene pipe as interior conduit, interior conduit and the concrete coefficient of friction resistance is small, wear-resisting, self-lubricating, It is not susceptible to adhesion, is not easy plugging;Reduce the frictional resistance with concrete, reduces bonding with concrete.
Two, since ultra-high molecular weight polyethylene rigidity is smaller, using steel pipe as Outer Tube, the whole of pump line is improved Body rigidity.Outer Tube with non-standard pipeline or can use standard pipe.
Three, it is compounded to form using steel outer tube road and ultra-high molecular weight polyethylene interior conduit, inner wall is replaceable, reduces outer tube Abrasion, turnover rate are higher.
Four, pipeline enclosure uses flanged joint, keeps the connection between Guan Yuguan closer, does not leak pressure spillage, pumping efficiency is more Height improves the pumpability of concrete.
Invention additionally discloses a kind of conversion pump lines for being exclusively used in the compound pump line and connecting with original pump line, i.e. conventional concrete The conversion pump line that delivery pump pipe is connected with compound pump line, it is converted for the caliber of conventional concrete delivery pump pipe, connection type Pump line is connected to the connection method of compound pump line.Conventional concrete delivery pump pipe is connect with concrete mixer using buckle, It is secondary to be connect the one end for converting pump line with traditional delivery pump pipe using buckle, another hold-carrying of pump line will be converted using bolt again Orchid connect with combination pump pipe flange, and solving traditional delivery pump pipe and buckling can not connect and tradition is defeated directly between compound pump line Send the overscale problems of pump line caliber Yu compound pump line caliber.The present invention is completely embedded, caliber excessively straight unobstructed, delivering concrete It works well.
The press belt that flange bolt connection after the converted pump line connection of the present invention can preferably bear casting concrete comes Disturbance.One end of conversion pump pipe clamp button and conventional concrete delivery pump pipe carry out bayonet connection first, solve traditional coagulation Native delivery pump pipe connect to special concrete delivery pump pipe first excessively, then again will conversion pump line other end flange and multiple It closes pump line and carries out flange bolt connection, solve the transition from conventional concrete delivery pump pipe completely to compound pump line, while compared with It is good solve snap connection converted pump line after the fixing means that is all connected to flange bolt, reduce because of pump truck conveying Pressure causes pump line vibration in the quality and safety accident of weak junction, can preferably guarantee conventional concrete delivery pump pipe The globality connecting with special concrete delivery pump pipe, further strengthening concrete conveyance continuity ensure that concrete is defeated The construction quality sent, connection method is clear, Connection Step is clear, application surface is wider, and relatively traditional connection type can save Manually, it improves construction efficiency, reduce pumping oil consumption simultaneously, saved the energy, reduced cost, while obtaining good conversion and connecting Connect effect.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the decomposition diagram of Fig. 1.
Fig. 3 is the structural schematic diagram of buckle.
Fig. 4 is the structural schematic diagram of rubber washer.
Fig. 5 is the side structure schematic view in the conversion pump pipe flange direction of Fig. 1.
Fig. 6 is the cross section structure schematic diagram of compound pump line.
Appended drawing reference: the original pump line of 1-, 2- conversion pump line, the compound pump line of 3-, 31- outer tube, 32- inner tube, 33- are turned over Side, 4- annular groove, 5- buckle, 6- annular flange dish, 7- flange bolt hole, 8- annular steel plate washer, 9- flange bolt, 10- spring shim, 11- rubber washer.
Specific embodiment
Referring to shown in Fig. 1-6, a kind of concrete delivery pump pipe connection transformational structure, including original pump line 1, original pump Pipe 1 is steel pipe, and the annular groove 4 for snap lock is provided on the both ends outer wall of original pump line 1, further include conversion pump line 2 and The compound pump line 3 being connected to by converting pump line 2 with original pump line 1.
For the pump line of converting into steel pipe, the connecting pin including converting tube body and two sides, the connecting pin of side is to snap connection It holds, the annular groove 4 for snap lock, the company of original pump line is also provided on the conversion tube wall for snapping connection end It connects end and locks connection together by being lined with the buckle 5 of rubber washer 11 with the annular groove snapped connection on end.
The connecting pin of the other side is ring flange connecting pin, is fixed between two parties on the conversion tube wall of the ring flange connecting pin It is connected with steel annular ring flange 6, the edge circumferential direction uniform intervals of the annular flange dish are provided with one group of flange bolt hole 7, institute The outer surface for stating annular flange dish is concordant with the end face of ring flange connecting pin.
The compound pump line is double-layer composite pipe, including composite pipe body, further includes on the end face outer wall of composite pipe body two sides It is fixedly connected with the annular flange dish 6 of steel between two parties respectively, the edge circumferential direction uniform intervals of the annular flange dish are also provided with one group Flange bolt hole 7, the composite pipe body include outer tube 31 and inner tube 32, and the outer tube 31 is steel pipe, and said inner tube 32 is by superelevation Molecular polyethylene is made, and the outer wall surface of said inner tube 32 is close to the inner wall surface of outer tube, and the both ends of inner tube pass through hot melt 33 anti-package of flange is to the both ends of outer tube 31, the outer surface of abutting annular flange dish 6, and the width of the flange 33 is not to block method Subject to blue bolt hole.
The annular flange dish 6 of the compound pump line 3 is connect by the flange bolt 9 through flange bolt hole 7 with ring flange The annular flange dish 6 at end bolts connection.
Original pump line 1 and compound pump line are the constant cross-section pipe of internal diameter, and the internal diameter of original pump line 1 is less than compound The internal diameter of pump line 3, for the tube body of converting into the varying cross-section duct of internal diameter even transition, the internal diameter for snapping connection end is equal to original pump line 1 internal diameter, the internal diameter of ring flange connecting pin are equal to the internal diameter of compound pump line 3.
The ring flange connecting pin is connected with the annular steel plate washer 8 of the outer end face evagination of opposed annular flanges disk, institute between two parties The internal diameter for stating annular steel plate washer 8 is identical as the internal diameter of ring flange connecting pin.
The outer diameter of the annular steel plate washer is not more than the width of flange.
The width of the flange 33 is 30mm-40mm.
At least eight flange bolt holes 7 are provided in each annular flange dish 6, the length for converting pump line 2 is 500mm- 600mm。
The internal diameter of the outer tube 31 is 125mm-175mm, and wall thickness 4.5mm-5mm, the length of outer tube 31 is 3m, 2m, 1m Or 0.5m;
The internal diameter of said inner tube 32 is 100mm-150mm, and wall thickness 8mm, the length of inner tube 32 is 3m, 2m, 1m or 0.5m.
The compound pump line 3 includes straight tube and bend pipe, and the bend pipe includes four kinds of forms, and bending angle is respectively 90 Degree, 45 degree, 30 degree or 15 degree, corresponding turning radius are respectively 1000mm, 750mm, 500mm or 350mm.
It is 24mm in aperture the present embodiment of flange bolt hole in the present embodiment, the diameter of flange bolt is 22mm, length For 120mm, when use, can add conventional pads and spring shim.The width of annular steel plate washer is 40mm, with a thickness of 3mm, card The internal diameter of button is 130mm, outer diameter 150mm.
The construction method of this concrete delivery pump pipe connection transformational structure, construction procedure are as follows:
Step 1 processes compound pump line:
A, the internal diameter of type selecting outer tube 31, wall thickness, length, bend pipe angle, the size of turning radius and annular flange dish, by loop method Blue disk is welded in place;In the present embodiment, annular flange dish with a thickness of 20mm, diameter 280mm, eight flange bolts are set altogether Hole, aperture 24mm.In the present embodiment, the size of internal diameter is 125mm.
B, the internal diameter, wall thickness of type selecting inner tube 32, length, bend pipe angle, the size of turning radius, in the present embodiment, internal diameter Size be 125mm.
C, in the present embodiment, inner tube outside diameter is 9mm smaller than outer tube diameter, and outer tube 31 is directly sleeved on to the outside of inner tube 32, and There is the gap of 4.5mm around interior conduit, inner tube 32 reserves the length of flange 33 and by hot melt anti-package to annular flange dish 6 Outer surface, flange ensure it is smooth, flatness be not more than 1mm.
When production, it is ensured that inside and outside pipe diameter and wall thickness meet pumping requirements, and temperature should be controlled at 80 degree when inner tube flange Left and right, flange want smooth, and flange plate bolt hole site is accurate, is evenly distributed.Pump line firm welding is converted, face of weld is not There must be the surface defects such as incompletely filling, stomata, overlap, crackle, weld seam should be met the requirements of the standard.Outer tube manufactured size should be accurate, no Spillage.
Step 2, processing conversion pump line:
Because ground pumping unit discharge port, cloth machine inlet are original pump line, i.e., common buckle-type steel pump line interface, internal diameter is 130mm, and compound pump line connection type is flange form connection, internal diameter 125mm.Two kinds of pipe diameters and connection type are not Together, it is connected so needing to process crossover sub.
A, the internal diameter of original pump line 1 and the internal diameter of compound pump line 3 are determined;
B, according to the prefabricated production processing conversion pump line of the size of two sides pump line to be connected, loop method is socketed in ring flange connecting pin Blue disk 6 is snapping connection end open loop connected in star 4.
The annular groove 4 of step 3, the annular groove 4 for snapping connection end and original pump line of converting pump line is embedded in rubber Then two pipes are connected by 5 connection of buckle, the annular flange dish for converting the ring flange connecting pin of pump line 2 are passed through by washer 11 The annular flange dish 6 of flange bolt 9 and compound pump line 3, which bolts, to be connected.
Step 4, conversion pump line 2 carry out concreting experiment after connecting, and verify it and connect tightness and fastness.
Step 5 is required according to site operation, and the compound pump line 3 of different length and bend pipe angle is selected to carry out live group Dress;It is all made of annular flange dish 6 between compound pump line to connect by flange bolt 9, firmly installs, it is ensured that pipeline is seamless, no Spillage.
The reinforcement measure of compound pump line and common pump line are without too many differences, after the completion of Pipe installing, in flat segments and vertical Duan Caiyong fastener type steel pipe frame is fixed, and is fixed at turning and impact force larger part using concrete pier.In floor Surrounding plug is stoppered in fact with flitch at hole to be provided.
Step 6, concrete pumping with pour: after compound pump line 3 installs, carried out according to regulation and code requirement The pumping of concrete with pour, concrete material performance and pouring construction method are consistent with original pump line.
Step 7 washes pipe:
Using rotating wash bowl air purge;
Rotating wash bowl needs to impregnate in water in advance 30 minutes or more when in use, after concrete pumping, rotating wash bowl is put into multiple Pump line end is closed, with pulsometer by rotating wash bowl reverse ejection to feed inlet.
Hopper inner concrete rise speed is observed when cleaning, beats pipeline, when sound becomes hollow sound, pipeline cleaning is complete Finish.
During the step 2 is connected with the ring flange in step 3, using interval jump point connection type, flange bolt 9 and ring Spring shim 10 is added between shape ring flange 6.
After the waste water for washing pipe of the invention answers secondary precipitation, recycling;Concrete using it is preceding it is accrued calculate accurately really, be considered as Using washing out remaining concrete.After the inner wall abrasion of inner tube reaches to a certain degree, it need to be replaced, it can to the inner core of replacement It is re-worked after decomposition, secondary use is environmentally protective.

Claims (10)

1. a kind of concrete delivery pump pipe connection transformational structure, including original pump line (1), original pump line (1) is steel pipe, former The annular groove (4) for snap lock is provided on the both ends outer wall for having pump line (1), it is characterised in that: further include conversion pump line (2) And the compound pump line (3) being connected to by converting pump line (2) with original pump line (1),
For the pump line of converting into steel pipe, the connecting pin including converting tube body and two sides, the connecting pin of side is to snap connection end, institute State the annular groove (4) being also provided on the conversion tube wall for snap connection end for snap lock, the connection of original pump line It holds and snaps connection the annular groove on end and lock connection together by being lined with the buckle (5) of rubber washer (11),
The connecting pin of the other side is ring flange connecting pin, is fixedly connected between two parties on the conversion tube wall of the ring flange connecting pin Have steel annular ring flange (6), the edge circumferential direction uniform intervals of the annular flange dish are provided with one group of flange bolt hole (7), institute The outer surface for stating annular flange dish is concordant with the end face of ring flange connecting pin,
The compound pump line is double-layer composite pipe, including composite pipe body, further includes distinguishing on the end face outer wall of composite pipe body two sides It is fixedly connected with the annular flange dish (6) of steel between two parties, the edge circumferential direction uniform intervals of the annular flange dish are also provided with one group of method Blue bolt hole (7), the composite pipe body include outer tube (31) and inner tube (32), and the outer tube (31) is steel pipe, said inner tube (32) it is made of ultra high molecular polyethylene, the outer wall surface of said inner tube (32) is close to the inner wall surface of outer tube, the both ends of inner tube Portion passes through flange (33) anti-package of hot melt to the both ends of outer tube (31), the outer surface of abutting annular flange dish (6), the flange (33) width, which is subject to, does not block flange bolt hole,
The annular flange dish (6) of the compound pump line (3) passes through the flange bolt (9) and ring flange through flange bolt hole (7) The annular flange dish (6) of connecting pin bolts connection.
2. concrete delivery pump pipe connection transformational structure according to claim 1, it is characterised in that: original pump line (1) and compound pump line is the constant cross-section pipe of internal diameter, and the internal diameter of original pump line (1) is less than the internal diameter of compound pump line (3), institute It states and converts tube body as the varying cross-section duct of internal diameter even transition, the internal diameter for snapping connection end is equal to the internal diameter of original pump line (1), flange The internal diameter of disk connecting pin is equal to the internal diameter of compound pump line (3).
3. concrete delivery pump pipe connection transformational structure according to claim 1, it is characterised in that: the ring flange connection End is connected with the annular steel plate washer (8) of the outer end face evagination of opposed annular flanges disk, the internal diameter of the annular steel plate washer (8) between two parties It is identical as the internal diameter of ring flange connecting pin.
4. concrete delivery pump pipe connection transformational structure according to claim 3, it is characterised in that: the annular steel plate washer Outer diameter be not more than flange width.
5. concrete delivery pump pipe connection transformational structure according to claim 1 or 4, it is characterised in that: the flange (33) width is 30mm-40mm.
6. concrete delivery pump pipe connection transformational structure according to claim 1, it is characterised in that: each annular flange dish (6) it is provided at least eight flange bolt holes (7), the length for converting pump line (2) is 500mm-600mm.
7. concrete delivery pump pipe connection transformational structure according to claim 1, it is characterised in that:
The internal diameter of the outer tube (31) is 125mm-175mm, and wall thickness 4.5mm-5mm, the length of outer tube (31) is 3m, 2m, 1m Or 0.5m;
The internal diameter of said inner tube (32) is 100mm-150mm, and wall thickness 8mm, the length of inner tube (32) is 3m, 2m, 1m or 0.5m.
8. concrete delivery pump pipe connection transformational structure according to claim 7, it is characterised in that: the compound pump line (3) include straight tube and bend pipe, the bend pipe include four kinds of forms, bending angle is respectively 90 degree, 45 degree, 30 degree or 15 degree, Corresponding turning radius is respectively 1000mm, 750mm, 500mm or 350mm.
9. a kind of construction method of concrete delivery pump pipe connection transformational structure according to any one of claims 1 to 8, It is characterized in that, construction procedure is as follows:
Step 1 processes compound pump line:
A, the internal diameter of type selecting outer tube (31), wall thickness, length, bend pipe angle, the size of turning radius and annular flange dish, will be annular Ring flange is welded in place;
B, the internal diameter, wall thickness of type selecting inner tube (32), length, bend pipe angle, the size of turning radius,
C, outer tube (31) is directly sleeved on to the outside of inner tube (32), inner tube (32) reserves the length of flange (33) and passes through hot melt Anti-package to annular flange dish (6) outer surface, flange ensure it is smooth, flatness be not more than 1mm;
Step 2, processing conversion pump line:
A, the internal diameter of original pump line (1) and the internal diameter of compound pump line (3) are determined;
B, according to the prefabricated production processing conversion pump line of the size of two sides pump line to be connected, loop method is socketed in ring flange connecting pin Blue disk (6) is snapping connection end open loop connected in star (4);
Step 3, the annular groove (4) for converting the annular groove (4) and original pump line that snap connection end of pump line are embedded in rubber Then two pipes are connected by buckle (5) connection, will convert the annular flange of the ring flange connecting pin of pump line (2) by washer (11) Disk is bolted by the annular flange dish (6) of flange bolt (9) and compound pump line (3) and is connected;
Step 4 carries out concreting experiment after conversion pump line (2) connection, verifies it and connects tightness and fastness;
Step 5 is required according to site operation, and different length and the compound pump line (3) of bend pipe angle is selected to carry out on-site assembly; It is all made of annular flange dish (6) between compound pump line to connect by flange bolt (9), firmly installs, it is ensured that pipeline is seamless, no Spillage;
Step 6, concrete pumping with pour: after compound pump line (3) installs, mixed according to regulation and code requirement Coagulate soil pumping with pour, concrete material performance and pouring construction method are consistent with original pump line;
Step 7 washes pipe:
Using rotating wash bowl air purge;
Rotating wash bowl needs to impregnate in water in advance 30 minutes or more when in use, after concrete pumping, rotating wash bowl is put into multiple Pump line end is closed, with pulsometer by rotating wash bowl reverse ejection to feed inlet;
Hopper inner concrete rise speed is observed when cleaning, beats pipeline, when sound becomes hollow sound, pipeline cleaning is finished.
10. the construction method of concrete delivery pump pipe connection transformational structure according to claim 9, it is characterised in that:
During the step 2 is connected with the ring flange in step 3, using interval jump point connection type, flange bolt (9) and annular Spring shim (10) are added between ring flange (6).
CN201910289665.1A 2019-04-11 2019-04-11 Concrete conveying pump pipe connection conversion structure and construction method thereof Active CN109899609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910289665.1A CN109899609B (en) 2019-04-11 2019-04-11 Concrete conveying pump pipe connection conversion structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910289665.1A CN109899609B (en) 2019-04-11 2019-04-11 Concrete conveying pump pipe connection conversion structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109899609A true CN109899609A (en) 2019-06-18
CN109899609B CN109899609B (en) 2024-02-13

Family

ID=66954577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910289665.1A Active CN109899609B (en) 2019-04-11 2019-04-11 Concrete conveying pump pipe connection conversion structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109899609B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115183061A (en) * 2022-09-13 2022-10-14 中铁建设集团有限公司 Steel structure super high-rise concrete conveying pump pipe assembly and installation and construction method thereof

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1673597A (en) * 2005-03-29 2005-09-28 三一重工股份有限公司 Steel-plastic composite pipe used for concrete pumping machinery and producing method thereof
CN2779198Y (en) * 2005-03-30 2006-05-10 三一重工股份有限公司 Steel-plastic composite pipe for concrete pumping machine
CN201013277Y (en) * 2007-01-31 2008-01-30 黄翠金 Quick-speed installing type sludge reclaiming pipe line
KR20110014815A (en) * 2009-08-06 2011-02-14 (주)광산 Flange adaptor for connecting a pipe system
CN102168454A (en) * 2011-04-06 2011-08-31 中国二十二冶集团有限公司 Self-compacting concrete jacking-nonnonreturn device
CN102563250A (en) * 2010-12-01 2012-07-11 伊原科技株式会社 Pipe connection structure
CN202402841U (en) * 2012-01-17 2012-08-29 湖南双马新材料科技有限公司 Crossover coupling device of threaded pipeline
DE102014010087A1 (en) * 2014-07-08 2016-01-14 Beiqi Foton Motor Co., Ltd. Connection end for a concrete delivery pipe
CN205207722U (en) * 2015-12-18 2016-05-04 中国水电建设集团十五工程局有限公司 Flat concrete check valve
CN205842095U (en) * 2016-06-22 2016-12-28 中国三冶集团有限公司 Concrete pumping composite conveying pipe in construction
CN206072570U (en) * 2016-09-20 2017-04-05 清华大学 A kind of wear-resistant self-lubricating concrete pump pipe
CN106838530A (en) * 2016-12-30 2017-06-13 中国石油天然气第建设有限公司 A kind of blowing pipeline quick-replaceable blasting piece device and method
CN108194729A (en) * 2018-01-31 2018-06-22 姜堰区达康机械配件厂 A kind of pipe connecting device
CN208074327U (en) * 2018-01-30 2018-11-09 新昌县皇骐电子科技有限公司 A kind of valve easy for installation of domestic type
CN108798024A (en) * 2017-04-27 2018-11-13 中建城市建设发展有限公司 A kind of anti-backflow concrete filled steel tube jacking interface arrangement and its construction method
CN208719627U (en) * 2018-09-19 2019-04-09 王世利 A kind of building water supply and drainage pipe connecting structure
CN209705474U (en) * 2019-04-11 2019-11-29 北京建工四建工程建设有限公司 A kind of concrete delivery pump pipe connection transformational structure

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1673597A (en) * 2005-03-29 2005-09-28 三一重工股份有限公司 Steel-plastic composite pipe used for concrete pumping machinery and producing method thereof
CN2779198Y (en) * 2005-03-30 2006-05-10 三一重工股份有限公司 Steel-plastic composite pipe for concrete pumping machine
CN201013277Y (en) * 2007-01-31 2008-01-30 黄翠金 Quick-speed installing type sludge reclaiming pipe line
KR20110014815A (en) * 2009-08-06 2011-02-14 (주)광산 Flange adaptor for connecting a pipe system
CN102563250A (en) * 2010-12-01 2012-07-11 伊原科技株式会社 Pipe connection structure
CN102168454A (en) * 2011-04-06 2011-08-31 中国二十二冶集团有限公司 Self-compacting concrete jacking-nonnonreturn device
CN202402841U (en) * 2012-01-17 2012-08-29 湖南双马新材料科技有限公司 Crossover coupling device of threaded pipeline
DE102014010087A1 (en) * 2014-07-08 2016-01-14 Beiqi Foton Motor Co., Ltd. Connection end for a concrete delivery pipe
CN205207722U (en) * 2015-12-18 2016-05-04 中国水电建设集团十五工程局有限公司 Flat concrete check valve
CN205842095U (en) * 2016-06-22 2016-12-28 中国三冶集团有限公司 Concrete pumping composite conveying pipe in construction
CN206072570U (en) * 2016-09-20 2017-04-05 清华大学 A kind of wear-resistant self-lubricating concrete pump pipe
CN106838530A (en) * 2016-12-30 2017-06-13 中国石油天然气第建设有限公司 A kind of blowing pipeline quick-replaceable blasting piece device and method
CN108798024A (en) * 2017-04-27 2018-11-13 中建城市建设发展有限公司 A kind of anti-backflow concrete filled steel tube jacking interface arrangement and its construction method
CN208074327U (en) * 2018-01-30 2018-11-09 新昌县皇骐电子科技有限公司 A kind of valve easy for installation of domestic type
CN108194729A (en) * 2018-01-31 2018-06-22 姜堰区达康机械配件厂 A kind of pipe connecting device
CN208719627U (en) * 2018-09-19 2019-04-09 王世利 A kind of building water supply and drainage pipe connecting structure
CN209705474U (en) * 2019-04-11 2019-11-29 北京建工四建工程建设有限公司 A kind of concrete delivery pump pipe connection transformational structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115183061A (en) * 2022-09-13 2022-10-14 中铁建设集团有限公司 Steel structure super high-rise concrete conveying pump pipe assembly and installation and construction method thereof

Also Published As

Publication number Publication date
CN109899609B (en) 2024-02-13

Similar Documents

Publication Publication Date Title
CN103982748B (en) A kind of modified model pipeline stainless steel inner lining restorative procedure
KR101188471B1 (en) The production technique by which the lining covering types are corrugated steel pipe & lining and this among these
CN209705474U (en) A kind of concrete delivery pump pipe connection transformational structure
CN109899609A (en) A kind of concrete delivery pump pipe connection transformational structure and its construction method
CN105351671B (en) A kind of many sections of jurisdiction splicing renovation technique and pipeline repairing structure
CN214466717U (en) Composite concrete pipe
CN207762406U (en) A kind of flexibility slide-in type socket joint connecting tube
CN206320464U (en) Repairing applied to PCCP pipe fittings connects section
CN107327004A (en) A kind of plastic inspection well and its assemble method
CN208535347U (en) A kind of high pressure resistant reinforced thermoplastics multiple tube
CN201464427U (en) Ultrasonic detection pipe of bridge foundation pile
CN215173170U (en) Electric melting flange connecting device of fiber reinforced composite pipe for coal mine
CN212319073U (en) Flared seamless joint with composite ring
CN204387536U (en) A kind of flanged connecting structure of spoil disposal steel pipe
CN101788084A (en) Socket reinforced composite plastic pipe and manufacturing process thereof
CN201326838Y (en) Steel-plastic composite pipe
CN206874988U (en) A kind of fiber reinforcement cement pipe joint
CN210661703U (en) Embedded steel cylinder type reinforced concrete drain pipe
CN101787721A (en) Preparation method of composite mud discharge pipe for dredge boat
CN207569421U (en) A kind of socket joint connecting tube for being capable of automatic aligning
CN201836547U (en) Socket-enhanced composite plastic pipe
CN209484138U (en) A kind of internal-rib reinforced plastics helical bellows are to connected components
CN203532999U (en) Drainage pipe with corrosion resistant inner lining layer
CN218954296U (en) Steel pipeline socket joint type connector
CN215442283U (en) Polyolefin winding solid wall inspection well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant