CN109899084A - A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method - Google Patents

A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method Download PDF

Info

Publication number
CN109899084A
CN109899084A CN201910130383.7A CN201910130383A CN109899084A CN 109899084 A CN109899084 A CN 109899084A CN 201910130383 A CN201910130383 A CN 201910130383A CN 109899084 A CN109899084 A CN 109899084A
Authority
CN
China
Prior art keywords
portal
tunnel
anchor
anchor pole
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910130383.7A
Other languages
Chinese (zh)
Inventor
赵辉
毛伟栋
桑丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Finance Bureau Highway Survey And Design Institute Co Ltd
Original Assignee
China Finance Bureau Highway Survey And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Finance Bureau Highway Survey And Design Institute Co Ltd filed Critical China Finance Bureau Highway Survey And Design Institute Co Ltd
Priority to CN201910130383.7A priority Critical patent/CN109899084A/en
Publication of CN109899084A publication Critical patent/CN109899084A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention is suitable for tunnel portal technical field of construction, it provides a kind of anchor and draws the light-duty tunnel portal of armored concrete and its construction method, tunnel portal includes tunnel mechanism, portal mechanism, the tunnel mechanism includes facing upward slope, tunnel, the one end in the tunnel has an opening, the opening is located at the bottom for facing upward slope, the portal mechanism includes portal wall, main reinforcement, multiple anchor poles, the portal wall is fixed on the opening, the inside of the portal wall has the through-hole in a connection tunnel, main ribs are located in the side wall of the portal wall and around the through-hole, one end of the multiple anchor pole is fixedly connected with main ribs, the other end of the multiple anchor pole protrudes into described face upward in slope, construction method is anchor pole embedded first and the casting concrete between anchor pole, then main reinforcement is installed and be fixedly connected with the one of main reinforcement and anchor pole End, finally pours portal wall, and the present invention has the characteristics of stabilized structure, construction is simple.

Description

A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method
Technical field
The invention belongs to the technical fields of tunnel portal construction more particularly to a kind of anchor to draw the light-duty Tunnel of armored concrete Door and its construction method.
Background technique
Normal concrete end wall tunnel portal maintains its own stability mainly by self gravity, and there are some defects, such as Portal design size is larger, side at hole, faces upward that slope excavation project amount is big, slope protection project amount is big.Entire duty cycle is long, right Ambient enviroment destroys big etc..
Summary of the invention
The present invention provides a kind of anchor and draws the light-duty tunnel portal of armored concrete and its construction method, it is intended to solve construction work Measure big problem.
The invention is realized in this way providing a kind of anchor drawing light-duty tunnel portal of armored concrete, including tunnel mechanism, hole Door machine structure;
The tunnel mechanism includes: to face upward slope, tunnel, and the one end in the tunnel has an opening, and the opening is located at institute State the bottom for facing upward slope;
The portal mechanism includes portal wall, main reinforcement, multiple anchor poles, and the portal wall is fixed on the opening, described The inside of portal wall has the through-hole in a connection tunnel, and main ribs are located in the side wall of the portal wall and around institute Through-hole is stated, one end of the multiple anchor pole is fixedly connected with main ribs, and the other end of the multiple anchor pole protrudes into described face upward in slope.
The present invention also provides preferred, the multiple anchor pole is parallel to each other between any two.
The present invention also provides preferred, the portal wall is fixed with a draining in face of described face upward at the top of the side wall on slope Slot.
The present invention also provides preferred, the anchor pole includes threaded rod, and one end of the threaded rod passes through a billet It is weldingly fixed in main ribs.
The present invention also provides preferred, multiple groups locating rod group is welded on the threaded rod, every group of locating rod group includes three The locating rod of root bending structure, the both ends of the locating rod are welded on the threaded rod.
The present invention also provides the construction methods that a kind of anchor draws the light-duty tunnel portal of armored concrete, and it is suitable for above-mentioned any A kind of anchor drawing light-duty tunnel portal of armored concrete, comprising the following steps:
Step 1: successively being excavated for burying downwards in the slope surface for facing upward slope of the one end in the tunnel along short transverse The bolthole of the anchor pole;
Step 2: the anchor pole is protruded into the bolthole;
Step 3: main ribs being placed in the one end in the tunnel, and are fixedly connected with one end of main reinforcement and anchor pole;
Step 4: in the outside of main ribs, perfusion wraps up the concrete of main ribs to constitute the portal wall.
The present invention also provides preferred, the bolthole is divided into multilayer according to the position in short transverse of the anchor pole, And in step 1, one layer of bolthole is excavated every time, then the corresponding anchor pole is installed in step 2, and in installation institute Before stating main reinforcement, it is repeated in and carries out step 1 and step 2 to install whole anchor poles.
Compared with prior art, the beneficial effects of the present invention are: a kind of anchor of the invention draws the light-duty tunnel of armored concrete Portal and its construction method, by the way that multiple anchor poles are arranged, one end of anchor pole is fixedly connected with the main reinforcement of portal within the walls, and the other end protrudes into It faces upward in slope, so as to be supported by anchor pole to portal wall, to maintain the stability of the slopes after portal wall, there is portal ruler Very little advantage small, protection works amount is small, the activity duration is short, environmental disruption is small.
Detailed description of the invention
Fig. 1 is the overall structure diagram that a kind of anchor of the invention draws the light-duty tunnel portal of armored concrete.
Fig. 2 is the structural schematic diagram of anchor pole of the invention.
In figure: the tunnel 1- mechanism, 11- face upward slope, the tunnel 12-, 2- portal mechanism, 21- portal wall, 22- main reinforcement, 23- anchor pole, 24- rhone, 231- threaded rod, 232 locating rods.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Embodiment 1
The present embodiment provides a kind of anchors to draw the light-duty tunnel portal of armored concrete and its construction method, packet referring to FIG. 1-2, Include tunnel mechanism 1, portal mechanism 2.
Tunnel mechanism 1 includes facing upward slope 11, tunnel 12, and the one end in tunnel 12 has an opening, and opening, which is located at, faces upward slope 11 Bottom, tunnel 12 are located at the inside for facing upward slope 11, and the one end in tunnel 12 has an opening for vehicles disengaging.
Portal mechanism 2 includes portal wall 21, main reinforcement 22, multiple anchor poles 23, and portal wall 21 is fixed on opening, portal wall 21 Inside there is the through-hole in a connection tunnel 12, main reinforcement 22 is located in the side wall of portal wall 21 and circular through-hole, main reinforcement 22 are adopted With reinforced mesh structure, so that the contact area between main reinforcement 22 and the concrete of portal wall 21 is bigger, portal wall 21 and main reinforcement Connection between 22 is more firm, and one end of multiple anchor poles 23 is fixedly connected with main reinforcement 22, and the other end of multiple anchor poles 23, which protrudes into, to be faced upward In slope, portal mechanism 2 is used to fix the opening in tunnel 12, prevents partial collapse, and main reinforcement 22 is irregular annular enclosed type Structure, and the edge of the opening around tunnel 12, portal wall 21 is formed using concreting and size is greater than opening for tunnel 12 Mouthful size, the through-hole anchor pole 23 with a connection opening in the middle part of portal wall 21 is spaced downwards along the short transverse for facing upward slope to be set It sets, and multiple anchor poles 23 are symmetrical set in the two sides of the Axisymmetric Distributed Line of the vertical direction of opening, multiple anchor poles 23 are between any two It is parallel to each other, mixed mud has been poured between anchor pole 23, and be connected and fixed between anchor pole 23 by concrete, thus anchor pole 23 and anchor Concrete between bar 23 constitutes the reinforced concrete wall of a connection portal wall 21, can further reinforce to portal wall 21.
Anchor pole 23 includes threaded rod 231, multiple groups locating rod group, and threaded rod 231 is able to maintain that the structural stability of anchor pole 23, And in 231 outside casting concrete of threaded rod, the company between concrete and threaded rod is firm, and contact area is big, every group of positioning Bar group includes the locating rod 232 of three bending structures, and the both ends of locating rod 232 are weldingly fixed on threaded rod 231, locating rod 232 use round reinforcing bar, and the angle formed between three locating rods 232 in same group of locating rod group is 120 degree, locating rod 232 pairs of threaded rods 231 are supported, so that the structure in slope 11 is more firm facing upward for threaded rod 231, one end of threaded rod 231 is logical Billet connection main reinforcement 22 is crossed, the side of main reinforcement 22 is close in the side of billet, and threaded rod 231 is perpendicular to billet, billet Two sides be fixedly connected by welding respectively threaded rod 231 and main reinforcement 22.
Portal wall 21 is fixed with a rhone 24 at the top of the side wall for facing upward slope 11, and rhone 24 will be for that will face upward slope The ponding flowed down on 11 is discharged from the two sides of portal wall 21, avoids ponding from being flushed on the road surface of the opening in tunnel 12, traffic work The opening traveling having in tunnel 12 is safer.
In conclusion a kind of anchor of the invention draws the light-duty tunnel portal of armored concrete, slope 11 is faced upward by multiple be fixed on Interior anchor pole 23 reinforces portal wall 21, to casting concrete between a anchor pole 23 so that anchor pole 23 and anchor pole 23 it Between concrete constitute connection portal wall 21 reinforced concrete wall, so that the structure of portal wall 21 is more firm, in addition, anchor pole 23 Self structure intensity is big, light weight, while the whole structural strength for increasing tunnel portal of the invention, and has excessive increasing Add tunnel portal quality, reduce the risk of partial collapse, use is safer, and easy for construction.
Embodiment 2
Please refer to Fig. 1 and Fig. 2, a kind of construction party of the anchor drawing light-duty tunnel portal of armored concrete provided in this embodiment Method, it is suitable for the anchors in embodiment 1 to draw the light-duty tunnel portal of armored concrete, and steps are as follows:
Step 1: successively being excavated for burying downwards in the slope surface for facing upward slope 11 of the one end in tunnel 12 along short transverse The bolthole of anchor pole 23, bolthole are divided into multilayer according to the position in short transverse of anchor pole 23, excavate one layer of bolthole every time.
Step 2: anchor pole 23 being protruded into bolthole, the casting concrete between anchor pole 23, the concrete note in bolthole Slurry uses slip casing by pressure, and grouting pressure is not less than 0.6Mpa.
Step 3: being repeated in and carry out step 1 and step 2 to install whole anchor poles 23, main reinforcement 22 is placed in tunnel 12 One end, and weld billet between main reinforcement 22 and anchor pole 23 to be fixedly connected with one end of main reinforcement 22 and anchor pole 23.
Step 4: in the outside of main reinforcement 22, perfusion wraps up the concrete of main reinforcement 22 to constitute portal wall 21.
In conclusion a kind of anchor of the present embodiment draws the construction method of the light-duty tunnel portal of armored concrete, excavate first Bolthole is to bury anchor pole 23, and then the casting concrete between anchor pole 23, the concrete between anchor pole 23 and anchor pole 23 are constituted Main reinforcement 22 is then placed in the one end in tunnel 23, and is fixedly welded the one of anchor pole 23 using billet by reinforced concrete wall End and main reinforcement 22 finally pour concrete of the concrete for being wrapped in 22 outside of main reinforcement to constitute portal wall 21, in portal wall 21 Concrete between anchor pole 23 is connected, and the present embodiment maintains the stability of slopes after portal wall 21, and anchor pole by anchor pole 23 Then prevent part from collapsing by relatively thin armored concrete between 23, stabilized structure, construction is simple.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (7)

1. a kind of anchor draws the light-duty tunnel portal of armored concrete, it is characterised in that: including tunnel mechanism, portal mechanism;
The tunnel mechanism includes: to face upward slope, tunnel, and the one end in the tunnel has an opening, and the opening is located at described face upward The bottom on slope;
The portal mechanism includes portal wall, main reinforcement, multiple anchor poles, and the portal wall is fixed on the opening, the portal The inside of wall has the through-hole in a connection tunnel, and main ribs are located in the side wall of the portal wall and around described logical Hole, one end of the multiple anchor pole are fixedly connected with main ribs, and the other end of the multiple anchor pole protrudes into described face upward in slope.
2. a kind of anchor as described in claim 1 draws the light-duty tunnel portal of armored concrete, it is characterised in that: the multiple anchor pole It is parallel to each other between any two.
3. a kind of anchor as described in claim 1 draws the light-duty tunnel portal of armored concrete, it is characterised in that: the portal wall A rhone is fixed at the top of the side wall for facing upward slope.
4. a kind of anchor as described in claim 1 draws the light-duty tunnel portal of armored concrete, it is characterised in that: the anchor pole includes One end of threaded rod, the threaded rod is weldingly fixed in main ribs by a billet.
5. a kind of anchor as claimed in claim 4 draws the light-duty tunnel portal of armored concrete, it is characterised in that: on the threaded rod It is welded with multiple groups locating rod group, every group of locating rod group includes the locating rod of three bending structures, the both ends welding of the locating rod On the threaded rod.
6. a kind of anchor draws the construction method of the light-duty tunnel portal of armored concrete, it is suitable for described in the claims 1 to 5 Any one anchor draws the light-duty tunnel portal of armored concrete, it is characterised in that: the following steps are included:
Step 1: successively being excavated downwards along short transverse for embedded described in the slope surface for facing upward slope of the one end in the tunnel The bolthole of anchor pole;
Step 2: the anchor pole being protruded into the bolthole, the casting concrete between anchor pole;
Step 3: main ribs being placed in the one end in the tunnel, and are fixedly connected with one end of main reinforcement and anchor pole;
Step 4: in the outside of main ribs, perfusion wraps up the concrete of main ribs to constitute the portal wall.
7. the construction method that a kind of anchor as claimed in claim 6 draws the light-duty tunnel portal of armored concrete, it is characterised in that: institute It states bolthole and multilayer is divided into according to the position in short transverse of the anchor pole, and in step 1, excavate one layer of anchor every time Then rod aperture installs the corresponding anchor pole in step 2, and before installing main ribs, be repeated in carry out step 1 and Step 2 is to install whole anchor poles.
CN201910130383.7A 2019-02-21 2019-02-21 A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method Pending CN109899084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910130383.7A CN109899084A (en) 2019-02-21 2019-02-21 A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910130383.7A CN109899084A (en) 2019-02-21 2019-02-21 A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method

Publications (1)

Publication Number Publication Date
CN109899084A true CN109899084A (en) 2019-06-18

Family

ID=66945252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910130383.7A Pending CN109899084A (en) 2019-02-21 2019-02-21 A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method

Country Status (1)

Country Link
CN (1) CN109899084A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839980A (en) * 2012-08-25 2012-12-26 张双茁 Highway tunnel structure and construction method thereof
CN104278993A (en) * 2013-07-11 2015-01-14 福州市规划设计研究院 Construction method of unsymmetrical loading tunnel heterotropic hole
CN105863650A (en) * 2016-05-20 2016-08-17 浙江省交通规划设计研究院 Tunneling construction method with first wall construction and second tunneling construction
CN205604287U (en) * 2016-04-29 2016-09-28 中铁五局集团机械化工程有限责任公司 Highway tunnel portal wall
DE102016003333A1 (en) * 2016-03-14 2017-12-14 Baumhaustechnik GbR (vertretungsberechtigte Gesellschafter: Dipl.-Ing. (FH) Karl Weißenmayer, 75365 Calw, Dipl. Dipl. (FH) Tobias Weißenmayer, 75365 Calw) Tunnel system with pressure optimization and bat protection
CN208330388U (en) * 2018-04-28 2019-01-04 云南省交通规划设计研究院 A kind of headwall formula Tunnel Portal Structures setting embedding anchor pole
CN209724350U (en) * 2019-02-21 2019-12-03 中交一公局公路勘察设计院有限公司 A kind of anchor drawing light-duty tunnel portal of armored concrete

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839980A (en) * 2012-08-25 2012-12-26 张双茁 Highway tunnel structure and construction method thereof
CN104278993A (en) * 2013-07-11 2015-01-14 福州市规划设计研究院 Construction method of unsymmetrical loading tunnel heterotropic hole
DE102016003333A1 (en) * 2016-03-14 2017-12-14 Baumhaustechnik GbR (vertretungsberechtigte Gesellschafter: Dipl.-Ing. (FH) Karl Weißenmayer, 75365 Calw, Dipl. Dipl. (FH) Tobias Weißenmayer, 75365 Calw) Tunnel system with pressure optimization and bat protection
CN205604287U (en) * 2016-04-29 2016-09-28 中铁五局集团机械化工程有限责任公司 Highway tunnel portal wall
CN105863650A (en) * 2016-05-20 2016-08-17 浙江省交通规划设计研究院 Tunneling construction method with first wall construction and second tunneling construction
CN208330388U (en) * 2018-04-28 2019-01-04 云南省交通规划设计研究院 A kind of headwall formula Tunnel Portal Structures setting embedding anchor pole
CN209724350U (en) * 2019-02-21 2019-12-03 中交一公局公路勘察设计院有限公司 A kind of anchor drawing light-duty tunnel portal of armored concrete

Similar Documents

Publication Publication Date Title
CN203795438U (en) Miniature anchored pile and soil nailing wall combined retaining structure
CN110939212A (en) Connecting structure and construction method of assembled shear wall structure
KR20110072814A (en) Constructing method of concrete pile having various cross-section
CN115094911A (en) Discontinuous construction method of prefabricated underground continuous wall
KR101631447B1 (en) Top-Down method of underground structure using the CFT and the Composite Beam
CN212153472U (en) Underground continuous wall water stop structure
CN109899084A (en) A kind of anchor draws the light-duty tunnel portal of armored concrete and its construction method
CN217870407U (en) Wall is led to concatenation formula
CN208605185U (en) Tunnel portal support device
KR101137475B1 (en) Double steel pipe foundation and construction method thereof
CN209724350U (en) A kind of anchor drawing light-duty tunnel portal of armored concrete
KR101861684B1 (en) Reinforced earth-anchor structure for weakground
KR20200132791A (en) Support Structure for Tunnel and Construction Method for the same
JPH1077644A (en) Earthquake resisting pile foundation construction method
CN112081596A (en) Reaction frame structure of shield starting well
JPS5945073B2 (en) Liner plate for shaft and its usage
CN210799010U (en) Tunnel construction is with consolidating stock
CN215168236U (en) Clamping assembly for masonry of filler wall and main body structure
CN212956547U (en) Foundation ditch support tower crane basis integral type structure
KR102272258B1 (en) Apparatus for withstanding against displacement, and construction method for the same
CN219118183U (en) Foundation pit supporting structure
CN213390165U (en) Deep groove enclosure structure
CN212896852U (en) To wearing bolt multicavity steel pipe-concrete aseismatic wall column base node
CN214785190U (en) Hollow floor structure
CN212427067U (en) Movable assembly type steel frame capable of replacing guide wall construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190618