CN109898508A - From wedging type pipe pile connector - Google Patents

From wedging type pipe pile connector Download PDF

Info

Publication number
CN109898508A
CN109898508A CN201910279487.4A CN201910279487A CN109898508A CN 109898508 A CN109898508 A CN 109898508A CN 201910279487 A CN201910279487 A CN 201910279487A CN 109898508 A CN109898508 A CN 109898508A
Authority
CN
China
Prior art keywords
anchor ear
pipe pile
type pipe
pile connector
wedging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910279487.4A
Other languages
Chinese (zh)
Inventor
郭增强
陈锋
闫鑫
蔡德钩
张千里
李中国
李溙丰
崔颖辉
王鹏程
王仲锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China State Railway Group Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS, China Railway Corp filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201910279487.4A priority Critical patent/CN109898508A/en
Publication of CN109898508A publication Critical patent/CN109898508A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to one kind from wedging type pipe pile connector comprising: the outer surface of at least two anchor ear sections, the anchor ear section is configured to wedge surface;From wedge ring, wherein described be configured to when vertically there is the movement relative to the wedge surface of the anchor ear section from the inner surface of wedge ring by mutual wedging.The pipe pile connector is not only simple in structure, and via the type connector carry out tubular pole connection it is time saving and energy saving, and connect after tubular pole resistance to plucking and shear resistance it is strong.

Description

From wedging type pipe pile connector
Technical field
The present invention relates to concrete pipe pile construction technical fields, and in particular to one kind be capable of Fast Installation from wedging type pipe Stake connector.
Background technique
Concrete tubular pile is widely used in due to the features such as bearing capacity is high, geological conditions is adaptable, speed of application is fast In architectural engineering.Tension reinforcing steel bar skeleton when the effect of the pile end board at concrete tubular pile both ends is specifically included that for making tubular pole, It is allowed to generate prestressing force;Piling machine hammering is born when piling;Etc. important function.Usually by two concrete in existing construction technology Tubular pole is welded together two root canal piles, this mode weld interval is long, and welding quality is mainly according to resistance to by welding pile end board In the welding technique of worker, when connector enters underground, the quality of connector is unable to get guarantee, and tubular pole bears transverse shear stresses Scarce capacity, easily generation joint breaking, the phenomenon that upper and lower two root canal pile shifts so that tubular pole loses its effect, weldering The tubular pole that the mode of connecing connects, tubular pole quality and service life cannot all ensure.Also occur using connector in the prior art The construction technology for realizing tubular pole connection, can actually improve the connection speed of tubular pole to a certain extent, but its bonding strength Be not achieved guarantee, especially anti-cross shear it is indifferent.
Therefore, a kind of bonding strength of demand is high in industry, connects short time limit and low-cost tube pile connection device.
Summary of the invention
The present invention is intended to provide a kind of can at least be partially solved the various insufficient from wedging type pipe of the above-mentioned prior art Stake connector.
According to an aspect of the invention, there is provided one kind is used to connect stacked two from wedging type pipe pile connector The end of root concrete tubular pile, the concrete tubular pile is provided with annular endplate, wherein the annular endplate is provided with along ring The protrusion of all evaginations, wherein the pipe pile connector includes: at least two anchor ear sections, week of the anchor ear section along annular endplate To the outside for being arranged in the protrusion, wherein the inside setting of the anchor ear section is fluted, the wherein cross sectional shape of the groove The cross sectional shape for two protrusions for being configured to and being stacked matches, and the outer surface of the anchor ear section is configured to wedge Face;From wedge ring, it is described from wedge ring along the outside for being arranged circumferentially in the anchor ear section of the anchor ear section, wherein described from wedge ring By mutual wedging when inner surface is configured to vertically there is relative motion with the wedge surface of the anchor ear section.
The present inventor has found according to its long-term site operation experience by means of indispensable in tubular pole operation Hammering downwards come be automatically realized tubular pole connection be it is feasible, thus design in the present invention from wedging type pipe pile connector. Inventor creatively has found may be implemented to connect via the vertical relative motion between tubular pole and pipe pile connector to be connected Connect connecting from wedging to realize tubular pole in such a way that whole process is not necessarily to manually participate in for device.With existing welding or by example The mode of such as bolt connector is compared, it is of the invention from wedging type pipe pile connector no matter in required operation construction period and operation In cost, still the bending strength and pulling test strength of tubular pole upon connection have apparent improvement.And it is of the invention from The features such as component of wedging type pipe pile connector is few, assembly is simple, versatile is highly suitable for the tubular pole of such as railway territory Outdoor study.
Preferably, wherein at least two anchor ears section has essentially identical size.This permission can be in a batch It produces anchor ear section and allows in general mode using the anchor ear section, this brings great convenience for outdoor study Property.
Preferably, wherein Duan Weisan anchor ear section of at least two anchor ear, wherein each anchor ear section is relative to the ring The periphery of shape end plate is in 120 degree of central angle.This is convenient for instructing worker to assemble the anchor ear section in a prescribed manner, to reduce A possibility that worker's maloperation.
Preferably, the wedging angle of the inner surface from wedge ring is relative to vertically at 5-10 degree.This facilitates ensuring that tubular pole Between enough wedge actions to ensure the bonding strength of connector, this wedge action is not substantially by worker's assembly method and outside The influence of environment is highly suitable for outdoor study environment.
Preferably, the depth of the groove is equal with the degree of protruding out of the protrusion of the annular endplate.This facilitates ensuring that pipe Enough wedge actions are between stake to ensure that the bonding strength of connector, this fit system facilitate worker to confirm that anchor ear section has filled With in place, being highly suitable for outdoor study environment.
Preferably, the concrete tubular pile further includes the pipe sleeve for being connected to the annular endplate, wherein in annular endplate and Solidification has concrete tube body in space between pipe sleeve, and the multiple channels passed through for reinforcing bar are offered in the concrete tube body. This facilitates ensuring that enough wedge actions between tubular pole to ensure the bonding strength of connector.
Preferably, the outer diameter of the protrusion is greater than the outer diameter of the pipe sleeve.This facilitates ensuring that enough wedgings between tubular pole Effect can prevent between stacked tubular pole that there are undesirable inclination or inclination angles to ensure the bonding strength of connector.
Preferably, the multiple channel circumferentially uniform arranged for interval in the concrete tube body.This is facilitated ensuring that Enough wedge actions are between tubular pole to ensure the bonding strength of connector.
Preferably, the thickness of the anchor ear section is designed to when by wedging against the extremely pipe sleeve.This this help to increase Contact surface between big anchor ear section and tubular pole ontology to be connected, and can be with to further increase the bonding strength between tubular pole Prevent between stacked tubular pole that there are undesirable inclination or inclination angles.
Preferably, the extended height vertically of the anchor ear section is at least 3 times of the thickness of annular endplate.This equally has Help increase the contact surface between anchor ear section and tubular pole ontology to be connected to further increase the bonding strength between tubular pole, and And it can prevent between stacked tubular pole that there are undesirable inclination or inclination angles.
It is obvious after reading the application that a part of other features and advantages of the present invention will be those skilled in the art , another part will be described in conjunction with the accompanying in specific embodiment below.
Detailed description of the invention
Hereinafter, carrying out the embodiment that the present invention will be described in detail in conjunction with attached drawing, in which:
Fig. 1 is the schematic cross-section of pipe pile connector according to the present invention.
Description of symbols
11,12. tubular pole 11A, 12A. annular endplate 11B, 12B. pipe sleeve
11C, 12C. protrusion 11D, 12D.The channel concrete tube body 11E, 12E.
2. 21. groove of anchor ear section, 22. wedge surface 3. is from 31. inner surface of wedge ring
Specific embodiment
Description, the exemplary scheme for disclosed device and method that the present invention will be described in detail.Although providing attached drawing It is in order to which some embodiments of the present invention are presented, but attached drawing need not be drawn by the size of specific embodiment, and certain spies Sign can be amplified, remove or office is cutd open to be better shown and explain the disclosure.Partial component in attached drawing can be Position adjustment is not carried out according to actual needs under the premise of influence technique effect.The phrase " in the accompanying drawings " occurred in the description Or similar term need not refer to all attached drawings or example.
It should be noted that it can be directly on another component when component is referred to as " fixation " to another component Or there may also be components placed in the middle.When a component is considered as " connection " another component, it, which can be, is directly connected to To another component or it may be simultaneously present component placed in the middle.When a component is considered as " setting " in another component, it It can be and be set up directly on another component or may be simultaneously present component placed in the middle.It hereinafter be used to describe attached drawing Certain directional terminologies, such as "inner", "outside", " top ", " lower section " and other directional terminologies, it will accordingly be understood that for it just It Chang Hanyi and criticizes and often sees those related directions when attached drawing.Except as otherwise indicating, directional terminology base described in this specification This is according to conventional direction understood by one of ordinary skill in the art.
Term used in the present invention " vertical " refers to generally there is vertical relationship in solid space, it is above-mentioned it is vertical simultaneously It is not intended to limit to be stringent vertical, but allows that there are certain inclinations.Term " first " used in the present invention, " the Two " and its similar terms, be not offered as any sequence, quantity or importance in the present invention, but for by a component with Other components distinguish.Term " from wedging ", which refers to, can be automatically realized wedging without external auxiliary device or operation.
With reference to the accompanying drawing, it elaborates to embodiments of the present invention.
As shown in Figure 1, the first tubular pole 11 and the second tubular pole 12 made of stacked concrete are shown, wherein the second tubular pole 12 have for example been partially inserted into underground.First tubular pole 11 and the second tubular pole 12 are provided with first annular end plate in its end respectively 11A and the second annular endplate 12A, wherein realizing the first tubular pole 11 via first annular end plate 11A and the second annular endplate 12A With the abutting of the second tubular pole 12 vertically and preliminary alignment.As shown, first annular end plate 11A and the second annular endplate 12A is provided with protrusion 11C and 12C along ring week evagination, wherein it is preferred that these protrusions 11C and 12C is having the same protrudes out Length will not make the first tubular pole 11 that can incite somebody to action to ensure in superposed first tubular pole 11 in the downward hammering for being subjected to piling machine Protrusion 12C topples over as bearing surface.
Preferably, it is connected at the periphery of first annular end plate 11A and the second annular endplate 12A vertically extending respectively The first pipe sleeve 11B and the second pipe sleeve 12B, wherein the first pipe sleeve 11B and the second pipe sleeve 12B for example can be iron sheet, thus The space for concrete mud injection is formed in space between annular endplate 11A and 12A and pipe sleeve 11B and 12B, The first concrete tube body 11D and the second concrete tube body 12D are respectively formed after the slurry curing.As shown, pipe sleeve 11B and The outer diameter of 12B is preferably designed to the outer diameter of the protrusion 11C and 12C less than evagination.Optionally, in order to enhance the first tubular pole 11 and the second bonding strength between tubular pole 12, it is respectively formed in the first concrete tube body 11D and the second concrete tube body 12D There are the multiple channel 11E and 12E passed through for reinforcing bar, wherein these channels are preferably circumferentially uniform in the concrete tube body Arranged for interval.Correspondingly, it offers on first annular end plate 11A and the second annular endplate 12A and aligns with these channels Eyelet to allow reinforcing bar to pass through.
Further, as shown in Figure 1, can via it is according to the present invention connected from wedging type pipe pile connector illustrate it is folded Two concrete tubular piles 11 and 12 set.It should include wherein at least two anchor ear sections 2 from wedging type pipe pile connector, as one kind Preferred embodiment, these anchor ear sections 2 have essentially identical size, it is possible thereby to realize the standardized production of anchor ear section.This A little anchor ear sections for example can be to be formed by iron casting comprising the periphery of entire annular endplate 11A and 12A is surrounded, certainly, It is conceivable that most of position of entire periphery is only surrounded, as long as guaranteeing to realize stable connection.It is feasible It is that setting is there are three anchor ear section, wherein each anchor ear section is in 120 degree of central angle relative to the periphery of the annular endplate, from And surround the periphery of entire annular endplate 11A and 12A.
As shown in Figure 1, these anchor ear sections 2 are arranged in the outer of protrusion 11C and 12C along the periphery of annular endplate 11A and 12A Side, wherein the inside of these anchor ear sections 2 is provided with groove 21, as shown in Figure 1, wherein the cross sectional shape of the groove 21 is constructed To match with the cross sectional shape of stacked two protrusions 11C and 12C so that it is guaranteed that forming shape when being compacted between the two Cooperation.As shown in Figure 1, stacked protrusion 11C and 12C be collectively formed it is generally trapezoidal for what is protruded outwardly, correspondingly, the groove 21 cross section is formed as complementary to it trapezoidal, to by two stacked protrusion 11C and 12C clampings and be maintained at stacked State, even if so that two annular endplate 11A and 12A will not still occur when by the shearing force on directions such as laterally it is apparent Relative shift or dislocation, which ensure that stacked tubular pole has enough bonding strengths.
Meanwhile the outer surface of anchor ear section 2 is configured to wedge surface 31, which for example may be constructed such that relative to vertical Direction expands outwardly 5-10 degree, is provided with around the periphery of these anchor ear sections 2 in the outside of anchor ear section 2 from wedge ring 3, wherein should It may be constructed such that the inclined-plane as shown in Figure 1 connecting with the formation wedge surface of wedge surface 22 from the inner surface of wedge ring 3, to work as these It can be with the mutual wedging of the medial slope from wedge ring 3, this wedge when the wedge surface 22 of anchor ear section 2 vertically has relative motion The wedging angle being tightly connected for example is can be at this time relative to vertically at 5-10 degree.It is this it is vertical on relative motion for example can be Since anchor ear section 2 can be moved down with the tubular pole hammered downwards, and then made from wedge ring 3 by being hampered by soil or ground At.Certainly, other realization anchor ear sections 2 and be also that can think from the mode that wedge ring 3 deposits relative motion vertically between the two It arrives, however it is not limited to the embodiment provided in this as example.
It is further preferred that as shown in Figure 1, wherein the outer diameter of protrusion 11C is greater than pipe sleeve 11B, such design pair Bonding strength between increasing tubular pole is beneficial, and can prevent between stacked tubular pole there are undesirable inclination or incline Angle.Likewise it is preferred that can by the thickness design of anchor ear section 2 be can be against to the pipe sleeve 11B when by wedging, this helps to increase Contact surface between big anchor ear section 2 and tubular pole ontology to be connected, and can to further increase the bonding strength between tubular pole To prevent between stacked tubular pole, there are undesirable inclination or inclination angles.Similarly, preferably by the prolonging vertically of anchor ear section At least 3 times for stretching the thickness that height is annular endplate, similarly help to increase in this way anchor ear section 2 and tubular pole ontology to be connect it Between contact surface to further increase bonding strength between tubular pole.
Next working method according to the present invention from wedging type pipe pile connector is described in a manner of infinite:
When needing to carry out piling work, by two root canal piles 11 and 12 to be connected via the annular endplate of two alignment 11A and 12A is stacked on top of each other good.Next, can arrange multiple anchor ear sections 2 with by annular endplate from annular endplate 11A and 12A The groove 21 of protrusion 11C and 12C stacked on top of each other and the anchor ear section 2 in 11A and 12A align.Then, make from wedge ring 3 The outside of these anchor ear sections 2 is set in surround these anchor ear sections 2 on the periphery of entire tubular pole.Then, allow piling machine Stacked tubular pole 11 and 12 is hammered downwards, as stacked tubular pole 11 and 12 moves downward, in annular endplate 11A and 12A Protrusion 11C and 12C stacked on top of each other can be moved downwardly together with these anchor ear sections 2, and due to being hampered by mud from wedge ring 3 Soil or ground, can not move downward same distance with tubular pole and anchor ear section 2, it is vertical between the two on relative motion meeting so that The wedge surface in the outside of anchor ear section 2 is formed with the wedge surface from the inside of wedge ring 3 closely from wedge action, thus by 2 jail of anchor ear section It is clamped on by ground from wedge ring 3 without depositing any apparent displacement in the axial direction or radially, this is remarkably contributing to really Enough bonding strengths of keeping stake.Meanwhile it is not difficult to find out that of the invention very time saving and energy saving from wedging type pipe pile connector, It only needs to be arranged in the way of regulation by anchor ear section 2 and from wedge ring 3 in advance by worker and can be carried out conventional hammering work Industry, the duration of operation and engineering cost is greatly saved in this.Further, it by actual Internal Experiment, finds via the present invention The tubular pole connected from wedging type pipe pile connector bending strength and pulling test strength all meet the existing construction reference of country.
The foregoing is merely the schematical specific embodiment of the present invention, the range being not intended to limit the invention.It is any Those skilled in the art, made equivalent variations, modification and combination under the premise of not departing from design and the principle of the present invention, It should belong to the scope of protection of the invention.

Claims (10)

1. one kind is used to connect two stacked concrete tubular piles from wedging type pipe pile connector, the concrete tubular pile End is provided with annular endplate, which is characterized in that the annular endplate is provided with the protrusion along ring week evagination, wherein described Pipe pile connector includes:
At least two anchor ear sections, the anchor ear section are arranged in the outside of the protrusion along the periphery of annular endplate, wherein described The inside setting of anchor ear section is fluted, and two protrusions that wherein cross sectional shape of the groove is configured to and is stacked are cut Face shape matches, and the outer surface of the anchor ear section is configured to wedge surface;
From wedge ring, it is described from wedge ring along the outside for being arranged circumferentially in the anchor ear section of the anchor ear section, wherein described from wedge ring Inner surface be configured to when vertically there is movement relative to the wedge surface of the anchor ear section by mutual wedging.
2. as described in claim 1 from wedging type pipe pile connector, which is characterized in that the wherein at least two anchor ears section tool There is essentially identical size.
3. as claimed in claim 2 from wedging type pipe pile connector, which is characterized in that wherein at least two anchor ears section is Three anchor ear sections, each anchor ear section are in 120 degree of central angle relative to the periphery of the annular endplate.
4. as described in claim 1 from wedging type pipe pile connector, which is characterized in that the wedge of the inner surface from wedge ring Tight angle is relative to vertically at 5-10 degree.
5. as described in claim 1 from wedging type pipe pile connector, which is characterized in that the depth of the groove and the annular The protruding length of the protrusion of end plate is equal.
6. as described in claim 1 from wedging type pipe pile connector, which is characterized in that the concrete tubular pile further includes connection To the pipe sleeve of the annular endplate, wherein solidification has concrete tube body in space between the annular endplate and pipe sleeve, institute State the multiple channels for offering in concrete tube body and passing through for reinforcing bar.
7. as claimed in claim 6 from wedging type pipe pile connector, which is characterized in that the outer diameter of the protrusion is greater than described The outer diameter of pipe sleeve.
8. as claimed in claim 6 from wedging type pipe pile connector, which is characterized in that the multiple channel is circumferentially described Uniform arranged for interval in concrete tube body.
9. as claimed in claim 6 from wedging type pipe pile connector, which is characterized in that the thickness of the anchor ear section is designed to Against the extremely pipe sleeve when by wedging.
10. as claimed in claim 9 from wedging type pipe pile connector, which is characterized in that the prolonging vertically of the anchor ear section At least 3 times for stretching the thickness that height is annular endplate.
CN201910279487.4A 2019-04-08 2019-04-08 From wedging type pipe pile connector Pending CN109898508A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910279487.4A CN109898508A (en) 2019-04-08 2019-04-08 From wedging type pipe pile connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910279487.4A CN109898508A (en) 2019-04-08 2019-04-08 From wedging type pipe pile connector

Publications (1)

Publication Number Publication Date
CN109898508A true CN109898508A (en) 2019-06-18

Family

ID=66955495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910279487.4A Pending CN109898508A (en) 2019-04-08 2019-04-08 From wedging type pipe pile connector

Country Status (1)

Country Link
CN (1) CN109898508A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635416A (en) * 2022-03-17 2022-06-17 深圳宏业基岩土科技股份有限公司 Construction method for preventing leakage of water of prestressed pipe pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007016446A (en) * 2005-07-06 2007-01-25 Shintoku Kogyo Kk Connection structure of concrete pile
CN201924349U (en) * 2011-02-14 2011-08-10 江苏建华管桩有限公司 Anchor ear type connecting clamp for uplift pipe piles
CN202787248U (en) * 2012-09-21 2013-03-13 天津港航桩业有限公司 Hoop type mechanical quick connector for prestress concrete pipe piles
CN204000972U (en) * 2014-05-29 2014-12-10 齐齐哈尔大学 A kind of fixture of pile for prestressed pipe resistance to plucking test
CN107268606A (en) * 2017-07-21 2017-10-20 宁乡宁华建材有限公司 A kind of variable cross-section concrete tubular pile
CN209873786U (en) * 2019-04-08 2019-12-31 中国铁道科学研究院集团有限公司铁道建筑研究所 Self-wedging tubular pile connector

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007016446A (en) * 2005-07-06 2007-01-25 Shintoku Kogyo Kk Connection structure of concrete pile
CN201924349U (en) * 2011-02-14 2011-08-10 江苏建华管桩有限公司 Anchor ear type connecting clamp for uplift pipe piles
CN202787248U (en) * 2012-09-21 2013-03-13 天津港航桩业有限公司 Hoop type mechanical quick connector for prestress concrete pipe piles
CN204000972U (en) * 2014-05-29 2014-12-10 齐齐哈尔大学 A kind of fixture of pile for prestressed pipe resistance to plucking test
CN107268606A (en) * 2017-07-21 2017-10-20 宁乡宁华建材有限公司 A kind of variable cross-section concrete tubular pile
CN209873786U (en) * 2019-04-08 2019-12-31 中国铁道科学研究院集团有限公司铁道建筑研究所 Self-wedging tubular pile connector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114635416A (en) * 2022-03-17 2022-06-17 深圳宏业基岩土科技股份有限公司 Construction method for preventing leakage of water of prestressed pipe pile
CN114635416B (en) * 2022-03-17 2024-01-23 深圳宏业基岩土科技股份有限公司 Construction method for preventing water leakage of prestressed pipe pile

Similar Documents

Publication Publication Date Title
US20150225917A1 (en) Structural foundation
US8206063B2 (en) Concentrically loaded, adjustable piering system
KR100789426B1 (en) Composite pile
CN209722702U (en) Pipe pier and cushion cap connection structure
CN109853363A (en) Pipe pier and cushion cap connection structure and construction method
KR20140122724A (en) Joint structure for steel bridge pier and concrete pile foundation
CN109898508A (en) From wedging type pipe pile connector
KR102162125B1 (en) Pile and Coping for Bridge Construction
CN211368680U (en) Slurry anchor sleeve type precast pile connecting structure
KR20170139186A (en) Connecting structure between column and footing structure
KR101727206B1 (en) The smart front end cap for adjusting phc file length and the method using thereof
CN209873786U (en) Self-wedging tubular pile connector
JP6256383B2 (en) Column and pile joining method and structure
KR101252027B1 (en) Coupling apparatus of pile
JP4430496B2 (en) Pile head joint structure and construction method
CN215758594U (en) Widened pier column steel column tie beam device
CN206591540U (en) Basement bottom board cushion cap and engineering pile attachment structure
KR101148815B1 (en) Composite pile connected inner connecting member and composite construction method using the same
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
KR100720065B1 (en) Connecting structure for pile and column of building having member for length adjustment
RU2006102080A (en) SEPARATE SUPPORT OF A CONTACT NETWORK ESTABLISHED ON PUCCHIST SOILS
CN108222018B (en) Construction method for joint of double-row pile top crown beam and connecting beam
CN208137131U (en) A kind of steel-structure beam-column node
CN217150186U (en) Precast pile connecting structure with controllable installation precision and whole pile structure
CN209873785U (en) Tubular pile connector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination