CN109894477A - A kind of high precision steel tube equipment of hot rolling - Google Patents

A kind of high precision steel tube equipment of hot rolling Download PDF

Info

Publication number
CN109894477A
CN109894477A CN201910192104.XA CN201910192104A CN109894477A CN 109894477 A CN109894477 A CN 109894477A CN 201910192104 A CN201910192104 A CN 201910192104A CN 109894477 A CN109894477 A CN 109894477A
Authority
CN
China
Prior art keywords
compression roller
steel pipe
shaping
slide plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910192104.XA
Other languages
Chinese (zh)
Other versions
CN109894477B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Changxin Anti Corrosion Engineering Co ltd
Ningxia Jinyuan Petroleum Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910192104.XA priority Critical patent/CN109894477B/en
Publication of CN109894477A publication Critical patent/CN109894477A/en
Application granted granted Critical
Publication of CN109894477B publication Critical patent/CN109894477B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention belongs to steel pipe shaping technique field, specifically a kind of high precision steel tube equipment of hot rolling, including rack, controller and control panel;First compression roller both ends are socketed with fixed disk and the second compression roller;Second compression roller is slidably socketed in the first press roll surface;The second twin shaft cylinder is fixed between second compression roller and adjacent fixed disk;Pressure inductor and distance-sensor are equipped between first press roll surface and two adjacent second compression rollers of vertical direction;The present invention controls the first twin shaft cylinder by pressure inductor and distance-sensor and the second twin shaft cylinder realizes the movement of the first compression roller and the second compression roller, so as to adjust the accuracy of steel pipe shaping, the present invention is suitable for the steel pipe shaping of various criterion simultaneously, biggish steel pipe can carry out step-by-step processing when can not carry out disposable shaping, gradually shaping to ideal form, structure is simple and convenient to operate.

Description

A kind of high precision steel tube equipment of hot rolling
Technical field
The invention belongs to steel pipe shaping technique field, specifically a kind of high precision steel tube equipment of hot rolling.
Background technique
The development of steel pipe's production technology starts from the manufacturing rise of bicycle, the exploitation of 19th century younger oil, twice The manufacture of naval vessel, boiler, aircraft during world war, the manufacture of apparatus of thermo-electric power boiler after World War II, the hair of chemical industry Exhibition and the drilling of petroleum gas and transport etc., all effectively push hair of the Steel Tube Industries in kind, yield and quality Exhibition, steel pipe are applied not only to trandfer fluid and powdery solid, exchange thermal energy, manufacture machine components and container, it or a kind of economy Steel.Building structure rack, pillar and machinery mount are manufactured with steel pipe, weight can be mitigated, saves metal 20-40%, and Batch production mechanized construction can be achieved, steel can be saved, simplify construction by manufacturing highway bridge not only with steel pipe, and can be subtracted significantly The area of few stopping off, investment reduction and maintenance cost.
The shaping of steel pipe steel pipe in process of production is one of important step, and steel pipe is mainly passed through extruding by steel pipe shaping So that steel pipe is reached length, width and the height of setting, while guaranteeing to facilitate steel pipe shaping to cuboid at subsequent processing Reason, saves material simultaneously.
Steel pipe shaping is rotated usually using the module of different in width and height in the prior art, makes steel tube extrusion at setting Length height and width need steel pipe to reciprocate through repeatedly in extrusion process, wasting manpower and material resources, while steel pipe is reciprocal It needs to overturn steel pipe in the process, be bent after steel pipe shaping is easy to cause in switching process, increase the degree of difficulty of shaping, And the Immobility of compression roller, a pair of of compression roller are only applicable to a kind of steel pipe shaping of standard, there are larger when making steel pipe shaping Use limitation.
Summary of the invention
In order to make up for the deficiencies of the prior art, it solves to need back and forth when steel pipe shaping, wasting manpower and material resources, steel pipe are past Overturning is carried out during multiple leads to tube bending, increases shaping degree of difficulty and can not be suitable for asking for different steel pipe shapings Topic, a kind of high precision steel tube equipment of hot rolling proposed by the present invention.
The technical solution adopted by the present invention to solve the technical problems is: a kind of high precision steel tube hot rolling of the present invention Equipment, including rack, controller and control panel;The control panel is electrically connected with the controller, and is worked for control device;Institute The design of rack " u "-shaped is stated, and rack both ends are fixed with the first twin shaft cylinder;The both ends of the first twin shaft cylinder are fixed with Fixed link;First compression roller is rotatably connected between horizontal two opposite fixed links;Two fixed links in left side Motor has been respectively fixedly connected in surface, and the shaft of motor passes through the left end that fixed link is fixed on the first compression roller;First compression roller Both ends are socketed with fixed disk and the second compression roller;Second compression roller is located between two fixed disks;Described second squeezes Roller is slidably socketed in the first press roll surface, and fixed disk is fixedly sheathed in the first press roll surface;Second compression roller and phase The second twin shaft cylinder is fixed between adjacent fixed disk;Uniformly extraneous gas source connects for the first twin shaft cylinder and the second twin shaft cylinder It is logical, and be electrically connected with the controller;When work, the flexible of the first twin shaft cylinder and the second twin shaft cylinder is controlled by controller, from And the movement of the first compression roller and the second compression roller is controlled, to control the width after steel pipe shaping, height and length, simultaneously Controller can control the rotating forward and reversion of motor, when biggish steel pipe can not carry out that motor can be passed through when disposable whole forms function Positive and negative rotation realize the positive and negative rotation of the first compression roller and the second compression roller, realize the repetition shaping of steel pipe, and repeat reforming process In, the first compression roller and the second compression roller are controlled by controller and are moved, and realize the gradually shaping of steel pipe, final shaping to ideal Shaping uneven thorough problem when form, shaping gradually can effectively prevent steel pipe disposable shaping, while first can be prevented Compression roller and the second compression roller stress is excessive causes to damage.
Preferably, pressure is equipped between first press roll surface and two adjacent second compression rollers of vertical direction Power inductor and distance-sensor;The pressure inductor and distance-sensor are electrically connected with the controller;When work, by away from Moving distance from inductor induction the first compression roller and the second compression roller, when the first compression roller and the second compression roller it is mobile away from When from the setting value for being greater than control panel input, pressure inductor is fed back to the first compression roller of control and the second compression roller pair The pressure of steel pipe, when the moving distance of the first compression roller and the second compression roller is less than the setting value of control panel input, distance Inductor feeds back to pressure inductor, improves the first compression roller and the second compression roller to the pressure of steel pipe, whole so as to adjust steel pipe Accuracy when shape realizes the intelligent shaping of steel pipe, guarantees the accuracy of steel pipe shaping.
Preferably, top the second press roll surface fixing sleeve is connected to the first extrusion ring;Lower section second compression roller Surface fixing sleeve is connected to the second extrusion ring;The first groove is offered in first extrusion ring, the second extrusion ring can penetrate first In groove;When work, when the first compression roller is opposite and is moved away from, the second extrusion ring is slided in the first extrusion ring, is played good Good heat insulating function prevents high temperature when steel pipe shaping from influencing the work of pressure sensor and range sensor, while first squeezes Pressure ring and the second extrusion ring can prevent tube material when steel pipe shaping from entering gap between the second compression roller, and shaping is caused to fail, Waste material.
Preferably, first extrusion ring is equipped with close to the side side of fixed disk and is evenly arranged distance-sensor, away from It is electrically connected with the controller from inductor, while controller is electrically connected with alarm;When work, in steel pipe reforming process, by more The data that a distance-sensor provides, whether consistent, controller when inconsistent if analyzing distance between two the second compression rollers up and down Control alarm equipment alarm, apparatus for examination and repair, while can be convex by being formed between the first extrusion ring of eye-observation and the second extrusion ring It whether equal plays size, the first compression roller and the second compression roller run-off the straight is prevented by double insurance, steel pipe shaping is caused to be lost It loses, can lead to the damage of device when serious.
Preferably, the second compression roller opposite side side offers the second groove of circular ring shape;Described second is recessed The first spring being evenly arranged is equipped in slot;First spring be fixed on the first press roll surface and the second groove inner wall it Between, and two adjacent the first springs are in contact with each other setting;Sliding is provided with the first slide plate in second groove;Described first The design of slide plate circular ring shape, and the first sled surface cambered surface designs, and steel pipe can be made more easily to enter between the first slide plate, when initial First slide plate contacts the setting of the first spring surface, the first spring be contracted to completely can not deformation when, with second in the middle part of the first slide plate Press roll surface is parallel;When work, when steel pipe is inserted into progress shaping between the first compression roller and the second compression roller, inclined-plane setting First slide plate can prevent steel pipe that can not be inserted into, can since the second groove can be such that the second compression roller interior air-flow flows in reforming process Effectively cool down to the second compression roller, enhances the service life of the second compression roller.
Preferably, second compression roller offers the cavity being evenly arranged close to the side side of fixed disk;The sky Chamber is using the first compression roller as center of circle circumference;The second slide plate is slidably connected in the cavity;Second slide plate is close to Second spring is fixed between the side side of one compression roller and cavity inner wall;Empty cavity space connection above second slide plate Second groove and the external world;When work, during the rotating and reverse of the second compression roller, pass through centrifugal force suffered by the second slide plate and The effect of two spring tensions moves up and down the second slide plate, to accelerate the flowing of the second groove interior air-flow, while making the second groove Interior air-flow and air exchange cool down to the second compression roller and extrusion ring, improve service using life.
Beneficial effects of the present invention are as follows:
1. a kind of high precision steel tube equipment of hot rolling of the present invention passes through the first twin shaft cylinder of setting and the second twin shaft gas Cylinder controls the flexible of the first twin shaft cylinder and the second twin shaft cylinder by controller, so that the first compression roller of control and second squeezes The movement of pressure roller makes device be suitable for the steel pipe shaping of various criterion, while can carry out shaping to steel pipe step by step, prevents steel pipe whole Shape is halfway while damaging to device.
2. a kind of high precision steel tube equipment of hot rolling of the present invention, by the way that pressure inductor and distance-sensor is arranged, By the feedback between pressure inductor and distance-sensor, accuracy when steel pipe shaping is improved, while steel pipe presence can not Alarm can be fed back to by distance-sensor and pressure inductor when shaping, device is adjusted, prevent the waste of material.
3. a kind of high precision steel tube equipment of hot rolling of the present invention, by setting cavity, the first spring, the second groove, Second spring and the second slide plate can be such that the second groove interior air-flow flows by the effect of centrifugal force and second spring, squeeze to second Pressure roller is effectively cooled down, to improve the service life of device.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings.
Fig. 1 is main view of the invention;
Fig. 2 is the cross-sectional view of A-A in Fig. 1;
Fig. 3 is the cross-sectional view of B-B in Fig. 1;
In figure: rack 1, the first twin shaft cylinder 11, fixed link 12, the first compression roller 13, motor 14, fixed disk 15, second Compression roller 16, the second twin shaft cylinder 17, the first extrusion ring 2, the second extrusion ring 21, the first groove 22, the second groove 3, the first bullet Spring 31, the first slide plate 32, cavity 33, the second slide plate 34, second spring 35.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below Specific embodiment is closed, the present invention is further explained.
As shown in Figure 1 to Figure 3, a kind of high precision steel tube equipment of hot rolling of the present invention, including rack 1, controller and Control panel;The control panel is electrically connected with the controller, and is worked for control device;1 " u "-shaped of the rack design, and machine 1 both ends of frame are fixed with the first twin shaft cylinder 11;The both ends of the first twin shaft cylinder 11 are fixed with fixed link 12;Horizontal phase Pair two fixed links 12 between be rotatably connected to first compression roller 13;12 surface of the fixed link difference of two of left side It is fixed with motor 14, the shaft of motor 14 passes through the left end that fixed link 12 is fixed on the first compression roller 13;First compression roller 13 both ends are socketed with fixed disk 15 and the second compression roller 16;Second compression roller 16 is located between two fixed disks 15;Institute It states the second compression roller 16 to be slidably socketed in 13 surface of the first compression roller, fixed disk 15 is fixedly sheathed in 13 surface of the first compression roller; The second twin shaft cylinder 17 is fixed between second compression roller 16 and adjacent fixed disk 15;First twin shaft cylinder, 11 He The uniformly extraneous gas source connection of second twin shaft cylinder 17, and be electrically connected with the controller;When work, the first twin shaft is controlled by controller Cylinder 11 and the second twin shaft cylinder 17 it is flexible, thus the movement of control the first compression roller 13 and the second compression roller 16, to control Width, height and length after steel pipe shaping processed, while controller can control the rotating forward and reversion of motor 14, when biggish Steel pipe can not carry out realizing the first compression roller 13 and the second compression roller by the positive and negative rotation of motor 14 when disposable whole forms function 16 positive and negative rotation realizes the repetition shaping of steel pipe, and repeats in reforming process that the first compression roller 13 and the second compression roller 16 pass through Controller control movement, realizes that the gradually shaping of steel pipe, final shaping to ideal form, shaping gradually can effectively prevent steel pipe Shaping uneven thorough problem when disposable shaping, while the first compression roller 13 and 16 stress of the second compression roller can be prevented excessive Cause to damage.
As one embodiment of the present invention, 13 surface of the first compression roller and vertical direction two adjacent Pressure inductor and distance-sensor are equipped between two compression rollers 16;The pressure inductor and distance-sensor with control Device electrical connection;When work, the moving distance of the first compression roller 13 and the second compression roller 16 is incuded by distance-sensor, when first When the mobile distance of compression roller 13 and the second compression roller 16 is greater than the setting value of control panel input, feed back to pressure inductor from And the first compression roller 13 and the second compression roller 16 are controlled to the pressure of steel pipe, when the shifting of the first compression roller 13 and the second compression roller 16 When dynamic distance is less than the setting value of control panel input, distance-sensor feeds back to pressure inductor, improves the first compression roller 13 With the second compression roller 16 to the pressure of steel pipe, accuracy when so as to adjust steel pipe shaping realizes the intelligent shaping of steel pipe, guarantees The accuracy of steel pipe shaping.
As one embodiment of the present invention, the top 16 surface fixing sleeve of the second compression roller is connected to the first extrusion ring 2;The lower section 16 surface fixing sleeve of the second compression roller is connected to the second extrusion ring 21;First is offered in first extrusion ring 2 Groove 22, the second extrusion ring 21 can penetrate in the first groove 22;When work, when the first compression roller 13 is opposite and is moved away from, the Two extrusion rings 21 are slided in the first extrusion ring 2, play good heat insulating function, prevent high temperature when steel pipe shaping from influencing pressure The work of sensor and range sensor, while steel tubing when the first extrusion ring 2 and the second extrusion ring 21 can prevent steel pipe shaping Material enters gap between the second compression roller 16, and shaping is caused to fail, and wastes material.
As one embodiment of the present invention, first extrusion ring 2 is equipped with close to the side side of fixed disk 15 It is evenly arranged distance-sensor, distance-sensor is electrically connected with the controller, while controller is electrically connected with alarm;When work, In steel pipe reforming process, the data provided by multiple distance-sensors analyze distance between two the second compression rollers 16 up and down Whether consistent, controller controls alarm equipment alarm, apparatus for examination and repair when inconsistent, while can pass through the first extrusion ring of eye-observation 2 And second the raised size that is formed between extrusion ring 21 it is whether equal, prevent the first compression roller 13 and second from squeezing by double insurance 16 run-off the straight of pressure roller causes steel pipe shaping to fail, can lead to the damage of device when serious.
As one embodiment of the present invention, the 16 opposite side side of the second compression roller offers circular ring shape Second groove 3;The first spring 31 being evenly arranged is equipped in second groove 3;First spring 31 is fixed on first and squeezes Between 3 inner wall of 13 surface of pressure roller and the second groove, and two adjacent the first springs 31 are in contact with each other setting;Second groove Sliding is provided with the first slide plate 32 in 3;First slide plate, the 32 circular ring shape design, and 32 surface cambered surface of the first slide plate designs, it can Enter steel pipe more easily between the first slide plate 32, the first slide plate 32 contact 31 surface of the first spring setting when initial, first Spring 31 be contracted to completely can not deformation when, the middle part of the first slide plate 32 is parallel with 16 surface of the second compression roller;When work, steel pipe is inserted When entering to carry out shaping between the first compression roller 13 and the second compression roller 16, the first slide plate 32 of inclined-plane setting can prevent steel pipe can not Insertion, since the second groove 3 can be such that 16 interior air-flow of the second compression roller flows in reforming process, can effectively to the second compression roller 16 into Row cooling, enhances the service life of the second compression roller 16.
As one embodiment of the present invention, second compression roller 16 is offered close to the side side of fixed disk 15 The cavity 33 being evenly arranged;The cavity 33 is with the first compression roller 13 for center of circle circumference;It is slidably connected in the cavity 33 There is the second slide plate 34;Second slide plate 34 is fixed between 33 inner wall of side side and cavity of the first compression roller 13 Two springs 35;Space is connected to the second groove 3 and the external world in second slide plate, the 34 top cavity 33;When work, the second compression roller During 16 rotate and reverse, the second slide plate is made by the effect of 35 pulling force of centrifugal force suffered by the second slide plate 34 and second spring 34 move up and down, to accelerate the flowing of 3 interior air-flow of the second groove, while making 3 interior air-flow of the second groove and air exchange, to second Compression roller 16 and extrusion ring cool down, and improve service using life.
When work, the flexible of the first twin shaft cylinder 11 and the second twin shaft cylinder 17 is controlled by controller, thus control the The movement of one compression roller 13 and the second compression roller 16 controls simultaneously to control the width after steel pipe shaping, height and length Device can control the rotating forward and reversion of motor 14, can be by motor 14 when biggish steel pipe can not carry out disposable whole formation function Positive and negative rotation realize the positive and negative rotation of the first compression roller 13 and the second compression roller 16, realize the repetition shaping of steel pipe, and repeat shaping In the process, the first compression roller 13 and the second compression roller 16 are controlled by controller moves, and realizes the gradually shaping of steel pipe, final whole Shape is to ideal form, in reforming process, by distance-sensor incude the movement of the first compression roller 13 and the second compression roller 16 away from From feeding back to pressure when the mobile distance of the first compression roller 13 and the second compression roller 16 is greater than the setting value of control panel input Power inductor is to control the first compression roller 13 and the second compression roller 16 to the pressure of steel pipe, when the first compression roller 13 and second squeezes When the moving distance of pressure roller 16 is less than the setting value of control panel input, distance-sensor feeds back to pressure inductor, improves the One compression roller 13 and the second compression roller 16 are to the pressure of steel pipe, accuracy when so as to adjust steel pipe shaping, the first compression roller 13 It is opposite that the second extrusion ring 21 is slided in the first extrusion ring 2 with when being moved away from, meanwhile, it is provided by multiple distance-sensors Data, analyze up and down whether distance consistent between two the second compression rollers 16, controller controls alarm equipment alarm when inconsistent, Apparatus for examination and repair, at the same can by the raised size that is formed between eye-observation the first extrusion ring 2 and the second extrusion ring 21 whether phase Deng preventing 16 run-off the straight of the first compression roller 13 and the second compression roller, during the rotating and reverse of the second compression roller 16, pass through The effect of 35 pulling force of centrifugal force suffered by second slide plate 34 and second spring moves up and down the second slide plate 34, so that it is recessed to accelerate second The flowing of 3 interior air-flow of slot, while making 3 interior air-flow of the second groove and air exchange.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (6)

1. a kind of high precision steel tube equipment of hot rolling, it is characterised in that: including rack (1), controller and control panel;The control Device is electrically connected with control panel, is worked for control device;Rack (1) the " u "-shaped design, and rack (1) both ends are connected There is the first twin shaft cylinder (11);The both ends of the first twin shaft cylinder (11) are fixed with fixed link (12);Horizontal opposite two First compression roller (13) is rotatably connected between a fixed link (12);Fixed link (12) the surface difference of two of left side It is fixed with motor (14), the shaft of motor (14) passes through the left end that fixed link (12) are fixed on the first compression roller (13);Described One compression roller (13) both ends are socketed with fixed disk (15) and the second compression roller (16);Second compression roller (16) is located at two Between fixed disk (15);Second compression roller (16) is slidably socketed in the first compression roller (13) surface, and fixed disk (15) is fixed It is socketed on the first compression roller (13) surface;Second pair is fixed between second compression roller (16) and adjacent fixed disk (15) Axis cylinder (17);Uniformly extraneous gas source is connected to the first twin shaft cylinder (11) with the second twin shaft cylinder (17), and and controller Electrical connection can control stretching for the first twin shaft cylinder (11) and the second twin shaft cylinder (17), to control steel pipe by controller Width, height and length after shaping, while the rotating forward and reversion of controllable motor (14) make biggish steel pipe can not be into Step-by-step processing is carried out when the disposable shaping of row, gradually shaping to ideal form.
2. a kind of high precision steel tube equipment of hot rolling according to claim 1, it is characterised in that: first compression roller (13) Pressure inductor and distance-sensor are equipped between surface and two adjacent second compression rollers (16) of vertical direction;It is described Pressure inductor and distance-sensor are electrically connected with the controller, and can control first pair by pressure inductor and distance-sensor Axis cylinder (11) and the second twin shaft cylinder (17) realize the movement of the first compression roller (13) and the second compression roller (16), so as to adjust The accuracy of steel pipe shaping.
3. a kind of high precision steel tube equipment of hot rolling according to claim 2, it is characterised in that: top second compression roller (16) surface fixing sleeve is connected to the first extrusion ring (2);Lower section the second compression roller (16) surface fixing sleeve is connected to the second extruding Ring (21);It is offered the first groove (22) in first extrusion ring (2), the second extrusion ring (21) can penetrate the first groove (22) It is interior, steel when preventing high temperature when steel pipe shaping from influencing the work of pressure sensor and range sensor, while preventing steel pipe shaping Tube material enters gap between the second compression roller (16), and shaping is caused to fail.
4. a kind of high precision steel tube equipment of hot rolling according to claim 3, it is characterised in that: first extrusion ring (2) It is equipped with close to the side side of fixed disk (15) and is evenly arranged distance-sensor, distance-sensor is electrically connected with the controller, together When controller be electrically connected with alarm, the data provided by distance-sensor, analysis up and down two the second compression rollers (16) it Between distance it is whether consistent, and between observation the first extrusion ring (2) and the second extrusion ring (21) the raised size that is formed whether one It causes, inconsistent alarm device can carry out early warning prompting, prevent the first compression roller (13) and the second compression roller (16) run-off the straight, lead Cause steel pipe shaping failure.
5. a kind of high precision steel tube equipment of hot rolling according to claim 1, it is characterised in that: second compression roller (16) Opposite side side offers the second groove (3) of circular ring shape;The first bullet being evenly arranged is equipped in second groove (3) Spring (31);First spring (31) is fixed between the first compression roller (13) surface and the second groove (3) inner wall, and adjacent Two the first springs (31) are in contact with each other setting;Sliding is provided with the first slide plate (32) in second groove (3);Described first The design of slide plate (32) circular ring shape, and the first slide plate (32) surface cambered surface designs, and steel pipe can be made more easily to enter the first slide plate (32) between, first slide plate (32) contact the first spring (31) surface setting, the first spring (31) are contracted to nothing completely when initial It is parallel with the second compression roller (16) surface in the middle part of the first slide plate (32) when method deformation, effectively the second compression roller (16) can be carried out Cooling enhances the service life of the second compression roller (16).
6. a kind of high precision steel tube equipment of hot rolling according to claim 5, it is characterised in that: second compression roller (16) Side side close to fixed disk (15) offers the cavity (33) being evenly arranged;The cavity (33) is with the first compression roller (13) For center of circle circumference;The second slide plate (34) are slidably connected in the cavity (33);Second slide plate (34) is close to first Second spring (35) are fixed between the side side and cavity (33) inner wall of compression roller (13);Above second slide plate (34) The interior space connection the second groove (3) of cavity (33) and the external world, make the second slide plate by the effect of centrifugal force and second spring (35) (34) it moves up and down, cools down to the second compression roller (16) and extrusion ring.
CN201910192104.XA 2019-03-14 2019-03-14 High-precision steel pipe hot rolling equipment Active CN109894477B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910192104.XA CN109894477B (en) 2019-03-14 2019-03-14 High-precision steel pipe hot rolling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910192104.XA CN109894477B (en) 2019-03-14 2019-03-14 High-precision steel pipe hot rolling equipment

Publications (2)

Publication Number Publication Date
CN109894477A true CN109894477A (en) 2019-06-18
CN109894477B CN109894477B (en) 2020-09-25

Family

ID=66953242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910192104.XA Active CN109894477B (en) 2019-03-14 2019-03-14 High-precision steel pipe hot rolling equipment

Country Status (1)

Country Link
CN (1) CN109894477B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110802129A (en) * 2019-11-13 2020-02-18 梁良良 Special steel pipe precision shaping machine
CN112790913A (en) * 2020-12-30 2021-05-14 广州市智勋电子商务有限公司 Edge sealing device for sanitary towel
CN112916620A (en) * 2021-01-14 2021-06-08 王克宇 Forging process of GCr15 roller sleeve

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5750213A (en) * 1980-09-09 1982-03-24 Nippon Steel Metal Prod Co Ltd Manufacture of square metallic blank pipe
CN202052791U (en) * 2011-05-10 2011-11-30 河北新中联特种钢管有限公司 Stitching machine of single weld joint of square steel tube
CN204135129U (en) * 2014-09-19 2015-02-04 太原华欣诚机电设备有限公司 Square tube production line not roll change completely unit
CN205341548U (en) * 2015-12-08 2016-06-29 云南利源金属工贸有限公司 Square steel tube takes shape quick -wittedly
CN207204920U (en) * 2016-12-13 2018-04-10 新疆八钢钢管有限责任公司 Improved welded pipe units square tube head roll forming lower rolls

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5750213A (en) * 1980-09-09 1982-03-24 Nippon Steel Metal Prod Co Ltd Manufacture of square metallic blank pipe
CN202052791U (en) * 2011-05-10 2011-11-30 河北新中联特种钢管有限公司 Stitching machine of single weld joint of square steel tube
CN204135129U (en) * 2014-09-19 2015-02-04 太原华欣诚机电设备有限公司 Square tube production line not roll change completely unit
CN205341548U (en) * 2015-12-08 2016-06-29 云南利源金属工贸有限公司 Square steel tube takes shape quick -wittedly
CN207204920U (en) * 2016-12-13 2018-04-10 新疆八钢钢管有限责任公司 Improved welded pipe units square tube head roll forming lower rolls

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110802129A (en) * 2019-11-13 2020-02-18 梁良良 Special steel pipe precision shaping machine
CN112790913A (en) * 2020-12-30 2021-05-14 广州市智勋电子商务有限公司 Edge sealing device for sanitary towel
CN112916620A (en) * 2021-01-14 2021-06-08 王克宇 Forging process of GCr15 roller sleeve
CN112916620B (en) * 2021-01-14 2022-08-09 山东莱锻机械股份有限公司 Forging process of GCr15 roller sleeve

Also Published As

Publication number Publication date
CN109894477B (en) 2020-09-25

Similar Documents

Publication Publication Date Title
CN109894477A (en) A kind of high precision steel tube equipment of hot rolling
CN101818237B (en) Device for clamping and rotating steel tube
KR101327766B1 (en) Plunger type laminar flow cooling device
CN111945083B (en) Semi-closed tubular aluminum profile heat treatment device
CN116393911A (en) Tank plate rolling welding machine for chemical industry
CN113894284B (en) Water-cooled powder metallurgy forming die
CN101204719A (en) Core rod cycle device for drawing and extending hydraulic machine
CN114149170A (en) Hot pressing process for curved glass
CN214613282U (en) Roller-adjustable hot stretching device for manufacturing PP (polypropylene) rope
CN210614735U (en) Bending device for iron tower production
CN112974703A (en) Forging device for die steel
CN207091283U (en) Travel mechanism
CN108265527B (en) Synthetic leather embossing equipment
CN110117007A (en) Graphene fold forming equipment
CN202671589U (en) Novel energy-saving continuous type normalizing heat treatment furnace
CN212764767U (en) Flaring device for high polymer plastic pipe
CN208733171U (en) A kind of energy-saving aluminium sectional bar processing equipment
CN204148278U (en) Two cold mould power external aluminium section bar is cooling bed
CN203680482U (en) Roller forming machine for ceramic hydraulic straight rod
CN220116406U (en) Low-temperature vacuum dehydration and drying integrated machine
CN110802129A (en) Special steel pipe precision shaping machine
CN201313866Y (en) Glass bead profiling machine
CN209998118U (en) high-frequency welded pipe forming and extruding device
CN216550611U (en) High-wear-resistance bearing heat treatment processing kiln
CN207669635U (en) A kind of high compactness casting films rapid molding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200831

Address after: 751600 the Ningxia Hui Autonomous Region Wuzhong City Qingtongxia new material base

Applicant after: Ningxia Jinyuan Petroleum Technology Co.,Ltd.

Address before: 213300 Jiangsu Province Changzhou Liyang Kunlun North Road 288 Jiangsu Shente Iron and Steel Co., Ltd.

Applicant before: Xing Xiao

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220718

Address after: 751600 Qingtongxia Industrial Park, Wuzhong City, Ningxia Hui Autonomous Region

Patentee after: NINGXIA CHANGXIN ANTI-CORROSION ENGINEERING Co.,Ltd.

Patentee after: Ningxia Jinyuan Petroleum Technology Co.,Ltd.

Address before: 751600 new material base of Qingtongxia City, Wuzhong City, the Ningxia Hui Autonomous Region

Patentee before: Ningxia Jinyuan Petroleum Technology Co.,Ltd.

TR01 Transfer of patent right