CN109888924A - A kind of construction site electric energy optimizing scheduling designing system - Google Patents

A kind of construction site electric energy optimizing scheduling designing system Download PDF

Info

Publication number
CN109888924A
CN109888924A CN201910177016.2A CN201910177016A CN109888924A CN 109888924 A CN109888924 A CN 109888924A CN 201910177016 A CN201910177016 A CN 201910177016A CN 109888924 A CN109888924 A CN 109888924A
Authority
CN
China
Prior art keywords
electric energy
module
electricity
circuit
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910177016.2A
Other languages
Chinese (zh)
Inventor
李玮
曹典辉
安娜
魏厚玉
赵建宁
李政阳
武换财
王兴兴
李响
李英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Dongying Power Generation Co Ltd
Original Assignee
Datang Dongying Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Dongying Power Generation Co Ltd filed Critical Datang Dongying Power Generation Co Ltd
Priority to CN201910177016.2A priority Critical patent/CN109888924A/en
Publication of CN109888924A publication Critical patent/CN109888924A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/248UPS systems or standby or emergency generators

Abstract

The invention discloses a kind of construction site electric energy optimizing scheduling designing systems, including, main control module, power supply, transmission of electricity module, debug circuit, and application circuit, the power supply between transmission of electricity module and debug circuit by being electrically connected, using the debug circuit complete that the electric energy proportion of the power supply by transmission of electricity module is debugged and optimized, for completing optimizing and revising for power supply transmission of electricity electric energy, it is electrically connected between the debug circuit and application circuit, the optimal electrical power proportion that selection debugging is completed is applied to the application circuit of normal construction field application by the debug circuit, the use after optimal scheduling to complete electric energy;Using debug circuit complete that the electric energy proportion of the power supply by transmission of electricity module is debugged and optimized, optimal electrical power proportion that selection debugging is completed is applied to the application circuit of normal construction field application by debug circuit, thus the use after completing the optimal scheduling of electric energy.

Description

A kind of construction site electric energy optimizing scheduling designing system
Technical field
The present invention relates to electric energy dispatching distribution systems technology field, specially a kind of construction site electric energy optimizing scheduling design System.
Background technique
The distribution network automated development in China is the inevitable outcome of electricity market and economic construction, for a long time power distribution network Construction does not obtain due attention, construction fund shortage, and Technical properties of plant falls behind, and accident frequently occurs, and has seriously affected people The people's livelihood development living with economic construction, with the development of electric power and the foundation of electricity market, the weak link of power distribution network seems more It more protrudes, forms the situation uncoordinated with power grid construction.After the implementing of " electric power law " of country's issuing and implementation, electric power conduct A kind of commodity enter market, receive the supervision and selection of user, even investigate electric power warp to the power failure influence in power supply The responsibility of battalion person.On the other hand, to power quality requirement, distribution network reliability has been electric power for high-accuracy technology and equipment The main aspect that operator considers.With the demand of transformation and the electric power development of market concept, the automation of power distribution network has been made For the task that power supply enterprise is very urgent, big city utility grid just recognizes the potential danger of power distribution network from the eighties, and does one's utmost Appealing is actively hardy dedicated to the improvement project of urban distribution network, and nationwide conference is organized to propose tool to distribution network transform Body implementation plan, various channels gather together fund, propose change plan, are engaged in changing for power grid using the good equipment of high-tech, performance It makes.The basic demand of urban power distribution network electrical circuitry equipment is: technologically advanced, safe and reliable to operation, Operation and Maintenance is simple, economical closes It is reason, energy saving and meet environmental protection requirement.
It is had the disadvantage that in construction site electrical power distribution conveying scheduling process
Electric energy conveys at the construction field (site) and cannot be in optimized selection and then be dispensed, the electric energy of rated line rated power Dispatching easily causes the waste of electric energy, influences energy conservation and environmental protection.
Summary of the invention
The purpose of the present invention is to provide a kind of construction site electric energy optimizing scheduling designing systems, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme: a kind of construction site electric energy optimizing scheduling design department System, including, main control module, power supply, transmit electricity module, debug circuit and application circuit,
Wherein, the power supply utilizes the debug circuit by being electrically connected between transmission of electricity module and debug circuit It completes that the electric energy proportion of the power supply by transmission of electricity module is debugged and optimized, for completing power supply transmission of electricity electricity Energy is optimized and revised;
It is electrically connected between the debug circuit and application circuit, is completed selection debugging most by the debug circuit Excellent electric energy proportion is applied to the application circuit of normal construction field application, thus the use after completing the optimal scheduling of electric energy;
The main control module respectively the power supply, transmission of electricity module, signal between debug circuit and application circuit Connection is completed to manually selecting in electric energy use process and is operated by the main control module, for reducing accident Occur, also artificial pressure selection can be carried out to electric energy operational version by main control module, increase the hand in electric energy transmission process Dynamic control performance.
Preferably, the transmission of electricity module includes the first transmission line of electricity, the second transmission line of electricity and the n-th transmission line of electricity, wherein n For the natural number more than or equal to 3, first transmission line of electricity, the second transmission line of electricity and the n-th transmission line of electricity are used for the confession The electric energy of power supply is transmitted to each electricity utilization site of construction site, for completing the normal confession of each electricity utilization site in construction site Electricity uses.
Preferably, the debug circuit is provided with that multiple and it is set as with quantity and the n quantity of n-th transmission line of electricity It is equal, it is connected in series between the debug circuit and the transmission of electricity module, the debug circuit includes step-up transformer, decompression change Depressor, voltage-stablizer and current detection module, the step-up transformer, step-down transformer, voltage-stablizer, which are sequentially connected in series, to be used for Complete the debugging effect of transmission of electricity electric energy voltage, the current detection module and the step-up transformer, step-down transformer, voltage-stablizer It is connected in parallel between the series circuit of composition, for completing the detection of size of current in electric energy debugging process.
Preferably, signal connects between the current detection module and the main control module inside the debug circuit, passes through The current detection module completes the monitoring of size of current in debugging process, avoid the occurrence of that electric current is excessive or short circuit in it is any one The generation of kind phenomenon.
Preferably, the quantity of the application circuit is configured according to construction site electric energy application, and the application It is electrically connected between circuit and the electrical equipment of construction site, the normal use for construction site equipment.
It preferably, further include communication module, administrator module and mobile terminal,
By the communication module, signal is connect the main control module between administrator module and mobile terminal respectively, is used In by the data signal transmission of the main control module to the administrator module and mobile terminal, it is used to complete to the master control mould The operation of block controls.
Preferably, the communication module includes GPRS communication apparatus, wireless telecommunications system and bluetooth communication equipment, the pipe Reason person's module passes through the transmission and interaction that data are completed between GPRS communication apparatus and the main control module inside communication module, The mobile terminal by wireless telecommunications system inside the communication module and bluetooth communication equipment and the main control module it Between complete data transmission and interaction.
Preferably, the mobile terminal includes cell phone or hand-held plate, and is respectively arranged with inside it and master control Module matches APP module, to the remote control of main control module and remotely checks understanding for completing.
Preferably, the power supply includes main power source and emergency power supply, and the main power source is used for positive reason The power supply of electric energy uses under condition, and the emergency power supply is used for the emergency use under main power source abnormal conditions, provides stabilization Power supply electric energy supply.
Preferably, the power supply, transmission of electricity module, debug circuit and application circuit are respectively provided with waterproofing protection machine Structure, the regular supply for avoiding guaranteeing circuit electric energy in the biggish situation of wetness at the construction field (site).
Compared with prior art, the beneficial effects of the present invention are:
1, it is completed using debug circuit to logical by power supply by being electrically connected between transmission of electricity module and debug circuit The electric energy proportion for crossing the power supply of transmission of electricity module is debugged and is optimized, for completing the optimization of power supply transmission of electricity electric energy Adjustment;It is electrically connected between debug circuit and application circuit, is matched the optimal electrical power that selection debugging is completed by debug circuit It is applied to the application circuit of normal construction field application, thus the use after completing the optimal scheduling of electric energy;
2, by that will be connected in series between debug circuit and transmission of electricity module, debug circuit includes step-up transformer, decompression change Depressor, voltage-stablizer and current detection module, step-up transformer, step-down transformer, voltage-stablizer are sequentially connected in series for completing The debugging effect of transmission of electricity electric energy voltage, the series electrical of current detection module and step-up transformer, step-down transformer, voltage-stablizer composition It is connected in parallel between road, for completing the detection of size of current in electric energy debugging process, ensure that the normal of electric energy optimizing dispatching It uses.
Detailed description of the invention
Fig. 1 is principle of the invention structural framing figure.
In figure: 1- main control module;2- power supply;3- transmission of electricity module;The first transmission line of electricity of 31-;The second power transmission line of 32- Road;The n-th transmission line of electricity of 33-;4- debug circuit;5- application circuit;6- communication module;7- administrator module;8- mobile terminal.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution: a kind of construction site electric energy optimizing scheduling designing system, packet It includes, main control module 1, power supply 2, transmit electricity module 3, debug circuit 4 and application circuit 5,
Wherein, the power supply 2 utilizes the debugging electricity by being electrically connected between transmission of electricity module 3 and debug circuit 4 Road 4 completes that the electric energy proportion of the power supply 2 by transmission of electricity module 3 is debugged and optimized, for completing power supply 2 Transmission of electricity electric energy is optimized and revised;
It is electrically connected between the debug circuit 4 and application circuit 5, is completed selection debugging by the debug circuit 4 Optimal electrical power proportion be applied to the application circuit 5 of normal construction field application, to make after completing the optimal scheduling of electric energy With;
The main control module 1 is respectively between the power supply 2, transmission of electricity module 3, debug circuit 4 and application circuit 5 Signal connection is completed to manually selecting in electric energy use process and is operated by the main control module 1, for reducing unexpected thing The generation of part also can carry out artificial pressure selection to electric energy operational version by main control module 1, increase in electric energy transmission process Manually control performance.
The transmission of electricity module 3 includes the first transmission line of electricity 31, the second transmission line of electricity 32 and the n-th transmission line of electricity 33 wherein n For the natural number more than or equal to 3, first transmission line of electricity 31, the second transmission line of electricity 32 and the n-th transmission line of electricity 33 are used for will The electric energy of the power supply 2 is transmitted to each electricity utilization site of construction site, for completing each electricity utilization site in construction site Normal power supply use.
The debug circuit 4 is provided with the multiple and n quantity of itself and quantity and n-th transmission line of electricity 33 and is set as phase Deng, be connected in series between the debug circuit 4 and the transmission of electricity module 3, the debug circuit 4 include step-up transformer, decompression Transformer, voltage-stablizer and current detection module, the step-up transformer, step-down transformer, voltage-stablizer are sequentially connected in series use In the debugging effect for completing transmission of electricity electric energy voltage, the current detection module and the step-up transformer, step-down transformer, pressure stabilizing It is connected in parallel between the series circuit of device composition, for completing the detection of size of current in electric energy debugging process.
Signal connects between current detection module and the main control module 1 inside the debug circuit 4, passes through the electricity Flow the monitoring that detection module completes size of current in debugging process, avoid the occurrence of that electric current is excessive or short circuit in any one phenomenon Generation.
The quantity of the application circuit 5 is configured according to construction site electric energy application, and the application circuit 5 with It is electrically connected between the electrical equipment of construction site, the normal use for construction site equipment.
It further include communication module 6, administrator module 7 and mobile terminal 8,
By the communication module 6, signal connects the main control module 1 between administrator module 7 and mobile terminal 8 respectively It connects, for being used to complete to institute by the data signal transmission of the main control module 1 to the administrator module 7 and mobile terminal 8 State the operation control of main control module 1.
The communication module 6 includes GPRS communication apparatus, wireless telecommunications system and bluetooth communication equipment, administrator's mould Transmission and interaction of the block 7 by completion data between the GPRS communication apparatus and the main control module 1 inside communication module 6, institute State mobile terminal 8 by wireless telecommunications system inside the communication module 6 and bluetooth communication equipment and the main control module 1 it Between complete data transmission and interaction.
The mobile terminal 8 includes cell phone or hand-held plate, and is respectively arranged with inside it and 1 phase of main control module APP module is matched, understanding is checked with long-range to the remote control of main control module 1 for completing.
The power supply 2 includes main power source and emergency power supply, and the main power source is for electric under normal circumstances The power supply of energy uses, and the emergency power supply is used for the emergency use under main power source abnormal conditions, provides stable power supply Electric energy supply.
The power supply 2, transmission of electricity module 3, debug circuit 4 and application circuit 5 are respectively provided with waterproofing protection mechanism, use In the regular supply for avoiding guarantee circuit electric energy in the biggish situation of wetness at the construction field (site).
To sum up, in use, power supply 2 provides the regular supply of electric energy, then pass through transmission of electricity module 3, transmission of electricity module 3 First transmission line of electricity 31, the second transmission line of electricity 32 and the n-th transmission line of electricity 33 are for the electric energy of the power supply 2 to be transmitted to Each electricity utilization site of construction site, the normal power supply for completing each electricity utilization site in construction site uses, then by defeated It is connected between electric module 3 and debug circuit 4, the series connection of the step-up transformer, step-down transformer, voltage-stablizer composition of debug circuit 4 It is connected in parallel between circuit, for completing the detection of size of current in electric energy debugging process, is then transmit to the progress of application circuit 5 It uses, wherein main control module 1 is economical and practical for whole adjustment, efficiently convenient, effectively optimizes electric energy and resource It saves, convenient for promoting the use of.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
In several embodiments provided by the present invention, it should be understood that disclosed device and method can pass through Other modes are realized.For example, device embodiments described above are only schematical, for example, the module or list Member division, only a kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or Component can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point is shown The mutual coupling, direct-coupling or communication connection shown or discussed can be through some interfaces, between device or unit Coupling or communication connection are connect, can be electrical property, mechanical or other forms.
The unit illustrated as separating component may or may not be physically separated, as unit The component of display may or may not be physical unit, it can and it is in one place, or may be distributed over On multiple units.Some or all of unit therein can be selected to realize present embodiment scheme according to the actual needs Purpose.
In addition, each functional unit in each embodiment of the present invention can integrate in one processing unit, it can also To be that each unit physically exists alone, can also be integrated in one unit with two or more units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer It is each that equipment (can be personal computer, server or the network equipment etc.) or processor (processor) execute the present invention The all or part of the steps of embodiment the method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk Etc. the various media that can store program code.
Mode the above is only the implementation of the present invention is not intended to limit the scope of the invention, all to utilize this Equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content, it is relevant to be applied directly or indirectly in other Technical field is included within the scope of the present invention.

Claims (10)

1. a kind of construction site electric energy optimizing scheduling designing system, it is characterised in that: including,
Main control module (1),
Power supply (2),
It transmits electricity module (3),
Debug circuit (4), and
Application circuit (5),
Wherein, the power supply (2) utilizes the debugging by being electrically connected between transmission of electricity module (3) and debug circuit (4) Circuit (4) completes that the electric energy proportion of the power supply (2) by transmission of electricity module (3) is debugged and optimized, for completing Power supply (2) transmission of electricity electric energy is optimized and revised;
It is electrically connected between the debug circuit (4) and application circuit (5), has been debugged selection by the debug circuit (4) At optimal electrical power proportion be applied to the application circuit (5) of normal construction field application, thus after completing the optimal scheduling of electric energy Use;
The main control module (1) respectively with the power supply (2), transmission of electricity module (3), debug circuit (4) and application circuit (5) signal connects between, completes to manually selecting in electric energy use process and operates by the main control module (1), is used for The generation of accident is reduced, also artificial pressure selection can be carried out to electric energy operational version by main control module (1), increase electricity Performance is manually controlled in energy transmission process.
2. a kind of construction site electric energy optimizing scheduling designing system according to claim 1, it is characterised in that: the transmission of electricity Module (3) includes the first transmission line of electricity (31), the second transmission line of electricity (32) and the n-th transmission line of electricity (33), wherein n be greater than etc. In 3 natural number, first transmission line of electricity (31), the second transmission line of electricity (32) and the n-th transmission line of electricity (33) are used for institute The electric energy for stating power supply (2) is transmitted to each electricity utilization site of construction site, for completing each electricity utilization site in construction site Normal power supply use.
3. a kind of construction site electric energy optimizing scheduling designing system according to claim 2, it is characterised in that: the debugging Circuit (4) is provided with that multiple and it with quantity with the n quantity of n-th transmission line of electricity (33) is set as equal, the debugging electricity Be connected in series between road (4) and the transmission of electricity module (3), the debug circuit (4) include step-up transformer, step-down transformer, Voltage-stablizer and current detection module, the step-up transformer, step-down transformer, voltage-stablizer are sequentially connected in series defeated for completing The debugging of electric energy voltage acts on, and the current detection module and the step-up transformer, step-down transformer, voltage-stablizer form It is connected in parallel between series circuit, for completing the detection of size of current in electric energy debugging process.
4. a kind of construction site electric energy optimizing scheduling designing system according to claim 3, it is characterised in that: the debugging Signal is connect between the internal current detection module of circuit (4) and the main control module (1), complete by the current detection module At the monitoring of size of current in debugging process, avoid the occurrence of that electric current is excessive or short circuit in any one phenomenon generation.
5. a kind of construction site electric energy optimizing scheduling designing system according to claim 4, it is characterised in that: the application The quantity of circuit (5) is configured according to construction site electric energy application, and the use of the application circuit (5) and construction site It is electrically connected between electric equipment, the normal use for construction site equipment.
6. a kind of construction site electric energy optimizing scheduling designing system according to claim 5, it is characterised in that: further include,
Communication module (6),
Administrator module (7), and
Mobile terminal,
The main control module (1) is believed between administrator module (7) and mobile terminal (8) respectively by the communication module (6) Number connection, for by the data signal transmission of the main control module (1) to the administrator module (7) and mobile terminal (8), use It is controlled in completing the operation to the main control module (1).
7. a kind of construction site electric energy optimizing scheduling designing system according to claim 6, it is characterised in that: the communication Module (6) includes GPRS communication apparatus, wireless telecommunications system and bluetooth communication equipment, and the administrator module (7) passes through communication The transmission and interaction of data are completed between module (6) internal GPRS communication apparatus and the main control module (1), it is described mobile whole (8) are held to pass through between the communication module (6) internal wireless telecommunications system and bluetooth communication equipment and the main control module (1) Complete the transmission and interaction of data.
8. a kind of construction site electric energy optimizing scheduling designing system according to claim 7, it is characterised in that: the movement Terminal (8) includes cell phone or hand-held plate, and is respectively arranged with inside it and matches APP module with main control module (1), For completing to the remote control of main control module (1) and remotely to check understanding.
9. a kind of construction site electric energy optimizing scheduling designing system according to claim 8, it is characterised in that: the power supply Power supply (2) includes main power source and emergency power supply, and power supply of the main power source for electric energy under normal circumstances uses, institute Emergency power supply is stated for the emergency use under main power source abnormal conditions, stable power supply electric energy supply is provided.
10. a kind of construction site electric energy optimizing scheduling designing system according to claim 9, it is characterised in that: the confession Power supply (2), transmission of electricity module (3), debug circuit (4) and application circuit (5) are respectively provided with waterproofing protection mechanism, for avoiding Guarantee the regular supply of circuit electric energy in the biggish situation of wetness at the construction field (site).
CN201910177016.2A 2019-03-08 2019-03-08 A kind of construction site electric energy optimizing scheduling designing system Pending CN109888924A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910177016.2A CN109888924A (en) 2019-03-08 2019-03-08 A kind of construction site electric energy optimizing scheduling designing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910177016.2A CN109888924A (en) 2019-03-08 2019-03-08 A kind of construction site electric energy optimizing scheduling designing system

Publications (1)

Publication Number Publication Date
CN109888924A true CN109888924A (en) 2019-06-14

Family

ID=66931456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910177016.2A Pending CN109888924A (en) 2019-03-08 2019-03-08 A kind of construction site electric energy optimizing scheduling designing system

Country Status (1)

Country Link
CN (1) CN109888924A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1585953A (en) * 2001-09-13 2005-02-23 Abb股份有限公司 Method and system to calculate a demand for electric power
WO2005040992A3 (en) * 2003-10-24 2006-04-13 Square D Co Intelligent power management control system
CN102648479A (en) * 2009-06-26 2012-08-22 Abb研究有限公司 Load scheduling optimization in distributed system
CN203708104U (en) * 2014-01-29 2014-07-09 湖南城市学院 Power supply device
CN106941259A (en) * 2017-05-05 2017-07-11 秦伟喆 A kind of line segment formula three-phase load unbalance adjustment and boosting loss-reducing and electricity-saving device
CN206559140U (en) * 2017-03-04 2017-10-13 浙江涌原新能科技股份有限公司 A kind of monitoring power saving apparatus in real time
CN109076668A (en) * 2016-03-07 2018-12-21 智慧生长解决方案有限公司 Controllable electric power and lighting system
CN109347094A (en) * 2018-10-24 2019-02-15 珠海格力电器股份有限公司 Current transformer and its method, apparatus and electric power distribution system for distributing electric energy

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1585953A (en) * 2001-09-13 2005-02-23 Abb股份有限公司 Method and system to calculate a demand for electric power
WO2005040992A3 (en) * 2003-10-24 2006-04-13 Square D Co Intelligent power management control system
CN102648479A (en) * 2009-06-26 2012-08-22 Abb研究有限公司 Load scheduling optimization in distributed system
CN203708104U (en) * 2014-01-29 2014-07-09 湖南城市学院 Power supply device
CN109076668A (en) * 2016-03-07 2018-12-21 智慧生长解决方案有限公司 Controllable electric power and lighting system
CN206559140U (en) * 2017-03-04 2017-10-13 浙江涌原新能科技股份有限公司 A kind of monitoring power saving apparatus in real time
CN106941259A (en) * 2017-05-05 2017-07-11 秦伟喆 A kind of line segment formula three-phase load unbalance adjustment and boosting loss-reducing and electricity-saving device
CN109347094A (en) * 2018-10-24 2019-02-15 珠海格力电器股份有限公司 Current transformer and its method, apparatus and electric power distribution system for distributing electric energy

Similar Documents

Publication Publication Date Title
CN202310113U (en) Terminal equipment debugger and terminal equipment debugging system
CN202587030U (en) GPRS-based photovoltaic power generation remote monitoring device
CN102064604A (en) Multifunctional electric energy information concentrator and working method thereof
CN103679545A (en) Power distribution network reliability theoretical evaluation system
CN102738831A (en) Solar energy system and communication device
CN203930426U (en) Integrated manipulator based on energy efficiency monitoring
CN203455655U (en) Remote LED display screen self-diagnosis control system
CN106200389A (en) A kind of intelligent electric energy meter based on embedded system
CN106787190A (en) A kind of monitoring system and monitoring method for DC micro power grid system
CN203055003U (en) IC card meter cost control management system
CN202009272U (en) Layered distributive power grid system
CN102254414B (en) Embedded automatic meter reading system based on GPRS (Global System for Mobile Communications)
WO2015066958A1 (en) Td-scdma-based remote power load control system and realization method thereof
CN203423539U (en) Low-voltage power grid load and leak current integrated monitoring device
CN203148470U (en) Wireless telemetry terminal device for comprehensive water regimen
CN202120433U (en) Meter reading system
CN109888924A (en) A kind of construction site electric energy optimizing scheduling designing system
CN101729342B (en) Realization method of real-time memory calculation data structure of mixed mobile power system
CN202795709U (en) Dual-GPRS (general packet radio service) meter-reading concentrator
CN206282343U (en) Intelligence matches somebody with somebody power information Integrated System Architecture
CN205429783U (en) Electric automobile fills and trades power station intercommunication system based on industrial computer
CN205104017U (en) System of checking meter is concentrated to intelligence
CN202049617U (en) Wireless solar energy traffic signal lamp control system
CN103955761B (en) A kind of low-carbon (LC) schedule information platform
CN210629703U (en) Electric power operation and maintenance management equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 257091 Dongying Port Economic Development Zone, Dongying City, Shandong Province, west of Donggang Road and north of Haibin Road

Applicant after: Datang Dongying Power Generation Co., Ltd.

Address before: 257091 Dongying Economic Development Zone, Shandong Province, west of Donggang Road and north of Haibin Road

Applicant before: Datang Dongying Power Generation Co., Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190614