CN109888924A - A kind of construction site electric energy optimizing scheduling designing system - Google Patents
A kind of construction site electric energy optimizing scheduling designing system Download PDFInfo
- Publication number
- CN109888924A CN109888924A CN201910177016.2A CN201910177016A CN109888924A CN 109888924 A CN109888924 A CN 109888924A CN 201910177016 A CN201910177016 A CN 201910177016A CN 109888924 A CN109888924 A CN 109888924A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- module
- electricity
- circuit
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/12—Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/248—UPS systems or standby or emergency generators
Abstract
The invention discloses a kind of construction site electric energy optimizing scheduling designing systems, including, main control module, power supply, transmission of electricity module, debug circuit, and application circuit, the power supply between transmission of electricity module and debug circuit by being electrically connected, using the debug circuit complete that the electric energy proportion of the power supply by transmission of electricity module is debugged and optimized, for completing optimizing and revising for power supply transmission of electricity electric energy, it is electrically connected between the debug circuit and application circuit, the optimal electrical power proportion that selection debugging is completed is applied to the application circuit of normal construction field application by the debug circuit, the use after optimal scheduling to complete electric energy;Using debug circuit complete that the electric energy proportion of the power supply by transmission of electricity module is debugged and optimized, optimal electrical power proportion that selection debugging is completed is applied to the application circuit of normal construction field application by debug circuit, thus the use after completing the optimal scheduling of electric energy.
Description
Technical field
The present invention relates to electric energy dispatching distribution systems technology field, specially a kind of construction site electric energy optimizing scheduling design
System.
Background technique
The distribution network automated development in China is the inevitable outcome of electricity market and economic construction, for a long time power distribution network
Construction does not obtain due attention, construction fund shortage, and Technical properties of plant falls behind, and accident frequently occurs, and has seriously affected people
The people's livelihood development living with economic construction, with the development of electric power and the foundation of electricity market, the weak link of power distribution network seems more
It more protrudes, forms the situation uncoordinated with power grid construction.After the implementing of " electric power law " of country's issuing and implementation, electric power conduct
A kind of commodity enter market, receive the supervision and selection of user, even investigate electric power warp to the power failure influence in power supply
The responsibility of battalion person.On the other hand, to power quality requirement, distribution network reliability has been electric power for high-accuracy technology and equipment
The main aspect that operator considers.With the demand of transformation and the electric power development of market concept, the automation of power distribution network has been made
For the task that power supply enterprise is very urgent, big city utility grid just recognizes the potential danger of power distribution network from the eighties, and does one's utmost
Appealing is actively hardy dedicated to the improvement project of urban distribution network, and nationwide conference is organized to propose tool to distribution network transform
Body implementation plan, various channels gather together fund, propose change plan, are engaged in changing for power grid using the good equipment of high-tech, performance
It makes.The basic demand of urban power distribution network electrical circuitry equipment is: technologically advanced, safe and reliable to operation, Operation and Maintenance is simple, economical closes
It is reason, energy saving and meet environmental protection requirement.
It is had the disadvantage that in construction site electrical power distribution conveying scheduling process
Electric energy conveys at the construction field (site) and cannot be in optimized selection and then be dispensed, the electric energy of rated line rated power
Dispatching easily causes the waste of electric energy, influences energy conservation and environmental protection.
Summary of the invention
The purpose of the present invention is to provide a kind of construction site electric energy optimizing scheduling designing systems, to solve above-mentioned background skill
The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme: a kind of construction site electric energy optimizing scheduling design department
System, including, main control module, power supply, transmit electricity module, debug circuit and application circuit,
Wherein, the power supply utilizes the debug circuit by being electrically connected between transmission of electricity module and debug circuit
It completes that the electric energy proportion of the power supply by transmission of electricity module is debugged and optimized, for completing power supply transmission of electricity electricity
Energy is optimized and revised;
It is electrically connected between the debug circuit and application circuit, is completed selection debugging most by the debug circuit
Excellent electric energy proportion is applied to the application circuit of normal construction field application, thus the use after completing the optimal scheduling of electric energy;
The main control module respectively the power supply, transmission of electricity module, signal between debug circuit and application circuit
Connection is completed to manually selecting in electric energy use process and is operated by the main control module, for reducing accident
Occur, also artificial pressure selection can be carried out to electric energy operational version by main control module, increase the hand in electric energy transmission process
Dynamic control performance.
Preferably, the transmission of electricity module includes the first transmission line of electricity, the second transmission line of electricity and the n-th transmission line of electricity, wherein n
For the natural number more than or equal to 3, first transmission line of electricity, the second transmission line of electricity and the n-th transmission line of electricity are used for the confession
The electric energy of power supply is transmitted to each electricity utilization site of construction site, for completing the normal confession of each electricity utilization site in construction site
Electricity uses.
Preferably, the debug circuit is provided with that multiple and it is set as with quantity and the n quantity of n-th transmission line of electricity
It is equal, it is connected in series between the debug circuit and the transmission of electricity module, the debug circuit includes step-up transformer, decompression change
Depressor, voltage-stablizer and current detection module, the step-up transformer, step-down transformer, voltage-stablizer, which are sequentially connected in series, to be used for
Complete the debugging effect of transmission of electricity electric energy voltage, the current detection module and the step-up transformer, step-down transformer, voltage-stablizer
It is connected in parallel between the series circuit of composition, for completing the detection of size of current in electric energy debugging process.
Preferably, signal connects between the current detection module and the main control module inside the debug circuit, passes through
The current detection module completes the monitoring of size of current in debugging process, avoid the occurrence of that electric current is excessive or short circuit in it is any one
The generation of kind phenomenon.
Preferably, the quantity of the application circuit is configured according to construction site electric energy application, and the application
It is electrically connected between circuit and the electrical equipment of construction site, the normal use for construction site equipment.
It preferably, further include communication module, administrator module and mobile terminal,
By the communication module, signal is connect the main control module between administrator module and mobile terminal respectively, is used
In by the data signal transmission of the main control module to the administrator module and mobile terminal, it is used to complete to the master control mould
The operation of block controls.
Preferably, the communication module includes GPRS communication apparatus, wireless telecommunications system and bluetooth communication equipment, the pipe
Reason person's module passes through the transmission and interaction that data are completed between GPRS communication apparatus and the main control module inside communication module,
The mobile terminal by wireless telecommunications system inside the communication module and bluetooth communication equipment and the main control module it
Between complete data transmission and interaction.
Preferably, the mobile terminal includes cell phone or hand-held plate, and is respectively arranged with inside it and master control
Module matches APP module, to the remote control of main control module and remotely checks understanding for completing.
Preferably, the power supply includes main power source and emergency power supply, and the main power source is used for positive reason
The power supply of electric energy uses under condition, and the emergency power supply is used for the emergency use under main power source abnormal conditions, provides stabilization
Power supply electric energy supply.
Preferably, the power supply, transmission of electricity module, debug circuit and application circuit are respectively provided with waterproofing protection machine
Structure, the regular supply for avoiding guaranteeing circuit electric energy in the biggish situation of wetness at the construction field (site).
Compared with prior art, the beneficial effects of the present invention are:
1, it is completed using debug circuit to logical by power supply by being electrically connected between transmission of electricity module and debug circuit
The electric energy proportion for crossing the power supply of transmission of electricity module is debugged and is optimized, for completing the optimization of power supply transmission of electricity electric energy
Adjustment;It is electrically connected between debug circuit and application circuit, is matched the optimal electrical power that selection debugging is completed by debug circuit
It is applied to the application circuit of normal construction field application, thus the use after completing the optimal scheduling of electric energy;
2, by that will be connected in series between debug circuit and transmission of electricity module, debug circuit includes step-up transformer, decompression change
Depressor, voltage-stablizer and current detection module, step-up transformer, step-down transformer, voltage-stablizer are sequentially connected in series for completing
The debugging effect of transmission of electricity electric energy voltage, the series electrical of current detection module and step-up transformer, step-down transformer, voltage-stablizer composition
It is connected in parallel between road, for completing the detection of size of current in electric energy debugging process, ensure that the normal of electric energy optimizing dispatching
It uses.
Detailed description of the invention
Fig. 1 is principle of the invention structural framing figure.
In figure: 1- main control module;2- power supply;3- transmission of electricity module;The first transmission line of electricity of 31-;The second power transmission line of 32-
Road;The n-th transmission line of electricity of 33-;4- debug circuit;5- application circuit;6- communication module;7- administrator module;8- mobile terminal.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution: a kind of construction site electric energy optimizing scheduling designing system, packet
It includes, main control module 1, power supply 2, transmit electricity module 3, debug circuit 4 and application circuit 5,
Wherein, the power supply 2 utilizes the debugging electricity by being electrically connected between transmission of electricity module 3 and debug circuit 4
Road 4 completes that the electric energy proportion of the power supply 2 by transmission of electricity module 3 is debugged and optimized, for completing power supply 2
Transmission of electricity electric energy is optimized and revised;
It is electrically connected between the debug circuit 4 and application circuit 5, is completed selection debugging by the debug circuit 4
Optimal electrical power proportion be applied to the application circuit 5 of normal construction field application, to make after completing the optimal scheduling of electric energy
With;
The main control module 1 is respectively between the power supply 2, transmission of electricity module 3, debug circuit 4 and application circuit 5
Signal connection is completed to manually selecting in electric energy use process and is operated by the main control module 1, for reducing unexpected thing
The generation of part also can carry out artificial pressure selection to electric energy operational version by main control module 1, increase in electric energy transmission process
Manually control performance.
The transmission of electricity module 3 includes the first transmission line of electricity 31, the second transmission line of electricity 32 and the n-th transmission line of electricity 33 wherein n
For the natural number more than or equal to 3, first transmission line of electricity 31, the second transmission line of electricity 32 and the n-th transmission line of electricity 33 are used for will
The electric energy of the power supply 2 is transmitted to each electricity utilization site of construction site, for completing each electricity utilization site in construction site
Normal power supply use.
The debug circuit 4 is provided with the multiple and n quantity of itself and quantity and n-th transmission line of electricity 33 and is set as phase
Deng, be connected in series between the debug circuit 4 and the transmission of electricity module 3, the debug circuit 4 include step-up transformer, decompression
Transformer, voltage-stablizer and current detection module, the step-up transformer, step-down transformer, voltage-stablizer are sequentially connected in series use
In the debugging effect for completing transmission of electricity electric energy voltage, the current detection module and the step-up transformer, step-down transformer, pressure stabilizing
It is connected in parallel between the series circuit of device composition, for completing the detection of size of current in electric energy debugging process.
Signal connects between current detection module and the main control module 1 inside the debug circuit 4, passes through the electricity
Flow the monitoring that detection module completes size of current in debugging process, avoid the occurrence of that electric current is excessive or short circuit in any one phenomenon
Generation.
The quantity of the application circuit 5 is configured according to construction site electric energy application, and the application circuit 5 with
It is electrically connected between the electrical equipment of construction site, the normal use for construction site equipment.
It further include communication module 6, administrator module 7 and mobile terminal 8,
By the communication module 6, signal connects the main control module 1 between administrator module 7 and mobile terminal 8 respectively
It connects, for being used to complete to institute by the data signal transmission of the main control module 1 to the administrator module 7 and mobile terminal 8
State the operation control of main control module 1.
The communication module 6 includes GPRS communication apparatus, wireless telecommunications system and bluetooth communication equipment, administrator's mould
Transmission and interaction of the block 7 by completion data between the GPRS communication apparatus and the main control module 1 inside communication module 6, institute
State mobile terminal 8 by wireless telecommunications system inside the communication module 6 and bluetooth communication equipment and the main control module 1 it
Between complete data transmission and interaction.
The mobile terminal 8 includes cell phone or hand-held plate, and is respectively arranged with inside it and 1 phase of main control module
APP module is matched, understanding is checked with long-range to the remote control of main control module 1 for completing.
The power supply 2 includes main power source and emergency power supply, and the main power source is for electric under normal circumstances
The power supply of energy uses, and the emergency power supply is used for the emergency use under main power source abnormal conditions, provides stable power supply
Electric energy supply.
The power supply 2, transmission of electricity module 3, debug circuit 4 and application circuit 5 are respectively provided with waterproofing protection mechanism, use
In the regular supply for avoiding guarantee circuit electric energy in the biggish situation of wetness at the construction field (site).
To sum up, in use, power supply 2 provides the regular supply of electric energy, then pass through transmission of electricity module 3, transmission of electricity module 3
First transmission line of electricity 31, the second transmission line of electricity 32 and the n-th transmission line of electricity 33 are for the electric energy of the power supply 2 to be transmitted to
Each electricity utilization site of construction site, the normal power supply for completing each electricity utilization site in construction site uses, then by defeated
It is connected between electric module 3 and debug circuit 4, the series connection of the step-up transformer, step-down transformer, voltage-stablizer composition of debug circuit 4
It is connected in parallel between circuit, for completing the detection of size of current in electric energy debugging process, is then transmit to the progress of application circuit 5
It uses, wherein main control module 1 is economical and practical for whole adjustment, efficiently convenient, effectively optimizes electric energy and resource
It saves, convenient for promoting the use of.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
In several embodiments provided by the present invention, it should be understood that disclosed device and method can pass through
Other modes are realized.For example, device embodiments described above are only schematical, for example, the module or list
Member division, only a kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or
Component can be combined or can be integrated into another system, or some features can be ignored or not executed.Another point is shown
The mutual coupling, direct-coupling or communication connection shown or discussed can be through some interfaces, between device or unit
Coupling or communication connection are connect, can be electrical property, mechanical or other forms.
The unit illustrated as separating component may or may not be physically separated, as unit
The component of display may or may not be physical unit, it can and it is in one place, or may be distributed over
On multiple units.Some or all of unit therein can be selected to realize present embodiment scheme according to the actual needs
Purpose.
In addition, each functional unit in each embodiment of the present invention can integrate in one processing unit, it can also
To be that each unit physically exists alone, can also be integrated in one unit with two or more units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
It is each that equipment (can be personal computer, server or the network equipment etc.) or processor (processor) execute the present invention
The all or part of the steps of embodiment the method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory
(ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk
Etc. the various media that can store program code.
Mode the above is only the implementation of the present invention is not intended to limit the scope of the invention, all to utilize this
Equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content, it is relevant to be applied directly or indirectly in other
Technical field is included within the scope of the present invention.
Claims (10)
1. a kind of construction site electric energy optimizing scheduling designing system, it is characterised in that: including,
Main control module (1),
Power supply (2),
It transmits electricity module (3),
Debug circuit (4), and
Application circuit (5),
Wherein, the power supply (2) utilizes the debugging by being electrically connected between transmission of electricity module (3) and debug circuit (4)
Circuit (4) completes that the electric energy proportion of the power supply (2) by transmission of electricity module (3) is debugged and optimized, for completing
Power supply (2) transmission of electricity electric energy is optimized and revised;
It is electrically connected between the debug circuit (4) and application circuit (5), has been debugged selection by the debug circuit (4)
At optimal electrical power proportion be applied to the application circuit (5) of normal construction field application, thus after completing the optimal scheduling of electric energy
Use;
The main control module (1) respectively with the power supply (2), transmission of electricity module (3), debug circuit (4) and application circuit
(5) signal connects between, completes to manually selecting in electric energy use process and operates by the main control module (1), is used for
The generation of accident is reduced, also artificial pressure selection can be carried out to electric energy operational version by main control module (1), increase electricity
Performance is manually controlled in energy transmission process.
2. a kind of construction site electric energy optimizing scheduling designing system according to claim 1, it is characterised in that: the transmission of electricity
Module (3) includes the first transmission line of electricity (31), the second transmission line of electricity (32) and the n-th transmission line of electricity (33), wherein n be greater than etc.
In 3 natural number, first transmission line of electricity (31), the second transmission line of electricity (32) and the n-th transmission line of electricity (33) are used for institute
The electric energy for stating power supply (2) is transmitted to each electricity utilization site of construction site, for completing each electricity utilization site in construction site
Normal power supply use.
3. a kind of construction site electric energy optimizing scheduling designing system according to claim 2, it is characterised in that: the debugging
Circuit (4) is provided with that multiple and it with quantity with the n quantity of n-th transmission line of electricity (33) is set as equal, the debugging electricity
Be connected in series between road (4) and the transmission of electricity module (3), the debug circuit (4) include step-up transformer, step-down transformer,
Voltage-stablizer and current detection module, the step-up transformer, step-down transformer, voltage-stablizer are sequentially connected in series defeated for completing
The debugging of electric energy voltage acts on, and the current detection module and the step-up transformer, step-down transformer, voltage-stablizer form
It is connected in parallel between series circuit, for completing the detection of size of current in electric energy debugging process.
4. a kind of construction site electric energy optimizing scheduling designing system according to claim 3, it is characterised in that: the debugging
Signal is connect between the internal current detection module of circuit (4) and the main control module (1), complete by the current detection module
At the monitoring of size of current in debugging process, avoid the occurrence of that electric current is excessive or short circuit in any one phenomenon generation.
5. a kind of construction site electric energy optimizing scheduling designing system according to claim 4, it is characterised in that: the application
The quantity of circuit (5) is configured according to construction site electric energy application, and the use of the application circuit (5) and construction site
It is electrically connected between electric equipment, the normal use for construction site equipment.
6. a kind of construction site electric energy optimizing scheduling designing system according to claim 5, it is characterised in that: further include,
Communication module (6),
Administrator module (7), and
Mobile terminal,
The main control module (1) is believed between administrator module (7) and mobile terminal (8) respectively by the communication module (6)
Number connection, for by the data signal transmission of the main control module (1) to the administrator module (7) and mobile terminal (8), use
It is controlled in completing the operation to the main control module (1).
7. a kind of construction site electric energy optimizing scheduling designing system according to claim 6, it is characterised in that: the communication
Module (6) includes GPRS communication apparatus, wireless telecommunications system and bluetooth communication equipment, and the administrator module (7) passes through communication
The transmission and interaction of data are completed between module (6) internal GPRS communication apparatus and the main control module (1), it is described mobile whole
(8) are held to pass through between the communication module (6) internal wireless telecommunications system and bluetooth communication equipment and the main control module (1)
Complete the transmission and interaction of data.
8. a kind of construction site electric energy optimizing scheduling designing system according to claim 7, it is characterised in that: the movement
Terminal (8) includes cell phone or hand-held plate, and is respectively arranged with inside it and matches APP module with main control module (1),
For completing to the remote control of main control module (1) and remotely to check understanding.
9. a kind of construction site electric energy optimizing scheduling designing system according to claim 8, it is characterised in that: the power supply
Power supply (2) includes main power source and emergency power supply, and power supply of the main power source for electric energy under normal circumstances uses, institute
Emergency power supply is stated for the emergency use under main power source abnormal conditions, stable power supply electric energy supply is provided.
10. a kind of construction site electric energy optimizing scheduling designing system according to claim 9, it is characterised in that: the confession
Power supply (2), transmission of electricity module (3), debug circuit (4) and application circuit (5) are respectively provided with waterproofing protection mechanism, for avoiding
Guarantee the regular supply of circuit electric energy in the biggish situation of wetness at the construction field (site).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910177016.2A CN109888924A (en) | 2019-03-08 | 2019-03-08 | A kind of construction site electric energy optimizing scheduling designing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910177016.2A CN109888924A (en) | 2019-03-08 | 2019-03-08 | A kind of construction site electric energy optimizing scheduling designing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109888924A true CN109888924A (en) | 2019-06-14 |
Family
ID=66931456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910177016.2A Pending CN109888924A (en) | 2019-03-08 | 2019-03-08 | A kind of construction site electric energy optimizing scheduling designing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109888924A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1585953A (en) * | 2001-09-13 | 2005-02-23 | Abb股份有限公司 | Method and system to calculate a demand for electric power |
WO2005040992A3 (en) * | 2003-10-24 | 2006-04-13 | Square D Co | Intelligent power management control system |
CN102648479A (en) * | 2009-06-26 | 2012-08-22 | Abb研究有限公司 | Load scheduling optimization in distributed system |
CN203708104U (en) * | 2014-01-29 | 2014-07-09 | 湖南城市学院 | Power supply device |
CN106941259A (en) * | 2017-05-05 | 2017-07-11 | 秦伟喆 | A kind of line segment formula three-phase load unbalance adjustment and boosting loss-reducing and electricity-saving device |
CN206559140U (en) * | 2017-03-04 | 2017-10-13 | 浙江涌原新能科技股份有限公司 | A kind of monitoring power saving apparatus in real time |
CN109076668A (en) * | 2016-03-07 | 2018-12-21 | 智慧生长解决方案有限公司 | Controllable electric power and lighting system |
CN109347094A (en) * | 2018-10-24 | 2019-02-15 | 珠海格力电器股份有限公司 | Current transformer and its method, apparatus and electric power distribution system for distributing electric energy |
-
2019
- 2019-03-08 CN CN201910177016.2A patent/CN109888924A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1585953A (en) * | 2001-09-13 | 2005-02-23 | Abb股份有限公司 | Method and system to calculate a demand for electric power |
WO2005040992A3 (en) * | 2003-10-24 | 2006-04-13 | Square D Co | Intelligent power management control system |
CN102648479A (en) * | 2009-06-26 | 2012-08-22 | Abb研究有限公司 | Load scheduling optimization in distributed system |
CN203708104U (en) * | 2014-01-29 | 2014-07-09 | 湖南城市学院 | Power supply device |
CN109076668A (en) * | 2016-03-07 | 2018-12-21 | 智慧生长解决方案有限公司 | Controllable electric power and lighting system |
CN206559140U (en) * | 2017-03-04 | 2017-10-13 | 浙江涌原新能科技股份有限公司 | A kind of monitoring power saving apparatus in real time |
CN106941259A (en) * | 2017-05-05 | 2017-07-11 | 秦伟喆 | A kind of line segment formula three-phase load unbalance adjustment and boosting loss-reducing and electricity-saving device |
CN109347094A (en) * | 2018-10-24 | 2019-02-15 | 珠海格力电器股份有限公司 | Current transformer and its method, apparatus and electric power distribution system for distributing electric energy |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202310113U (en) | Terminal equipment debugger and terminal equipment debugging system | |
CN202587030U (en) | GPRS-based photovoltaic power generation remote monitoring device | |
CN102064604A (en) | Multifunctional electric energy information concentrator and working method thereof | |
CN103679545A (en) | Power distribution network reliability theoretical evaluation system | |
CN102738831A (en) | Solar energy system and communication device | |
CN203930426U (en) | Integrated manipulator based on energy efficiency monitoring | |
CN203455655U (en) | Remote LED display screen self-diagnosis control system | |
CN106200389A (en) | A kind of intelligent electric energy meter based on embedded system | |
CN106787190A (en) | A kind of monitoring system and monitoring method for DC micro power grid system | |
CN203055003U (en) | IC card meter cost control management system | |
CN202009272U (en) | Layered distributive power grid system | |
CN102254414B (en) | Embedded automatic meter reading system based on GPRS (Global System for Mobile Communications) | |
WO2015066958A1 (en) | Td-scdma-based remote power load control system and realization method thereof | |
CN203423539U (en) | Low-voltage power grid load and leak current integrated monitoring device | |
CN203148470U (en) | Wireless telemetry terminal device for comprehensive water regimen | |
CN202120433U (en) | Meter reading system | |
CN109888924A (en) | A kind of construction site electric energy optimizing scheduling designing system | |
CN101729342B (en) | Realization method of real-time memory calculation data structure of mixed mobile power system | |
CN202795709U (en) | Dual-GPRS (general packet radio service) meter-reading concentrator | |
CN206282343U (en) | Intelligence matches somebody with somebody power information Integrated System Architecture | |
CN205429783U (en) | Electric automobile fills and trades power station intercommunication system based on industrial computer | |
CN205104017U (en) | System of checking meter is concentrated to intelligence | |
CN202049617U (en) | Wireless solar energy traffic signal lamp control system | |
CN103955761B (en) | A kind of low-carbon (LC) schedule information platform | |
CN210629703U (en) | Electric power operation and maintenance management equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 257091 Dongying Port Economic Development Zone, Dongying City, Shandong Province, west of Donggang Road and north of Haibin Road Applicant after: Datang Dongying Power Generation Co., Ltd. Address before: 257091 Dongying Economic Development Zone, Shandong Province, west of Donggang Road and north of Haibin Road Applicant before: Datang Dongying Power Generation Co., Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190614 |