CN109886613A - A kind of material requirements prediction data Real-Time Sharing platform - Google Patents
A kind of material requirements prediction data Real-Time Sharing platform Download PDFInfo
- Publication number
- CN109886613A CN109886613A CN201711272913.9A CN201711272913A CN109886613A CN 109886613 A CN109886613 A CN 109886613A CN 201711272913 A CN201711272913 A CN 201711272913A CN 109886613 A CN109886613 A CN 109886613A
- Authority
- CN
- China
- Prior art keywords
- module
- project
- materials
- developing
- application
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 61
- 238000007726 management method Methods 0.000 claims description 87
- 230000008676 import Effects 0.000 claims description 39
- 238000012545 processing Methods 0.000 claims description 9
- 238000009415 formwork Methods 0.000 claims description 8
- 238000013461 design Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 7
- 238000012550 audit Methods 0.000 claims description 6
- 238000010606 normalization Methods 0.000 claims description 3
- 238000011160 research Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 2
- 235000013399 edible fruits Nutrition 0.000 claims 1
- 230000008521 reorganization Effects 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000013277 forecasting method Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of material requirements prediction data Real-Time Sharing platform, including login module, into interface module, application for developing project management module, construction drawing establishment phased project management module, query statistic module, detailed list of materials module, category directory management module, batch management module and authority management module.
Description
Technical field
The present invention relates to Power Material purchasing management fields, real-time more particularly, to a kind of material requirements prediction data
Shared platform.
Background technique
Under current big data era background, the Power Material purchasing management of large-scale power grid enterprise gradually turn to it is intensive,
Information-based mode, each large enterprises achieve considerable improvement in purchasing management process.In order to make each level in purchasing management,
The work of each link organically connects, and must just be linked up by means of a perfect information network, to reach modern
Change the purpose of purchasing management.Wherein material requirements prediction is as power grid enterprises' rational procurement strategy, planning and development strategic
The first step, while being also the effective means for promoting management level, improving operation efficiency, it has a very important significance.
Existing Power Material needing forecasting method multiplicity, more accurately, stronger operability be to apply power grid project
Project material inventory (inventory i.e. comprising whole material informations needed for a project) during work, it is pre- as material requirements
The initial data of survey, to provide reference frame for material demand plan and purchasing management.With informationization application and manager
The raising of method, material requirements forecasting accuracy also greatly improves, but still there are the following problems: since project material inventory is by each
Designing institute or project implementation unit are independently worked out, but not yet form unified format standard and requirement, also without corresponding
Organizational tool, thus the complicated multiplicity of disparity items detailed list of materials format, entry are not quite identical, cannot function as requirement forecasting and adopt
The immediate data source of plan is purchased, in addition, going deep into project implementation progress, project material inventory accuracy is gradually increased,
But fails to be updated and supplemented accordingly in time, thus can not predict to provide dynamic continuance with purchasing management for material requirements
Data foundation.
Summary of the invention
Present invention aim to address the complicated multiplicity of disparity items detailed list of materials format in current needs prediction mode, entry
Not quite identical defect designs a kind of power engineering project material inventory workout system.
To realize the above goal of the invention, the technical solution adopted is that:
A kind of material requirements prediction data Real-Time Sharing platform, including login module, into interface module, application for developing item
Mesh management module, construction drawing work out phased project management module, query statistic module, detailed list of materials module, category directory management
Module, batch management module and authority management module;
Wherein login module is used for authenticating users, judges different roles and shows different operation pages;
Application for developing and the project of construction documents design phase sum, master budget, grassroot project are used for into interface module
Number, examination and approval project number, the statistics displaying for exporting number;
Application for developing project management module is used to carry out the project management in scientific research stage;
Construction drawing establishment phased project management module is used for the project management for carrying out the construction drawing establishment stage;
Query statistic module is for being inquired and being exported to project and goods and materials;
Detailed list of materials module is used to be managed detailed list of materials, including checks and increase newly.
Category directory management module is for being managed the current catalogue of material;
Batch management module is used to be managed batch, including checks and increase newly;
Authority management module is for being managed user right.
Wherein the application for developing project management module includes that application for developing project creates module, application for developing project examination
Middle module, application for developing examination & approval complete module, application for developing acts on behalf projects module, application for developing has done projects module, feasibility study rank
Section project query module;Wherein application for developing project creates module and creates for application for developing project, application for developing project examination
Processing of the middle module for the project in application for developing examination & approval, application for developing examination & approval are completed module and are used for examining in application for developing
The project of completion is managed, and application for developing acts on behalf the processing that projects module acts on behalf project for application for developing, and application for developing is
Projects module is done for having done the processing of project to application for developing, application for developing project query module is for application for developing project
Inquiry.
Wherein module includes into page module, recalls module, node module in the application for developing project examination, wherein
It is used to show project information list under examination and approval into page module, recalls module for recalling the project reported, node
Module is used to check each node of project;
It includes entering page module, recalling module, node module, import template mould in batches that module is completed in application for developing examination & approval
Block, equipment and materials inventory managing detailed catalogue export module, equipment and materials inventory export module;Wherein enter page module for showing
In the project information list that examination & approval are completed;Module is recalled for recalling the project reported;Node module is for checking project
Each history node and used time;Batch imports formwork module for importing assets after demand unit equipment leading out detailed list of materials
Management system simultaneously obtains after project fills out, and project information carries out batch filling;Equipment and materials inventory managing detailed catalogue export module is used for
Export material requirements managing detailed catalogue;Material inventory of the equipment and materials inventory export module for application for developing exports;
Application for developing acts on behalf projects module and includes into page module, search module, approval module, checks module and node
Module;Wherein enter the project that page module is used to check requirement approval;Search module is used to remember row into according to specified conditions and search
Rope;Approval module fills in suggestions made after examination for examining to the information of project;Check module for checking setting for single project
Standby material specification;Node module is used to check each history node and the used time of project;
Application for developing has done projects module and has included into page module, search module, recall module, check module and node
Module;Wherein enter the project that page module is used to check requirement approval;Search module according to specified conditions for scanning for;
It recalls module and recalls the project reported for demand unit;Check module for checking the information of single project;Node module
For each history node for the project of checking and used time;
Application for developing project query module includes search module and checks module, and wherein search module is used for according to specific item
Part note scans for, and checks module for checking all items and relevant device detailed list of materials information.
Wherein the application for developing project creates module and includes into interface module, search module, newly-increased module, deletes mould
Block, reporting module, batch setup module, template download module, import modul, editor module and opinion module;
Wherein enter interface module and is used to show each project information for creating the stage in feasibility study;
Search module is used to scan for according to specified conditions note;
Newly-increased module is used for new projects;
Removing module is for deleting the project information not reported;
Reporting module for demand unit is newly-built finish and batch be set after, select corresponding auditor to audit;
After batch setup module is used for grassroot project, corresponding batch is selected to be arranged;
After template download module imports template for download items information batch, batch input can be carried out in template;
The project information batch that import modul will fill in imports template and is imported;
Editor module is for editing the project information not reported;
Opinion module is for checking this project information procedure information.
Wherein the newly-increased module includes that Item Detail fills in that module, self-service examination module, goods and materials detail is customized fills in
Module, goods and materials detail selection template completion module, goods and materials detail fill in module, batch setting module, deletion mould by catalogue is newly-increased
Block, export module, template download module, import modul and return module;
Wherein Item Detail is filled in basic information of the module for project and is made a report on, including item types, each phases-time, item
Mesh title etc., and input limitation and error prompting is added;
The self-service normalization for examining that module is used to fill in goods and materials detail examines, and the self-service examination of export detail
As a result;
The customized module of filling in of goods and materials detail is used to second confession or tears the relevant information that past heritage provide open fill in;
Goods and materials detail selects template completion module to be used to be based on built-in template, directly export history similar item goods and materials detail
Inventory;
Goods and materials detail is by the newly-increased module of filling in of catalogue for based on built-in newest catalogue of material pass corresponding with materiel code
It is directory tree, is selected, after selection, the basic information of the corresponding goods and materials of automatic spring.And with the algorithm of big data, it is added
Recommend column;
Batch setting module is used for the relevant price of equipment and materials inventory, quantity, regular model, the date is reported to criticize
Amount setting;
Removing module is to equipment and materials inventory or a plurality of deletes;
Export module is used for equipment leading out detailed list of materials information;
After template download module is for carrying equipment and materials inventory batch importing template, batch input can be carried out in template;
The equipment and materials inventory batch that import modul is used to will fill in imports template and is imported;
Return module is for returning to previous page.
Wherein the construction drawing establishment phased project management module includes mould during construction drawing creates module, construction drawing is examined
Block, construction drawing examination & approval complete module, construction drawing acts on behalf module, construction drawing has done module and construction drawing enquiry module;
Wherein construction drawing creates module for new projects in the construction drawing establishment stage, including enters interface module, search
Module, import modul, batch setup module, reporting module and editor module;Construction drawing is in for showing into interface module
Work out each project information in newly-built stage, search module is used to scan for according to specified conditions note, import modul be used for from
Feasibility study-is completed in the project information library of examination & approval, imported into construction drawing project information management list, batch setup module is used for
Select corresponding batch to be arranged after grassroot project, reporting module for demand unit it is newly-built finish and be arranged after batch select pair
The auditor answered audits, and editor module carries out more detailed list of materials when application for developing works out design drawing for Project Unit
Newly;
Module includes into page module, recalls module, node module in construction drawing examination & approval, is used wherein entering page module
In the project information list of display under examination and approval, module is recalled for recalling the project reported, node module is for checking item
The each node of purpose;
It includes entering page module, recalling module, node module, import template mould in batches that module is completed in construction drawing examination & approval
Block, equipment and materials inventory managing detailed catalogue export module, equipment and materials inventory export module;Wherein enter page module for showing
In the project information list that examination & approval are completed;Module is recalled for recalling the project reported;Node module is for checking project
Each history node and used time;Batch imports formwork module for importing assets after demand unit equipment leading out detailed list of materials
Management system simultaneously obtains after project fills out, and project information carries out batch filling;Equipment and materials inventory managing detailed catalogue export module is used for
Export material requirements managing detailed catalogue;Material inventory of the equipment and materials inventory export module for application for developing exports;
Construction drawing acts on behalf module and includes into page module, search module, approval module, checks module and node module;
Wherein enter the project that page module is used to check requirement approval;Search module is used to scan for according to specified conditions note;It examines
Module is criticized for examining to the information of project, fills in suggestions made after examination;Check module for checking single item purpose equipment material
Expect detail;Node module is used to check each history node and the used time of project;
Construction drawing has done module and has included into page module, search module, recall module, check module and node module;
Wherein enter the project that page module is used to check requirement approval;Search module according to specified conditions for scanning for;It recalls
Module recalls the project reported for demand unit;Check module for checking the information of single project;Node module is used for
Check each history node and the used time of project;
Construction drawing enquiry module includes search submodule and checks module, and wherein search module according to specified conditions for remembering
It scans for, checks module for checking all items and relevant device detailed list of materials information.
Wherein the query statistic module includes by catalogue of material statistical module, presses project statistical module and project application feelings
Condition tracking module;Wherein catalogue of material statistical module is used to carry out the statistics of the catalogue of material, including search module, month view mould
Block, time views module, export module, search module be used for according to specified conditions note scan for, month views module be used for
According to statistical query is carried out month, time views module is used to carry out statistical query according to the time, and export module is used for goods and materials
Query statistic result is exported;
It is used for goods and materials query statistic result by project statistical module by exporting;
Project application situation tracking module is tracked for project application situation, including search module and export module;Wherein
Search module is used to scan for according to specified conditions note, and export module is used to declare information from asset management system's export goods and materials
Afterwards, guiding system carries out situation tracking.
Wherein the detailed list of materials template is used to be managed detailed list of materials, including checks and increase newly.
Wherein the category directory management module is for being managed the current catalogue of material.
Wherein the batch management module is used to be managed batch, including checks and increase newly;Authority management module is used
In carrying out rights management, including user management module and power of examination and approval management module, wherein user management module is believed for user
Breath maintenance, user account management, Role Management, power of examination and approval management module is for revising the corresponding relationship of examination & approval.
Compared with prior art, the beneficial effects of the present invention are:
The present invention proposes to utilize the technical approach of big data, is each user using the formatting method of unified standard
A kind of organizational tool of project material inventory is provided, and can be carried out according to demand in actual use data increase,
It deletes and modification, realization dynamic updates.
Detailed description of the invention
Fig. 1 is system structure diagram of the invention.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
Below in conjunction with drawings and examples, the present invention is further elaborated.
Embodiment 1
Referring to FIG. 1, Fig. 1 is system structure diagram of the invention.
A kind of material requirements prediction data Real-Time Sharing platform is based on JDK, MySQL, Maven and Tomcat software environment
Developed, including login module, into interface module, application for developing project management module, construction drawing work out phased project pipe
Manage module, query statistic module, detailed list of materials module, category directory management module, batch management module and authority management module;
Wherein login module is used for authenticating users, judges different roles and shows different operation pages;
Application for developing and the project of construction documents design phase sum, master budget, grassroot project are used for into interface module
Number, examination and approval project number, the statistics displaying for exporting number;
Application for developing project management module is used to carry out the project management in scientific research stage;
Construction drawing establishment phased project management module is used for the project management for carrying out the construction drawing establishment stage;
Query statistic module is for being inquired and being exported to project and goods and materials;
Detailed list of materials module is used to be managed detailed list of materials, including checks and increase newly.
Category directory management module is for being managed the current catalogue of material;
Batch management module is used to be managed batch, including checks and increase newly;
Authority management module is for being managed user right.
On the one hand the work of unified project material inventory is worked out in the front end data typing of platform as each project implementation unit
On the other hand tool carries out the immediate data of requirement forecasting work as resources area.The classes of supplies of platform insertion is utilized simultaneously
Historical price database and materiel code library, for each sector of demand provide price of material refer to and expired encoded alert.Most
The establishment of the requirement forecasting Dan Kewei applying and purchasing the experiment materials list exported eventually provides foundation.
The data source of platform is two, and one is application for developing, and one is the construction drawing stage.Wherein each project is can
When grinding the stage must unified organizational system project material inventory, each designing institute's (project implementation unit) increases goods and materials data newly at this time, for the first time
Copying platform, the data source as resources area requirement forecasting work.Simultaneously as the progress of project deepens continuously, constructing
The goods and materials data in figure stage are more accurate, and designing institute's (project implementation unit) in platform enquiry of historical data and can be increased at this time
The operation such as add, delete, modifying, realizing the update of goods and materials data.
Application for developing project management module include application for developing project create module, module in application for developing project examination,
Module is completed in application for developing examination & approval, application for developing acts on behalf projects module, application for developing has done projects module, application for developing project is looked into
Ask module;Wherein application for developing project creates module and creates for application for developing project, and module is used in application for developing project examination
The processing of project in application for developing examination & approval, application for developing examination & approval are completed module and are used for the item for examining completion in application for developing
Mesh is managed, and application for developing acts on behalf the processing that projects module acts on behalf project for application for developing, and application for developing has done project mould
Block is used to do application for developing the processing of project, and application for developing project query module is used for the inquiry of application for developing project.
Module includes into page module, recalls module, node module in application for developing project examination, wherein entering the page
Module is used to show project information list under examination and approval, recalls module and be used to recall the project reported, node module is used for
Check each node of project;
It includes entering page module, recalling module, node module, import template mould in batches that module is completed in application for developing examination & approval
Block, equipment and materials inventory managing detailed catalogue export module, equipment and materials inventory export module;Wherein enter page module for showing
In the project information list that examination & approval are completed;Module is recalled for recalling the project reported;Node module is for checking project
Each history node and used time;Batch imports formwork module for importing assets after demand unit equipment leading out detailed list of materials
Management system simultaneously obtains after project fills out, and project information carries out batch filling;Equipment and materials inventory managing detailed catalogue export module is used for
Export material requirements managing detailed catalogue;Material inventory of the equipment and materials inventory export module for application for developing exports;
Application for developing acts on behalf projects module and includes into page module, search module, approval module, checks module and node
Module;Wherein enter the project that page module is used to check requirement approval;Search module is used to remember row into according to specified conditions and search
Rope;Approval module fills in suggestions made after examination for examining to the information of project;Check module for checking setting for single project
Standby material specification;Node module is used to check each history node and the used time of project;
Application for developing has done projects module and has included into page module, search module, recall module, check module and node
Module;Wherein enter the project that page module is used to check requirement approval;Search module according to specified conditions for scanning for;
It recalls module and recalls the project reported for demand unit;Check module for checking the information of single project;Node module
For each history node for the project of checking and used time;
Application for developing project query module includes search module and checks module, and wherein search module is used for according to specific item
Part note scans for, and checks module for checking all items and relevant device detailed list of materials information.
Application for developing project creates module and includes into interface module, search module, newly-increased module, removing module, reports
Module, batch setup module, template download module, import modul, editor module and opinion module;
Wherein enter interface module and is used to show each project information for creating the stage in feasibility study;
Search module is used to scan for according to specified conditions note;
Newly-increased module is used for new projects;Newly-increased module includes that fill in module, self-service examination module, goods and materials bright for Item Detail
Thin customized module, goods and materials detail selection template completion module, the goods and materials detail of filling in is increased newly by catalogue and fills in module, batch setting
Module, removing module, export module, template download module, import modul and return module;
Wherein Item Detail is filled in basic information of the module for project and is made a report on, including item types, each phases-time, item
Mesh title etc., and input limitation and error prompting is added;
The self-service normalization for examining that module is used to fill in goods and materials detail examines, and the self-service examination of export detail
As a result;
The customized module of filling in of goods and materials detail is used to second confession or tears the relevant information that past heritage provide open fill in;
Goods and materials detail selects template completion module to be used to be based on built-in template, directly export history similar item goods and materials detail
Inventory;
Goods and materials detail is by the newly-increased module of filling in of catalogue for based on built-in newest catalogue of material pass corresponding with materiel code
It is directory tree, is selected, after selection, the basic information of the corresponding goods and materials of automatic spring.And with the algorithm of big data, it is added
Recommend column;
Batch setting module is used for the relevant price of equipment and materials inventory, quantity, regular model, the date is reported to criticize
Amount setting;
Removing module is to equipment and materials inventory or a plurality of deletes;
Export module is used for equipment leading out detailed list of materials information;
After template download module is for carrying equipment and materials inventory batch importing template, batch input can be carried out in template;
The equipment and materials inventory batch that import modul is used to will fill in imports template and is imported;
Return module is for returning to previous page.
Removing module is for deleting the project information not reported;
Reporting module for demand unit is newly-built finish and batch be set after, select corresponding auditor to audit;
After batch setup module is used for grassroot project, corresponding batch is selected to be arranged;
After template download module imports template for download items information batch, batch input can be carried out in template;
The project information batch that import modul will fill in imports template and is imported;
Editor module is for editing the project information not reported;
Opinion module is for checking this project information procedure information.
Wherein construction drawing establishment phased project management module includes module during construction drawing creates module, construction drawing is examined, applies
Module is completed in the examination & approval of work figure, construction drawing acts on behalf module, construction drawing has done module and construction drawing enquiry module;
Construction drawing creates module for new projects in the construction drawing establishment stage, including enter interface module, search module,
Import modul, batch setup module, reporting module and editor module;It is new in construction drawing establishment for showing into interface module
Each project information in stage is built, search module is used to scan for according to specified conditions note, and import modul is used for from feasibility study-
It in the project information library for completing examination & approval, imported into construction drawing project information management list, batch setup module is used for New any
Select corresponding batch to be arranged after mesh, reporting module for demand unit it is newly-built finish and be arranged after batch select it is corresponding careful
Core people audits, and editor module is updated detailed list of materials when application for developing works out design drawing for Project Unit;
Module includes into page module, recalls module, node module in construction drawing examination & approval, is used wherein entering page module
In the project information list of display under examination and approval, module is recalled for recalling the project reported, node module is for checking item
The each node of purpose;
It includes entering page module, recalling module, node module, import template mould in batches that module is completed in construction drawing examination & approval
Block, equipment and materials inventory managing detailed catalogue export module, equipment and materials inventory export module;Wherein enter page module for showing
In the project information list that examination & approval are completed;Module is recalled for recalling the project reported;Node module is for checking project
Each history node and used time;Batch imports formwork module for importing assets after demand unit equipment leading out detailed list of materials
Management system simultaneously obtains after project fills out, and project information carries out batch filling;Equipment and materials inventory managing detailed catalogue export module is used for
Export material requirements managing detailed catalogue;Material inventory of the equipment and materials inventory export module for application for developing exports;
Construction drawing acts on behalf module and includes into page module, search module, approval module, checks module and node module;
Wherein enter the project that page module is used to check requirement approval;Search module is used to scan for according to specified conditions note;It examines
Module is criticized for examining to the information of project, fills in suggestions made after examination;Check module for checking single item purpose equipment material
Expect detail;Node module is used to check each history node and the used time of project;
Construction drawing has done module and has included into page module, search module, recall module, check module and node module;
Wherein enter the project that page module is used to check requirement approval;Search module according to specified conditions for scanning for;It recalls
Module recalls the project reported for demand unit;Check module for checking the information of single project;Node module is used for
Check each history node and the used time of project;
Construction drawing enquiry module includes search submodule and checks module, and wherein search module according to specified conditions for remembering
It scans for, checks module for checking all items and relevant device detailed list of materials information.
Wherein query statistic module include by catalogue of material statistical module, by project statistical module and project application situation with
Track module;Wherein catalogue of material statistical module is used to carry out the statistics of the catalogue of material, including search module, month views module,
Time views module, export module, search module be used for according to specified conditions note scan for, month views module be used for according to
Carry out statistical query month, time views module is used to carry out statistical query according to the time, and export module is for inquiring goods and materials
Statistical result is exported;
It is used for goods and materials query statistic result by project statistical module by exporting;
Project application situation tracking module is tracked for project application situation, including search module and export module;Wherein
Search module is used to scan for according to specified conditions note, and export module is used to declare information from asset management system's export goods and materials
Afterwards, guiding system carries out situation tracking.
Wherein batch management module is used to be managed batch, including checks and increase newly;Authority management module be used for into
Row rights management, including user management module and power of examination and approval management module, wherein user management module is tieed up for user information
Shield, user account management, Role Management, power of examination and approval management module is for revising the corresponding relationship of examination & approval.
Wherein derived table format is excel in this platform, and it is pdf that document, which exports format,.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair
The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description
To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this
Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention
Protection scope within.
Claims (8)
1. a kind of material requirements prediction data Real-Time Sharing platform, which is characterized in that including login module, into interface module,
Application for developing project management module, construction drawing work out phased project management module, query statistic module, detailed list of materials module, product
Class catalogue management module, batch management module and authority management module;
Wherein login module is used for authenticating users, judges different roles and shows different operation pages;
Application for developing and the project of construction documents design phase sum are used for into interface module, master budget, New any mesh number, are examined
The statistics displaying criticized item number, export number;
Application for developing project management module is used to carry out the project management in scientific research stage;
Construction drawing establishment phased project management module is used for the project management for carrying out the construction drawing establishment stage;
Query statistic module is for being inquired and being exported to project and goods and materials;
Detailed list of materials module is used to be managed detailed list of materials, including checks and increase newly.
Category directory management module is for being managed the current catalogue of material;
Batch management module is used to be managed batch, including checks and increase newly;
Authority management module is for being managed user right.
2. a kind of material requirements prediction data Real-Time Sharing platform according to claim 1, which is characterized in that the feasibility study
Phased project management module includes that application for developing project creates module, module, application for developing examination & approval in application for developing project examination
Complete module, application for developing acts on behalf projects module, application for developing has done projects module, application for developing project query module;Wherein
Application for developing project creates module and creates for application for developing project, and module is examined for application for developing in application for developing project examination
The processing of project in batch, application for developing examination & approval complete module and are used to be managed the project for examining completion in application for developing,
Application for developing acts on behalf the processing that projects module acts on behalf project for application for developing, and application for developing has done projects module for feasibility study
Stage has done the processing of project, and application for developing project query module is used for the inquiry of application for developing project.
3. a kind of material requirements prediction data Real-Time Sharing platform according to claim 2, which is characterized in that the feasibility study
Module includes into page module, recalls module, node module in phased project examination & approval, wherein entering page module for showing
Project information list under examination and approval recalls module for recalling the project reported, and node module is for checking each of project
A node;
Application for developing examination & approval complete module include into page module, recall module, node module, batch import formwork module,
Equipment and materials inventory managing detailed catalogue export module, equipment and materials inventory export module;Wherein enter page module for being shown in
Examine the project information list completed;Module is recalled for recalling the project reported;Node module is for checking each of project
A history node and used time;Batch imports formwork module for importing Assets Reorganization Taking after demand unit equipment leading out detailed list of materials
Reason system simultaneously obtains after project fills out, and project information carries out batch filling;Equipment and materials inventory managing detailed catalogue export module is for leading
Material requirements managing detailed catalogue out;Material inventory of the equipment and materials inventory export module for application for developing exports;
Application for developing acts on behalf projects module and includes into page module, search module, approval module, checks module and node mould
Block;Wherein enter the project that page module is used to check requirement approval;Search module is used to scan for according to specified conditions note;
Approval module fills in suggestions made after examination for examining to the information of project;Check module for checking single item purpose equipment
Material specification;Node module is used to check each history node and the used time of project;
Application for developing has done projects module and has included into page module, search module, recall module, check module and node mould
Block;Wherein enter the project that page module is used to check requirement approval;Search module according to specified conditions for scanning for;It removes
It returns module and recalls the project reported for demand unit;Check module for checking the information of single project;Node module is used
In each history node for the project of checking and used time;
Application for developing project query module includes search module and checks module, and wherein search module according to specified conditions for remembering
It scans for, checks module for checking all items and relevant device detailed list of materials information.
4. a kind of material requirements prediction data Real-Time Sharing platform according to claim 2, which is characterized in that the feasibility study
It includes into interface module, search module, newly-increased module, removing module, reporting module, batch setting that phased project, which creates module,
Module, template download module, import modul, editor module and opinion module;
Wherein enter interface module and is used to show each project information for creating the stage in feasibility study;
Search module is used to scan for according to specified conditions note;
Newly-increased module is used for new projects;
Removing module is for deleting the project information not reported;
Reporting module for demand unit is newly-built finish and batch be set after, select corresponding auditor to audit;
After batch setup module is used for grassroot project, corresponding batch is selected to be arranged;
After template download module imports template for download items information batch, batch input can be carried out in template;
The project information batch that import modul will fill in imports template and is imported;
Editor module is for editing the project information not reported;
Opinion module is for checking this project information procedure information.
5. a kind of material requirements prediction data Real-Time Sharing platform according to claim 4, which is characterized in that described newly-increased
Module include Item Detail fill in module, self-service examination module, goods and materials detail it is customized fill in module, goods and materials detail selection template
It fills in module, goods and materials detail and downloads mould by newly-increased module, batch setting module, removing module, export module, the template of filling in of catalogue
Block, import modul and return module;
Wherein Item Detail is filled in basic information of the module for project and is made a report on, including item types, each phases-time, entry name
Claim etc., and input limitation and error prompting is added;
The self-service normalization for examining that module is used to fill in goods and materials detail examines, and the self-service examination knot of export detail
Fruit;
The customized module of filling in of goods and materials detail is used to second confession or tears the relevant information that past heritage provide open fill in;
Goods and materials detail selects template completion module to be used to be based on built-in template, and directly export history similar item goods and materials detail is clear
It is single;
Goods and materials detail is by the newly-increased module of filling in of catalogue for the corresponding relationship mesh based on the built-in newest catalogue of material and materiel code
Record tree, is selected, after selection, the basic information of the corresponding goods and materials of automatic spring.And with the algorithm of big data, it is added and recommends
Column;
Batch setting module is used for the relevant price of equipment and materials inventory, quantity, regular model, the date is reported set in batches
It sets;
Removing module is to equipment and materials inventory or a plurality of deletes;
Export module is used for equipment leading out detailed list of materials information;
After template download module is for carrying equipment and materials inventory batch importing template, batch input can be carried out in template;
The equipment and materials inventory batch that import modul is used to will fill in imports template and is imported;
Return module is for returning to previous page.
6. a kind of material requirements prediction data Real-Time Sharing platform according to claim 1, which is characterized in that the construction
Figure establishment phased project management module include construction drawing create module, construction drawing examination & approval in module, construction drawing examination & approval complete module,
Construction drawing acts on behalf module, construction drawing has done module and construction drawing enquiry module;
Wherein construction drawing creates module for new projects in the construction drawing establishment stage, including enter interface module, search module,
Import modul, batch setup module, reporting module and editor module;It is new in construction drawing establishment for showing into interface module
Each project information in stage is built, search module is used to scan for according to specified conditions note, and import modul is used for from feasibility study-
It in the project information library for completing examination & approval, imported into construction drawing project information management list, batch setup module is used for New any
Select corresponding batch to be arranged after mesh, reporting module for demand unit it is newly-built finish and be arranged after batch select it is corresponding careful
Core people audits, and editor module is updated detailed list of materials when application for developing works out design drawing for Project Unit;
Module includes into page module, recalls module, node module in construction drawing examination & approval, wherein entering page module for showing
Show project information list under examination and approval, recalls module for recalling the project reported, node module is for checking project
Each node;
It includes entering page module, recalling module, node module, import formwork module in batches, set that module is completed in construction drawing examination & approval
Standby detailed list of materials managing detailed catalogue export module, equipment and materials inventory export module;It is careful for being shown in wherein to enter page module
Criticize the project information list completed;Module is recalled for recalling the project reported;Node module is for checking each of project
History node and used time;Batch imports formwork module for importing asset management after demand unit equipment leading out detailed list of materials
System simultaneously obtains after project fills out, and project information carries out batch filling;Equipment and materials inventory managing detailed catalogue export module is for exporting
Material requirements managing detailed catalogue;Material inventory of the equipment and materials inventory export module for application for developing exports;
Construction drawing acts on behalf module and includes into page module, search module, approval module, checks module and node module;Wherein
It is used to check the project of requirement approval into page module;Search module is used to scan for according to specified conditions note;Examine mould
Block fills in suggestions made after examination for examining to the information of project;Check module for checking that the equipment and materials of single project is bright
Carefully;Node module is used to check each history node and the used time of project;
Construction drawing has done module and has included into page module, search module, recall module, check module and node module;Wherein
It is used to check the project of requirement approval into page module;Search module according to specified conditions for scanning for;Recall module
The project reported is recalled for demand unit;Check module for checking the information of single project;Node module is for checking
Each history node of project and used time;
Construction drawing enquiry module includes search submodule and checks module, and wherein search module is used to remember row into according to specified conditions
Search checks module for checking all items and relevant device detailed list of materials information.
7. a kind of material requirements prediction data Real-Time Sharing platform according to claim 1, which is characterized in that the inquiry
Statistical module includes by catalogue of material statistical module, presses project statistical module and project application situation tracking module;Wherein goods and materials
Catalogue statistical module is used to carry out the statistics of the catalogue of material, including search module, month views module, time views module, leads
Module out, search module be used for according to specified conditions note scan for, month views module be used for according to carry out in month statistics look into
It askes, time views module is used to carry out statistical query according to the time, and export module is for leading goods and materials query statistic result
Out;
It is used for goods and materials query statistic result by project statistical module by exporting;
Project application situation tracking module is tracked for project application situation, including search module and export module;Wherein search for
Module is used to scan for according to specified conditions note, after export module is used to declare information from asset management system's export goods and materials,
Guiding system carries out situation tracking.
8. a kind of material requirements prediction data Real-Time Sharing platform according to claim 1, which is characterized in that the batch
Management module is used to be managed batch, including checks and increase newly;Authority management module for carrying out rights management, including with
Family management module and power of examination and approval management module, wherein user management module is for user information maintenance, user account management, angle
Colour tube reason, power of examination and approval management module is for revising the corresponding relationship of examination & approval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711272913.9A CN109886613A (en) | 2017-12-06 | 2017-12-06 | A kind of material requirements prediction data Real-Time Sharing platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711272913.9A CN109886613A (en) | 2017-12-06 | 2017-12-06 | A kind of material requirements prediction data Real-Time Sharing platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109886613A true CN109886613A (en) | 2019-06-14 |
Family
ID=66923326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711272913.9A Pending CN109886613A (en) | 2017-12-06 | 2017-12-06 | A kind of material requirements prediction data Real-Time Sharing platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109886613A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113742001A (en) * | 2021-09-02 | 2021-12-03 | 刘忠琪 | Tomcat cluster visual unified management system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103021219A (en) * | 2012-11-27 | 2013-04-03 | 四川省电力公司技术技能培训中心 | Intelligent simulation system for power ERP service |
CN104850940A (en) * | 2015-04-29 | 2015-08-19 | 国网辽宁省电力有限公司鞍山供电公司 | Completion settlement making method and completion settlement making system based on project whole-process management |
CN106096843A (en) * | 2016-06-08 | 2016-11-09 | 国网安徽省电力公司检修公司 | A kind of engineering project data processing method and system |
-
2017
- 2017-12-06 CN CN201711272913.9A patent/CN109886613A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103021219A (en) * | 2012-11-27 | 2013-04-03 | 四川省电力公司技术技能培训中心 | Intelligent simulation system for power ERP service |
CN104850940A (en) * | 2015-04-29 | 2015-08-19 | 国网辽宁省电力有限公司鞍山供电公司 | Completion settlement making method and completion settlement making system based on project whole-process management |
CN106096843A (en) * | 2016-06-08 | 2016-11-09 | 国网安徽省电力公司检修公司 | A kind of engineering project data processing method and system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113742001A (en) * | 2021-09-02 | 2021-12-03 | 刘忠琪 | Tomcat cluster visual unified management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8340995B2 (en) | Method and system of using artifacts to identify elements of a component business model | |
CN106991183B (en) | A kind of packaging method and system of business intelligence ETL | |
US8560576B2 (en) | Mass change of master data via templates | |
CN107908566A (en) | Automatic test management method, device, terminal device and storage medium | |
WO2007005949A2 (en) | Dispute resolution processing method and system | |
US7512451B2 (en) | System and method for interactive process management | |
CN108197258A (en) | A kind of Science Research Information Management System and science research information management method | |
CN105184503A (en) | Contract management system and method for executing contract management by utilizing contract management system | |
CN111897866A (en) | Remote sensing monitoring pattern spot docking system and using method thereof | |
CN106096915A (en) | A kind of engineering project data handling system | |
CN104541297A (en) | Extensibility for sales predictor (SPE) | |
Raju et al. | Software sizing and productivity with Function Points | |
NOVIKOV et al. | Improving the enterprise resource planning system based on digital modules of the industry 4.0 concept | |
CN109886613A (en) | A kind of material requirements prediction data Real-Time Sharing platform | |
KR100441660B1 (en) | Knowledge service system through ordered workflow, service method thereof, service method for developing products through network and system thereof | |
CN115827051A (en) | Software integration management system, method and server | |
Xu et al. | Value-aware service model driven architecture and methodology | |
US20140149186A1 (en) | Method and system of using artifacts to identify elements of a component business model | |
Shikhli et al. | Data Acquisition Model for Analyzing Schedule Delays Using KDD: Knowledge Discovery and Datamining | |
Hansen et al. | Factors influencing scheduling activities of construction projects | |
Dumitriu | Modelling and simulation software solutions as a premise for enhancing processes’ quality and business overall value | |
CN114004542A (en) | Enterprise task management method, system, computer equipment and storage medium | |
CN114331355A (en) | Remote multi-stage approval method and system for flexible employment platform | |
Aksu et al. | An approach for automatically deriving key performance indicators from ontological enterprise models | |
Khan et al. | ETL Maturity Model for Data Warehouse Systems: A CMMI Compliant Framework. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190614 |