CN109886550A - 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法 - Google Patents

煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法 Download PDF

Info

Publication number
CN109886550A
CN109886550A CN201910061539.0A CN201910061539A CN109886550A CN 109886550 A CN109886550 A CN 109886550A CN 201910061539 A CN201910061539 A CN 201910061539A CN 109886550 A CN109886550 A CN 109886550A
Authority
CN
China
Prior art keywords
aver
max
fracturing
ground
effect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910061539.0A
Other languages
English (en)
Other versions
CN109886550B (zh
Inventor
匡铁军
高瑞
孟祥斌
兰奕文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201910061539.0A priority Critical patent/CN109886550B/zh
Publication of CN109886550A publication Critical patent/CN109886550A/zh
Application granted granted Critical
Publication of CN109886550B publication Critical patent/CN109886550B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

本发明涉及采用地面压裂的方法对坚硬顶板进行压裂弱化时的压裂效果综合评价方法,具体为煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法,填补目前缺乏地面压裂效果综合评价方法。具体步骤为:一、地表压裂井周围布置检波器;二、监测裂缝扩展方向;三、井下布置巷道变形和支架阻力测点;四、监测测点数据;五、对比分析给出压裂效果。优点:在裂缝扩展范围内监测巷道变形及支架受力,保证了评价效果的可靠性和准确性。

Description

煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法
技术领域
本发明属于采用地面压裂技术对坚硬顶板进行压裂弱化控制技术领域,具体是一种煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法。
背景技术
地下煤层开采时,上覆岩层受扰动发生破断失稳,对工作面造成矿压危害;尤其对于坚硬顶板条件,因顶板抗拉强度大,破断步距广,坚硬顶板的破断失稳更易造成采场强矿压显现,因此对于坚硬顶板的控制尤为重要。采用地面水力压裂坚硬顶板的方法,即通过地面压裂装备对煤层上覆坚硬顶板进行压裂,降低顶板的完整性和破断步距,从而实现减弱采场矿压的目的,是目前对于坚硬顶板控制的一个创新性强、效果显著的控制技术措施。但对于地面压裂的效果评价,目前缺乏一个较为客观完善的评价方法,无法定性定量的考量坚硬顶板地面压裂的控制效果。
发明内容
本发明为了解决目前缺乏一个较为客观完善的评价方法,无法定性定量的考量坚硬顶板地面压裂的控制效果的问题,提供一种煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法。
本发明采取以下技术方案:一种煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法,包括以下步骤,
a.在地面压裂井周围布置微震检波器用以监测压裂裂缝扩展方向,检波器埋于地表之下10~15cm;
b.开始压裂,通过检波器捕捉岩层破裂信号,实时记录裂缝扩展方向至压裂结束;
c.在裂缝扩展区域对应井下工作面巷道中,每隔5~10m布置位移测点,在工作面支架每隔10架布置支架阻力监测仪;
d.当工作面开采至裂缝扩展区域内,监测巷道变形最大值Smax,工作面平均支架阻力Paver,同时,对相似条件未压裂工作面同一区域内巷道变形最大值Smax 0、工作面平均支架阻力Paver 0进行监测;
e.对比两个工作面的巷道变形最大值和平均支架工作阻力,若Smax=(0.1~0.3)Smax 0、Paver=(0.1~0.6)Paver 0,则认为地面压裂的强矿压控制效果极好;若Smax=(0.1~0.3)Smax 0、Paver=(0.7~1.0)Paver 0或Smax=(0.4~0.7)Smax 0、Paver≤Paver 0,则认为地面压裂的强矿压控制效果较好;若Smax=(0.8~1.0)Smax 0、Paver≤Paver 0,则认为地面压裂的强矿压控制效果一般。
与现有技术相比,本发明具有以下优点:1)首先对裂缝扩展区域进行监测,然后在裂缝扩展区域对应井下工作面范围内对巷道变形及支架受力进行监测对比,保证了压裂效果评价的可靠性;2)通过现场实测巷道变形和支架受力的方法,保证了压裂效果评价的准确性;3)通过监测裂缝扩展范围及井下工作面巷道变形及支架受力特征即可对地面压裂效果进行评价,评价方法简单易行,应用前景广阔。
具体实施方式
下面以大同矿区坚硬顶板特厚煤层开采条件的地面压裂目标层选取为例,对本发明作进一步的描述。
一种煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法,其步骤在于:
a.在地面压裂井周围布置微震检波器用以监测压裂裂缝扩展方向,检波器埋于地表之下10~15cm。
b.开始压裂,通过检波器捕捉岩层破裂信号,实时记录裂缝扩展方向至压裂结束。
c.在裂缝扩展区域对应井下工作面巷道中,每隔5m布置位移测点,在工作面支架每隔10架布置支架阻力监测仪。
d.当工作面开采至裂缝扩展区域内,监测巷道变形最大值Smax,工作面平均支架阻力Paver,得到巷道变形最大值为0.4m,支架平均阻力为9000kN,同时,对相似条件未压裂工作面同一区域内巷道变形最大值Smax 0、工作面平均支架阻力Paver 0进行监测,得到巷道变形最大值为1.5m,支架平均阻力为12000kN。
e.对比两个工作面的巷道变形最大值和平均支架工作阻力,结果表明,Smax=0.26Smax 0、Paver=0.75Paver 0,则认为地面压裂的强矿压控制效果较好。

Claims (1)

1.一种煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法,其特征在于:包括以下步骤,
a.在地面压裂井周围布置微震检波器用以监测压裂裂缝扩展方向,检波器埋于地表之下10~15cm;
b.开始压裂,通过检波器捕捉岩层破裂信号,实时记录裂缝扩展方向至压裂结束;
c.在裂缝扩展区域对应井下工作面巷道中,每隔5~10m布置位移测点,在工作面支架每隔10架布置支架阻力监测仪;
d.当工作面开采至裂缝扩展区域内,监测巷道变形最大值Smax,工作面平均支架阻力Paver,同时,对相似条件未压裂工作面同一区域内巷道变形最大值Smax 0、工作面平均支架阻力Paver 0进行监测;
e.对比两个工作面的巷道变形最大值和平均支架工作阻力,若Smax=(0.1~0.3)Smax 0、Paver=(0.1~0.6)Paver 0,则认为地面压裂的强矿压控制效果极好;若Smax=(0.1~0.3)Smax 0、Paver=(0.7~1.0)Paver 0或Smax=(0.4~0.7)Smax 0、Paver≤Paver 0,则认为地面压裂的强矿压控制效果较好;若Smax=(0.8~1.0)Smax 0、Paver≤Paver 0,则认为地面压裂的强矿压控制效果一般。
CN201910061539.0A 2019-01-23 2019-01-23 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法 Active CN109886550B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910061539.0A CN109886550B (zh) 2019-01-23 2019-01-23 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910061539.0A CN109886550B (zh) 2019-01-23 2019-01-23 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法

Publications (2)

Publication Number Publication Date
CN109886550A true CN109886550A (zh) 2019-06-14
CN109886550B CN109886550B (zh) 2023-05-12

Family

ID=66926592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910061539.0A Active CN109886550B (zh) 2019-01-23 2019-01-23 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法

Country Status (1)

Country Link
CN (1) CN109886550B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077576A (zh) * 2019-12-12 2020-04-28 天地科技股份有限公司 地面压裂的监测方法
CN111173487A (zh) * 2019-12-25 2020-05-19 天地科技股份有限公司 区域式水力压裂的监测方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030075970A1 (en) * 2000-04-26 2003-04-24 Hainsworth David William Mining machine and method
US20090166029A1 (en) * 2006-05-31 2009-07-02 Schlumberger Technology Corporation Method of formation fracture dimensions
US20130127231A1 (en) * 2010-07-21 2013-05-23 Ian Gray Hydraulic Mining System for Tabular Orebodies Utilising Directional Drilling
CN104018830A (zh) * 2014-06-23 2014-09-03 中国矿业大学 一种煤层水力压裂效果时空评价方法
CN104790951A (zh) * 2015-03-12 2015-07-22 大同煤矿集团有限责任公司 弱化距煤层100~350m高位坚硬顶板的方法及装置
CN104866914A (zh) * 2015-04-28 2015-08-26 山东科技大学 一种充填开采导水裂缝带最大高度的预测方法
CN106408208A (zh) * 2016-10-14 2017-02-15 东北石油大学 体积压裂改造效果评价方法
WO2017096674A1 (zh) * 2015-12-11 2017-06-15 大同煤矿集团有限责任公司 特大采场空间远近场井上下协同顶板控制方法
CN106884677A (zh) * 2017-04-10 2017-06-23 大同煤矿集团有限责任公司 坚硬顶板特厚煤层开采强矿压预测预控方法
CN108756884A (zh) * 2018-06-12 2018-11-06 王帆 煤矿坚硬顶板全工作面地面提前消突方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030075970A1 (en) * 2000-04-26 2003-04-24 Hainsworth David William Mining machine and method
US20090166029A1 (en) * 2006-05-31 2009-07-02 Schlumberger Technology Corporation Method of formation fracture dimensions
US20130127231A1 (en) * 2010-07-21 2013-05-23 Ian Gray Hydraulic Mining System for Tabular Orebodies Utilising Directional Drilling
CN104018830A (zh) * 2014-06-23 2014-09-03 中国矿业大学 一种煤层水力压裂效果时空评价方法
CN104790951A (zh) * 2015-03-12 2015-07-22 大同煤矿集团有限责任公司 弱化距煤层100~350m高位坚硬顶板的方法及装置
CN104866914A (zh) * 2015-04-28 2015-08-26 山东科技大学 一种充填开采导水裂缝带最大高度的预测方法
WO2017096674A1 (zh) * 2015-12-11 2017-06-15 大同煤矿集团有限责任公司 特大采场空间远近场井上下协同顶板控制方法
CN106408208A (zh) * 2016-10-14 2017-02-15 东北石油大学 体积压裂改造效果评价方法
CN106884677A (zh) * 2017-04-10 2017-06-23 大同煤矿集团有限责任公司 坚硬顶板特厚煤层开采强矿压预测预控方法
CN108756884A (zh) * 2018-06-12 2018-11-06 王帆 煤矿坚硬顶板全工作面地面提前消突方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周世轩等: "沿空巷道围岩变形特征及控制技术研究", 《现代矿业》 *
康红普等: "煤矿井下水力压裂技术及在围岩控制中的应用", 《煤炭科学技术》 *
黄炳香等: "坚硬顶板水压致裂控制理论与成套技术", 《岩石力学与工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077576A (zh) * 2019-12-12 2020-04-28 天地科技股份有限公司 地面压裂的监测方法
CN111173487A (zh) * 2019-12-25 2020-05-19 天地科技股份有限公司 区域式水力压裂的监测方法
CN111173487B (zh) * 2019-12-25 2022-02-08 天地科技股份有限公司 区域式水力压裂的监测方法

Also Published As

Publication number Publication date
CN109886550B (zh) 2023-05-12

Similar Documents

Publication Publication Date Title
WO2021007960A1 (zh) 一种基于裂隙演化的沿空掘巷窄煤柱合理宽度确定方法
CN111270987B (zh) 一种煤矿井下远程区域精准防控冲击地压方法
CN106779231B (zh) 一种基于采空区压力监测的煤矿采空区飓风灾害预警方法
CN106555609B (zh) 一种煤矿采空区水探放方法
CN113622913B (zh) 一种全垮落法开采下井上下一体化隧道围岩变形控制方法
CN112711847B (zh) 一种关键层位于覆岩不同位置的地表下沉系数确定方法
CN105736022B (zh) 基于深部软弱复合顶板的矩形煤巷的分层支护方法
CN102955025B (zh) 一种煤矿采场上覆岩梁断裂带高度及范围确定方法
CN112483068B (zh) 一种采煤工作面超前顶板预裂爆破钻孔的倾角确定方法
CN109681180B (zh) 煤矿地面压裂坚硬顶板控制采场强矿压效果预评价方法
CN104500139A (zh) 一种基于声发射技术的矿井灾害防治系统及其实现方法
CN108802838A (zh) 一种工作面开采岩层破坏井下顶底板钻孔电法监测方法
CN110029996B (zh) 一种煤矿冲击地压防治的护壁式钻孔卸压方法
CN110792419A (zh) 一种煤矿冲击地压井上下超前预控方法
WO2021088190A1 (zh) 一种多参量随钻测量确定煤体应力高峰区并预警的方法
CN106405678A (zh) 一种基于应力监测的采动覆岩导水裂隙带高度探测方法
CN108086977A (zh) 一种煤层为含水层防治底板隔水层采煤方法
CN116771348A (zh) 一种减小末采时大巷动压影响并优化停采线煤柱的方法
CN109886550A (zh) 煤矿地面压裂坚硬顶板控制强矿压效果综合评价方法
CN101165315A (zh) 电磁辐射法监测矿井岩层应力状态的方法
CN109779634B (zh) 煤矿地面垂直井压裂坚硬顶板位置确定方法
CN111677514B (zh) 顶板弱化方法
CN110130895B (zh) 一种弱化遗留煤柱潜在破坏面的煤柱破坏方法
CN202914103U (zh) 煤矿采场上覆岩梁断裂带高度及范围监测系统
Liu et al. The spatio-temporal evolution law of overlying rock fractures in an experimental working face (N00 mining method) based on microseismic monitoring technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant