CN109884578B - Rapid method for testing anti-diving performance of electronic electric energy meter - Google Patents

Rapid method for testing anti-diving performance of electronic electric energy meter Download PDF

Info

Publication number
CN109884578B
CN109884578B CN201910284044.4A CN201910284044A CN109884578B CN 109884578 B CN109884578 B CN 109884578B CN 201910284044 A CN201910284044 A CN 201910284044A CN 109884578 B CN109884578 B CN 109884578B
Authority
CN
China
Prior art keywords
electric energy
energy meter
electronic electric
time
electronic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910284044.4A
Other languages
Chinese (zh)
Other versions
CN109884578A (en
Inventor
曹献炜
武晓勇
常兴智
张军
李全堂
魏鹏举
李晓雄
张生利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia LGG Instrument Co Ltd
Original Assignee
Ningxia LGG Instrument Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxia LGG Instrument Co Ltd filed Critical Ningxia LGG Instrument Co Ltd
Priority to CN201910284044.4A priority Critical patent/CN109884578B/en
Publication of CN109884578A publication Critical patent/CN109884578A/en
Application granted granted Critical
Publication of CN109884578B publication Critical patent/CN109884578B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Magnetic Variables (AREA)

Abstract

A quick method for testing anti-diving performance of an electronic electric energy meter; putting the electronic electric energy meter under the power frequency magnetic field condition with the magnetic field intensity of 0.5 mT; connecting the electronic electric energy meter to the voltage of 115% UnSo that the electronic electric energy meter can work normally, and the real-time current I sampled by the metering chip of the electronic electric energy meter is read by the upper computer softwarekAnd real-time voltage Uk(ii) a If tSThe sampling times of the data are measured for the reading time of the upper computer by n bits, W is the accumulated electric quantity in the reading time, and pavgFor average power, by a first formula
Figure DDA0002840598820000011
And a second formula
Figure DDA0002840598820000012
Calculating the average power; if so:
Figure DDA0002840598820000013
the sneak current generated by the electronic electric energy meter in the power frequency magnetic field of 0.5mT is not enough to enable the electric energy meter to generate a pulse within 20 times of the starting time, and the sneak prevention performance of the electric energy meter is judged to be qualified; the automatic detection and mass production detection are facilitated, and a large amount of time and labor are saved.

Description

Rapid method for testing anti-diving performance of electronic electric energy meter
Technical Field
The invention relates to the technical field of electric energy meters, in particular to a quick method for testing anti-diving performance of an electronic electric energy meter.
Background
The metering accuracy of the electronic electric energy meter is closely related to the working environment of the electronic electric energy meter, and one main factor is a power frequency magnetic field. The electric energy meter is often in a space power frequency magnetic field due to unreasonable installation and wiring on a working site, so that the error metering is caused, extra electric energy metering is brought to a user, and the user is subjected to unnecessary fee payment.
In order to ensure that the electric energy meter can reliably work in a complicated field power frequency magnetic field environment, a new Q/GDW364-2013 specified in the state network of 2013 is added: under the condition of alternating current 0.5mT magnetic field, the voltage circuit of the electronic electric energy meter is connected with 115% Un, the current loop has no current, the 0.5mT power frequency magnetic field is applied to the position where the electric energy meter is most sensitive to the influence of the magnetic field, and the electric energy meter cannot generate more than one pulse output within 20 times of theoretical starting time. "the theoretical starting time refers to the charging time t required by the electric energy meter to generate a pulse output under the starting current condition of 0.004IbQ. The starting test time specified by the technical specification of the intelligent electric energy meter of the national grid company is
Figure GDA0002840598810000011
Wherein C is an electric energy meter constant; pQTo initiate power.
Taking the specification of the electronic single-phase electric energy meter as Un of 220VAC, In of 5A and meter constant C of 1200imp/kWh as an example, P is under the conditions that the power factor is 1.0 and the starting current is 0.004InQ0.004 Ib-4.4W ═ Un, then tQ13.6 minutes, namely the theoretical starting time of the electronic single-phase electric energy meter is 13.6 minutes, and the anti-potential performance test time of each electronic single-phase electric energy meter is at least 13.6 minutes by 20 minutes to 272 minutes according to the specification requirement, which is not acceptable for the batch production test of the electronic electric energy meters.
Disclosure of Invention
The application provides a quick method for testing the anti-potentiality performance of an electronic electric energy meter, which aims to solve the problem that the anti-potentiality performance of each electronic single-phase electric energy meter is too long to test according to the standard requirement in the prior art, so that the electronic electric energy meters cannot be produced in batches.
The technical purpose of the invention is realized by the following technical scheme:
a quick method for testing anti-latency performance of an electronic electric energy meter specifically comprises the following steps:
putting the electronic electric energy meter under the power frequency magnetic field condition with the magnetic field intensity of 0.5 mT;
the electronic electric energy meter is connected to the voltage of 115% Un, so that the electronic electric energy meter can normally work, and the real-time current I sampled by a metering chip of the electronic electric energy meter is read by the software of an upper computer at the momentkAnd real-time voltage Uk
If tSThe sampling times of the data are measured for the reading time of the upper computer by n bits, W is the accumulated electric quantity in the reading time, and pavgFor average power, by a first formula
Figure GDA0002840598810000021
And a second formula
Figure GDA0002840598810000022
The average power is calculated.
If so:
Figure GDA0002840598810000023
the sneak current generated by the electronic electric energy meter in the power frequency magnetic field of 0.5mT is not enough to enable the electric energy meter to generate a pulse within 20 times of the starting time, and the sneak prevention performance of the electric energy meter is judged to be qualified.
The technical scheme provided by the application comprises the following beneficial technical effects:
the invention provides a rapid method for testing anti-diving performance of an electronic electric energy meter, which adopts a first formula
Figure GDA0002840598810000024
And a second formula
Figure GDA0002840598810000025
Calculating the average power;
if so:
Figure GDA0002840598810000026
the sneak current generated by the electronic electric energy meter in the power frequency magnetic field of 0.5mT is not enough to enable the electric energy meter to generate a pulse within 20 times of the starting time, and the sneak prevention performance of the electric energy meter is judged to be qualified; the anti-creeping performance of the electronic electric energy meter can be quickly detected in actual operation, the detection of automation and mass production is facilitated, and a large amount of time and labor cost are saved.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without any creative effort.
FIG. 1 is a schematic view of the working states of an upper computer and an electronic electric energy meter in the application;
FIG. 2 is a screenshot of a host computer in the present application;
fig. 3 is a schematic diagram of the specific steps of the overall method of the present application.
Description of reference numerals: 1. an upper computer; 2. an electronic electric energy meter; 3. 0.5mT power frequency magnetic field.
Detailed Description
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and together with the description, serve to explain the principles of the application.
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious for those skilled in the art to obtain other drawings without inventive exercise.
Examples
As shown In fig. 1 and fig. 2, the tool for testing the anti-latency performance of the electronic electric energy meter 2 comprises an upper computer 1 and the electronic electric energy meter 2 to be tested, which is arranged In a 0.5mT power frequency magnetic field 3, wherein the electronic electric energy meter 2 is an electronic single-phase electric energy meter with specifications of Un 220V, In 5(60) A C1200 imp/kWh 50Hz, and the upper computer 1 is connected with the electronic electric energy meter 2 through a 485 communication interface.
Referring to fig. 3, a method for quickly testing anti-latency performance of an electronic electric energy meter 2 specifically includes the following steps:
s1, placing an electronic electric energy meter 2 under the condition of a power frequency magnetic field 3 with the magnetic field intensity of 0.5 mT.
S2, the electronic electric energy meter 2 is connected to the voltage of 115% Un, so that the electronic electric energy meter 2 works normally, and at the moment, the real-time current I sampled by the metering chip of the electronic electric energy meter 2 is read through software of the upper computer 1kAnd real-time voltage Uk
S3, if tSReading time for the upper computer 1, measuring the sampling times of data by n bits, W is the accumulated electric quantity in the reading time, and pavgFor average power, by a first formula
Figure GDA0002840598810000031
And a second formula
Figure GDA0002840598810000032
The average power is calculated.
If so:
Figure GDA0002840598810000033
the sneak current generated by the electronic electric energy meter 2 in the power frequency magnetic field 3 of 0.5mT is not enough to enable the electric energy meter to generate a pulse within 20 times of the starting time, and the anti-sneak performance of the electric energy meter is judged to be qualified.
Reading time t S1 minute, the number of reading n is 30, and the upper computer 1 software compares tS、n、Ik、UkSubstituting the parameters into a first formula and a second formula to automatically calculate the average power p in the reading time tSavg=0.005W。
When the anti-latency performance test is qualified under the condition of a power factor of 1.0 and the power frequency magnetic field condition of 0.5mT under 3
The maximum average power allowed to be generated in the 0.5mT power frequency magnetic field 3 is:
Figure GDA0002840598810000034
thereby determining pavg=0.005W<Pmax=0.009W。
Comparative example
Under the condition that the power factor is 1.0, the anti-potential performance test time of each electronic single-phase electric energy meter is at least equal to the time required by the specification
Figure GDA0002840598810000041
The comparison of the results of the embodiment and the comparative example shows that the anti-creeping performance time of the electronic electric energy meter 2 is shortened from 272 minutes to 1 minute, the detection efficiency is greatly improved, if the anti-creeping performance of the electronic electric energy meter under a 0.5mT power frequency magnetic field 3 is detected by 1000 electric energy meters, only 1000 minutes are needed, compared with the original detection method, the required time is shortened by nearly 270 times, the detection efficiency is greatly improved, and the method can be completely suitable for automatic and mass production detection.
It is noted that relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that an article or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above description is merely exemplary of the present application and is presented to enable those skilled in the art to understand and practice the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
It will be understood that the present application is not limited to what has been described above and shown in the accompanying drawings, and that various modifications and changes can be made without departing from the scope thereof. The scope of the application is limited only by the appended claims.

Claims (1)

1. A quick method for testing anti-diving performance of an electronic electric energy meter is characterized by comprising the following steps:
the electronic electric energy meter (2) is placed under the condition of a power frequency magnetic field (3) with the magnetic field intensity of 0.5 mT;
the electronic electric energy meter (2) is connected to the voltage of 115% Un, so that the electronic electric energy meter (2) works normally, and the real-time current I sampled by the metering chip of the electronic electric energy meter (2) is read through software of the upper computer (1) at the momentkAnd real-time voltage Uk
If tSReading time for an upper computer (1), n is the sampling frequency of the metering data, W is the accumulated electric quantity in the reading time, and pavgFor average power, by a first formula
Figure FDA0002840598800000011
And a second formula
Figure FDA0002840598800000012
The average power is calculated and,
if so:
Figure FDA0002840598800000013
the sneak current generated by the electronic electric energy meter (2) in the power frequency magnetic field (3) of 0.5mT is not enough to enable the electric energy meter to generate a pulse within 20 times of the starting time, and the sneak prevention performance of the electric energy meter is judged to be qualified;
wherein Un is the rated voltage of the electronic voltmeter; t is tQGenerating a pulse output time for the electronic electric energy meter; and C is the constant of the electronic electric energy meter.
CN201910284044.4A 2019-04-10 2019-04-10 Rapid method for testing anti-diving performance of electronic electric energy meter Active CN109884578B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910284044.4A CN109884578B (en) 2019-04-10 2019-04-10 Rapid method for testing anti-diving performance of electronic electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910284044.4A CN109884578B (en) 2019-04-10 2019-04-10 Rapid method for testing anti-diving performance of electronic electric energy meter

Publications (2)

Publication Number Publication Date
CN109884578A CN109884578A (en) 2019-06-14
CN109884578B true CN109884578B (en) 2021-03-09

Family

ID=66936826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910284044.4A Active CN109884578B (en) 2019-04-10 2019-04-10 Rapid method for testing anti-diving performance of electronic electric energy meter

Country Status (1)

Country Link
CN (1) CN109884578B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110988780B (en) * 2019-11-05 2022-04-22 广西电网有限责任公司 Method for realizing power frequency anti-shunt running and electric energy meter

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3157467B2 (en) * 1996-07-24 2001-04-16 東京計器工業株式会社 Creep hole detection device for inductive watt-hour meter.
CN100425994C (en) * 2006-12-06 2008-10-15 北京中星微电子有限公司 Circuit and method for preventing shunt running in electric energy measurement
CN205450250U (en) * 2016-02-24 2016-08-10 国家电网公司 Indoor electric energy meter shunt running test instrument for examination
CN107942283A (en) * 2017-12-16 2018-04-20 国网辽宁省电力有限公司电力科学研究院 A kind of automatic calibration of electric energy meter assembly line condition monitoring system and method

Also Published As

Publication number Publication date
CN109884578A (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN104198091B (en) A kind of intelligent platinum resistance temperature measurement tester and its method of calibration
CN103901388A (en) Parallel detection terminal device and detection method
CN105116369A (en) Radio frequency radiation disturbance rejection degree test apparatus and system
CN102338865A (en) Method for quickly calibrating error of three-phase intelligent electric energy meter
CN106646333A (en) Intelligent electric energy meter on-line monitoring and remote control system
CN204855786U (en) From measurement formula ammeter accuracy testing check table
CN102156227A (en) Detecting system and detecting method for non-vehicular charging machine
CN109884578B (en) Rapid method for testing anti-diving performance of electronic electric energy meter
CN102236046B (en) Method for detecting voltage monitoring function of electricity utilization management terminals in batches
CN101846708B (en) Method for detecting power-failure counting function of distribution transformer terminals in batch
CN103698598B (en) Ammeter and low error pulse output intent thereof
CN108107313A (en) The method that unloaded situation judges connection box of electric energy meter correctness
CN105301412A (en) Method and system for automatic terminal detection
CN109085414A (en) Voltage detection method and device
CN104316882A (en) Method and device for detecting residual capacity of mobile power supply
CN204989309U (en) On -vehicle electric current true RMS detection device who charges machine of electric vehicle
CN105021909A (en) Automatic detection method for digital electric energy quality monitoring terminal and system thereof
Luthfi et al. Design of raspberry pi web-based energy monitoring system for residential electricity consumption
CN104678216A (en) Method and device for testing energy or power conversion efficiency of circuit board of mobile power supply
CN109342971B (en) Fill electric pile part quality detecting system and fill electric pile part detecting system of alternating current direct current
CN115061079A (en) Electric energy meter metering error online measurement method and batch test system
Zhang et al. Application Verification of Power IOT Low-power MCU in Laboratory Environment
CN110888100A (en) Single-phase intelligent electric energy meter online on-load detection system and method
CN207502984U (en) A kind of portable intelligent actuating of relay power measuring
CN205049727U (en) Radio -frequency radiation noise immunity experimental apparatus and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant