CN109884463A - A kind of detection of buried cable and standardized management method - Google Patents
A kind of detection of buried cable and standardized management method Download PDFInfo
- Publication number
- CN109884463A CN109884463A CN201811648811.7A CN201811648811A CN109884463A CN 109884463 A CN109884463 A CN 109884463A CN 201811648811 A CN201811648811 A CN 201811648811A CN 109884463 A CN109884463 A CN 109884463A
- Authority
- CN
- China
- Prior art keywords
- cable
- data
- detection
- standardized management
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Locating Faults (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The invention discloses a kind of buried cable detection and standardized management method, including the following steps: step 1: cable on-site data gathering;Step 2: field data transmission;Step 3: field data cloud platform storage;Step 4: field data standardized management;Step 5: troubleshooting.Beneficial effects of the present invention: the blank that platform has filled up power cable data cloud platform is managed by building cable field data;Using wireless PDA terminal, power cable information is called in scene typing in real time, realizes resource-sharing;Information-based guarantee is provided for the intelligent operation and maintenance of power distribution network.
Description
Technical field
The invention belongs to Force system fault detection and administrative skill field, in particular to a kind of buried cable detection and mark
Standardization management method.
Background technique
With the development of society, the expansion in city, mentioning for environmental requirement is done, and the quantity of power cable is continuously increased;Cable
Management work it is increasingly heavier;Five Hua Zuomen of cable management system at present, level is uneven, and maximum problem is to be necessarily mounted at platform
In formula PC machine, on-site data gathering is extremely difficult, and information input is usually manual entry;Workload is very big, and error rate is very
It is high.
Summary of the invention
Mesh of the invention solves the problems, such as that the on-site data gathering of power cable is difficult, Information Administration Mode is backward, proposes
A kind of buried cable detection and standardized management method, can be with collection in worksite data, and data are called at scene, by big data cloud
Platform applies to the storage and transmission of field data, keeps the management work of power cable lighter, is more convenient, more in real time.
To realize the above-mentioned technical purpose, a kind of technical solution provided by the invention is, a kind of buried cable detection and mark
Standardization management method, which is characterized in that including the following steps:
Step 1: cable on-site data gathering;
Step 2: field data transmission;
Step 3: field data cloud platform storage;
Step 4: field data standardized management;
Step 5: troubleshooting.
Preferably, in the step 1, cable field data, the cable field data are acquired by cable detector
Include: track detection and fault detection.
Preferably, track detection includes the track data, tag data, disk remainder of real-time detection power cable
According to, depth of burying data, covering data.
Preferably, a kind of buried cable detection according to claim 2 and standardized management method, feature exist
In: the fault detection include quickly the detecting of power cable fault, accurately identify, safety is stabbed.
Preferably, in the step 2, data transmission, the PAD are realized in PAD terminal and cable detector communication connection
Data Integration packing is issued field data cloud platform storage by the electronic tag of terminal recognition on-site cable.
Preferably, in the step 3, data cloud platform is connect with the PAD terminal called realizes data transmission.
Preferably, it in the step 4, is measured by the on-site cable of computer data management cell call cloud platform storage
Data packet carries out the standardized management of cable field data.
Preferably, the field data standardized management include icon standard management, information standardization management with
And way to manage standardized management.
Preferably, the icon standard management includes following icon: power cable, transition joint, fault point, terminal
Head, channel management, tunnel, direct-burried, land mark, underground marker;The information standardization management includes following information: electricity
The specifications and models of power cable, laying scene, failure modes, nature of trouble, test report;The way to manage standardized management
Including following way to manage: power cable construction management, detection management, trial, reporting standards.
Beneficial effects of the present invention: 1, it by build cable field data manages platform filled up power cable data cloud flat
The blank of platform;2, using wireless PDA terminal, scene typing in real time calls power cable information, realizes resource-sharing;3, for
The intelligent operation and maintenance of power grid provide information-based ensure.
Detailed description of the invention
Fig. 1 is the flow chart of a kind of buried cable detection of the present invention and standardized management method.
Specific embodiment
It is right with reference to the accompanying drawings and examples for the purpose of the present invention, technical solution and advantage is more clearly understood
The present invention is described in further detail, it should be appreciated that the specific embodiments described herein are only one kind of the invention
Most preferred embodiment, only to explain the present invention, and the scope of protection of the present invention is not limited, and those of ordinary skill in the art are not having
Every other embodiment obtained under the premise of creative work is made, shall fall within the protection scope of the present invention.
Embodiment: as shown in Figure 1, a kind of buried cable detection and standardized management method, which is characterized in that including with
Under several steps:
Step 1, cable on-site data gathering;
Step 2, field data transmission;
Step 3, field data cloud platform storage;
Step 4, field data standardized management;
Step 5: troubleshooting.
Preferably, in the step 1, cable field data, the cable field data are acquired by cable detector
Include: track detection and fault detection.In the present embodiment, the track of cable may be implemented by cable failure detection instrument device
Detection and fault detection, and the data that real-time storage detects.
Preferably, track detection includes the track data, tag data, disk remainder of real-time detection power cable
According to, depth of burying data, covering data.In the present embodiment, track detection includes the track data of cable, the street between multistage cable
Head data, disk remainder evidence, the coverage data of the depth data of cable burial and cable.
Preferably, a kind of buried cable detection according to claim 2 and standardized management method, feature exist
In: the fault detection include quickly the detecting of power cable fault, accurately identify, safety is stabbed.In the present embodiment, therefore
Barrier detection includes that detection and malfunction elimination, the fault distinguishing of fault point and positioning, cable are carried out to the routine data of cable
Safety stab.
Preferably, in the step 2, data transmission, the PAD are realized in PAD terminal and cable detector communication connection
Data Integration packing is issued field data cloud platform storage by the electronic tag of terminal recognition on-site cable.In the present embodiment,
Surface mark board well lid is opened in construction site, and PAD terminal scans the electronic tag under well lid, matches the position letter of current cable
Breath, then by PAD terminal and cable fault measuring instrument communication connection, on-site test personnel are measured with cable fault measuring instrument
Cable field data is transported to PAD terminal, and cable position information and cable field data are packaged by PAD, are sent to cloud, realizes
End data is shared.
Preferably, in the step 3, data cloud platform is connect with the PAD terminal called realizes data transmission.
Preferably, it in the step 4, is measured by the on-site cable of computer data management cell call cloud platform storage
Data packet carries out the standardized management of cable field data.In the present embodiment, computer terminal transfers cloud platform and obtains my data, uses
The information management platform of self-service research and development, decompresses data packet, and data are recorded in the display pattern of setting by certain format.
Preferably, the field data standardized management include icon standard management, information standardization management with
And way to manage standardized management.In the present embodiment, the design of field data data management platform follows three kinds of design logics: point
It Wei not icon standard management, information standardization management and way to manage standardized management.
Preferably, the icon standard management includes following icon: power cable, transition joint, fault point, terminal
Head, channel management, tunnel, direct-burried, land mark, underground marker;The information standardization management includes following information: electricity
The specifications and models of power cable, laying scene, failure modes, nature of trouble, test report;The way to manage standardized management
Including following way to manage;Power cable construction management, detection management, trial, reporting standards.It, will in the present embodiment
Collected data are successively referred in the different display modules of management platform, and information management platform can be sentenced according to field data
The type and treatment measures of disconnected cable fault, while Trouble Report is generated, it sounds an alarm and timely maintenance personal is notified to go to
Fault point processing, improves the efficiency of breakdown maintenance;Fault prediction model can be used simultaneously, judge the fault point easily broken down
And fault type, accomplish to take precautions against, reduces maintenance cost.
The specific embodiment of the above be a kind of detection of buried cable of the present invention and standardized management method compared with
Good embodiment, limits specific implementation range of the invention not with this, and the scope of the present invention includes being not limited to this specifically in fact
Mode is applied, equivalence changes made by all shape, structures according to the present invention are within the scope of the invention.
Claims (9)
1. a kind of buried cable detection and standardized management method, which is characterized in that including the following steps:
Step 1, cable on-site data gathering;
Step 2, field data transmission;
Step 3, field data cloud platform storage;
Step 4, field data standardized management;
Step 5: troubleshooting.
2. a kind of buried cable detection according to claim 1 and standardized management method, it is characterised in that: the step
In rapid 1, cable field data is acquired by cable detector, the cable field data includes: track detection and event
Barrier detection.
3. a kind of buried cable detection according to claim 2 and standardized management method, it is characterised in that: described
Track detection includes the track data, tag data, disk remainder evidence, depth of burying data, covering of real-time detection power cable
Data.
4. a kind of buried cable detection according to claim 2 and standardized management method, it is characterised in that: described
Fault detection includes quickly detecting, accurately identify, stabbing safely for power cable fault.
5. a kind of buried cable detection according to claim 1 and standardized management method, it is characterised in that: the step
In rapid 2, data transmission, the electronics of the PAD terminal recognition on-site cable are realized in PAD terminal and cable detector communication connection
Data Integration packing is issued field data cloud platform storage by label.
6. a kind of buried cable detection according to claim 1 and standardized management method, it is characterised in that: the step
In rapid 3, data cloud platform is connect with the PAD terminal called realizes data transmission.
7. a kind of buried cable detection according to claim 1 and standardized management method, it is characterised in that: the step
In rapid 4, by the on-site cable measurement data packet of computer data management cell call cloud platform storage, cable scene number is carried out
According to standardized management.
8. a kind of buried cable detection according to claim 1 or claim 7 and standardized management method, it is characterised in that: institute
The field data standardized management stated includes icon standard management, information standardization management and way to manage standardization pipe
Reason.
9. a kind of buried cable detection according to claim 8 and standardized management method, it is characterised in that: described
Icon standard management includes following icon: power cable, transition joint, fault point, terminals, channel management, tunnel, straight
It buries, land mark, underground marker;The information standardization management includes following information: the specifications and models of power cable are applied
If scene, failure modes, nature of trouble, test report;The way to manage standardized management includes following way to manage:
Power cable construction management, detection management, trial, reporting standards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811648811.7A CN109884463A (en) | 2018-12-30 | 2018-12-30 | A kind of detection of buried cable and standardized management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811648811.7A CN109884463A (en) | 2018-12-30 | 2018-12-30 | A kind of detection of buried cable and standardized management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109884463A true CN109884463A (en) | 2019-06-14 |
Family
ID=66925421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811648811.7A Pending CN109884463A (en) | 2018-12-30 | 2018-12-30 | A kind of detection of buried cable and standardized management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109884463A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111579898A (en) * | 2020-04-22 | 2020-08-25 | 广东电网有限责任公司 | Regional resource sharing method and system based on cloud platform |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101930470A (en) * | 2010-09-07 | 2010-12-29 | 上海盈隽实业有限公司 | Urban power network geographic information system and urban pipeline geographic information system |
CN104283309A (en) * | 2014-05-23 | 2015-01-14 | 国家电网公司 | Online monitoring technical system for 110-kV high-voltage cable |
CN104853090A (en) * | 2015-04-21 | 2015-08-19 | 浙江图维电力科技有限公司 | On-site data collection method for power cable survey |
CN106557892A (en) * | 2016-12-08 | 2017-04-05 | 天津市矩辉数据科技有限公司 | City Buried Pipeline GIS-Geographic Information System |
CN107340440A (en) * | 2017-05-22 | 2017-11-10 | 合肥瑞达软件科技有限公司 | The system for searching cable trace online using cloud computing |
CN108470386A (en) * | 2018-04-16 | 2018-08-31 | 国网上海市电力公司 | A kind of cable run intelligent inspection system based on GPS and cloud platform |
CN108564752A (en) * | 2018-06-15 | 2018-09-21 | 四川艾贝斯科技发展有限公司 | Cable anti-theft system based on NB-IoT and its alarm method |
-
2018
- 2018-12-30 CN CN201811648811.7A patent/CN109884463A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101930470A (en) * | 2010-09-07 | 2010-12-29 | 上海盈隽实业有限公司 | Urban power network geographic information system and urban pipeline geographic information system |
CN104283309A (en) * | 2014-05-23 | 2015-01-14 | 国家电网公司 | Online monitoring technical system for 110-kV high-voltage cable |
CN104853090A (en) * | 2015-04-21 | 2015-08-19 | 浙江图维电力科技有限公司 | On-site data collection method for power cable survey |
CN106557892A (en) * | 2016-12-08 | 2017-04-05 | 天津市矩辉数据科技有限公司 | City Buried Pipeline GIS-Geographic Information System |
CN107340440A (en) * | 2017-05-22 | 2017-11-10 | 合肥瑞达软件科技有限公司 | The system for searching cable trace online using cloud computing |
CN108470386A (en) * | 2018-04-16 | 2018-08-31 | 国网上海市电力公司 | A kind of cable run intelligent inspection system based on GPS and cloud platform |
CN108564752A (en) * | 2018-06-15 | 2018-09-21 | 四川艾贝斯科技发展有限公司 | Cable anti-theft system based on NB-IoT and its alarm method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111579898A (en) * | 2020-04-22 | 2020-08-25 | 广东电网有限责任公司 | Regional resource sharing method and system based on cloud platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104880986A (en) | System and method for comprehensive pipe gallery management based on BIM | |
CN109919451B (en) | Digital power grid system and method based on real power grid topology analysis and safety knowledge base | |
CN103414251A (en) | Substation network communication simulation system based on IEC 61850 | |
CN106841908A (en) | The visual presentation method of the distribution network failure positioning based on power grid GIS | |
CN107290623A (en) | A kind of transmission line malfunction reason recognition methods based on Auto-matching | |
CN102435868A (en) | Power quality monitoring system | |
CN104266681A (en) | Electric cable well state safety monitoring system based on Internet of Things and GIS | |
CN204465143U (en) | Distribution line detects and management system | |
CN109712262A (en) | Line data-logging method based on technology of Internet of things | |
US20200153503A1 (en) | Modular Systems and Methods for Monitoring and Distributing Power | |
CN105655920A (en) | Multifunctional air-ground dual-purpose electric unmanned aerial vehicle | |
CN103412213A (en) | Crosslinked polyethylene high-voltage cable on-line monitoring and early warning system | |
CN106026388A (en) | Substation fault information automatic publishing and processing system | |
CN109884463A (en) | A kind of detection of buried cable and standardized management method | |
CN201142127Y (en) | Landslide monitoring apparatus | |
CN204376958U (en) | Based on Big Dipper location and the railway Landslide Forecast System of Minimal routing jumping figure agreement | |
CN203535128U (en) | Crosslinked polyethylene high-voltage cable on-line monitoring and early warning system | |
CN114065955A (en) | Power cable visual monitoring maintenance management system based on GIS | |
CN113240240A (en) | Offshore oilfield group power system reliability assessment system and method thereof | |
CN204330009U (en) | Based on the cable shaft status safety monitoring system of Internet of Things and GIS | |
CN205638554U (en) | Colliery floods alarm system based on image and hydrologic data monitoring | |
CN204613941U (en) | The data acquisition system (DAS) of pipeline facility | |
CN204374737U (en) | A kind of water supply well management control system | |
CN106888128A (en) | A kind of transformer station's Intranet monitoring system and its monitoring method | |
CN105373888A (en) | Transmission line physical information fusion multi-layer management and control method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190614 |