CN109881790A - Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method - Google Patents

Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method Download PDF

Info

Publication number
CN109881790A
CN109881790A CN201910177538.2A CN201910177538A CN109881790A CN 109881790 A CN109881790 A CN 109881790A CN 201910177538 A CN201910177538 A CN 201910177538A CN 109881790 A CN109881790 A CN 109881790A
Authority
CN
China
Prior art keywords
formwork
integrated wall
steel
integrated
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910177538.2A
Other languages
Chinese (zh)
Other versions
CN109881790B (en
Inventor
钱增志
方宏伟
周大兴
董磊
武利平
王宽
张晓刚
冯鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
China Railway Construction Corp Ltd CRCC
Original Assignee
China Railway Construction Group Co Ltd
China Railway Construction Corp Ltd CRCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, China Railway Construction Corp Ltd CRCC filed Critical China Railway Construction Group Co Ltd
Priority to CN201910177538.2A priority Critical patent/CN109881790B/en
Publication of CN109881790A publication Critical patent/CN109881790A/en
Application granted granted Critical
Publication of CN109881790B publication Critical patent/CN109881790B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of steel bar template integrated walls to add movable reinforcing bar connecting structure and installation method.It includes adding movable reinforcing bar-bearing rod, adding movable horizontal reinforcement and be fixed temporarily reinforcing bar that the present invention, which adds movable reinforcing bar,.The invention enables steel bar template integrated wall components in design, production and installation process, in horizontal direction, the not exposed template edge of reinforcing bar.Greatly improve integrated wall component assembly efficiency.Efficiently solve the connectivity problem of shear wall horizontal distribution muscle and edge member stirrup between adjacent members.

Description

Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method
Technical field
The present invention relates to one kind to add movable reinforcing bar connecting structure and installation method, specially a kind of steel bar template integration Wall adds movable reinforcing bar connecting structure and installation method, belongs to engineering construction technology field.
Background technique
Steel bar template integrated wall component is during assembly, the overlap joint and edge of horizontal distribution muscle at vertical abutment joint The overlap joint of component stirrup is critical issue of steel bar template integrated wall component during design and construction.
Conventional industrialization armored concrete system, at component overlapped position, reinforcing bar needs to expose outside concrete, with Realize the overlap joint between building and building.Reinforcing steel bars exposed template can increase during assembly to steel bar template integrated wall component Add great difficulty of construction.
In current all industrialization armored concrete systems, could not it find real under the premise of reinforcing bar not visual concrete Overlapped between existing component and component effective ways.Under the premise of such a, industrialization reinforced concrete body ties up to design, peace Very big concession is made that in dress and work progress, has caused that vertical member assembly rate is low, a system such as quality of connection difference between component Therefore column problem proposes that a kind of steel bar template integrated wall adds movable reinforcing bar connecting structure and installation regarding to the issue above Method.
Summary of the invention
The object of the invention is that solve the above-mentioned problems and provide that a kind of steel bar template integrated wall is additional can Dynamic reinforcing bar connecting structure and installation method are able to solve shear wall horizontal distribution muscle and edge member stirrup between adjacent members Connectivity problem.
The present invention is achieved through the following technical solutions above-mentioned purpose, and a kind of steel bar template integrated wall adds movable steel Muscle connecting structure, including steel bar template integrated wall component A, steel bar template integrated wall component B and add movable reinforcing bar;
The steel bar template integrated wall component A is bound round by component A stirrup I, insulation board, component A longitudinal reinforcement, component A Muscle II, component A horizontal distribution reinforcing bar I, integrated template and to draw connector composition, wherein the component A horizontal distribution steel It is fixed by component A stirrup I between muscle I, and pass through integrated template between the component A horizontal distribution reinforcing bar I and insulation board It is fixed, and by solid to connector is drawn inside insulation board and component A horizontal distribution reinforcing bar I between the integrated template It is fixed;The outside of component A stirrup II is welded with horizontal distribution reinforcing bar;
The steel bar template integrated wall component B includes horizontal to drawing connector, insulation board, integrated template, component B The outside of distribution bar and component B longitudinal reinforcement, the component B longitudinal reinforcement is fixed by component B horizontal distribution reinforcing bar, and steel The outside of muscle template integrated wall component B passes through fixing to drawing connector through insulation board;Pacify in the outside of the insulation board Equipped with integrated template;
It is described to add movable reinforcing bar including being fixed temporarily reinforcing bar, adding movable horizontal reinforcement and adding movable reinforcing bar-erection Muscle, the side for adding movable reinforcing bar-bearing rod, which is fixed with, adds movable horizontal reinforcement, and described adds movable horizontal reinforcement It is fixed by fixed steel bars;
It is equipped between the inside of the component B horizontal distribution reinforcing bar and adds movable reinforcing bar-bearing rod;The component B is horizontal Distribution bar and add between movable horizontal reinforcement be equipped be fixed temporarily reinforcing bar.
Preferably, steel bar template integrated wall component A it is adjacent with steel bar template integrated wall component B vertically connect All reinforcing bars of seam do not expose outside integrated template, and integrated with steel bar template in steel bar template integrated wall component A All reinforcing bars of wall body construction B adjacent vertical abutment joint do not expose outside integrated template.
Preferably, the distance between four component A longitudinal reinforcements inside component A stirrup II are greater than additional moveable water The width of flat reinforcing bar.
Preferably, it adds movable horizontal reinforcement and adds movable reinforcing bar-bearing rod using welding or mechanical connection.
Preferably, movable reinforcing bar and steel bar template integrated wall component B are added by being fixed temporarily reinforcing bar using welding Or mechanical connection.
A kind of steel bar template integrated wall adds the installation method of movable reinforcing bar connecting structure, includes the following steps:
Step A, steel bar template integrated wall component A and steel bar template integrated wall component B on working face just Position, requires integrated template to abut with integrated template in place;Steel bar template integrated wall component A and steel bar template one The vertical transports tool-aided engagements such as tower crane or truck crane can be used on working face in place by changing wall body construction B;
Step B, after in place, the connection of temporary fixing lifting reinforcing bar and steel bar template integrated wall component B;It releases interim Fixed steel bars and the connection for adding movable horizontal reinforcement;
Step C, by add movable reinforcing bar-bearing rod provide it is mobile to the steel bar template integrated wall side component A External force, realization adds movable reinforcing bar and enters inside steel bar template integrated wall component A;
Step D, casting concrete realizes steel bar template integrated wall component A and steel bar template integrated wall structure The connection of part B.
Preferably, steel bar template integrated wall component A in place and steel bar template integrated wall component B in place are in seam Place's integrated template is adjacent to.
The beneficial effects of the present invention are: steel bar template integrated wall component is in design, production and installation process, it is horizontal On direction, the not exposed template edge of reinforcing bar.Greatly improve integrated wall component assembly efficiency.Efficiently solve adjacent structure The overlap joint of the overlap joint of horizontal distribution muscle and edge member stirrup between part has good economic benefit and social benefit, is suitble to It promotes the use of.
Detailed description of the invention
Fig. 1 is that the present invention is preferably implemented with the one of the steel bar template integrated wall component for adding movable horizontal reinforcement connection The structural plan schematic diagram of example.
Fig. 2 be in Fig. 1 A-A to diagrammatic cross-section.
Fig. 3 is structure after steel bar template integrated wall component A of the present invention and steel bar template integrated wall component B assembled Floor map.
Fig. 4 is the assembled process schematic of Fig. 3.
After Fig. 5 adds movable reinforcing bar connection template integrated wall component A and steel bar template integrated wall component B Effect diagram.
Fig. 6 be in Fig. 5 A-A to diagrammatic cross-section.
In figure: 1, steel bar template integrated wall component A, 1.1, to drawing connector, 1.2, insulation board, 1.3, integrated mould Plate, 1.4, component A horizontal distribution reinforcing bar I, 1.5, component A stirrup I, 1.6, component A longitudinal reinforcement, 1.7, component A stirrup II, 2, Steel bar template integrated wall component B, 2.1, to drawing connector, 2.2, insulation board, 2.3, integrated template, 2.4, component B water Flat distribution bar, 2.5, component B longitudinal reinforcement, 3, add movable reinforcing bar, 3.1, be fixed temporarily reinforcing bar, 3.2, additional movable horizontal Reinforcing bar, 3.3, add movable reinforcing bar-bearing rod.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It please refers to shown in Fig. 1-6, a kind of steel bar template integrated wall adds movable reinforcing bar connecting structure, including reinforcing bar mould Plate integrated wall component A1, steel bar template integrated wall component B2 and add movable reinforcing bar 3;
The steel bar template integrated wall component A1 is by component A stirrup I 1.5, insulation board 1.2, component A longitudinal reinforcement 1.6, component A stirrup II 1.7, component A horizontal distribution reinforcing bar I 1.4, integrated template 1.3 and to draw connector 1.1 form, Wherein, fixed by component A stirrup I 1.5 between the component A horizontal distribution reinforcing bar I 1.4, and the component A horizontal distribution steel It is fixed by integrated template 1.3 between muscle I 1.4 and insulation board, and by running through insulation board between the integrated template 1.3 1.2 and component A horizontal distribution reinforcing bar I 1.4 inside to drawing connector 1.1 fixed;The outside of component A stirrup II 1.7 is welded with Horizontal distribution reinforcing bar 1.4;
The steel bar template integrated wall component B2 includes to drawing connector 2.1, insulation board 2.2, integrated template 2.3, the outside of component B horizontal distribution reinforcing bar 2.4 and component B longitudinal reinforcement 2.5, the component B longitudinal reinforcement 2.5 passes through structure Part B horizontal distribution reinforcing bar 2.4 is fixed, and the outside of steel bar template integrated wall component B2 passes through pair through insulation board 2.2 Draw connector 2.1 fixed;The outside of the insulation board 2.2 is equipped with integrated template 2.3;
It is described to add movable reinforcing bar 3 including being fixed temporarily reinforcing bar 3.1, adding movable horizontal reinforcement 3.2 and adding movable steel Muscle-bearing rod 3.3, the side for adding movable reinforcing bar-bearing rod 3.3, which is fixed with, adds movable horizontal reinforcement 3.2, and described It is fixed by fixed steel bars 3.1 to add movable horizontal reinforcement 3.2;
It is equipped between the inside of the component B horizontal distribution reinforcing bar 2.4 and adds movable reinforcing bar-bearing rod 3.3;The component B horizontal distribution reinforcing bar 2.4 and add between movable horizontal reinforcement 3.2 be equipped be fixed temporarily reinforcing bar 3.1.
In vertical abutment joint steel bar template integrated wall component A1 adjacent with steel bar template integrated wall component B2 All reinforcing bars do not expose outside integrated template 1.3, and integrated with steel bar template in steel bar template integrated wall component A1 All reinforcing bars of wall body construction B2 adjacent vertical abutment joint do not expose outside integrated template 2.3;Positioned at component A stirrup II 1.7 The distance between four internal component A longitudinal reinforcements 1.6 are greater than the width for adding movable horizontal reinforcement 3.2;Additional moveable water Flat reinforcing bar 3.2 uses welding or mechanical connection to fix with movable reinforcing bar-bearing rod 3.3 is added.Add movable reinforcing bar 3 and reinforcing bar mould Plate integrated wall component B2 is fixed by being fixed temporarily reinforcing bar 3.1 using welding or mechanical connection.
A kind of steel bar template integrated wall adds the installation method of movable reinforcing bar connecting structure, includes the following steps:
Step A, steel bar template integrated wall component A1 and steel bar template integrated wall component B2 are on working face In place, integrated template 1.3 is required to abut with integrated template 2.3 in place;Steel bar template integrated wall component A1 and steel Muscle template integrated wall component B2 can use the vertical transports tools such as tower crane or truck crane auxiliary in place on working face Help cooperation;
Step B, after in place, the connection of temporary fixing lifting reinforcing bar 3.1 and steel bar template integrated wall component B2;It releases It is fixed temporarily reinforcing bar 3.1 and adds the connection of movable horizontal reinforcement 3;
Step C, by providing to the side steel bar template integrated wall component A1 to adding movable reinforcing bar-bearing rod 3.3 Mobile external force, realization add movable reinforcing bar 3 and enter inside steel bar template integrated wall component A1;
Step D, casting concrete realizes steel bar template integrated wall component A1 and steel bar template integrated wall structure The connection of part B2.
Steel bar template integrated wall component A1 and steel bar template integrated wall component B2 in place in place is in seam crossing one Body template is adjacent to.
In actual design, preferably, between four component A longitudinal reinforcements 1.6 being located inside component A stirrup II 1.7 Distance be greater than and add the width of movable horizontal reinforcement 3.2, allow to add the steel bar template integration again of movable horizontal reinforcement 3.2 It is moved in the horizontal direction in wall body construction A1.
It adds movable horizontal reinforcement 3.2 and adds movable reinforcing bar-bearing rod 3.3 using welding or mechanical connection fixation, make Movable horizontal reinforcement 16 must be added at being integral.In actual design, adds movable horizontal reinforcement 3.2 and add movable steel The connection of muscle-bearing rod 3.3 can also have other forms of the composition, it is not limited to above-mentioned.
Movable horizontal reinforcement 16 and steel bar template integrated wall component B2 is added by being fixed temporarily reinforcing bar 3.1 using weldering Fixation is connect or is mechanically connected, guarantee adds movable horizontal reinforcement 16 and do not fall off during vertical transport and horizontal transport, and not Generate biggish displacement;In actual design, adding movable horizontal reinforcement 3.2 can also have with the connection for being fixed temporarily reinforcing bar 3.1 Other forms of the composition, it is not limited to above-mentioned.Steel bar template integrated wall component B2 and the connection of fixed steel bars 3.1 can also have Other forms of the composition, it is not limited to above-mentioned.
In actual design, positioned at adding between 3.2 outer peripheral six component B longitudinal reinforcements 2.5 of movable horizontal reinforcement Distance be greater than and add the width of movable horizontal reinforcement 3.2, allow to add the steel bar template integration again of movable horizontal reinforcement 3.2 It is moved in the horizontal direction in wall body construction B2.
Such as Fig. 3 to Fig. 5, the invention also provides a kind of for above-mentioned using the reinforcing bar mould for adding movable horizontal reinforcement connection Plate integrated wall component vertical abutment joint installation method, includes the following steps:
Step A, steel bar template integrated wall component A1 and steel bar template integrated wall component B2 are on working face In place, the integrated template 5 for requiring two components to close in place abuts.Steel bar template integrated wall component A1 and reinforcing bar mould Plate integrated wall component B2 can be matched in place using the vertical transports tools such as tower crane or truck crane auxiliary on working face It closes.Process in place is as shown in Figure 4.In actual design, steel bar template integrated wall component B2 can also be prior to steel bar template one Body wall body construction A1 is in place on working face, it is not limited to above-mentioned.
Step B, after in place, the connection of temporary fixing lifting reinforcing bar 3.1 and steel bar template integrated wall component B2;It releases It is fixed temporarily reinforcing bar 3.1 and adds the connection of movable horizontal reinforcement 16.
Step C, by providing to the side steel bar template integrated wall component A1 to adding movable reinforcing bar-bearing rod 3.3 Mobile external force, realization add movable horizontal reinforcement 16 and enter inside steel bar template integrated wall component A1.
Step D, casting concrete realizes steel bar template integrated wall component A1 and steel bar template integrated wall structure The connection of part B2.
Steel bar template integrated wall component A1 and steel bar template integrated wall component B2 in place in place is in seam crossing one Body template is adjacent to;Steel bar template integrated wall component A and steel bar template integrated wall component B in place in place is being hung just No requirement (NR) on the sequencing of position.
The invention has the advantages that
Steel bar template integrated wall component may be implemented in design, production and installation process, in horizontal direction, reinforcing bar Not exposed template edge.Under the premise of overlapping quality between meeting component, integrated wall component assembly effect is greatly improved Rate.Efficiently solve the connectivity problem of shear wall horizontal distribution muscle and edge member stirrup between adjacent members.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1.一种钢筋模板一体化墙体附加可动钢筋连接构造,其特征在于:包括钢筋模板一体化墙体构件A(1)、钢筋模板一体化墙体构件B(2)和附加可动钢筋(3);1. An additional movable reinforcing bar connection structure of a reinforcing bar formwork integrated wall body is characterized in that: comprising a reinforcing bar formwork integrated wall body member A (1), a reinforcing bar formwork integrated wall body member B (2) and an additional movable reinforcing bar (3); 所述钢筋模板一体化墙体构件A(1)由构件A箍筋Ⅰ(1.5)、保温板(1.2)、构件A纵向钢筋(1.6)、构件A箍筋Ⅱ(1.7)、构件A水平分布钢筋Ⅰ(1.4)、一体化模板(1.3)以及对拉连接件(1.1)组成,其中,所述构件A水平分布钢筋Ⅰ(1.4)之间通过构件A箍筋Ⅰ(1.5)固定,且所述构件A水平分布钢筋Ⅰ(1.4)与保温板之间通过一体化模板(1.3)固定,且所述一体化模板(1.3)之间通过贯穿保温板(1.2)和构件A水平分布钢筋Ⅰ(1.4)内部的对拉连接件(1.1)固定;构件A箍筋Ⅱ(1.7)的外侧焊接有水平分布钢筋(1.4);The said reinforced formwork integrated wall member A(1) consists of member A stirrups I (1.5), thermal insulation boards (1.2), member A longitudinal reinforcement bars (1.6), member A stirrups II (1.7), member A horizontally distributed Reinforcing bars I (1.4), integrated formwork (1.3) and tension connectors (1.1), wherein the horizontally distributed reinforcing bars I (1.4) of member A are fixed by stirrups I (1.5) of member A, and all The horizontal distribution reinforcement I (1.4) of the component A and the insulation board are fixed by the integrated formwork (1.3), and the integrated formwork (1.3) is passed through the insulation board (1.2) and the horizontal distribution reinforcement I (1.2) of the component A. 1.4) The inner tension connector (1.1) is fixed; the outer side of member A stirrup II (1.7) is welded with horizontally distributed steel bars (1.4); 所述钢筋模板一体化墙体构件B(2)包括对拉连接件(2.1)、保温板(2.2)、一体化模板(2.3)、构件B水平分布钢筋(2.4)和构件B纵向钢筋(2.5),所述构件B纵向钢筋(2.5)的外侧通过构件B水平分布钢筋(2.4)固定,且钢筋模板一体化墙体构件B(2)的外侧通过贯穿保温板(2.2)的对拉连接件(2.1)固定;所述保温板(2.2)的外侧安装有一体化模板(2.3);The said steel-reinforced formwork integrated wall member B(2) includes a pair of tension connectors (2.1), a thermal insulation board (2.2), an integrated formwork (2.3), horizontally distributed steel bars of member B (2.4) and longitudinal steel bars of member B (2.5). ), the outer side of the longitudinal steel bar (2.5) of the component B is fixed by the horizontal distribution steel bar (2.4) of the component B, and the outer side of the steel-reinforced formwork integrated wall component B (2) is passed through the insulation board (2.2). (2.1) Fixed; an integrated formwork (2.3) is installed on the outer side of the insulation board (2.2); 所述附加可动钢筋(3)包括临时固定钢筋(3.1)、附加可动水平钢筋(3.2)和附加可动钢筋-架立筋(3.3),所述附加可动钢筋-架立筋(3.3)的一侧固定有附加可动水平钢筋(3.2),且所述附加可动水平钢筋(3.2)通过固定钢筋(3.1)固定;The additional movable steel bars (3) include temporarily fixed steel bars (3.1), additional movable horizontal steel bars (3.2), and additional movable steel bars - erecting bars (3.3), the additional movable steel bars - erecting bars (3.3) ) is fixed with an additional movable horizontal steel bar (3.2), and the additional movable horizontal steel bar (3.2) is fixed by the fixed steel bar (3.1); 所述构件B水平分布钢筋(2.4)的内侧之间设有附加可动钢筋-架立筋(3.3);所述构件B水平分布钢筋(2.4)与附加可动水平钢筋(3.2)之间设有临时固定钢筋(3.1)。Additional movable steel bars - erecting bars (3.3) are arranged between the inner sides of the horizontally distributed steel bars (2.4) of the component B; There are temporary fixing bars (3.1). 2.根据权利要求1所述的钢筋模板一体化墙体附加可动钢筋连接构造,其特征在于:在钢筋模板一体化墙体构件A(1)与钢筋模板一体化墙体构件B(2)相邻的竖向接缝的所有钢筋均不外露出一体化模板(1.3),且在钢筋模板一体化墙体构件A(1)与钢筋模板一体化墙体构件B(2)相邻的竖向接缝的所有钢筋均不外露出一体化模板(2.3)。2. The additional movable reinforcing bar connection structure for the integrated wall of the reinforcement formwork according to claim 1, characterized in that: in the integrated wall body member A(1) of the reinforcement formwork and the integrated wall body member B(2) of the reinforcement formwork All the reinforcing bars of the adjacent vertical joints are not exposed to the integrated formwork (1.3), and in the vertical adjacent to the reinforcing steel formwork integrated wall member A(1) and the reinforcing steel formwork integrated wall member B(2) Integral formwork (2.3) shall not be exposed to all reinforcement of the joint. 3.根据权利要求1所述的钢筋模板一体化墙体附加可动钢筋连接构造,其特征在于:位于构件A箍筋Ⅱ(1.7)内部的四个构件A纵向钢筋(1.6)之间的距离大于附加可动水平钢筋(3.2)的宽度。3. The additional movable steel bar connection structure for the integrated wall of the steel bar formwork according to claim 1, characterized in that: the distance between the four longitudinal steel bars (1.6) of the four members A inside the stirrup II (1.7) of the member A greater than the width of the additional movable horizontal reinforcement (3.2). 4.根据权利要求1所述的钢筋模板一体化墙体附加可动钢筋连接构造,其特征在于:附加可动水平钢筋(3.2)与附加可动钢筋-架立筋(3.3)采用焊接或机械连接。4. The additional movable steel bar connection structure of the integrated wall of the steel bar formwork according to claim 1 is characterized in that: the additional movable horizontal steel bar (3.2) and the additional movable steel bar-frame erection bar (3.3) adopt welding or mechanical connect. 5.根据权利要求1所述的钢筋模板一体化墙体附加可动钢筋连接构造,其特征在于:附加可动钢筋(3)与钢筋模板一体化墙体构件B(2)通过临时固定钢筋(3.1)采用焊接或机械连接。5. The additional movable steel bar connection structure for the integrated wall of the reinforcement formwork according to claim 1 is characterized in that: the additional movable reinforcement bar (3) and the integrated wall body member B (2) of the reinforcement formwork are temporarily fixed by the reinforcement bar ( 3.1) Use welding or mechanical connection. 6.一种钢筋模板一体化墙体附加可动钢筋连接构造的安装方法,其特征在于:包括如下步骤:6. An installation method for an additional movable steel bar connection structure for an integrated wall of reinforcing bars and formwork, characterized in that: it comprises the following steps: 步骤A、钢筋模板一体化墙体构件A(1)以及钢筋模板一体化墙体构件B(2)在工作面上就位,就位要求一体化模板(1.3)与一体化模板(2.3)紧靠;钢筋模板一体化墙体构件A(1)以及钢筋模板一体化墙体构件B(2)在工作面上的就位可以采用塔吊或者汽车吊等垂直运输工具辅助配合;Step A. Reinforcement formwork integrated wall member A (1) and reinforcing steel formwork integrated wall member B (2) are in place on the working surface, and the in-position requires the integrated formwork (1.3) and the integrated formwork (2.3) to be tight. Relying on; the reinforced formwork integrated wall member A (1) and the reinforced formwork integrated wall member B (2) can be assisted by vertical transportation tools such as tower cranes or truck cranes in place on the working surface; 步骤B、就位后,解除临时固定钢筋(3.1)与钢筋模板一体化墙体构件B(2)的连接;解除临时固定钢筋(3.1)与附加可动水平钢筋(3)的连接;Step B, after being in place, release the connection between the temporarily fixed steel bar (3.1) and the steel-reinforced formwork integrated wall member B (2); release the connection between the temporarily fixed steel bar (3.1) and the additional movable horizontal steel bar (3); 步骤C、通过给附加可动钢筋-架立筋(3.3)提供向钢筋模板一体化墙体构件A(1)一侧移动的外力,实现附加可动钢筋(3)进入钢筋模板一体化墙体构件A(1)内部;Step C, by providing an external force to the side of the reinforcement formwork integrated wall member A (1) by providing the additional movable steel bar-frame upright reinforcement (3.3), so that the additional movable steel bar (3) enters the steel reinforcement formwork integrated wall body Inside member A(1); 步骤D、浇筑混凝土,实现钢筋模板一体化墙体构件A(1)以及钢筋模板一体化墙体构件B(2)的连接。Step D, pouring concrete to realize the connection of the steel-reinforced formwork integrated wall member A (1) and the steel-reinforced formwork integrated wall member B (2). 7.根据权利要求7所述的一种钢筋模板一体化墙体附加可动钢筋连接构造的安装方法,其特征在于:就位钢筋模板一体化墙体构件A(1)与就位钢筋模板一体化墙体构件B(2)在接缝处一体化模板贴紧。7. The method for installing a reinforcing bar formwork integrated wall with an additional movable reinforcing bar connection structure according to claim 7, characterized in that: the in-place reinforcing bar formwork integrated wall member A (1) is integrated with the in-place reinforcing bar formwork The wall member B(2) is tightly attached to the integrated formwork at the joint.
CN201910177538.2A 2019-03-09 2019-03-09 Connection structure and installation method of additional movable steel bars for steel bar formwork integrated wall Active CN109881790B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910177538.2A CN109881790B (en) 2019-03-09 2019-03-09 Connection structure and installation method of additional movable steel bars for steel bar formwork integrated wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910177538.2A CN109881790B (en) 2019-03-09 2019-03-09 Connection structure and installation method of additional movable steel bars for steel bar formwork integrated wall

Publications (2)

Publication Number Publication Date
CN109881790A true CN109881790A (en) 2019-06-14
CN109881790B CN109881790B (en) 2024-04-16

Family

ID=66931492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910177538.2A Active CN109881790B (en) 2019-03-09 2019-03-09 Connection structure and installation method of additional movable steel bars for steel bar formwork integrated wall

Country Status (1)

Country Link
CN (1) CN109881790B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528782A (en) * 2019-08-15 2019-12-03 中铁建设集团有限公司 Connection structure and installation method of horizontally dislocated steel bar in integrated wall with reinforced formwork
CN111809778A (en) * 2020-07-31 2020-10-23 中铁建设集团有限公司 Reinforcing formwork integrated wall opening edge member and its assembly method
CN113323161A (en) * 2021-06-28 2021-08-31 中冶建设高新工程技术有限责任公司 Additional movable steel bar connection structure of steel bar formwork integrated wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3144708U (en) * 2008-06-27 2008-09-11 有限会社 成東鉄筋工業 Reinforcing bar temporary fixing device
CN202209050U (en) * 2011-09-08 2012-05-02 中国二十二冶集团有限公司 Steel large formwork top stick
CN104775553A (en) * 2015-04-16 2015-07-15 华东建筑设计研究院有限公司 Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member
US20160108619A1 (en) * 2014-10-16 2016-04-21 Emin Buzimkic Prefabricated modular rebar modules and methods of using the same
CN106121085A (en) * 2016-08-18 2016-11-16 戴欣旸 Assembled integral concrete shear force wall splicing structure and assembling method thereof
CN208486404U (en) * 2018-07-03 2019-02-12 中铁建设集团有限公司 A concrete shear wall with integrated steel formwork installation
CN209907606U (en) * 2019-03-09 2020-01-07 中铁建设集团有限公司 Additional movable reinforcement connection structure for integrated wall with reinforcement formwork

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3144708U (en) * 2008-06-27 2008-09-11 有限会社 成東鉄筋工業 Reinforcing bar temporary fixing device
CN202209050U (en) * 2011-09-08 2012-05-02 中国二十二冶集团有限公司 Steel large formwork top stick
US20160108619A1 (en) * 2014-10-16 2016-04-21 Emin Buzimkic Prefabricated modular rebar modules and methods of using the same
CN104775553A (en) * 2015-04-16 2015-07-15 华东建筑设计研究院有限公司 Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member
CN106121085A (en) * 2016-08-18 2016-11-16 戴欣旸 Assembled integral concrete shear force wall splicing structure and assembling method thereof
CN208486404U (en) * 2018-07-03 2019-02-12 中铁建设集团有限公司 A concrete shear wall with integrated steel formwork installation
CN209907606U (en) * 2019-03-09 2020-01-07 中铁建设集团有限公司 Additional movable reinforcement connection structure for integrated wall with reinforcement formwork

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528782A (en) * 2019-08-15 2019-12-03 中铁建设集团有限公司 Connection structure and installation method of horizontally dislocated steel bar in integrated wall with reinforced formwork
CN111809778A (en) * 2020-07-31 2020-10-23 中铁建设集团有限公司 Reinforcing formwork integrated wall opening edge member and its assembly method
CN113323161A (en) * 2021-06-28 2021-08-31 中冶建设高新工程技术有限责任公司 Additional movable steel bar connection structure of steel bar formwork integrated wall

Also Published As

Publication number Publication date
CN109881790B (en) 2024-04-16

Similar Documents

Publication Publication Date Title
CN105839846A (en) Prefabricated reinforced concrete composite beam
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN108425429A (en) The forming method of steel tube concrete beam and column cross connection node structure and composite structure
CN104032854B (en) Assembled T-shaped mixing coupled wall and construction method thereof
CN106013455A (en) Prefabricated combination reinforcement cage member and reinforcement arrangement assembling method thereof
CN206052964U (en) Prefabricated composite steel reinforcement cage component and structure
CN108678220A (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN109881790A (en) Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method
CN207032601U (en) A kind of two-way close spelling laminated floor slab connecting joint structure
CN203834738U (en) T-shaped prefabricated mixed coupled wall
CN104032861B (en) Connecting joint structure of mixed coupled wall section steel column and non-energy dissipation beam and construction method thereof
CN104032855B (en) Assembled cross mixing coupled wall and construction method thereof
CN205153530U (en) Structure is assembled to integral template of reinforced concrete floor
CN105544402B (en) A kind of hanging gang form support frame and construction method for pier capping beam high
CN104032859B (en) Assembled L-shaped mixing coupled wall and construction method thereof
CN104032862B (en) Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN104746791B (en) Semirigid frame-interior fills out regeneration concrete wallboard and manufacture method
CN209907606U (en) Additional movable reinforcement connection structure for integrated wall with reinforcement formwork
CN214656368U (en) A vertical connecting device suitable for steel-concrete composite girder deck and steel girder body
CN203834741U (en) Prefabricated steel beam joint L-shaped mixed coupled wall
CN205617245U (en) A unsettled built -up plate support frame for high pier capping beam
CN116411654A (en) A prefabricated shear wall connection structure for prefabricated buildings
CN108797845A (en) Steel plate concrete structure wall crosses connecting node reinforcement structure
CN104032863B (en) Assembled in-line mixing coupled wall and construction method thereof
CN104047380B (en) Assembled girder steel seam T-shaped mixing coupled wall and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant