CN109881723A - 一种锚杆静压桩综合可控纠偏方法 - Google Patents

一种锚杆静压桩综合可控纠偏方法 Download PDF

Info

Publication number
CN109881723A
CN109881723A CN201910211028.2A CN201910211028A CN109881723A CN 109881723 A CN109881723 A CN 109881723A CN 201910211028 A CN201910211028 A CN 201910211028A CN 109881723 A CN109881723 A CN 109881723A
Authority
CN
China
Prior art keywords
stake
anchor
pile
jacked pile
anchor jacked
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910211028.2A
Other languages
English (en)
Inventor
周寅
杜桑帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HUAZHU FOUNDATION TECHNOLOGY CO LTD
Original Assignee
SHANGHAI HUAZHU FOUNDATION TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HUAZHU FOUNDATION TECHNOLOGY CO LTD filed Critical SHANGHAI HUAZHU FOUNDATION TECHNOLOGY CO LTD
Priority to CN201910211028.2A priority Critical patent/CN109881723A/zh
Publication of CN109881723A publication Critical patent/CN109881723A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开的一种锚杆静压桩综合可控纠偏方法,包括:步骤一:对已发生倾斜建筑物进行现场勘察和测量,掌握上部结构情况和土层分布情况;步骤二:对沉降多的一侧,用锚杆静压桩进行补桩加固,并及时封桩,或采用预加反力进行封桩,封桩砼为超早强砼,使桩及时受力,使桩沉降多的一侧制止沉降;步骤三:根据纠偏加固方案,设置纠偏用沉井,为纠偏施工准备好设备;步骤四:在沉降少的一侧用锚杆静压桩压桩,此桩暂不封桩,当回倾量达到设计要求时再封桩;步骤五:对于新建建筑物的倾斜率即将超过允许倾斜率时,在沉降小的一侧封桩时在桩顶上埋设钙塑板,本发明施工时居民不搬迁、结构安全可靠、纠偏施工速度快、施工时无振动无噪音无污染。

Description

一种锚杆静压桩综合可控纠偏方法
技术领域
本发明涉及岩土工程事故加固处理领域,特别涉及一种锚杆静压桩综合可控纠偏方法。
背景技术
岩土工程中许多事故工程往往与地基勘察、地基基础设计、现场施工不当所造成的,特别处于已建成的建筑物发生大量沉降和倾斜,直接影响建筑物内居民的安全。为此必须及时采取纠偏加固措施。目前常用的钻孔取土纠偏法、应力解除法、抬高法、降水法等都存在各种问题。例如:纠偏后无法保证建筑物返回倾,降水纠偏影响相邻建筑物沉降,大体量建筑物、大倾斜建筑物都无法采用上述纠偏方法。
发明内容
有鉴于此,本发明实施例提供了一种锚杆静压桩综合可控纠偏方法,施工时居民不搬迁、结构安全可靠、纠偏施工速度快、施工时无振动无噪音无污染。
本发明公开的一种锚杆静压桩综合可控纠偏方法,包括:
步骤一:对已发生倾斜建筑物进行现场勘察和测量,掌握上部结构情况和土层分布情况;
步骤二:对沉降多的一侧,用锚杆静压桩进行补桩加固,并及时封桩,并采用预加反力进行封桩,封桩砼为超早强砼,使桩及时受力,使桩沉降多的一侧制止沉降;
步骤三:根据纠偏加固方案,设置纠偏用沉井,为纠偏施工准备好设备;
步骤四:在沉降少的一侧用锚杆静压桩压桩,此桩暂不封桩,当回倾量达到设计要求时再封桩;
步骤五:对于新建建筑物的倾斜率即将超过允许倾斜率时,在沉降小的一侧封桩时在桩顶上埋设钙塑板。
进一步的,步骤二中的锚杆静压桩为支撑桩,在外挑基础上压桩。
进一步的,步骤四中的锚杆静压桩为保护桩,锚杆静压桩在外挑基础上压桩。
进一步的,步骤二中的锚杆静压桩的上端为底板,锚杆静压桩的正上方为钢管支架,钢管支架的正上方为千斤顶,千斤顶的上方为反力梁,压桩架采用锚杆固定在底板的上端面,钢管支架两侧设置有锚固筋,锚固筋下端焊接在锚杆静压桩上,锚固筋与钢管支架之间设置有C35微膨胀超早强混泥土。
进一步的,步骤四中的锚杆静压桩的上端与锚固筋的下端焊接,锚固筋穿过底板,两个锚杆的下端垂直固定在底板内,两个锚杆之间通过交叉钢筋焊接,锚固筋的上端折弯后与交叉钢筋焊接,锚杆静压桩的桩顶上设有钙塑板,两个锚固筋之间填充C35微膨胀超早强砼。
本发明可以使沉降和倾斜建(构)筑物返回倾至规范允许范围内,有效控制沉降和倾斜,有效的运用于既有建筑物加固、桩基事故处理、倾斜建筑纠偏、新建建筑逆作法施工等领域。
附图说明
图1为本发明实施例采用预加反力进行封桩示意图。
图2为本发明实施例埋设钙塑板部分示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明公开的一种锚杆静压桩综合可控纠偏方法,包括:
步骤一:对已发生倾斜建筑物进行现场勘察和测量,掌握上部结构情况和土层分布情况;
步骤二:对沉降多的一侧,用锚杆静压桩进行补桩加固,并及时封桩,或采用预加反力进行封桩,封桩砼为超早强砼,使桩及时受力,使桩沉降多的一侧制止沉降;
步骤三:根据纠偏加固方案,设置纠偏用沉井,为纠偏施工准备好设备;
步骤四:在沉降少的一侧用锚杆静压桩压桩,此桩暂不封桩,当回倾量达到设计要求时再封桩;
步骤五:对于新建建筑物的倾斜率即将超过允许倾斜率时,在沉降小的一侧封桩时在桩顶上埋设钙塑板。
在本发明一实施例中,步骤二中的锚杆静压桩为支撑桩,在外挑基础上压桩。
在本发明一实施例中,步骤四中的锚杆静压桩为保护桩,锚杆静压桩在外挑基础上压桩。
如图1所示,步骤二中的锚杆静压桩1的上端为底板2,锚杆静压桩1的正上方为钢管支架3,钢管支架3的正上方为千斤顶4,千斤顶4的上方为反力梁6,压桩架7采用锚杆8固定在底板2的上端面,钢管支架3两侧设置有锚固筋9,锚固筋9下端焊接在锚杆静压桩1上,锚固筋9与钢管支架3之间设置有C35微膨胀超早强混泥土10。
千斤顶侧面设置有油压表5,千斤顶可以为手动千斤顶。有利于操作和降成本。
如图2所示,步骤四中的锚杆静压桩11的上端与锚固筋12的下端焊接,锚固筋12穿过底板2,两个锚杆13的下端垂直固定在底板2内,两个锚杆13之间通过交叉钢筋14焊接,锚固筋12的上端121折弯后与交叉钢筋14焊接,锚杆静压桩11的桩顶上设有钙塑板16,两个锚固筋12之间填充C35微膨胀超早强砼15。
钙塑板的厚度通过预留回倾量来计算。本发明可以有效解决各类建筑物的事故难题。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换等,均应包含在本发明的保护范围之内。

Claims (5)

1.一种锚杆静压桩综合可控纠偏方法,其特征在于,包括:
步骤一:对已发生倾斜建筑物进行现场勘察和测量,掌握上部结构情况和土层分布情况;
步骤二:对沉降多的一侧,用锚杆静压桩进行补桩加固,并及时封桩,或采用预加反力进行封桩,封桩砼为超早强砼,使桩及时受力,使桩沉降多的一侧制止沉降;
步骤三:根据纠偏加固方案,设置纠偏用沉井,为纠偏施工准备好设备;
步骤四:在沉降少的一侧用锚杆静压桩压桩,此桩暂不封桩,当回倾量达到设计要求时再封桩;
步骤五:对于新建建筑物的倾斜率即将超过允许倾斜率时,在沉降小的一侧封桩时在桩顶上埋设钙塑板。
2.如权利要求1所述的一种锚杆静压桩综合可控纠偏方法,其特征在于,步骤二中的锚杆静压桩为支撑桩,在外挑基础上压桩。
3.如权利要求1所述的一种锚杆静压桩综合可控纠偏方法,其特征在于,步骤四中的锚杆静压桩为保护桩,锚杆静压桩在外挑基础上压桩。
4.如权利要求1所述的一种锚杆静压桩综合可控纠偏方法,其特征在于,步骤二中的锚杆静压桩的上端为底板,锚杆静压桩的正上方为钢管支架,钢管支架的正上方为千斤顶,千斤顶的上方为反力梁,压桩架采用锚杆固定在底板的上端面,钢管支架两侧设置有锚固筋,锚固筋下端焊接在锚杆静压桩上,锚固筋与钢管支架之间设置有C35微膨胀超早强混泥土。
5.如权利要求1所述的一种锚杆静压桩综合可控纠偏方法,其特征在于,步骤四中的锚杆静压桩的上端与锚固筋的下端焊接,锚固筋穿过底板,两个锚杆的下端垂直固定在底板内,两个锚杆之间通过交叉钢筋焊接,锚固筋的上端折弯后与交叉钢筋焊接,锚杆静压桩的桩顶上设有钙塑板,两个锚固筋之间填充C35微膨胀超早强砼。
CN201910211028.2A 2019-03-20 2019-03-20 一种锚杆静压桩综合可控纠偏方法 Pending CN109881723A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910211028.2A CN109881723A (zh) 2019-03-20 2019-03-20 一种锚杆静压桩综合可控纠偏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910211028.2A CN109881723A (zh) 2019-03-20 2019-03-20 一种锚杆静压桩综合可控纠偏方法

Publications (1)

Publication Number Publication Date
CN109881723A true CN109881723A (zh) 2019-06-14

Family

ID=66933092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910211028.2A Pending CN109881723A (zh) 2019-03-20 2019-03-20 一种锚杆静压桩综合可控纠偏方法

Country Status (1)

Country Link
CN (1) CN109881723A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622281A (zh) * 2020-06-08 2020-09-04 广东精特建设工程有限公司 一种筏板基础建筑物同步顶升纠偏的施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202644531U (zh) * 2012-04-01 2013-01-02 江苏东南特种技术工程有限公司 锚杆静压桩预加压力封桩装置
CN102966128A (zh) * 2012-11-28 2013-03-13 三峡大学 锚杆静压钢护筒水气合冲纠偏方法
CN103726503A (zh) * 2014-01-08 2014-04-16 中铁十一局集团有限公司 用于加固变形桥桩的锚杆桩加固承台结构及施工方法
CN204040033U (zh) * 2014-08-28 2014-12-24 浙江大学城市学院 锚杆静压桩压桩结构
CN107090860A (zh) * 2017-05-09 2017-08-25 广东省建筑科学研究院集团股份有限公司 一种浅基础建筑物纠偏加固结构及其施工方法
CN107246037A (zh) * 2017-08-09 2017-10-13 上海岩土工程勘察设计研究院有限公司 一种用于桩端砂性土持力层的建筑物纠偏结构及方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202644531U (zh) * 2012-04-01 2013-01-02 江苏东南特种技术工程有限公司 锚杆静压桩预加压力封桩装置
CN102966128A (zh) * 2012-11-28 2013-03-13 三峡大学 锚杆静压钢护筒水气合冲纠偏方法
CN103726503A (zh) * 2014-01-08 2014-04-16 中铁十一局集团有限公司 用于加固变形桥桩的锚杆桩加固承台结构及施工方法
CN204040033U (zh) * 2014-08-28 2014-12-24 浙江大学城市学院 锚杆静压桩压桩结构
CN107090860A (zh) * 2017-05-09 2017-08-25 广东省建筑科学研究院集团股份有限公司 一种浅基础建筑物纠偏加固结构及其施工方法
CN107246037A (zh) * 2017-08-09 2017-10-13 上海岩土工程勘察设计研究院有限公司 一种用于桩端砂性土持力层的建筑物纠偏结构及方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622281A (zh) * 2020-06-08 2020-09-04 广东精特建设工程有限公司 一种筏板基础建筑物同步顶升纠偏的施工方法

Similar Documents

Publication Publication Date Title
CN104975622B (zh) 一种高层建筑预制桩桩基纠偏加固方法
CN108343102B (zh) 一种桩基础沉降加固顶升调平结构及其施工方法
Greenwood Load tests on stone columns
CN106436788A (zh) 一种高层建筑摩擦桩基础加固纠倾方法
CN111291492A (zh) 一种提升既有衡重式挡墙抗滑、抗倾覆安全性的方法
CN209243794U (zh) 一种桩基建筑物纠倾截桩托换限位结构
CN103821060A (zh) 一种既有高速公路软基处治技术的施工方法
Fellenius Recent advances in the design of piles for axial loads, dragloads, downdrag, and settlement
CN108978635A (zh) 一种同步注浆钢板桩及使用方法
CN109577322A (zh) 一种用于土体内部既有桩基接桩的施工装置
Li et al. Structural response and preservation of historic buildings adjacent to oversized deep excavation
CN109881723A (zh) 一种锚杆静压桩综合可控纠偏方法
CN101215840A (zh) 飞机式基础加固予力工法
CN210195766U (zh) 一种拱盖暗挖顺筑地下结构
CN111305182A (zh) 一种软弱地基加固施工方法
Burtin et al. Embankment on soft soil reinforced by CMC semi-rigid inclusions for the high-speed railway SEA
CN109869009A (zh) 一种框架结构建筑物断柱纠倾方法
CN209703493U (zh) 一种用于土体内部既有桩基接桩的施工装置
Teparaksa Prediction of movement and behavior of sheet pile wall for deep braced cut excavation in soft Bangkok clay
Morgan The influence of variation in effective stress on the serviceability of soil nailed slopes
CN220565238U (zh) 一种适用于大高差深基坑的桩锚与内支撑组合支护系统
CN214363533U (zh) 一种公路边坡抗滑装配式双排桩成桩结构
Fok et al. Reinforced soil wall and approach embankment for Cliff Street overpass constructed on stabilized foundations
CN112663631B (zh) 一种公路边坡抗滑装配式双排桩成桩方法
CN210194711U (zh) 一种桩基础沉降加固顶升调平结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614