CN109880991A - A kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller - Google Patents

A kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller Download PDF

Info

Publication number
CN109880991A
CN109880991A CN201910192310.0A CN201910192310A CN109880991A CN 109880991 A CN109880991 A CN 109880991A CN 201910192310 A CN201910192310 A CN 201910192310A CN 109880991 A CN109880991 A CN 109880991A
Authority
CN
China
Prior art keywords
blade
impeller
heat treatment
wheel disc
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910192310.0A
Other languages
Chinese (zh)
Other versions
CN109880991B (en
Inventor
闫孟秋
闫寒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Northwest Fan Development Co Ltd
Original Assignee
Wuhan Northwest Fan Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Northwest Fan Development Co Ltd filed Critical Wuhan Northwest Fan Development Co Ltd
Priority to CN201910192310.0A priority Critical patent/CN109880991B/en
Publication of CN109880991A publication Critical patent/CN109880991A/en
Application granted granted Critical
Publication of CN109880991B publication Critical patent/CN109880991B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention discloses a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller, the following steps are included: after (1) fixes the wheel disc or shrouding disc that need to be heat-treated and high temperature deform-proof tire, it hangs in dedicated heat treatment process furnace, dedicated heat treatment process furnace is automatically performed solid solution and Wetted constructures;(2) it after fixing blade and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, dedicated heat treatment process furnace is automatically performed solid solution and Wetted constructures;(3) by step (1) treated wheel disc and shrouding disc, treated that blade carries out welding with step (2) respectively.Production technology provided by the invention realizes the high-strength soldering effect of stainless steel and stainless steel or steel alloy, and the impeller produced is durable.

Description

A kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller
Technical field
The present invention relates to Environmental-protecting dust-removing blower fields, particularly relate to a kind of high anticorrosion antiwear once dust collection of converter wind The thermal treatment production process of machine impeller.
Background technique
In steel-making dust-removal system, once dust collection of converter blower is unique core drive equipment, a large amount of coal gas of converter In flow process, coal gas of converter is purified, recycles and arranges so that gas generates flowing by the acting of draught fan impeller It puts.
Coal gas of converter is made of CO, CO2, N2, O2, SO2, NOX and vapor, in which:
1:NO+O2=> 2NO2 ↑ 3NO2+H2O=2HNO3+NO ↑
2:SO2+H2O → H2SO4 (dilute) H2SO4+Fe → FeSO4+H ↑
From the foregoing, it can be seen that the presence of NOX, SO2 and vapor leads to the corrosion of dust technology and dilute sulfuric acid to impeller.
Currently, the blade in steelmaking converter primary dedusting draught fan impeller generallys use high-strength alloy steel production, this material is strong Though degree is high, do not have anti-corrosion function, and because coal gas of converter medium contains stronger sour corrosion, the strength of materials is caused to be lost It loses, leading to impeller, there are serious worn out, cracking phenomenas.Therefore service life is short (generally scrapping at 1 year or so);Online fortune The problems such as row time short (general operation will shut down cleaning impeller for 10 days or so), thus seriously affect rhythm of production.
In existing example, only by taking three steel mills of Wuhan Iron and Steel Plant as an example: Wuhan Iron and Steel Plant one was made steel before 2005, to scrap 2 every year ~3 group rotors.Wuhan Iron and Steel Plant two is made steel will scrap 3~4 group rotors every year.Wuhan Iron and Steel Plant three makes steel 2004 and orders 6 sets of new rotor.Annual steel-making Its feature of the rotor that factory scraps all is that the blade in impeller is corroded.The original steel-making of Chengdu-Chongqing Fan Tai Science and Technology Ltd. steel mill Blower will shut down cleaning impeller less than one month.For another example: iron company, Hebei Xin Gang iron company, Laigang be forever in length and breadth in Hebei High-speed steel ironworks, Shandong Lu Li steel mill etc. are substantially so.There is an urgent need to a kind of once dust collection of converter blower energy for national steel mill The product of impeller life and on-line operation time is enough greatly improved, the core effect of such product is in impeller.
Precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb is a kind of acid-resistant stainless steel, and in impeller work, surface is raw At Cr2O3 protective film (passivating film), contact of the iron atom with acid medium in steel is isolated, has played the role of acid corrosion-resistant.
Precipitation-hardening stainless steel intensity is high, its big song of hardness takes intensity up to 1050MPa.It is austenitic stainless steel such as 304, The materials song such as 316,1Cr18Ni9Ti takes 4 times of intensity (σ s=255MPa).It fully meets and does once dust collection of converter draught fan impeller Condition.In short, using this material (0Cr14Ni6Mo2Cu2Nb) in the case where corroding and wearing stronger severe environmental conditions Draught fan impeller is entirely capable of reaching not only wear-resisting but also corrosion-resistant good result.
Shallow lake hardening stainless steel blade (0Cr14Ni6Mo2Cu2Nb) differed with steel alloy (15MnNiCrMo2V) its material compared with Greatly.One is stainless steels, and one is steel alloys, and welding stress is different, weldment easily modification or cracking.Therefore, the present invention provides A kind of completely new impeller thermal treatment production process.
Summary of the invention
To solve the problems mentioned above in the background art, the purpose of the present invention is to provide a kind of high anticorrosion antiwear converters The thermal treatment production process of primary dedusting draught fan impeller.
To achieve the above object, the technical scheme adopted by the invention is as follows:
The present invention provides a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller, including following Step:
(1) it after fixing the wheel disc or shrouding disc that need to be heat-treated and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, Dedicated heat treatment process furnace is automatically performed solid solution and Wetted constructures;
(2) it after fixing blade and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, dedicated heat treatment process furnace It is automatically performed solid solution and Wetted constructures;
(3) by step (1) treated wheel disc and shrouding disc, treated that blade carries out welding with step (2) respectively, specifically Steps are as follows:
During (3-1) welding, step (1) treated wheel disc, step (2) treated blade and welding rod are hung in In dedicated heat treatment process furnace, it is warming up to 150-200 DEG C and continues to hang out welding after keeping the temperature 2-3h, until wheel disc and blade pass through Welding rod group is welded into impeller blank to be processed, then hangs in dedicated heat treatment process furnace and carries out welding stress-removal processing;
Treated impeller blank obtained by (3-1) and step (1) shrouding disc and welding rod are hung in dedicated heat treatment by (3-2) It in technique furnace, is warming up to 150-200 DEG C and continues to hang out welding after keeping the temperature 2-3h, until impeller blank and shrouding disc pass through welding rod group It is welded into rough machined impeller, then impeller is hung in dedicated heat treatment process furnace and carries out welding stress-removal processing to get impeller.
In above-mentioned technical proposal, the impeller includes wheel disc, shrouding disc and multiple blades, and the blade includes linear leaf And short blade, impeller are respectively welded with wheel disc, shrouding disc by blade and are formed, and is described using the long and short blade shape of the double-deck slit type Linear leaf and short blade on impeller are staggeredly in concentric circles arrangement.
In above-mentioned technical proposal, wheel disc or shrouding disc solution treatment in step (1) specifically: be warming up to wheel disc or shrouding disc 1h is kept the temperature after 850 DEG C, then proceedes to be warming up to 1000-1100 DEG C of progress solution treatment 2-5h, then air is cooling;Wherein it is dissolved Lead to argon gas protection when processing;
Wheel disc or shrouding disc Wetted constructures in step (1) specifically: by after solution treatment wheel disc or shrouding disc be warming up to Air is cooling after 500-700 DEG C of heat preservation 5-6h.
In above-mentioned technical proposal, blade solution treatment in step (2) specifically: 1h is kept the temperature after blade is warming up to 850 DEG C, It then proceedes to be warming up to 1000-1100 DEG C of progress solution treatment 2-5h, then air is cooling;Wherein lead to argon gas when solution treatment to protect Shield;
Blade Wetted constructures in step (2) specifically: the blade after solution treatment is warming up to 500-700 DEG C of heat preservation 5h Air is cooling afterwards.
In above-mentioned technical proposal, the welding stress-removal in step (3-1) and step (3-2) handles specific steps are as follows: will apply The workpiece of postwelding, i.e. impeller blank and impeller are warming up to 500-700 DEG C of heat preservation 7h, and then air is cooling.
In above-mentioned technical proposal, blade uses precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb;Wheel disc and shrouding disc are adopted With steel alloy 15MnNiCrMo2V.
In above-mentioned technical proposal, blade, wheel disc and shrouding disc are all made of precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb.
In above-mentioned technical proposal, precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb is forged before being polished into workpiece Heat treatment, after specially precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb is forged, after 850 DEG C of heat preservations adjust 1h, 1050 DEG C solution treatment 2-5h, then air is cooling after 640 DEG C of Wetted constructures 5-6h.
In above-mentioned technical proposal, the selection of welding rod meets the following conditions in step (3-1) and step (3-2): alloying element Including Cr, Ni and Mo;Elongation percentage is 20~25%;Tensile strength is 800~850MPa;Hardness is HB 90~96.
Compared with prior art, the beneficial effects of the present invention are:
1, the heat treatment process of production impeller provided by the invention, due to increasing the technique of innovation, with former common process Weldering is compared, and has the advantage that the intensity 1. welded is high, test data proves commissure strength of parent δ b >=800MPa.2. eliminating Internal stress (never occur postwelding crack existing angle).3. the height of intact two kinds of unlike materials for realizing stainless steel and steel alloy is fierce Connect effect.4. weldment is durable, Wuhan Iron and Steel Plant one makes steel rotor 2019 manufactured within 2005 also with 14 years as long as.It is military Previous service life of the part rotor never greater than 1 year of one steel-making of steel.
2, the present invention is using full precipitation-hardening stainless steel impeller (i.e. blade, wheel disc and shrouding disc use precipitation-hardening stainless steel) Or half precipitation-hardening stainless steel impeller (i.e. blade uses precipitation-hardening stainless steel, wheel disc, and shrouding disc uses high-strength alloy steel material), And the impeller for providing heat treatment process production makes the blade material in impeller most easy to damage durable, improves than prophyll wheel 5-10 times of service life, or even more than.It is equivalent to we a set of rotor and supports 5-10 and cover the use value of original rotor.By every 2 sets of operation blowers of a steel mill, every about 40 Wan Yuanji of set rotor can save about 400~8,000,000 yuan every year for enterprise.It mentions simultaneously It is 2-3 times of the on-line operation time high, that is, reducing the shutdown of 2 times or more, tear machine open, clears up impeller and do dynamically balanced work Make, keeps the stability of steel-making.
3, smooth blade surface used in the impeller of technique production provided by the present invention, non-corrosive, while blade is adopted It is a kind of acid-resistant stainless steel with precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb, in impeller work, Surface Creation Cr2O3 Protective film (passivating film) has been isolated contact of the iron atom with acid medium in steel, has played the role of acid corrosion-resistant.So that blower Impeller is entirely capable of reaching not only wear-resisting but also corrosion-resistant good result, and the workload of about half is reduced for steel-making blower maintenance workers.
Detailed description of the invention
Fig. 1 is the structural schematic diagram using impeller produced by the invention;
Fig. 2 is the sectional view in Fig. 1 on the direction A-A;
Description of symbols:
1, wheel disc;2, shrouding disc;3, blade;3-1, linear leaf;3-2, short blade.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to The drawings and specific embodiments, how the present invention is further explained implements.
The present invention provides a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller, including following Step:
(1) it after fixing the wheel disc or shrouding disc that need to be heat-treated and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, Dedicated heat treatment process furnace is automatically performed solid solution and Wetted constructures;
(2) it after fixing blade and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, dedicated heat treatment process furnace It is automatically performed solid solution and Wetted constructures;
(3) by step (1) treated wheel disc and shrouding disc, treated that blade carries out welding with step (2) respectively, specifically Steps are as follows:
During (3-1) welding, step (1) treated wheel disc, step (2) treated blade and welding rod are hung in In dedicated heat treatment process furnace, it is warming up to 150-200 DEG C and continues to hang out welding after keeping the temperature 2-3h, until wheel disc and blade pass through Welding rod group is welded into impeller blank to be processed, then hangs in dedicated heat treatment process furnace and carries out welding stress-removal processing;
Treated impeller blank obtained by (3-1) and step (1) shrouding disc and welding rod are hung in dedicated heat treatment by (3-2) It in technique furnace, is warming up to 150-200 DEG C and continues to hang out welding after keeping the temperature 2-3h, until impeller blank and shrouding disc pass through welding rod group It is welded into rough machined impeller, then impeller is hung in dedicated heat treatment process furnace and carries out welding stress-removal processing to get impeller.
As depicted in figs. 1 and 2, in the present invention, impeller includes wheel disc 1, shrouding disc 2 and multiple blades 3, and the blade 3 wraps Linear leaf 3-1 and short blade 3-2 are included, impeller is divided using the long and short blade shape of the double-deck slit type by blade 3 and wheel disc 1, shrouding disc 2 It is not welded to form, the linear leaf 3-1 on the impeller and short blade 3-2 are staggeredly in concentric circles arrangement.
In the present invention, wheel disc or shrouding disc solution treatment in step (1) specifically: after wheel disc or shrouding disc are warming up to 850 DEG C 1h is kept the temperature, then proceedes to be warming up to 1000-1100 DEG C of progress solution treatment 2-5h, then air is cooling;Wherein when solution treatment Logical argon gas protection;
Wheel disc or shrouding disc Wetted constructures in step (1) specifically: by after solution treatment wheel disc or shrouding disc be warming up to Air is cooling after 500-700 DEG C of heat preservation 5-6h.
In the present invention, blade solution treatment in step (2) specifically: blade is warming up to after 850 DEG C and keeps the temperature 1h, then after Continuous to be warming up to 1000-1100 DEG C of progress solution treatment 2-5h, then air is cooling;Wherein lead to argon gas protection when solution treatment;
Blade Wetted constructures in step (2) specifically: the blade after solution treatment is warming up to 500-700 DEG C of heat preservation 5h Air is cooling afterwards.
In the present invention, the welding stress-removal in step (3-1) and step (3-2) handles specific steps are as follows: after welding Workpiece, i.e. impeller blank and impeller are warming up to 500-700 DEG C of heat preservation 7h, and then air is cooling.Stress-removal is welded to handle so that weldering After be not in existing angle of cracking.
In the present invention, blade uses precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb, tensile strength δ b >=800MPa, sinks Shallow lake hardening stainless steel 0Cr14Ni6Mo2Cu2Nb is processed into before workpiece (blade) by calcining heat treatment;Wheel disc and shrouding disc are adopted With steel alloy 15MnNiCrMo2V, tensile strength δ b >=800MPa.Or to be all made of precipitation-hardening stainless for blade, wheel disc and shrouding disc Steel 0Cr14Ni6Mo2Cu2Nb;Precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb is processed into workpiece (blade, wheel disc and shrouding disc) Before by calcining heat treatment.Forging heat treatment specifically: after precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb forging, After 850 DEG C of heat preservation adjustment 1h, 1050 DEG C of solution treatment 2-5h, then air is cooling after 640 DEG C of Wetted constructures 5-6h.
In the present invention, since the material properties of two kinds of steel of precipitation-hardening stainless steel and high-strength alloy steel has a long way to go, weldering Item first has to select:
I) equal strength matches wlding.
Ii) the compatible wlding of metallographic structure.
Iii) in the suitable heat treatment condition wlding of blade.
Iv) the wlding that postwelding can be machined.
The selection of welding rod meets the following conditions in step (3-1) and step (3-2): alloying element includes Cr, Ni and Mo;Prolong Stretching rate is 20~25%;Tensile strength is 800~850MPa;Hardness is HB90~96.
Embodiment 1
Instrument: 1. dedicated heat treatment process furnace is a set of;2. high temperature power control cabinet is a set of (alarm of semi-automatic-controlled band);3. high temperature is preapred for an unfavorable turn of events Type tire;4. special welding rack;5. thermometric primary instrument is several;Instrument is purchased from market.
Blade, wheel disc and shrouding disc are all made of precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb.
The present invention provides a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller, including following Step:
(1) wheel is reprocessed into after raw material precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb being carried out forging heat treatment Lid, shrouding disc and blade;Wherein forging heat treatment specifically: after precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb forging, After 850 DEG C of heat preservation adjustment 1h, 1050 DEG C of solution treatment 2-5h, then air is cooling after 640 DEG C of Wetted constructures 5-6h.
(2) it after fixing (1) resulting wheel disc or shrouding disc and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, Dedicated heat treatment process furnace keeps the temperature 1h after wheel disc or shrouding disc are warming up to 850 DEG C automatically, then proceedes to be warming up to 1000-1100 DEG C Solution treatment 2-5h is carried out, then air is cooling;
Wherein lead to argon gas protection when solution treatment;By after solution treatment wheel disc or shrouding disc be warming up to 500-700 DEG C of heat preservation Air is cooling after 5-6h;
(3) it after fixing blade obtained by (1) and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, at dedicated heat Science and engineering skill furnace keeps the temperature 1h after blade is warming up to 850 DEG C automatically, then proceedes to be warming up to 1000-1100 DEG C of progress solution treatment 2- 5h, then air is cooling;Wherein lead to argon gas protection when solution treatment;Blade after solution treatment is warming up to 500-700 DEG C of guarantor Air is cooling after warm 5h.
(4) by step (2) treated wheel disc and shrouding disc, treated that blade carries out welding with step (3) respectively, specifically Steps are as follows:
During (4-1) welding, step (2) treated wheel disc, step (3) treated blade and welding rod are hung in It in dedicated heat treatment process furnace, is warming up to 200 DEG C and continues to hang out welding after keeping the temperature 2h, until wheel disc and blade pass through welding rod group It is welded into impeller blank to be processed, then hangs in dedicated heat treatment process furnace and carries out welding stress-removal processing;
Treated impeller blank obtained by (4-1) and step (2) shrouding disc and welding rod are hung in dedicated heat treatment by (4-2) It in technique furnace, is warming up to 200 DEG C and continues to hang out welding after keeping the temperature 2h, until impeller blank is welded into slightly with shrouding disc by welding rod group Then impeller is hung in dedicated heat treatment process furnace and carries out welding stress-removal processing to get impeller by the impeller of processing.
Wherein, welding stress-removal handles specific steps are as follows: by the workpiece after welding, i.e. impeller blank and impeller is warming up to 500-700 DEG C of heat preservation 7h, then air is cooling.
Embodiment 2
Instrument: 1. dedicated heat treatment process furnace is a set of.2. high temperature power control cabinet is a set of (alarm of semi-automatic-controlled band).3. high temperature is preapred for an unfavorable turn of events Type tire.4. special welding rack.5. thermometric primary instrument is several.
Blade uses precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb;Wheel disc and shrouding disc are all made of steel alloy 15MnNiCrMo2V。
The present invention provides a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller, including following Step:
(1) by steel alloy 15MnNiCrMo2V by calcining post-processing into wheel cap and shrouding disc;Not by raw material precipitation-hardening Rust steel 0Cr14Ni6Mo2Cu2Nb is reprocessed into blade after carrying out forging heat treatment;Wherein forging heat treatment specifically: will precipitate After hardening stainless steel 0Cr14Ni6Mo2Cu2Nb forging, after 850 DEG C of heat preservations adjust 1h, 1050 DEG C of solution treatment 2-5h, then Air is cooling after 640 DEG C of Wetted constructures 5-6h.
(2) it after fixing (1) resulting wheel disc or shrouding disc and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, Dedicated heat treatment process furnace is automatically performed solid solution and Wetted constructures;
(3) it after fixing blade obtained by (1) and high temperature deform-proof tire, hangs in dedicated heat treatment process furnace, at dedicated heat Science and engineering skill furnace keeps the temperature 1h after blade is warming up to 850 DEG C automatically, then proceedes to be warming up to 1050 DEG C of progress solution treatment 2-5h, so Air is cooling afterwards;Wherein lead to argon gas protection when solution treatment;Blade after solution treatment is warming up to air after 640 DEG C of heat preservation 5h It is cooling.
(4) by step (2) treated wheel disc and shrouding disc, treated that blade carries out welding with step (3) respectively, specifically Steps are as follows:
During (4-1) welding, step (2) treated wheel disc, step (3) treated blade and welding rod are hung in It in dedicated heat treatment process furnace, is warming up to 200 DEG C and continues to hang out welding after keeping the temperature 3h, until wheel disc and blade pass through welding rod group It is welded into impeller blank to be processed, then hangs in dedicated heat treatment process furnace and carries out welding stress-removal processing;
Treated impeller blank obtained by (4-1) and step (2) shrouding disc and welding rod are hung in dedicated heat treatment by (4-2) It in technique furnace, is warming up to 200 DEG C and continues to hang out welding after keeping the temperature 3h, until impeller blank is welded into slightly with shrouding disc by welding rod group Then impeller is hung in dedicated heat treatment process furnace and carries out welding stress-removal processing to get impeller by the impeller of processing.
In the present embodiment, precipitation-hardening stainless steel blade (0Cr14Ni6Mo2Cu2Nb) and steel alloy (15MnNiCrMo2V) Its material difference is larger.One is stainless steels, and one is steel alloys, and welding stress is different, weldment easily modification or cracking.Step The selection of welding rod meets the following conditions in (4-1) and step (4-2): alloying element includes Cr, Ni and Mo;Elongation percentage be 20~ 25%;Tensile strength is 800~850MPa;Hardness is HB90~96.Precipitation-hardening stainless steel blade (0Cr14Ni6Mo2Cu2Nb) and steel alloy (15MnNiCrMo2V) contains alloying elements cr, Ni and Mo, alloy member in welding rod Element includes Cr, Ni and Mo, and convenient for the compatible welding rod of metallographic structure of stainless steel and steel alloy, and tensile strength is 800~850MPa, With stainless steel, steel alloy strength matching.
Chinese shipbuilding industry Wuhan material and structural test inspection center are raw to heat treatment process provided by the present embodiment The impeller of production carries out the stretching experiment of verifying wheel disc or shrouding disc and blade weld: yield strength Rp0.2 (N/mm2)=863; Tensile strength Rm (N/mm2)=958;Test data proves commissure strength of parent δ b >=800MPa.
Application Example:
The using effect case of the impeller of heat treatment process production provided by the invention:
I) before Wuhan Iron and Steel Plant one is made steel 2005, two once dust collection of converter blowers need to scrap two sets of rotors every year, from 2005 After our precipitation-hardening stainless steel impellers, until still being run at the beginning of 2019 intact.The 14 years in-service time of this impeller, before comparing A set of rotor, which is used only ten months, just to be scrapped, and is improved service life up to as many as 14 times.
Ii) average every Fans operation just needs for 10~15 days or so before Chengdu-Chongqing Fan Tai Science and Technology Ltd. steel mill 2016 It shuts down clear impeller or does dynamic balancing, after the stainless steel blade rotor for using us to be transformed from after 2016, the on-line operation time reaches 11 months, improve 12 times of runing time.
Iii) Tianjin iron company, Xiangtan Iron and Steel, more than 40 steel mills such as Dadong River iron company are using After our this patented product, the service life of impeller, on-line operation time and to save human resources etc. all many-sided Great raising is arrived.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the scope of the claims of invention.

Claims (9)

1. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller, which is characterized in that including following Step:
(1) it after fixing wheel disc or shrouding disc and high temperature deform-proof tire to be welded, hangs in dedicated heat treatment process furnace, dedicated heat Treatment process furnace is automatically performed solid solution and Wetted constructures;
(2) it after fixing blade and high temperature deform-proof tire to be welded, hangs in dedicated heat treatment process furnace, dedicated heat treatment work Skill furnace is automatically performed solid solution and Wetted constructures;
(3) by step (1) treated wheel disc and shrouding disc, treated that blade carries out welding, specific steps with step (2) respectively It is as follows:
During (3-1) welding, step (1) treated wheel disc, step (2) treated blade and welding rod are hung in dedicated It in heat treatment process furnace, is warming up to 150-200 DEG C and continues to hang out welding after keeping the temperature 2-3h, until wheel disc and blade pass through welding rod Group is welded into impeller blank to be processed, then hangs in dedicated heat treatment process furnace and carries out welding stress-removal processing;
Treated impeller blank obtained by (3-1) and step (1) shrouding disc and welding rod are hung in dedicated heat treatment process by (3-2) It in furnace, is warming up to 150-200 DEG C and continues to hang out welding after keeping the temperature 2-3h, until impeller blank is welded into shrouding disc by welding rod group Then impeller is hung in dedicated heat treatment process furnace and carries out welding stress-removal processing to get impeller by rough machined impeller.
2. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, the impeller includes wheel disc (1), shrouding disc (2) and multiple blades (3), the blade (3) includes linear leaf (3-1) and short blade (3-2), impeller is using the long and short blade shape of the double-deck slit type, by blade (3) and wheel disc (1), shrouding disc (2) Composition is respectively welded, and the linear leaf (3-1) on the impeller and short blade (3-2) staggeredly arrange in concentric circles.
3. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, wheel disc or shrouding disc solution treatment in step (1) specifically: 1h is kept the temperature after wheel disc or shrouding disc are warming up to 850 DEG C, It then proceedes to be warming up to 1000-1100 DEG C of progress solution treatment 2-5h, then air is cooling;Wherein lead to argon gas when solution treatment to protect Shield;
Wheel disc or shrouding disc Wetted constructures in step (1) specifically: by after solution treatment wheel disc or shrouding disc be warming up to 500-700 Air is cooling after DEG C heat preservation 5-6h.
4. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, blade solution treatment in step (2) specifically: keep the temperature 1h after blade is warming up to 850 DEG C, then proceed to heat up To 1000-1100 DEG C of progress solution treatment 2-5h, then air is cooling;Wherein lead to argon gas protection when solution treatment;
Blade Wetted constructures in step (2) specifically: the blade after solution treatment is warming up to after 500-700 DEG C of heat preservation 5h empty Air cooling.
5. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, the welding stress-removal in step (3-1) and step (3-2) handles specific steps are as follows: by the workpiece after welding, i.e., Impeller blank and impeller are warming up to 500-700 DEG C of heat preservation 7h, and then air is cooling.
6. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, blade uses precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb;Wheel disc and shrouding disc are all made of steel alloy 15MnNiCrMo2V。
7. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, blade, wheel disc and shrouding disc are all made of precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb.
8. a kind of heat treatment of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 6 or 7 produces work Skill, which is characterized in that precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb carries out forging heat treatment before being processed into workpiece, tool After precipitation-hardening stainless steel 0Cr14Ni6Mo2Cu2Nb is is forged by body, after 850 DEG C of heat preservations adjust 1h, 1050 DEG C of solution treatment 2-5h, then air is cooling after 640 DEG C of Wetted constructures 5-6h.
9. a kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller according to claim 1, It is characterized in that, the selection of welding rod meets the following conditions in step (3-1) and step (3-2): alloying element include Cr, Ni and Mo;Elongation percentage is 20~25%;Tensile strength is 800~850MPa;Hardness is HB 90~96.
CN201910192310.0A 2019-03-14 2019-03-14 Heat treatment production process of high-corrosion-resistance wear-resistance converter primary dust removal fan impeller Active CN109880991B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910192310.0A CN109880991B (en) 2019-03-14 2019-03-14 Heat treatment production process of high-corrosion-resistance wear-resistance converter primary dust removal fan impeller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910192310.0A CN109880991B (en) 2019-03-14 2019-03-14 Heat treatment production process of high-corrosion-resistance wear-resistance converter primary dust removal fan impeller

Publications (2)

Publication Number Publication Date
CN109880991A true CN109880991A (en) 2019-06-14
CN109880991B CN109880991B (en) 2020-12-08

Family

ID=66932180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910192310.0A Active CN109880991B (en) 2019-03-14 2019-03-14 Heat treatment production process of high-corrosion-resistance wear-resistance converter primary dust removal fan impeller

Country Status (1)

Country Link
CN (1) CN109880991B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112222655A (en) * 2020-09-10 2021-01-15 沈阳航天新光集团有限公司 15-5PH stainless steel strengthening post-welding method
CN113151660A (en) * 2021-03-22 2021-07-23 西安理工大学 Two-stage aging process for improving strength of welding part of impeller of air blower

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2725214A4 (en) * 2011-06-22 2015-03-18 Kawasaki Heavy Ind Ltd Rotor for turbine, process for producing same, method for bonding ni-based superalloy material to steel material, and structure
CN105269278A (en) * 2015-11-19 2016-01-27 湖北双剑鼓风机股份有限公司 Machining method for three-dimensional flow impeller
CN205689491U (en) * 2016-06-29 2016-11-16 武汉西北风机发展有限公司 The most not viscous ash air blower for coal gas to converter rotor
CN107674956A (en) * 2016-08-02 2018-02-09 沈阳鼓风机集团安装检修配件有限公司 The Technology for Heating Processing of martensitic precipitation impeller and its application

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2725214A4 (en) * 2011-06-22 2015-03-18 Kawasaki Heavy Ind Ltd Rotor for turbine, process for producing same, method for bonding ni-based superalloy material to steel material, and structure
CN105269278A (en) * 2015-11-19 2016-01-27 湖北双剑鼓风机股份有限公司 Machining method for three-dimensional flow impeller
CN205689491U (en) * 2016-06-29 2016-11-16 武汉西北风机发展有限公司 The most not viscous ash air blower for coal gas to converter rotor
CN107674956A (en) * 2016-08-02 2018-02-09 沈阳鼓风机集团安装检修配件有限公司 The Technology for Heating Processing of martensitic precipitation impeller and its application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方顺发: "OCr17Ni4Cu4Nb钢制叶片的热处理", 《热处理》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112222655A (en) * 2020-09-10 2021-01-15 沈阳航天新光集团有限公司 15-5PH stainless steel strengthening post-welding method
CN113151660A (en) * 2021-03-22 2021-07-23 西安理工大学 Two-stage aging process for improving strength of welding part of impeller of air blower

Also Published As

Publication number Publication date
CN109880991B (en) 2020-12-08

Similar Documents

Publication Publication Date Title
CN109880991A (en) A kind of thermal treatment production process of high anticorrosion antiwear once dust collection of converter draught fan impeller
CN104694832B (en) Martensitic stainless steel for nuclear reactor and preparation method of stainless steel
CN110788513B (en) Production method for improving wire feeding stability of wire-welded steel
CN107460412B (en) High-strength and high-toughness corrosion-resistant steel and rolling method thereof
CN101148720A (en) Cobalt-base high-temperature alloy and manufacture method thereof
CN102691002A (en) Nuclear electric weldable seamless carbon steel pipe and production method thereof
CN104630565A (en) High-strength and high-plasticity Ni-Cr-Co based turbine disc blade material and preparation method thereof
CN105586546A (en) Machining manufacturing process for spline shaft made of high-manganese steel
CN110656286A (en) High-strength bolt and processing method thereof
CN109055692A (en) A kind of pressure vessel is with exempting from anneal Dual-phase steel wire rod and its production method
CN108555478A (en) 25Cr2Ni4MoV steel alloys and the stainless steel welded metal flux-cored wires and preparation method thereof of G520
CN109295390B (en) Ultrahigh-strength corrosion-resistant steel bar and production method thereof
CN103173697B (en) Preparation technology of biphase alloy steel tank container seal head
CN110760763A (en) Forging method of steel ring forging for nuclear power equipment
CN110438511A (en) A kind of rust-proofing method of stainless steel support
CN104785895A (en) Submerged arc surfacing manufacturing technology of looper roll for rolling mill
CN111206178A (en) Rare earth steel for resisting sulfuric acid dew point corrosion and preparation method thereof
CN113174532B (en) Preparation method of high-quenching-hardness martensitic stainless steel coil for measuring tool
CN108754294A (en) A kind of anti abrasive engine alloy cylinder jacket and its technique
CN115369401A (en) Corrosion-resistant layer material for laser cladding and preparation method and application thereof
CN106947939A (en) A kind of method that thermal diffusion prepares anti-corrosion reinforcing bar
CN108411198A (en) A kind of high-performance stainless steel and seamless steel pipe and its manufacturing method
CN113969332A (en) high-Mn ultralow-Ni dual-phase stainless steel and high-corrosion-resistance welding heat affected zone hot working method thereof
CN112430714A (en) Annealing process of 04Cr13Ni5Mo hydroelectric super martensitic stainless steel medium plate
CN111979471B (en) Preparation method of nuclear power sealing chamber

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant