CN109877360A - Oil filler point drilling equipment on a kind of long axis class support base - Google Patents

Oil filler point drilling equipment on a kind of long axis class support base Download PDF

Info

Publication number
CN109877360A
CN109877360A CN201910193965.XA CN201910193965A CN109877360A CN 109877360 A CN109877360 A CN 109877360A CN 201910193965 A CN201910193965 A CN 201910193965A CN 109877360 A CN109877360 A CN 109877360A
Authority
CN
China
Prior art keywords
support base
positioning seat
lever
stadium
worker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910193965.XA
Other languages
Chinese (zh)
Other versions
CN109877360B (en
Inventor
季晓龙
张玉燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhu Yongjia Machinery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910193965.XA priority Critical patent/CN109877360B/en
Publication of CN109877360A publication Critical patent/CN109877360A/en
Application granted granted Critical
Publication of CN109877360B publication Critical patent/CN109877360B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The invention discloses oil filler point drilling equipments on a kind of long axis class support base, the long axis class support base includes end cap portions and the bearing holder (housing, cover) portion of integrated molding and coaxial arrangement, including chute feeder, positioning seat, material toggling unit, first pressure plate, second pressure plate and drill bit, the end of the chute feeder is equipped with temporary station, positioning seat is set to the end of temporary station, several described support bases are successively set in chute feeder side by side, single support base in chute feeder is sequentially sent on temporary station and positioning seat by material toggling unit one by one, first pressure plate and the second pressure plate are respectively corresponded along the radial direction and axial direction of positioning seat upper support seat to be pressed in the bearing holder (housing, cover) portion and end cap portions, and by support base positioning compression on positioning seat, drill bit drills through oil filler point in bearing holder (housing, cover) portion.The present invention is convenient for the batch machining of workpiece, reduces labor intensity of workers, saves working hour, and labour cost is low.

Description

Oil filler point drilling equipment on a kind of long axis class support base
Technical field:
The present invention relates to oil filler point drilling equipments on a kind of long axis class support base.
Background technique:
The structure of long axis class support base is as shown in Figure 1, include the end cap portions 400 and bearing holder (housing, cover) for being integrally formed and being coaxially disposed The axial length in portion 500, bearing holder (housing, cover) portion 500 is greater than 400 axial width of end cap portions.When in use, bearing location and installation inner bearing In set portion 500, for the lubricant effect guaranteed, need in bearing holder (housing, cover) portion 500 lube oil injection, so will be in bearing holder (housing, cover) portion 500 Inside drill through oil filler point.Existing mode is to be fixed on support base one by one on drilling machine one by one, and one workpiece of every processing needs weight New fixed primary, working hour is longer, is unfavorable for the batch machining of workpiece, therefore, it is necessory to improve the prior art to solve The certainly deficiency of the prior art.
Summary of the invention:
The present invention is that oil filler point on a kind of long axis class support base is provided to solve the above-mentioned problems of the prior art Drilling equipment.
The technical solution adopted in the present invention has: oil filler point drilling equipment on a kind of long axis class support base, the long axis class Support base includes being integrally formed and the end cap portions of coaxial arrangement and bearing holder (housing, cover) portion, including chute feeder, positioning seat, material toggling unit, the One pressure plate, the second pressure plate and drill bit, the end of the chute feeder are equipped with temporary station, and positioning seat is set to the end of temporary station End, several described support bases successively side by side be set to chute feeder in, material toggling unit one by one by the single support base in chute feeder according to It is secondary to be sent on temporary station and positioning seat, the first pressure plate and the second pressure plate along positioning seat upper support seat radial direction and Axial direction, which respectively corresponds, to be pressed in the bearing holder (housing, cover) portion and end cap portions, and support base positioning compression is bored on positioning seat Head drills through oil filler point in bearing holder (housing, cover) portion.
Further, the material toggling unit includes upper lever, the first lower lever, the second lower lever and discharge arm, upper lever Set on the top of chute feeder, the first lower lever, the second lower lever and discharge arm are set to the lower section of chute feeder, upper lever and second It is formed with charging between lower lever and prepares station, several described support bases are successively set in chute feeder side by side, and chute feeder is most Two support bases of end sequentially form the first the Worker's Stadium to be added and the second the Worker's Stadium to be added, first the Worker's Stadium to be added be placed in it is described into Material prepares in station, and is positioned at charging by upper lever and prepares in station;
Material toggling unit moves up, and makes lever, the first lower lever, the second lower lever and discharge arm while moving up, discharging Bar ejects the support base that oil filler point has been drilled through on positioning seat, and it is to be processed that upper lever is detached from the charging prepares in station first Body, and the first the Worker's Stadium to be added is entered in temporary station, the first the Worker's Stadium to be added is positioned in temporary station by the first lower lever, Second lower lever, which stretches in the second the Worker's Stadium side to be added and the second the Worker's Stadium to be added is positioned at charging, to be prepared on the outside of station;
Material toggling unit moves down, and makes lever, the first lower lever, the second lower lever and discharge arm while moving down, first Lower lever is detached from the first the Worker's Stadium to be added and the first the Worker's Stadium to be added is entered on positioning seat, and it is to be processed that the second lower lever is detached from second Body simultaneously enters the second the Worker's Stadium to be added in charging preparation station.
Further, the height of lever under the height of the discharge arm is lower than first.
Further, the material toggling unit includes cylinder and mounting rack, and the cylinder driving mounting rack is moved up and down, performed Bar is fixed on the upper end of mounting rack, and the first lower lever, the second lower lever and discharge arm are both secured to the lower end of mounting rack.
Further, the chute feeder includes that supporting table, postive stop baffle and support groove body, the postive stop baffle are set to support The top of platform, and bearing holder (housing, cover) limiting slot is formed between postive stop baffle and supporting table, support groove body is fixed on the side wall of supporting table On, support groove body is parallel to each other with bearing holder (housing, cover) limiting slot, and the end cap portions of support base are placed in support slot body, and bearing holder (housing, cover) portion is placed in axis In bearing sleeve limiting slot.
Further, the end of the supporting table is equipped with the first tilt feeding portion, supports the end of groove body to be equipped with second and inclines Oblique feeding portion, the first tilt feeding portion are parallel to each other and isometric with the second tilt feeding portion, and the first tilt feeding portion inclines with second Oblique feeding portion collectively constitutes temporary station;Positioning seat is set to the end in the first tilt feeding portion.
Further, the end of the postive stop baffle is equipped with extension, and extension is placed in the top in the first tilt feeding portion.
Further, the end in second tilt feeding portion is equipped with kerve portion, and kerve portion is placed in the front side of positioning seat.
Further, the positioning seat is equipped with taper locating slot, on the top surface of positioning seat and is located at taper locating slot Side be equipped with inclination discharge side.
Further, first pressure plate is equipped with arc groove, and arc groove pressure touching is in the bearing holder (housing, cover) portion.
The invention has the following beneficial effects:
The present invention is convenient for the batch machining of workpiece, reduces labor intensity of workers, saves working hour, and labour cost is low.
Detailed description of the invention:
Fig. 1 is the structure chart of long axis class support base to be processed.
Fig. 2 is structure chart of the invention.
Fig. 3 is left view schematic diagram of the invention.
Fig. 4 is the structure chart of chute feeder and positioning seat of the invention.
Fig. 5, Fig. 6 and Fig. 7 are the procedure chart of the feeding of material toggling unit and discharging of the invention.
Specific embodiment:
The present invention will be further described below with reference to the drawings.
Oil filler point drilling equipment on a kind of long axis class support base of the present invention, the long axis class support base include be integrally formed and The end cap portions 400 of coaxial arrangement and bearing holder (housing, cover) portion 500, drilling equipment of the present invention are to bore oiling in bearing holder (housing, cover) portion 500 for batch Hole, drilling equipment complete feeding, discharging and bore operation, improve efficiency, make specifically to the structure of apparatus of the present invention below Description.
Such as Fig. 1 to Fig. 7, apparatus of the present invention include chute feeder 1, positioning seat 2, material toggling unit 3, the first pressure plate 41, second Pressure plate 42 and drill bit 5, the end of chute feeder 1 are equipped with temporary station 100, and positioning seat 2 is set to the end of temporary station 100, if Dry support base is successively set in chute feeder 1 side by side, and the single support base in chute feeder 1 is sequentially sent to by material toggling unit 3 one by one On temporary station 100 and positioning seat 2, the first pressure plate 41 is pressed on the support along the radial direction of 2 upper support seat of positioning seat In the bearing holder (housing, cover) portion 500 of seat, the second pressure plate 42 is pressed on the end of the support base along the axial direction of 2 upper support seat of positioning seat In cover 400, the first pressure plate 41 and the second pressure plate 42 are jointly by support base positioning compression on positioning seat 2, and drill bit 5 is in axis Oil filler point is drilled through in bearing sleeve portion 500.
Chute feeder 1 in the present invention includes supporting table 11, postive stop baffle 12 and support groove body 13, postive stop baffle 12 and support Groove body 13 is arranged each along the length direction of supporting table 11, and postive stop baffle 12 is set to the top of supporting table 11, and postive stop baffle 12 Bearing holder (housing, cover) limiting slot 14 is formed between supporting table 11, support groove body 13 is fixed on the side wall of 11 front end of supporting table, supports Groove body 13 is parallel to each other with bearing holder (housing, cover) limiting slot 14, and the end cap portions 400 of support base are placed in support groove body 13, bearing holder (housing, cover) portion 500 It is placed in bearing holder (housing, cover) limiting slot 14.
Since the length in the bearing holder (housing, cover) portion 500 in support base is greater than the thickness of end cap portions 400, general delivery chute exists During conveying support base, two delivery chutes (i.e. support groove body 13 and axis is arranged in support base meeting run-off the straight situation, the present invention Bearing sleeve limiting slot 14) conveying is supported to bearing holder (housing, cover) portion 500 and end cap portions 400 jointly, avoid support base during transportation The case where run-off the straight.
It is equipped with the first tilt feeding portion 110 in the end of supporting table 11, the end of support groove body 13 is equipped with the second inclination and send Material portion 130, the first tilt feeding portion 110 is parallel to each other with the second tilt feeding portion 130 and isometric, the first tilt feeding portion 110 Temporary station 100 is collectively constituted with the second tilt feeding portion 130;Positioning seat 2 is set to the end in the first tilt feeding portion 110.
Single support base in chute feeder 1 is first sent on temporary station 100 by material toggling unit 3, then again by temporary station Support base on 100 is sent on positioning seat 2, and last first pressure plate 41 and the second pressure plate 42 are jointly by support base positioning compression In on positioning seat 2.
To extend convenient for preferably by support base positioning support on temporary station 100, the end of postive stop baffle 12 is equipped with Portion 121, extension 121 are placed in the top in the first tilt feeding portion 110, and extension 121 can effectively avoid support base from rolling To temporary 100 process centre bearer bush portion 500 of station, there is a situation where tilt.
It is equipped with kerve portion 131 in the end in the second tilt feeding portion 130, kerve portion 131 is placed in the front side of positioning seat 2, props up Seat positioning compression is supportted when on positioning seat 2, the end cap portions 400 of support base are supported in kerve portion 131.
Material toggling unit 3 in the present invention includes the lower lever 32, second of upper lever 31, first lower lever 33, discharge arm 34, gas The output shaft of cylinder 35 and mounting rack 36, cylinder 35 is connected with mounting rack 36, and cylinder 35 drives mounting rack 36 to move up and down, upper lever 31 are fixed on the upper end of mounting rack 36, and the lower lever 33 of the first lower lever 32, second and discharge arm 34 are both secured to mounting rack 36 Lower end.
Upper lever 31 is set to the top of chute feeder 1, and lever 33 and discharge arm 34 are set to and send under the first lower lever 32, second The lower section of hopper 1.It is formed with charging between upper lever 31 and the second lower lever 33 and prepares station 300, the second lower lever 33 is vertical It is arranged in support groove body 13, the first lower lever 32 and discharge arm 34 are arranged in vertically in kerve portion 131, the first lower lever 32 Between the second lower lever 33 and discharge arm 34, height of the height lower than the first lower lever 32 of discharge arm 34, the first lower gear For the height of bar 32 lower than the height of the second lower lever 33, the first lower lever 32 and the second lower lever 33 are used for backgauge, discharge arm 34 For discharging.
In conjunction with Fig. 5, Fig. 6 and Fig. 7, the present invention makes the process of 3 feeding of material toggling unit and discharging and retouches in detail as follows It states:
1) several support bases are successively set in chute feeder 1 side by side, and the end cap portions 400 of each support base are placed in support In groove body 13, bearing holder (housing, cover) portion 500 is placed in bearing holder (housing, cover) limiting slot 14.Two support bases of 1 least significant end of chute feeder sequentially form The one the Worker's Stadium c to be added of the Worker's Stadium b and second to be added.When having work pieces process on positioning seat 2, the first the Worker's Stadium b to be added is contradicted in upper lever On 31 (i.e. charging prepares in station 300), the first the Worker's Stadium b to be added is positioned at charging by upper lever 31 and prepares in station 300 (such as Fig. 5).
2) after the completion of the Workpiece boring on positioning seat 2, the first pressure plate 41, the second pressure plate 42 and drill bit 5 are returned to just Beginning position, then material toggling unit 3 moves up, and material toggling unit 3 drives the lower lever 33 of the lower lever 32, second of upper lever 31, first and unloads Material bar 34 is whole to be moved up.
When discharge arm 34 moves up, the workpiece that will have drilled through oil filler point is jacked up, and workpiece is from the inclination discharge side 21 on positioning seat 2 Rolling is drawn off;
Upper lever 31 is detached from the first the Worker's Stadium b to be added in charging preparation station 300 after moving up, the first the Worker's Stadium b to be added is rolled To temporary station 100, the first lower lever 32, which moves up, to be extended back in the top in the second tilt feeding portion 130, and the first lower lever 32 is kept off Live in the first the Worker's Stadium b to be added continues to roll, and finally the first the Worker's Stadium b to be added is positioned in temporary station 100.
Second lower lever 33, which moves up, to be extended back in support groove body 13, before the second lower lever 33 blocks the second the Worker's Stadium c to be added Side, the second lower lever 33 block the second the Worker's Stadium c to be added and prepare movement in station 300 towards charging, and the second lower lever 33 is by second The Worker's Stadium c to be added is positioned at charging and prepares 300 outside (such as Fig. 6) of station.
3) material toggling unit 3 moves down, and makes the lower lever 33 of lever 32, second and discharge arm 34 under lever 31, first whole Body moves down, and the first lower lever 32, which moves down, to be extended back in the lower section in the second tilt feeding portion 130, and the first lower lever 32 is to be processed to first The blocking of body b disappears, and the end cap portions 400 of the first the Worker's Stadium b to be added are tumbled to kerve portion 131 at this time, the axis of the first the Worker's Stadium b to be added Bearing sleeve portion 500 is tumbled to positioning seat 2, and the second lower lever 33, which moves down, to be extended back in the lower section of support groove body 13, the second lower lever 33 It disappears to the blocking of the second the Worker's Stadium c to be added, the second the Worker's Stadium c to be added, which is tumbled to charging, to be prepared in station 300, after upper lever 31 moves down Second the Worker's Stadium c to be added is blocked, and the second the Worker's Stadium c to be added is positioned at charging and is prepared in station 300 (such as Fig. 7), first compresses Plate 41 and the second pressure plate 42 are pressed on the first the Worker's Stadium b to be added, and drill bit 5 carries out bore operation.
It repeats the above process, support base self-feeding, discharging and drilling can be realized.
Taper locating slot 20 is equipped on positioning seat 2, the side on the top surface of positioning seat 2 and positioned at taper locating slot 20 Equipped with inclination discharge side 21.When support base is tumbled to positioning seat 2, the first pressure plate 41 and the second pressure plate 42 are in two cylinders Under the action of, it moves simultaneously, end cap portions 400 are first contradicted and realize axially position on positioning seat 2 by the second pressure plate 42, and then Bearing holder (housing, cover) portion 500 is contradicted and realizes radial positioning on taper locating slot 20 by the first pressure plate 41.
Preferably to press touching in bearing holder (housing, cover) portion 500 convenient for the first pressure plate 41, circular arc is equipped on the first pressure plate 41 Slot, arc groove pressure touching is in bearing holder (housing, cover) portion 500.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art It for member, can also make several improvements without departing from the principle of the present invention, these improvement also should be regarded as of the invention Protection scope.

Claims (10)

1. oil filler point drilling equipment on a kind of long axis class support base, the long axis class support base includes being integrally formed and being coaxially disposed End cap portions (400) and bearing holder (housing, cover) portion (500), it is characterised in that: including chute feeder (1), positioning seat (2), material toggling unit (3), The end of first pressure plate (41), the second pressure plate (42) and drill bit (5), the chute feeder (1) is equipped with temporary station (100), Positioning seat (2) is set to the end of temporary station (100), several described support bases are successively set in chute feeder (1) side by side, material toggling Single support base in chute feeder (1) is sequentially sent on temporary station (100) and positioning seat (2) by unit (3) one by one, the first pressure Tight plate (41) respectively corresponds pressing along the radial direction and axial direction of positioning seat (2) upper support seat with the second pressure plate (42) In on the bearing holder (housing, cover) portion (500) and end cap portions (400), and by support base positioning compression on positioning seat (2), drill bit (5) exists Bearing holder (housing, cover) portion drills through oil filler point on (500).
2. oil filler point drilling equipment on long axis class support base as described in claim 1, it is characterised in that: the material toggling unit It (3) include upper lever (31), first lower lever (32), the second lower lever (33) and discharge arm (34), upper lever (31) is set to and send The top of hopper (1), first lower lever (32), second lower lever (33) and discharge arm (34) are set to the lower section of chute feeder (1), Charging is formed between upper lever (31) and second lower lever (33) and prepares station (300), several described support bases are successively simultaneously Column are set in chute feeder (1), and two support bases of chute feeder (1) least significant end sequentially form the first the Worker's Stadium (b) to be added and second The Worker's Stadium (c) to be added, first the Worker's Stadium (b) to be added are placed in the charging and prepare in station (300), and fixed by upper lever (31) Prepare in station (300) positioned at charging;
Material toggling unit (3) moves up, and makes lever (31), first lower lever (32), the second lower lever (33) and discharge arm (34) it moves up simultaneously, discharge arm (34) ejects the support base that oil filler point has been drilled through on positioning seat (2), and upper lever (31) is detached from institute The first the Worker's Stadium (b) to be added in charging preparation station (300) is stated, and the first the Worker's Stadium (b) to be added is made to enter temporary station (100) Interior, the first the Worker's Stadium (b) to be added is positioned in temporary station (100) by first lower lever (32), and second lower lever (33) stretch in the Second the Worker's Stadium (c) to be added is simultaneously positioned on the outside of charging preparation station (300) by two the Worker's Stadium (c) sides to be added;
Material toggling unit (3) moves down, and makes lever (31), first lower lever (32), the second lower lever (33) and discharge arm (34) it moves down simultaneously, first lower lever (32) are detached from the first the Worker's Stadium (b) to be added and the first the Worker's Stadium (b) to be added is made to enter positioning seat (2) on, second lower lever (33), which are detached from the second the Worker's Stadium (c) to be added and the second the Worker's Stadium (c) to be added is made to enter charging, prepares station (300) in.
3. oil filler point drilling equipment on long axis class support base as claimed in claim 2, it is characterised in that: the discharge arm (34) Height lower than first lower lever (32) height.
4. oil filler point drilling equipment on long axis class support base as claimed in claim 2, it is characterised in that: the material toggling unit It (3) include cylinder (35) and mounting rack (36), cylinder (35) driving mounting rack (36) moves up and down, and upper lever (31) is fixed In the upper end of mounting rack (36), first lower lever (32), second lower lever (33) and discharge arm (34) are both secured to mounting rack (36) lower end.
5. oil filler point drilling equipment on long axis class support base as described in claim 1, it is characterised in that: the chute feeder (1) Including supporting table (11), postive stop baffle (12) and support groove body (13), the postive stop baffle (12) is set to the upper of supporting table (11) Side, and bearing holder (housing, cover) limiting slot (14) are formed between postive stop baffle (12) and supporting table (11), branch is fixed in support groove body (13) On the side wall for supportting platform (11), support groove body (13) is parallel to each other with bearing holder (housing, cover) limiting slot (14), and the end cap portions (400) of support base are set In in support groove body (13), bearing holder (housing, cover) portion (500) are placed in bearing holder (housing, cover) limiting slot (14).
6. oil filler point drilling equipment on long axis class support base as claimed in claim 5, it is characterised in that: the supporting table (11) End be equipped with the first tilt feeding portion (110), support groove body (13) end be equipped with the second tilt feeding portion (130), first Tilt feeding portion (110) is parallel to each other with the second tilt feeding portion (130) and isometric, the first tilt feeding portion (110) and second Tilt feeding portion (130) collectively constitutes temporary station (100);Positioning seat (2) is set to the end in the first tilt feeding portion (110).
7. oil filler point drilling equipment on long axis class support base as claimed in claim 6, it is characterised in that: the postive stop baffle (12) end is equipped with extension (121), and extension (121) is placed in the top in the first tilt feeding portion (110).
8. oil filler point drilling equipment on long axis class support base as claimed in claim 5, it is characterised in that: second inclination is sent The end in material portion (130) is equipped with kerve portion (131), and kerve portion (131) are placed in the front side of positioning seat (2).
9. oil filler point drilling equipment on long axis class support base as described in claim 1, it is characterised in that: the positioning seat (2) It is equipped with taper locating slot (20), on the top surface of positioning seat (2) and is equipped with inclination positioned at the side of taper locating slot (20) and unloads Charge level (21).
10. oil filler point drilling equipment on long axis class support base as described in claim 1, it is characterised in that: described first compresses Plate (41) is equipped with arc groove, and arc groove pressure touching is on the bearing holder (housing, cover) portion (500).
CN201910193965.XA 2019-03-14 2019-03-14 Oil filler point drilling equipment on major axis class supporting seat Active CN109877360B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910193965.XA CN109877360B (en) 2019-03-14 2019-03-14 Oil filler point drilling equipment on major axis class supporting seat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910193965.XA CN109877360B (en) 2019-03-14 2019-03-14 Oil filler point drilling equipment on major axis class supporting seat

Publications (2)

Publication Number Publication Date
CN109877360A true CN109877360A (en) 2019-06-14
CN109877360B CN109877360B (en) 2020-09-22

Family

ID=66932289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910193965.XA Active CN109877360B (en) 2019-03-14 2019-03-14 Oil filler point drilling equipment on major axis class supporting seat

Country Status (1)

Country Link
CN (1) CN109877360B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110480060A (en) * 2019-08-30 2019-11-22 玉环市大众铜业制造有限公司 A kind of ball valve core process equipment
CN111618330A (en) * 2020-05-20 2020-09-04 江苏蓝奥华尚智能科技有限公司 Multi-station automatic drilling machine for batch processing of small workpieces
CN113752069A (en) * 2021-09-06 2021-12-07 山东铭扬输送设备有限公司 Automatic circulation-based flat milling machine for carrier roller shaft

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6076940A (en) * 1983-09-30 1985-05-01 Toshiba Corp Automatic work supply device
CN104275509A (en) * 2014-10-08 2015-01-14 泛科轴承集团有限公司 Automatic multihole processing machine for outer bearing rings
CN204195376U (en) * 2014-10-08 2015-03-11 泛科轴承集团有限公司 The feed arrangement of bearing ring processing machine
CN106743693A (en) * 2016-12-29 2017-05-31 浙江工业大学 High-order hacking machine
CN106944861A (en) * 2017-04-19 2017-07-14 中信戴卡股份有限公司 A kind of device and method for large-scale bar interval feeding
CN107552833A (en) * 2017-10-19 2018-01-09 常州市武进亚太机电配件有限公司 Magnetic pole perforating device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6076940A (en) * 1983-09-30 1985-05-01 Toshiba Corp Automatic work supply device
CN104275509A (en) * 2014-10-08 2015-01-14 泛科轴承集团有限公司 Automatic multihole processing machine for outer bearing rings
CN204195376U (en) * 2014-10-08 2015-03-11 泛科轴承集团有限公司 The feed arrangement of bearing ring processing machine
CN106743693A (en) * 2016-12-29 2017-05-31 浙江工业大学 High-order hacking machine
CN106944861A (en) * 2017-04-19 2017-07-14 中信戴卡股份有限公司 A kind of device and method for large-scale bar interval feeding
CN107552833A (en) * 2017-10-19 2018-01-09 常州市武进亚太机电配件有限公司 Magnetic pole perforating device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110480060A (en) * 2019-08-30 2019-11-22 玉环市大众铜业制造有限公司 A kind of ball valve core process equipment
CN111618330A (en) * 2020-05-20 2020-09-04 江苏蓝奥华尚智能科技有限公司 Multi-station automatic drilling machine for batch processing of small workpieces
CN113752069A (en) * 2021-09-06 2021-12-07 山东铭扬输送设备有限公司 Automatic circulation-based flat milling machine for carrier roller shaft
CN113752069B (en) * 2021-09-06 2023-10-20 山东铭扬输送设备有限公司 Automatic circulation-based carrier roller shaft flat milling machine

Also Published As

Publication number Publication date
CN109877360B (en) 2020-09-22

Similar Documents

Publication Publication Date Title
CN109877360A (en) Oil filler point drilling equipment on a kind of long axis class support base
CN101318291A (en) Automatic processing product line for source nipple of gas cylinder
CN114161156A (en) Drilling and tapping integrated laser pipe cutting machine capable of automatically feeding
CN105619079B (en) A kind of automatic assembly line of processing disc-shaped workpiece
CN109732389A (en) Bar depth drill automatic charging & discharging machine
CN103480886A (en) Fully-automatic numerical control two-station marble hole drilling machine for lock case
CN108838423A (en) A kind of multistation aluminum profile drilling machine
CN105328457B (en) A kind of bearing inner race automatic drilling tooth machining unit
CN109027018A (en) A kind of automatic assembling device of bearing
CN113263200B (en) Workpiece drilling processing equipment
CN104175129A (en) Automatic production line for cylinder body bottom ring of flame arrester
CN108971550A (en) A kind of column cap drilling equipment
CN205551521U (en) Bearing ring automatic drilling machine
CN110625157A (en) High-precision cylinder head camshaft hole rotating machine
CN215941593U (en) Conveying and positioning structure for bearing seat drilling
CN206010402U (en) Shift lever bearing process equipment
CN108608322A (en) A kind of plunger sleeve fixture mechanism material device of plunger bushing end face Plane surface grinding machine
CN111230563B (en) Drilling device
CN211804723U (en) Press-fitting and oil-injecting integrated conveying system of universal joint
CN109928177A (en) A kind of feeding unit for axle bed
CN207103911U (en) A kind of drilling machine for facilitating product circumferentially positioned
CN209754509U (en) Drilling and twisting all-in-one machine for upper part and lower part of inertia block
CN219541587U (en) Feeding and discharging device of thread rolling machine
CN219582302U (en) Horizontal two-way drilling chamfer tapping machine
CN111113173B (en) Automatic fine grinding equipment for inner hole of graphite tube

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200820

Address after: China Industrial Park Qingfeng town 224700 Jiangsu province Yancheng City Jianhu County crown

Applicant after: JIANHU YONGJIA MACHINERY Co.,Ltd.

Address before: 224700 No. 31 Xuxi Road, Jinhu Town, Jianhu County, Yancheng City, Jiangsu Province

Applicant before: Zhang Yuyan

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A drilling device for oil injection holes on long axis support seats

Effective date of registration: 20230327

Granted publication date: 20200922

Pledgee: Bank of China Limited Jianhu Branch

Pledgor: JIANHU YONGJIA MACHINERY Co.,Ltd.

Registration number: Y2023980036327