CN109874905A - Cooling temperature back system for chewing gum production line - Google Patents

Cooling temperature back system for chewing gum production line Download PDF

Info

Publication number
CN109874905A
CN109874905A CN201910184241.9A CN201910184241A CN109874905A CN 109874905 A CN109874905 A CN 109874905A CN 201910184241 A CN201910184241 A CN 201910184241A CN 109874905 A CN109874905 A CN 109874905A
Authority
CN
China
Prior art keywords
water
pipe
cooling
water tank
chewing gum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910184241.9A
Other languages
Chinese (zh)
Inventor
韩聃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Sanxi Rubber-Based Manufacturing Co Ltd
Original Assignee
Wuxi Sanxi Rubber-Based Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Sanxi Rubber-Based Manufacturing Co Ltd filed Critical Wuxi Sanxi Rubber-Based Manufacturing Co Ltd
Priority to CN201910184241.9A priority Critical patent/CN109874905A/en
Publication of CN109874905A publication Critical patent/CN109874905A/en
Pending legal-status Critical Current

Links

Landscapes

  • Confectionery (AREA)

Abstract

The present invention relates to the technical fields of chewing gum production equipment, disclose a kind of cooling temperature back system for chewing gum production line, its key points of the technical solution are that including the temperature control cylinder being laterally erected on ground, temperature control cylinder includes inner barrel and outer barrel, screw conveyor shaft is rotatably connected in the inner cylinder, the lateral wall of inner cylinder, which is wrapped up in, is wound with heating tube, the electric heating cable with extraneous power electric connection is equipped in heating tube, absorbing pipe is equipped with close to heating tube, one end of outer cylinder is communicated with water inlet pipe, the other end is communicated with outlet pipe, absorbing pipe is connected to water inlet pipe and outlet pipe, it is placed with suction pump on ground and is stored with the water tank of cooling water, the bottom of the water tank is communicated with water-supply-pipe, water-supply-pipe is connected to the water inlet of suction pump, the water outlet of suction pump is connected with water inlet pipe, it is connected at the top of outlet pipe and water tank.The present invention has the control for cooling down and heating up to gum base materials, thus the advantages of improving gum base materials output quality.

Description

Cooling temperature back system for chewing gum production line
Technical field
The present invention relates to the technical field of chewing gum production equipment, in particular to a kind of cooling for chewing gum production line Temperature back system.
Background technique
The production of chewing gum is since the high temperature melting of gum base materials, by the melten gel after filter device by special first Pipeline input blender in.There is strong rollover stand in blender, meanwhile, after gum base materials are injected, it is incorporated auxiliary material, root According to the listed tight timing requirements of formula, blender slowly stirs evenly raw material and auxiliary material, forms carbohydrate gum.
After carbohydrate gum comes out from blender, by temperature control system, so that chewing gum keeps optimal feeling of freshness and mouthfeel.Temperature control The carbohydrate gum of completion forms round bar shape by extruder, and forms chewing-gum particle by the cutting of cutter, at this time chewing-gum particle The package to it is completed by the package and vibrosieve of sugar-coat.
Locate automatically currently, the Chinese patent of Publication No. CN106852393A discloses one kind for chewing gum colloid sill Reason and cooling system, including a continuous extruder, a pair of of spiral cooling tower, a feed device, conveying device and robot dress It sets, conveying device is for conveying in the container to the spiral cooling tower for filling liquid gum base materials, a pair of of spiral Cooling tower includes the first cooling tower and the second cooling tower, and the first cooling tower has the first conveying device, in a upward spiral path Transport box, the second cooling tower have the second conveying device, and in a downward spiral path transport box, robot device is used for The container of filled gum material is conveyed from the second cooling tower to subsequent interim dispatch station.
In order to enable chewing gum colloid sill has good mouthfeel and feeling of freshness, the temperature control to chewing gum base material It makes and needs regulation meticulously, but this automatically process for chewing gum colloid sill contains only a pair of of spiral cooling with cooling system Tower can not can only make unilaterally to reduce temperature to the adjusting that chewing gum base material heats up, when cooling temperature is lower than glue When the minimum temperature boundary that sill can bear, which can not be made up, finally be produced to affect gum base materials Quality when out.
Summary of the invention
The object of the present invention is to provide a kind of cooling temperature back system for chewing gum production line, have to gum base materials into The control of row cooling and heating, thus the advantages of improving gum base materials output quality.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of cooling temperature back system for chewing gum production line, including the temperature control cylinder being laterally erected on ground, the temperature control Cylinder includes inner barrel and outer barrel, is rotatably connected to screw conveyor shaft in the inner cylinder of the outer cylinder, the lateral wall of the inner cylinder is wrapped up in It is wound with heating tube, the heating tube is spirally wrapped around on inner cylinder along the length direction of inner cylinder, is worn in the heating tube There is the electric heating cable with extraneous power electric connection, is equipped with absorbing pipe close to heating tube, the absorbing pipe is spirally wrapped around On the lateral wall of inner cylinder, one end of the outer cylinder is communicated with water inlet pipe, and the other end is communicated with outlet pipe, and the absorbing pipe is connected to Water inlet pipe and outlet pipe are placed with suction pump on ground and are stored with the water tank of cooling water, the bottom connection of the water tank There is water-supply-pipe, the water-supply-pipe is connected to the water inlet of suction pump, and the water outlet of the suction pump is connected with water inlet pipe, described It is connected at the top of outlet pipe and water tank.
By using above-mentioned technical proposal, in actual use, the screw conveyor shaft in inner cylinder is used for transporting molten Electric heating cable is powered by the gum base materials under state during conveying gum base materials, the heat transfer that electric heating cable generates To inner cylinder, the heating to gum base materials is realized with this.At the same time, the water flow in water tank is extracted using suction pump, water flow is logical It crosses water inlet pipe to enter in absorbing pipe, during water flow migration, the heat of gum base materials is absorbed, is realized with this to glue The cooling of sill.In the course of work, when the cooling extent of gum base materials is excessive, the heating power of electric heating cable is increased, with This achievees the effect that heating;When the increasing extent of temperature of gum base materials is excessive, adds the speed of block heat absorption in-pipe flow, reach cold with this But effect.Absorbing pipe and heating tube synchronous working, the control that can gum base materials are cooled down and heated up simultaneously, to mention The high output quality of gum base materials.
Further, the top of the water tank is equipped with cooling fan, is equipped in the water tank and holds made of aluminium Water plate, the floatboard is used to accept the water flow from absorbing pipe and is located at the top of cooling water, by upper in water tank It is successively arranged several under and, is provided with scupper on the floatboard.
By using above-mentioned technical proposal, the air-flow that cooling fan generates is blown towards floatboard to be penetrated, since floatboard is aluminium Plate, has a good thermal conductivity, therefore floatboard is under the blowing and penetrate of cooling fan, in cooling state.At this point, by heat absorption The water flow of pipe be again introduced into water tank and under fall on floatboard, carry out heat exchange between the heat and floatboard in water flow, The cooling to water flow is realized with this, so that water flow becomes cooling water again, carries out next time cooling use.
Further, the scupper on two neighboring floatboard is staggered.
By using above-mentioned technical proposal, the scupper on adjacent floatboard is staggered, in the case where water flow is by floatboard During falling, water flow can not straight line decline, extend the whereabouts route of water flow with this, reached and extended water flow fall time Effect, so as to improve the cooling effect to water flow.
Further, agitating shaft is transversely provided in the water tank, the agitating shaft is rotationally connected with the side wall of water tank, Stirring blade is fixedly connected on the agitating shaft, the agitating shaft and stirring blade are located in cooling water, outside the water tank Equipped with for driving the stirring motor of agitating shaft.
By using above-mentioned technical proposal, the driving force that stirring motor generates is applied on agitating shaft, to drive stirring Blade rotates in cooling water.Cooling water is rolled by generation after the agitation of stirring blade, cooling water and storage under tumbling state Air in water pot is contacted, and with this heat in cooling water is further dissipated, while stirring blade can be right Impurity in cooling water is crushed, and generates a possibility that blocking water inlet pipe since impurity partial size is larger to reduce.
Further, being scattered in the cooling water of the bottom of the water tank has several heat dissipation particles, the heat dissipation particle by Aluminium is made.
By using above-mentioned technical proposal, the particle that radiates is blended in cooling water by stirring evenly for stirring blade, is mixed Cooling water being drawn into absorbing pipe by suction pump for having heat dissipation particle is closed, heat dissipation particle is made of aluminum, can assist in cold But water absorbs the heat from gum base materials jointly, further improves the heat absorption efficiency of absorbing pipe with this.
Further, the inner sidewall of the outer cylinder is fitted with reflecting drum, and the inner sidewall of the reflecting drum is fitted with reflectance coating, The reflectance coating fits in heating tube and absorbing pipe.
By using above-mentioned technical proposal, the setting of reflectance coating can reflect the heat from heating tube, make Obtaining heat can radiate towards inner cylinder more fully hereinafter, so as to improve the heat utilization ratio of electric heating cable, reduce power consumption.
Further, the reflecting drum is made of ceramic materials.
By using above-mentioned technical proposal, ceramics have good thermal insulation property, the heat that can generate electric heating cable More efficiently pass to inner cylinder.
Further, heat insulating strip is filled between adjacent heating tube and absorbing pipe, the heat insulating strip is made of asbestos.
By using above-mentioned technical proposal, heat insulating strip reduces the amount in the heat transfer to absorbing pipe in heating tube, from And it ensure that the cooling effect of absorbing pipe.
Further, support chip is fixedly connected on the lateral wall of the inner cylinder, the support chip is in spiral shell along heating tube Shape setting is revolved, the support chip is shored between inner cylinder and reflecting drum.
By using above-mentioned technical proposal, support chip plays the role of protecting heating tube and absorbing pipe, inner cylinder and reflecting drum Between spacing limited by support chip, inner cylinder is reduced with this and reflecting drum is expressed to heating tube and absorbing pipe so that A possibility that heating tube and absorbing pipe are deformed.
In conclusion the invention has the following advantages:
1. absorbing pipe and heating tube synchronous working, the control that can be cooled down and be heated up to gum base materials simultaneously, to improve The output qualities of gum base materials;
2. the cooling fan being arranged on water tank can cool down water flow, so that cooling water can recycle, subtract The waste of water resource is lacked;
3. the heat dissipation particle being arranged in cooling water can assist in the heat that cooling water absorbs gum base materials, so as to improve to matrix Material carries out cooling efficiency.
Detailed description of the invention
Fig. 1 is for embodying structural schematic diagram of the invention;
Fig. 2 is the cross-sectional view for embodying temperature control cylinder internal structure;
Fig. 3 is the structural schematic diagram for embodying heating tube and absorbing pipe;
Fig. 4 is the cross-sectional view for embodying water tank internal structure.
In figure, 1, temperature control cylinder;11, inner cylinder;12, outer cylinder;13, screw conveyor shaft;131, driving motor;14, feed pipe; 15, discharge nozzle;16, water inlet pipe;17, outlet pipe;171, flow control valve;18, temperature measuring set;2, support frame;3, heating tube; 31, electric heating cable;311, temperature controller;4, absorbing pipe;5, suction pump;6, water tank;61, water-supply-pipe;62, cooling fan; 63, floatboard;631, scupper;64, retainer ring;65, agitating shaft;651, stirring blade;66, stirring motor;7, reflecting drum; 71, reflectance coating;8, support chip;9, heat insulating strip.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment: a kind of cooling temperature back system for chewing gum production line referring to Fig.1, including is laterally erected at ground On temperature control cylinder 1, the lower section of temperature control cylinder 1 is fixedly connected with support support frame 2 on the ground.
Referring to Fig. 2, temperature control cylinder 1 includes inner cylinder 11 and outer cylinder 12, is rotatably connected to helical feed in the inner cylinder 11 of outer cylinder 12 Axis 13.The driving motor 131(for driving screw conveyor shaft 13 to rotate is equipped with referring to Fig.1 in one end of temperature control cylinder 1), temperature control cylinder The feed pipe 14(communicated with inner cylinder 11 is communicated with above 1 one end referring to Fig.1), it is communicated with and 11 phase of inner cylinder below the other end Logical discharge nozzle 15.
Referring to Fig.1, in process of production, the gum base materials under fluid state enter inner cylinder 11(reference by feed pipe 14 In Fig. 2), the screw conveyor shaft 13 rotated in inner cylinder 11 realizes the fortune to gum base materials by the spiral conveying blade on its axle body Defeated, gum base materials are flowed out out of temperature control cylinder 1 by discharge nozzle 15.
Referring to Fig. 3, the lateral wall of inner cylinder 11, which is wrapped up in, is wound with heating tube 3, heating tube 3 along inner cylinder 11 length direction helically Shape is wrapped on inner cylinder 11, is equipped in heating tube 3 with the electric heating cable 31(of extraneous power electric connection referring to Fig.1).Close to Heating tube 3 is equipped with absorbing pipe 4, and absorbing pipe 4 is spirally wrapped around on the lateral wall of inner cylinder 11.Outer cylinder 12(referring to Fig. 2) one End is communicated with water inlet pipe 16(referring to Fig.1), the other end is communicated with outlet pipe 17(referring to Fig. 2), and absorbing pipe 4 is connected to water inlet pipe 16 With outlet pipe 17.
Referring to Fig.1, it is placed with suction pump 5 on the ground and is stored with the water tank 6 of cooling water.The bottom of water tank 6 connects It is connected with water-supply-pipe 61, water-supply-pipe 61 is connected to the water inlet of suction pump 5, and the water outlet of suction pump 5 is connected with water inlet pipe 16, out Water pipe 17 is connected with the top of water tank 6.
Referring to Fig.1, it is installed on temperature control cylinder 1 for measuring inner cylinder 11(referring to the temperature measuring set 18 of Fig. 2) temperature.? Screw conveyor shaft 13(is referring to Fig. 2) when being conveyed to gum base materials, the temperature of 18 real-time measurement inner cylinder 11 of temperature measuring set is It is no to meet the requirement temperature of gum base materials during transportation.When installing outlet pipe 17(referring to Fig. 2) and electric heating cable 31, in advance Flow control valve 171(is first installed on outlet pipe 17 referring to Fig. 2), is electrically connected with temperature controller on electric heating cable 31 311.During conveying gum base materials, the temperature of electric heating cable 31 is adjusted in temperature controller 311, flow control valve The flow that 171 pairs of outlet pipes 17 convey cooling water is adjusted, and cooling water is used to absorb the heat of gum base materials, electric heating cable 31 For towards gum base materials heat supply, heat supply to carry out simultaneously with heat absorption, with this temperature in inner cylinder 11 is able to maintain constant In the state of.Staff observes the temperature of inner cylinder 11 by the display of temperature measuring set 18, and by electric heating cable 31 The water supply of calorific value and absorbing pipe 4 is controlled, and makes the temperature of inner cylinder 11 suitable for the temperature of regulation gum base materials with this Degree, so that gum base materials have good mouthfeel and feeling of freshness in last molding.
Referring to Fig. 4, it is equipped with cooling fan 62 at the top of water tank 6, the wind direction of cooling fan 62 is blown downwards.In water storage Floatboard 63 made of aluminium are equipped in tank 6, floatboard 63 is used to accept from absorbing pipe 4(reference Fig. 3) water flow and Positioned at the top of cooling water, from top to bottom it is successively arranged in water tank 6 several.It is welded on the inner sidewall of water tank 6 Retainer ring 64, the sectional view on 64 vertical direction of retainer ring is L-shaped, and floatboard 63 is placed on retainer ring 64, the two it Between be fastenedly connected by bolt assembly.Scupper 631 is provided on floatboard 63, it is overboard on two neighboring floatboard 63 Hole 631 is staggered.
Referring to Fig. 4, the air-flow of cooling fan 62 is blown towards floatboard 63 to be penetrated, since floatboard 63 is made of aluminium, When being cooled the cold wind of fan 62, itself can relatively rapid cool down.From absorbing pipe 4(referring to the water of Fig. 3) Stream contains more heat due to absorbing the heat from gum base materials.When the water flow is flow to again in water tank 6 When, the water flow of whereabouts passes through floatboard 63, and the air-flow that floatboard 63 is cooled fan 62 at this time is under the state of cooling, works as water It flows down when dropping down on floatboard 63, the heat contained is absorbed by floatboard 63, realizes the cooling to water flow with this.It is two neighboring Scupper 631 between floatboard 63 is staggered so that water flow during the falling process can not straight line decline, extend water flow Fall time so that water flow have the longer time contacted with floatboard 63, further improve the cooling to water flow Effect.
Referring to Fig. 2, the inner sidewall of outer cylinder 12 is fitted with reflecting drum 7, and reflecting drum 7 is made of ceramic materials.In reflecting drum 7 Inner sidewall is fitted with reflectance coating 71, and reflectance coating 71 fits in heating tube 3(referring to Fig. 3) and absorbing pipe 4(referring to Fig. 3).Inner cylinder 11 Lateral wall on be fixedly connected with support chip 8(referring to Fig. 3), support chip 8 is arranged in the shape of a spiral along heating tube 3, and support chip 8 pushes up Between inner cylinder 11 and reflecting drum 7, width is slightly larger than the diameter of heating tube 3 and absorbing pipe 4 for support.
Referring to Fig. 2, the reflectance coating 71 being arranged in reflecting drum 7 can be to heating tube 3(referring to Fig. 3) heat reflect, Reduce heating tube 3 heat pass through outer cylinder 12 amount, to improve electric heating cable 31(referring to Fig.1) heat utilization ratio. Support chip 8(between outer cylinder 12 and inner cylinder 11 is set referring to Fig. 3) play supporting role, enable inner cylinder 11 steadily In outer cylinder 12, while the width of support chip 8 is slightly larger than heating tube 3 and absorbing pipe 4(referring to the diameter of Fig. 3), plays guarantor The effect for protecting heating tube 3 and absorbing pipe 4, reduce that heating tube 3 and absorbing pipe 4 be crushed between inner cylinder 11 and outer cylinder 12 can It can property.
Referring to Fig. 3, heat insulating strip 9 is filled between adjacent heating tube 3 and absorbing pipe 4, heat insulating strip 9 is made of asbestos.Asbestos With heat insulation, electric heating cable 31(is reduced referring to Fig.1) heat of absorbing pipe 4 is passed to, suction is further improved with this The heat absorption efficiency of heat pipe 4.
Referring to Fig. 4, agitating shaft 65 is transversely provided in water tank 6, agitating shaft 65 is rotationally connected with the side wall of water tank 6. Stirring blade 651 is fixedly connected on agitating shaft 65, agitating shaft 65 and stirring blade 651 are located in cooling water, 6 peripheral hardware of water tank There is the stirring motor 66 for driving agitating shaft 65.Stirring blade 651 can be stirred the cooling water in water tank 6, from And the heat in cooling water is further dissipated.Stirring blade 651 can carry out brokenly impurity in cooling water simultaneously It is broken, to reduce a possibility that generating blocking pipeline since impurity partial size is larger.
Referring to Fig. 4, being scattered in the cooling water of the bottom of water tank 6 has several heat dissipation particles (not marking in figure), radiates micro- Grain is made of aluminium.Suction pump 5(is referring to Fig.1) during extracting cooling water, heat dissipation particle follows water flow to enter absorbing pipe 4 In (referring to Fig. 3), heat dissipation particle is made of aluminium, and aluminium has good heat dissipation and the capacity of heat transmission, therefore flows in absorbing pipe 4 In dynamic process, heat dissipation particle can help water flow to absorb the heat of gum base materials, further improve the suction of absorbing pipe 4 with this The thermal efficiency.
Specific implementation process: before the conveying for carrying out gum base materials, staff measures inner cylinder using temperature measuring set 18 11 temperature is at this time adjusted the flow of water inlet pipe 16 and the heat of electric heating cable 31 according to the size of temperature, until interior The temperature of cylinder 11 reaches the temperature value suitable for gum base materials, stops the tune to temperature controller 311 and flow control valve at this time Section.
When carrying out heat supply to inner cylinder 11, electric heating cable 31 and extraneous power supply are connected, the heat that electric heating cable 31 dissipates at this time Amount dissipates between inner cylinder 11 and outer cylinder 12, and due to the setting of reflecting drum 7 and reflectance coating 71, the heat that electric heating cable 31 generates is big Part is dissipated into inner cylinder 11, realizes the heat supply to inner cylinder 11 with this.
When cooling down to inner cylinder 11, the water that suction pump 5 extracts in water tank 6 is flow in absorbing pipe 4, gum base materials Heat is absorbed by the heat dissipation particle in water flow and water flow, to realize the cooling to gum base materials, has absorbed heat Water flow is back in water tank 6.
During water flow falls in water tank 6, prime minister passes through floatboard 63.Gas of the floatboard 63 in cooling fan 62 Stream is being in low-temperature condition, and when the water flow containing heat drops down on floatboard 63, heat can directly be passed with floatboard 63 It passs, the heat in water flow is absorbed by floatboard 63, realizes the cooling to water flow with this, water flow is cooled down rapidly, is carried out Gum base materials are cooled down next time to use.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (9)

1. a kind of cooling temperature back system for chewing gum production line, it is characterised in that: including the temperature being laterally erected on ground It controls cylinder (1), the temperature control cylinder (1) includes inner cylinder (11) and outer cylinder (12), rotation in the inner cylinder (11) of the outer cylinder (12) It is connected with screw conveyor shaft (13), the lateral wall of the inner cylinder (11), which is wrapped up in, to be wound with heating tube (3), and the heating tube (3) is along interior The length direction of cylinder (11) is spirally wrapped around on inner cylinder (11), is equipped in the heating tube (3) and is electrically connected with extraneous power supply The electric heating cable (31) connect is equipped with absorbing pipe (4) close to heating tube (3), and the absorbing pipe (4) is spirally wrapped around inner cylinder (11) on lateral wall, one end of the outer cylinder (12) is communicated with water inlet pipe (16), and the other end is communicated with outlet pipe (17), described Absorbing pipe (4) is connected to water inlet pipe (16) and outlet pipe (17), and suction pump (5) is placed on ground and is stored with the storage of cooling water The bottom of water pot (6), the water tank (6) is communicated with water-supply-pipe (61), the water-supply-pipe (61) be connected to suction pump (5) into The water outlet at the mouth of a river, the suction pump (5) is connected with water inlet pipe (16), the top of the outlet pipe (17) and water tank (6) It is connected.
2. the cooling temperature back system according to claim 1 for chewing gum production line, it is characterised in that: the water tank (6) top is equipped with cooling fan (62), is equipped with the floatboard made of aluminium (63) in the water tank (6), described to hold water Plate (63) is used to accept the water flow from absorbing pipe (4) and is located at the top of cooling water, in water tank (6) from top to bottom It is successively arranged several, is provided with scupper (631) on the floatboard (63).
3. the cooling temperature back system according to claim 2 for chewing gum production line, it is characterised in that: two neighboring to hold Scupper (631) on water plate (63) is staggered.
4. the cooling temperature back system according to claim 1 for chewing gum production line, it is characterised in that: the water tank (6) it is transversely provided with agitating shaft (65) in, the agitating shaft (65) is rotationally connected with the side wall of water tank (6), the agitating shaft (65) it is fixedly connected on stirring blade (651), the agitating shaft (65) and stirring blade (651) are located in cooling water, described Water tank (6) is externally provided with the stirring motor (66) for driving agitating shaft (65).
5. the cooling temperature back system according to claim 4 for chewing gum production line, it is characterised in that: the water tank (6) being scattered in the cooling water of bottom has several heat dissipation particles, and the heat dissipation particle is made of aluminium.
6. the cooling temperature back system according to claim 1 for chewing gum production line, it is characterised in that: the outer cylinder (12) inner sidewall is fitted with reflecting drum (7), and the inner sidewall of the reflecting drum (7) is fitted with reflectance coating (71), the reflectance coating (71) heating tube (3) and absorbing pipe (4) are fitted in.
7. the cooling temperature back system according to claim 6 for chewing gum production line, it is characterised in that: the reflecting drum (7) it is made of ceramic materials.
8. the cooling temperature back system according to claim 1 for chewing gum production line, it is characterised in that: adjacent heating tube (3) heat insulating strip (9) are filled between absorbing pipe (4), the heat insulating strip (9) is made of asbestos.
9. the cooling temperature back system according to claim 6 for chewing gum production line, it is characterised in that: the inner cylinder (11) it is fixedly connected on lateral wall support chip (8), the support chip (8) is arranged in the shape of a spiral along heating tube (3), described Support chip (8) is shored between inner cylinder (11) and reflecting drum (7).
CN201910184241.9A 2019-03-12 2019-03-12 Cooling temperature back system for chewing gum production line Pending CN109874905A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910184241.9A CN109874905A (en) 2019-03-12 2019-03-12 Cooling temperature back system for chewing gum production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910184241.9A CN109874905A (en) 2019-03-12 2019-03-12 Cooling temperature back system for chewing gum production line

Publications (1)

Publication Number Publication Date
CN109874905A true CN109874905A (en) 2019-06-14

Family

ID=66931707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910184241.9A Pending CN109874905A (en) 2019-03-12 2019-03-12 Cooling temperature back system for chewing gum production line

Country Status (1)

Country Link
CN (1) CN109874905A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110261567A (en) * 2019-06-27 2019-09-20 安徽科技学院 A kind of delivery pipe being used for transmission liquid metal medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5756133A (en) * 1996-10-03 1998-05-26 Warner-Lambert Company Continuous gum base processing with cooling towers
CN101059273A (en) * 2007-05-22 2007-10-24 唐春芳 High temperature reflecting water-heating cartridge
CN202962320U (en) * 2012-10-30 2013-06-05 安徽祈艾特电子科技有限公司 Temperature-sensing type liquid product temperature control stirring device
CN203713019U (en) * 2014-03-19 2014-07-16 富强鑫(宁波)机器制造有限公司 Temperature control device of injection molding machine
CN207866023U (en) * 2018-02-06 2018-09-14 孝感广盐华源制盐有限公司 A kind of continuous recover of high-efficiency steam thermal energy
CN208098010U (en) * 2017-12-29 2018-11-16 武汉市黄鹤塑料有限公司 Agitating device with function of temperature control
CN109059415A (en) * 2018-05-07 2018-12-21 安徽金龙山葛业有限公司 A kind of cooling device of kudzuvine root juice

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5756133A (en) * 1996-10-03 1998-05-26 Warner-Lambert Company Continuous gum base processing with cooling towers
CN101059273A (en) * 2007-05-22 2007-10-24 唐春芳 High temperature reflecting water-heating cartridge
CN202962320U (en) * 2012-10-30 2013-06-05 安徽祈艾特电子科技有限公司 Temperature-sensing type liquid product temperature control stirring device
CN203713019U (en) * 2014-03-19 2014-07-16 富强鑫(宁波)机器制造有限公司 Temperature control device of injection molding machine
CN208098010U (en) * 2017-12-29 2018-11-16 武汉市黄鹤塑料有限公司 Agitating device with function of temperature control
CN207866023U (en) * 2018-02-06 2018-09-14 孝感广盐华源制盐有限公司 A kind of continuous recover of high-efficiency steam thermal energy
CN109059415A (en) * 2018-05-07 2018-12-21 安徽金龙山葛业有限公司 A kind of cooling device of kudzuvine root juice

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110261567A (en) * 2019-06-27 2019-09-20 安徽科技学院 A kind of delivery pipe being used for transmission liquid metal medium
CN110261567B (en) * 2019-06-27 2021-10-12 安徽科技学院 Conveying pipe for conveying liquid metal medium

Similar Documents

Publication Publication Date Title
CN109838971A (en) A kind of low-temperature storing apparatus of PVC material
CN109874905A (en) Cooling temperature back system for chewing gum production line
CN108827030B (en) Dairy product cooling device based on water cooling mode
CN213382359U (en) Stirring equipment with cooling structure for plastic production
CN206746026U (en) Twin flue crystallization kettle is used in epoxy resin synthesis
CN210400020U (en) Efficient cement cooler
CN111595127A (en) Drying device for compound fertilizer processing
CN215491178U (en) Cement cooling device
CN214419291U (en) A material conveyor after raw materials is broken for PVB production
CN206953327U (en) A kind of batch mixing unit for being used to process tubing raw material
CN211612544U (en) Zirconia powder ball-milling agitating unit
CN108189364A (en) Plastic extruder
CN205079656U (en) Drum -type sand cooling apparatus
CN220541415U (en) Quick cooling packaging system of chilli powder
CN211026029U (en) Glue production system
CN210054580U (en) Feed quality guaranteeing device
CN107310802A (en) A kind of auger type powdery paints cooling device
CN209348517U (en) A kind of grape pip extracting solution cooling tank
CN206264190U (en) Starch plasticses batch mixing pellet device
CN207838972U (en) A kind of cooling back installation of pesticide producing line
CN206996562U (en) A kind of stirred tank
CN215140828U (en) Automatic feeding device for ball mill
CN209406224U (en) High pressure homogenizer with radiator
CN220665405U (en) High-temperature melting ash cooling machine
CN109282558A (en) A kind of reactant quickly cooling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614

RJ01 Rejection of invention patent application after publication