CN109872109A - A kind of equipment and material management method and system - Google Patents
A kind of equipment and material management method and system Download PDFInfo
- Publication number
- CN109872109A CN109872109A CN201910138124.9A CN201910138124A CN109872109A CN 109872109 A CN109872109 A CN 109872109A CN 201910138124 A CN201910138124 A CN 201910138124A CN 109872109 A CN109872109 A CN 109872109A
- Authority
- CN
- China
- Prior art keywords
- equipment
- materials
- goods
- unit
- logistics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 34
- 238000009434 installation Methods 0.000 claims abstract description 31
- 238000002372 labelling Methods 0.000 claims description 15
- 238000000034 method Methods 0.000 claims description 6
- 230000006870 function Effects 0.000 description 6
- 238000012806 monitoring device Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of equipment and material management method and system, comprising: the corresponding facility information of each equipment goods and materials of equipment supplier's typing, the facility information include number of devices, device model, equipment installation position, logistics information;Equipment supplier is given to corresponding logistics unit according to the logistics information, by each equipment goods and materials;Each equipment goods and materials are sent to and corresponding use unit according to the equipment installation positions of each equipment goods and materials by logistics unit;After unit recipient equipment goods and materials, installation personnel is installed to corresponding designated position according to the equipment installation position, by each equipment goods and materials.A kind of equipment and material management method and system provided in an embodiment of the present invention, it is managed from the buying source of equipment goods and materials, allow equipment supplier before the factory of equipment goods and materials, by the facility information typing of equipment goods and materials, so that equipment goods and materials are from start to finish effectively managed, solve the problems, such as because of the more and more bring difficult managements of equipment goods and materials.
Description
Technical field
The invention belongs to administrative skill field more particularly to a kind of equipment and material management method and system.
Background technique
As the scale of enterprise is increasing, equipment goods and materials are more and more, this brings new management to equipment and material management
Problem.For example, how the various information, including number of devices, device model, device location etc. of accurate perception business equipment goods and materials
Information.
Summary of the invention
The purpose of the present invention is to provide a kind of equipment and material management method and system, to solve since equipment goods and materials are more next
The new management problems of more brings.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of equipment and material management method, comprising:
The corresponding facility information of each equipment goods and materials of equipment supplier's typing, the facility information include number of devices, set
Standby model, equipment installation position, logistics information;
Equipment supplier is given to corresponding logistics unit according to the logistics information, by each equipment goods and materials;
Each equipment goods and materials are sent to corresponding by logistics unit according to the equipment installation position of each equipment goods and materials
Use unit;
After unit recipient equipment goods and materials, installation personnel pacifies each equipment goods and materials according to the equipment installation position
It is attached to corresponding designated position.
Optionally, the method for the corresponding facility information of each equipment goods and materials of equipment supplier's typing includes:
Designing institute's design determines the corresponding facility information of each equipment goods and materials;
Each equipment supplier obtains the corresponding equipment of each equipment goods and materials for belonging to its own supply scope respectively
Information;
Each equipment supplier is according to the facility information, and typing belongs to each equipment object of its own supply scope respectively
Provide the corresponding facility information.
Optionally, it is independent for identifying the two-dimension code label of equipment goods and materials that one is pasted on each equipment goods and materials;
When each equipment goods and materials successively in order from equipment supplier, logistics unit, use unit and designated position four
When place is mobile, when reaching each place, the two-dimension code label is scanned by scanning labeling apparatus, it will equipment at this time
The location information of goods and materials is stored as equipment real time position;
Wherein, the scanning labeling apparatus has GPS positioning function.
A kind of equipment and material management system, comprising:
Server terminal is used for the corresponding facility information of each equipment goods and materials of equipment supplier's typing, the facility information
Including number of devices, device model, equipment installation position, logistics information;
First client obtains the logistics information for equipment supplier, each equipment goods and materials is given to corresponding
Logistics unit;
Second client obtains the equipment installation position of each equipment goods and materials for logistics unit, by each equipment
Goods and materials are sent to corresponding using unit;
Third client, for using after unit recipient equipment goods and materials, the installation personnel acquisition equipment installation position will
Each equipment goods and materials are installed to corresponding designated position.
Optionally, the two-dimension code label and be used for that one is only used for mark equipment goods and materials are pasted on each equipment goods and materials
Scan the scanning labeling apparatus of the two-dimension code label;
When each equipment goods and materials successively in order from equipment supplier, logistics unit, use unit and designated position four
When place is mobile, when reaching each place, the two-dimension code label is scanned by scanning labeling apparatus, it will equipment at this time
The location information of goods and materials is stored as equipment real time position;
Wherein, the scanning labeling apparatus has GPS positioning function.
Compared with prior art, the embodiment of the present invention has the advantages that
A kind of equipment and material management method and system provided in an embodiment of the present invention, from the buying source of equipment goods and materials into
Row management allows equipment supplier before the factory of equipment goods and materials, by the facility information typing of equipment goods and materials, then logistics unit, make
It is operated with unit and installation personnel according to facility information, so that equipment goods and materials are from start to finish effectively managed, is solved
It is of the existing technology because of the more and more bring difficult management problems of equipment goods and materials.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other attached drawings according to these attached drawings.
Fig. 1 is a kind of method flow diagram of equipment and material management method provided in an embodiment of the present invention.
Specific embodiment
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention
Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that disclosed below
Embodiment be only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field
Those of ordinary skill's all other embodiment obtained without making creative work, belongs to protection of the present invention
Range.
Refering to Figure 1, a kind of equipment and material management method provided in an embodiment of the present invention, comprising the following steps:
Step S1, the corresponding facility information of each equipment goods and materials of equipment supplier's typing, the facility information includes equipment
Quantity, device model, equipment installation position, logistics information;
Step S2, equipment supplier are given to corresponding logistics unit according to the logistics information, by each equipment goods and materials;
Each equipment goods and materials are sent to by step S3, logistics unit according to the equipment installation position of each equipment goods and materials
It is corresponding to use unit;
Step S4, after unit recipient equipment goods and materials, installation personnel is according to the equipment installation position, by each equipment
Goods and materials are installed to corresponding designated position.
By above-mentioned management method step, administrative staff can easily inquire the quantity of each equipment goods and materials, model,
The various information such as present position, greatly optimize the management of equipment goods and materials.
Therefore, a kind of equipment and material management method provided in an embodiment of the present invention, from the buying source of equipment goods and materials into
Row management allows equipment supplier before the factory of equipment goods and materials, by the facility information typing of equipment goods and materials, then logistics unit, make
It is operated with unit and installation personnel according to facility information, so that equipment goods and materials are from start to finish effectively managed, is solved
It is of the existing technology because of the more and more bring difficult management problems of equipment goods and materials.
Further, in step sl, the side of the corresponding facility information of each equipment goods and materials of equipment supplier's typing
Method includes: that designing institute's design determines the corresponding facility information of each equipment goods and materials;Each equipment supplier obtains category respectively
In the corresponding facility information of each equipment goods and materials of its own supply scope;Each equipment supplier believes according to the equipment
Breath, typing belongs to the corresponding facility information of each equipment goods and materials of its own supply scope respectively.
By authority's design of designing institute, the reasonability and correctness of facility information ensure that, so that equipment goods and materials
It can effectively be managed.
Further, it is independent for identifying the two-dimension code label of equipment goods and materials that one is pasted on each equipment goods and materials;
When each equipment goods and materials successively in order from equipment supplier, logistics unit, use four places of unit and designated position mobile
When, when reaching each place, the two-dimension code label is scanned by scanning labeling apparatus, by the position of equipment goods and materials at this time
Confidence breath is stored as equipment real time position;Wherein, the scanning labeling apparatus has GPS positioning function.Pass through GPS positioning function
Can, where the positions of monitoring device goods and materials, the real time position of feedback device goods and materials, it is ensured that this equipment and material management method it is feasible
Property and accuracy.
Optionally, in another embodiment of the application, a kind of equipment and material management system is additionally provided, comprising:
Server terminal is used for the corresponding facility information of each equipment goods and materials of equipment supplier's typing, the facility information
Including number of devices, device model, equipment installation position, logistics information;
First client obtains the logistics information for equipment supplier, each equipment goods and materials is given to corresponding
Logistics unit;
Second client obtains the equipment installation position of each equipment goods and materials for logistics unit, by each equipment
Goods and materials are sent to corresponding using unit;
Third client, for using after unit recipient equipment goods and materials, the installation personnel acquisition equipment installation position will
Each equipment goods and materials are installed to corresponding designated position.
Equipment and material management system provided in an embodiment of the present invention, for realizing above-mentioned goods and material handling method, accomplish from
The buying source of equipment goods and materials is risen and is managed, and allows equipment supplier before the factory of equipment goods and materials, the equipment of equipment goods and materials is believed
Cease typing, then logistics unit, operated according to facility information using unit and installation personnel so that equipment goods and materials from begin to
It is effectively managed, is solved the problems, such as of the existing technology because of the more and more bring difficult managements of equipment goods and materials eventually.
Further, the two-dimension code label and use for being only used for mark equipment goods and materials is pasted on each equipment goods and materials
In the scanning labeling apparatus for scanning the two-dimension code label;When each equipment goods and materials are successively in order from equipment supplier, logistics
Unit, it is mobile using four places of unit and designated position when, when reaching each place, by scanning labeling apparatus to described two
Dimension code label is scanned, and the location information of equipment goods and materials at this time is stored as equipment real time position;Wherein, the scanning label
Equipment has GPS positioning function.By GPS positioning function, where the position of monitoring device goods and materials, feedback device goods and materials it is real-time
Position, it is ensured that the feasibility and accuracy of this equipment and material management method.
It should be noted that as an alternative embodiment, the equipment and material management system is a kind of based on wechat
The mobile management system of small routine exploitation.Therefore, scanning labeling apparatus can be the mobile terminal device for being equipped with wechat.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before
Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding
Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these
It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (5)
1. a kind of equipment and material management method characterized by comprising
The corresponding facility information of each equipment goods and materials of equipment supplier's typing, the facility information include number of devices, equipment type
Number, equipment installation position, logistics information;
Equipment supplier is given to corresponding logistics unit according to the logistics information, by each equipment goods and materials;
Each equipment goods and materials are sent to corresponding use according to the equipment installation position of each equipment goods and materials by logistics unit
Unit;
After unit recipient equipment goods and materials, each equipment goods and materials are installed to by installation personnel according to the equipment installation position
Corresponding designated position.
2. equipment and material management method according to claim 1, which is characterized in that equipment supplier's typing is each to be set
Include: for the method for the corresponding facility information of goods and materials
Designing institute's design determines the corresponding facility information of each equipment goods and materials;
Each equipment supplier obtains the corresponding facility information of each equipment goods and materials for belonging to its own supply scope respectively;
Each equipment supplier is according to the facility information, and typing belongs to each equipment goods and materials pair of its own supply scope respectively
The facility information answered.
3. equipment and material management method according to claim 1, which is characterized in that be pasted with one on each equipment goods and materials solely
The vertical two-dimension code label for being used to identify equipment goods and materials;
When each equipment goods and materials successively in order from equipment supplier, logistics unit, use unit and the place of designated position four
When mobile, when reaching each place, the two-dimension code label is scanned by scanning labeling apparatus, it will equipment goods and materials at this time
Location information be stored as equipment real time position;
Wherein, the scanning labeling apparatus has GPS positioning function.
4. a kind of equipment and material management system characterized by comprising
Server terminal, is used for the corresponding facility information of each equipment goods and materials of equipment supplier's typing, and the facility information includes
Number of devices, device model, equipment installation position, logistics information;
First client obtains the logistics information for equipment supplier, each equipment goods and materials is given to corresponding logistics
Unit;
Second client obtains the equipment installation position of each equipment goods and materials for logistics unit, by each equipment goods and materials
It is sent to corresponding using unit;
Third client, for using after unit recipient equipment goods and materials, installation personnel to obtain the equipment installation position, will be each
Equipment goods and materials are installed to corresponding designated position.
5. equipment and material management system according to claim 4, which is characterized in that be pasted with one only on each equipment goods and materials
One two-dimension code label for identifying equipment goods and materials and the scanning labeling apparatus for scanning the two-dimension code label;
When each equipment goods and materials successively in order from equipment supplier, logistics unit, use unit and the place of designated position four
When mobile, when reaching each place, the two-dimension code label is scanned by scanning labeling apparatus, it will equipment goods and materials at this time
Location information be stored as equipment real time position;
Wherein, the scanning labeling apparatus has GPS positioning function.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910138124.9A CN109872109A (en) | 2019-02-25 | 2019-02-25 | A kind of equipment and material management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910138124.9A CN109872109A (en) | 2019-02-25 | 2019-02-25 | A kind of equipment and material management method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109872109A true CN109872109A (en) | 2019-06-11 |
Family
ID=66919244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910138124.9A Pending CN109872109A (en) | 2019-02-25 | 2019-02-25 | A kind of equipment and material management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109872109A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102142108A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Information processing method of corresponding relationship among materials and equipment suitable for power system |
CN107506935A (en) * | 2017-08-31 | 2017-12-22 | 广州智谱慧科技有限公司 | A kind of material Management System and method |
CN107944509A (en) * | 2017-10-25 | 2018-04-20 | 国网浙江省电力公司物资分公司 | A kind of electric power material management system based on RFID technique |
CN109272279A (en) * | 2018-11-07 | 2019-01-25 | 国网上海市电力公司 | A kind of electric logistics tracking based on Internet of Things positioning cards |
-
2019
- 2019-02-25 CN CN201910138124.9A patent/CN109872109A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102142108A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Information processing method of corresponding relationship among materials and equipment suitable for power system |
CN107506935A (en) * | 2017-08-31 | 2017-12-22 | 广州智谱慧科技有限公司 | A kind of material Management System and method |
CN107944509A (en) * | 2017-10-25 | 2018-04-20 | 国网浙江省电力公司物资分公司 | A kind of electric power material management system based on RFID technique |
CN109272279A (en) * | 2018-11-07 | 2019-01-25 | 国网上海市电力公司 | A kind of electric logistics tracking based on Internet of Things positioning cards |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8731999B2 (en) | Management system, and associated methods and apparatus, for providing improved visibility, quality control and audit capability for underground facility locate and/or marking operations | |
US7487079B2 (en) | Enterprise service delivery technical architecture | |
CN103236951A (en) | Method and system for distributing and identifying optical network resource | |
Poth et al. | Systematic agile development in regulated environments | |
Sahara et al. | Real-time data integration of an internet-of-things-based smart warehouse: a case study | |
Lerche et al. | Application of Takt and Kanban to modular wind turbine construction | |
CN103699978A (en) | Method for managing fire-fighting facility | |
CN107506805A (en) | A kind of inspecting substation equipment smart electronicses reminding method and system | |
Network | Sustainable development | |
CN109872109A (en) | A kind of equipment and material management method and system | |
Udoka | The role of automatic identification (Auto ID) in the computer integrated manufacturing (CIM) architecture | |
Vasilyev et al. | BIM and QR-codes interaction on a construction site | |
CN107730142A (en) | Using Quick Response Code in BIM project management system | |
EP2610796A1 (en) | Managing a project during transition | |
CN105427090A (en) | Electronic sign-in method by using electronic identifier and latitude and longitude information | |
Bari et al. | Managing knowledge in development of agile software | |
CN104301412B (en) | A kind of big data cloud service centralized management system | |
CN202120313U (en) | Production device and spare part machine account management system | |
CN110414791A (en) | A kind of system and method for the distribution of electrical construction task and examination based on BIM | |
CN105046431A (en) | Service assistant system | |
CN109886629A (en) | A kind of digital management method and system of equipment goods and materials | |
Nakafuji et al. | Distributed resource energy analysis and management system (DREAMS) development for real-time grid operations | |
IT202200000827U1 (en) | Improved system for tracking and managing assets. | |
Ashish et al. | Exploring Defects in Construction—An Experimental Study | |
Sandagomika et al. | Drivers and Barriers of Using Intrenet of Things for Successful Lean Implementation in Construction Projects in Sri Lanka |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190611 |
|
RJ01 | Rejection of invention patent application after publication |