CN109871423A - The update method and device of public bus network crestal line - Google Patents

The update method and device of public bus network crestal line Download PDF

Info

Publication number
CN109871423A
CN109871423A CN201910140157.7A CN201910140157A CN109871423A CN 109871423 A CN109871423 A CN 109871423A CN 201910140157 A CN201910140157 A CN 201910140157A CN 109871423 A CN109871423 A CN 109871423A
Authority
CN
China
Prior art keywords
crestal line
original
bus network
crestal
public bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910140157.7A
Other languages
Chinese (zh)
Inventor
孙熙
刘江红
刘坤朋
邵凌霜
陈晓
肖平原
张翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yuanguang Technology Co Ltd
Original Assignee
Wuhan Yuanguang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yuanguang Technology Co Ltd filed Critical Wuhan Yuanguang Technology Co Ltd
Priority to CN201910140157.7A priority Critical patent/CN109871423A/en
Publication of CN109871423A publication Critical patent/CN109871423A/en
Pending legal-status Critical Current

Links

Abstract

The embodiment of the present invention provides the update method and device of a kind of public bus network crestal line, the method comprise the steps that generating alternative crestal line according to the driving trace of all public transit vehicles of the public bus network of history preset time;The similarity for calculating the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line obtains target crestal line according to original crestal line described in the length adjustment of crestal line section orderly in similarity-rough set result and the alternative crestal line;Calculate the driving traces of all public transit vehicles of the public bus network of the following preset time registration with the target crestal line and original crestal line respectively, if the target crestal line registration result better than original crestal line registration as a result, if using the target crestal line as the updated crestal line of the public bus network.Whole process of the embodiment of the present invention need not be participated in manually, greatly improve error correction efficiency, effectively reduce the influence that human factor generates in route crestal line error correction work.

Description

The update method and device of public bus network crestal line
Technical field
The present embodiments relate to intelligent bus technical fields, more particularly, to the update method of public bus network crestal line And device.
Background technique
Public bus network crestal line: certain public bus network includes two crestal lines of uplink and downlink, and crestal line is by including route starting point, end Point latitude and longitude information and orderly crestal line section composition.Crestal line section comprising two endpoint latitude and longitude informations of beginning and end and two by holding Finite part between point.
Public bus network is during operation because the influence of the factors such as urban construction, road construction and transit network planning very may be used The public bus network of operation can be changed, be adjusted.Public bus network crestal line is caused to change in such cases, for public in real time The basic information for needing to safeguard a large amount of public bus networks in multiple cities of covering for enterprise is handed over, wherein crestal line is believed as public bus network Chief component in breath is that can real-time enterprises of public transport accurately provide bus real-time arrival information for user, and then improve Citizens' activities efficiency reduces the key of platform Waiting time.
In order to keep public bus network crestal line information more accurate, usually enterprises of public transport need to put into a large amount of personnel to public transport in real time Crestal line after route changes carries out correction maintenance, and low efficiency is of poor quality.The maintenance of traditional public bus network crestal line needs artificial It participates in and combines to complete with reference to GIS electronic map road net data mode, if there is a large amount of route crestal line needs error correction to safeguard Words, then need to put into that a large amount of manpower observes by the naked eye judgement and manual error correcting system is safeguarded, inefficiency.And because of people Inevitably there is irregular situation, lead to the route of error correction in the influence of member individual ability to work and working condition, error correction work Crestal line quality is difficult to ensure.
Summary of the invention
The embodiment of the present invention provides a kind of public bus network for overcoming the above problem or at least being partially solved the above problem The update method and device of crestal line.
First aspect, the embodiment of the present invention provide a kind of update method of public bus network crestal line, comprising:
Alternative crestal line is generated according to the driving trace of all public transit vehicles of the public bus network of history preset time, it is described standby Selecting crestal line is the highest crestal line of original Ridge Comparability with public bus network;
The similarity for calculating the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line, according to similarity Original crestal line described in the length adjustment of orderly crestal line section in comparison result and the alternative crestal line obtains target crestal line;
Calculate the driving traces of all public transit vehicles of the public bus network of the following preset time respectively with the target crestal line With the registration of original crestal line, if the target crestal line registration result better than original crestal line registration as a result, if Using the target crestal line as the updated crestal line of the public bus network.
The second aspect, the embodiment of the present invention provide a kind of updating device of public bus network crestal line, comprising:
Similarity calculation module, for the driving trace according to all public transit vehicles of the public bus network of history preset time Alternative crestal line is generated, the alternative crestal line is the highest crestal line of original Ridge Comparability with public bus network;
Module is adjusted, for calculating the similar of the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line Degree is obtained according to original crestal line described in the length adjustment of crestal line section orderly in similarity-rough set result and the alternative crestal line Target crestal line;
Authentication module, the driving trace of all public transit vehicles of the public bus network for calculating the following preset time respectively with The registration of the target crestal line and original crestal line, if the registration result of the target crestal line is better than the weight of original crestal line It is right as a result, then using the target crestal line as the updated crestal line of the public bus network.
In terms of third, the embodiment of the present invention provides a kind of electronic equipment, including memory, processor and is stored in storage On device and the computer program that can run on a processor, realize that such as first aspect mentions when the processor executes described program The step of method of confession.
4th aspect, the embodiment of the present invention provide a kind of non-transient computer readable storage medium, are stored thereon with meter Calculation machine program is realized as provided by first aspect when the computer program is executed by processor the step of method.
The update method and device of public bus network crestal line provided in an embodiment of the present invention are capable of the effective of effective guarantee crestal line Property and accuracy, with tradition manually to the mode of public bus network crestal line error correction compared with, whole process of the embodiment of the present invention need not It is artificial to participate in, error correction efficiency is greatly improved, the influence that human factor generates in route crestal line error correction work is effectively reduced.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow diagram of the update method of public bus network crestal line provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the updating device of public bus network crestal line provided in an embodiment of the present invention;
Fig. 3 is the entity structure schematic diagram of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
In order to overcome the above problem of the prior art, the inventive concept of the embodiment of the present invention are as follows: in recent years increasingly More public transport companies is that public transit vehicle is mounted with global position system, and public transport company is facilitated to realize the real-time prison to public transit vehicle Control, Optimized Operation promote operation level.The location data of the public transit vehicle generated by mobile satellite location equipment calculates public transit vehicle Driving trace, driving trace is compared with former crestal line, the crestal line section by being associated with variation automatically forms new route Crestal line carries out error correction to original route crestal line, and verifies in the following specific time to the route crestal line after error correction, makes to entangle Crestal line after mistake is more accurate.
Fig. 1 is the flow diagram of the update method of public bus network crestal line provided in an embodiment of the present invention, as shown in Figure 1, Include:
S101, alternative crestal line is generated according to the driving trace of all public transit vehicles of the public bus network of history preset time.
It should be noted that the embodiment of the present invention can according to history preset time, such as the last week public bus network institute Have the driving trace of public transit vehicle, generate the new crestal line of corresponding each train number respectively, by by new crestal line and original crestal line into Row compares, by the highest new crestal line of similarity alternately crestal line.It is understood that including the letter of orderly crestal line section in crestal line Breath, is compared one by one by the sequence according to crestal line section, the sum of quantity and orderly crestal line section that crestal line section is overlapped is divided by, It can be used as the similarity of new crestal line Yu original crestal line.
The similarity of the orderly crestal line section of S102, the orderly crestal line section for calculating the alternative crestal line and original crestal line, according to Original crestal line described in the length adjustment of orderly crestal line section in similarity-rough set result and the alternative crestal line obtains target ridge Line.
It should be noted that the embodiment of the present invention after filtering out alternative crestal line, passes through the alternative crestal line of calculating and original ridge The similarity of the orderly crestal line section of line can obtain and the lower crestal line section of original Ridge Comparability, and phase from alternative crestal line Like spend lower crestal line section be clearly with original crestal line crestal line section that there is any discrepancy, and the embodiment of the present invention is further combined with crestal line Whether the length comprehensive descision crestal line section that there is any discrepancy of section has necessity of adjustment, only when the similarity of crestal line section is lower and the ridge It, could be as the reference for adjusting original crestal line when the length of line segment is longer.
S103, calculate the following preset time public bus network all public transit vehicles driving trace respectively with the target The registration of crestal line and original crestal line, if the registration result of the target crestal line is better than the registration knot of original crestal line Fruit, then using the target crestal line as the updated crestal line of the public bus network.
It should be noted that the embodiment of the present invention will continue to be verified after adjusting original crestal line and obtaining target crestal line, Specific verification method is the weight for calculating the driving trace and target crestal line and reason crestal line of the public bus network of the following preset time It is right, if the target crestal line registration result better than original crestal line registration as a result, if by the target crestal line Updated crestal line as the public bus network.
The target crestal line formed after the adjustment of the embodiment of the present invention tests the validity of effective guarantee crestal line by registration And accuracy, with tradition manually to the mode of public bus network crestal line error correction compared with, whole process of the embodiment of the present invention is without people Work participates in, and greatly improves error correction efficiency, effectively reduces the influence that human factor generates in route crestal line error correction work.
On the basis of the various embodiments described above, the public bus network according to history preset time of the embodiment of the present invention owns The driving trace of public transit vehicle generates alternative crestal line, specifically:
S200, the positioning for obtaining all public transit vehicles that meet preset condition of the public bus network in history preset time Data.
Specifically, it according to the execution time of each shift of the public bus network, screens out and is not belonging in the shift execution time Public transit vehicle location data;Positioning number by the cleaning of DBSCAN algorithm with original crestal line distance more than preset threshold According to;Remaining location data is treated as according to shift to correspond to the driving trace of each shift, using road network as reference standard, is led to Road network mapping method is crossed to map to the tracing point in driving trace at a distance from road more than preset threshold in road network map. DBSCAN is a kind of density-based algorithms, and this kind of density clustering algorithm commonly assumes that classification can be by sample distribution Tightness degree determines.Same category of sample is closely coupled between them, that is to say, that in category arbitrary sample week It encloses nearby centainly with the presence of generic sample.By dividing closely coupled sample into one kind, one has thus been obtained Cluster classification.By dividing the closely coupled sample of all each groups into each different classification, then we have just obtained finally All cluster category results.
S201, the location data of the operation vehicle of each shift is mapped in road network map by road network mapping method, Generate the new crestal line of the corresponding shift.
The road network mapping method of the embodiment of the present invention can be hidden Markov model viterbi algorithm.
S202, the orderly crestal line section of every new crestal line and the orderly crestal line section of original crestal line are subjected to similarity It compares, using the highest new crestal line of similarity as the alternative crestal line.
It should be noted that location data of the embodiment of the present invention by public transit vehicle, screens positioning number to preset condition According to effectively reduce the influence for the driving trace that vehicle generates under non-operational regime.Driving trace is being mapped to road network mistake Cheng Zhong is to improve accuracy with reference to elimination positioning data of vehicles noise with road network map.
On the basis of the various embodiments described above, the embodiment of the present invention is according to similarity-rough set result and the alternative crestal line In orderly original crestal line described in the length adjustment of crestal line section, obtain target crestal line, specifically:
Similarity in the alternative crestal line is greater than to the crestal line section of the second preset threshold less than the first preset threshold and length As variation crestal line section;
The corresponding crestal line section of variation crestal line section described in orderly crestal line Duan Zhongyu by original crestal line replaces with the change Dynamic crestal line section, obtains the target crestal line.
The embodiment of the present invention is selected from alternative crestal line changes crestal line section, since each crestal line section is carrying out similarity ratio Clock synchronization all has corresponding crestal line section, therefore after picking out variation crestal line section, the crestal line section in original crestal line is revised as becoming Dynamic crestal line section, modified original crestal line section is target crestal line section.
On the basis of the various embodiments described above, according to the traveling of all public transit vehicles of the tool route of the following preset time Track carries out registration test to the target crestal line and original crestal line respectively, specifically:
The public bus network is obtained in the location data of all public transit vehicles for meeting preset condition of the following preset time; The ratio that the location data is fallen into the target crestal line, the coincidence factor result as the target crestal line;By the positioning Data fall into the ratio of original crestal line, the coincidence factor result as original crestal line.
On the basis of the various embodiments described above, the traveling of all public transit vehicles of the public bus network of the following preset time is calculated The track registration with the target crestal line and original crestal line respectively, later further include: if the registration knot of the target crestal line Fruit is not better than the registration of original crestal line as a result, not updating the crestal line of the public bus network then.
Fig. 2 is the structural schematic diagram of the updating device of public bus network crestal line provided in an embodiment of the present invention, as shown in Fig. 2, The updating device of the public bus network crestal line includes: similarity calculation module 201, adjustment module 202 and authentication module 203, in which:
Similarity calculation module 201, for the traveling according to all public transit vehicles of the public bus network of history preset time Track generates alternative crestal line, and the alternative crestal line is the highest crestal line of original Ridge Comparability with public bus network.
It should be noted that the embodiment of the present invention can according to history preset time, such as the last week public bus network institute Have the driving trace of public transit vehicle, generate the new crestal line of corresponding each train number respectively, by by new crestal line and original crestal line into Row compares, by the highest new crestal line of similarity alternately crestal line.It is understood that including the letter of orderly crestal line section in crestal line Breath, is compared one by one by the sequence according to crestal line section, the sum of quantity and orderly crestal line section that crestal line section is overlapped is divided by, It can be used as the similarity of new crestal line Yu original crestal line.
Module 202 is adjusted, for calculating the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line Similarity, according to original crestal line described in the length adjustment of crestal line section orderly in similarity-rough set result and the alternative crestal line, Obtain target crestal line.
It should be noted that the embodiment of the present invention after filtering out alternative crestal line, passes through the alternative crestal line of calculating and original ridge The similarity of the orderly crestal line section of line can obtain and the lower crestal line section of original Ridge Comparability, and phase from alternative crestal line Like spend lower crestal line section be clearly with original crestal line crestal line section that there is any discrepancy, and the embodiment of the present invention is further combined with crestal line Whether the length comprehensive descision crestal line section that there is any discrepancy of section has necessity of adjustment, only when the similarity of crestal line section is lower and the ridge It, could be as the reference for adjusting original crestal line when the length of line segment is longer.
Authentication module 203, the driving trace point of all public transit vehicles of the public bus network for calculating the following preset time Not with the registration of the target crestal line and original crestal line, if the registration result of the target crestal line be better than original crestal line Registration as a result, then using the target crestal line as the updated crestal line of the public bus network.
It should be noted that the embodiment of the present invention will continue to be verified after adjusting original crestal line and obtaining target crestal line, Specific verification method is the weight for calculating the driving trace and target crestal line and original crestal line of the public bus network of the following preset time It is right, if the target crestal line registration result better than original crestal line registration as a result, if by the target crestal line Updated crestal line as the public bus network.
The updating device of public bus network crestal line provided in an embodiment of the present invention specifically executes above-mentioned each public bus network crestal line The embodiment process of update method please specifically be detailed in the content of the update method embodiment of above-mentioned each public bus network crestal line, herein It repeats no more.It is effectively protected it should be noted that the target crestal line formed after the adjustment of the embodiment of the present invention is tested by registration The validity and accuracy for hindering crestal line, with tradition manually to the mode of public bus network crestal line error correction compared with, the present invention is real Applying example whole process need not manually participate in, and greatly improve error correction efficiency, effectively reduce human factor and work in route crestal line error correction The influence of middle generation.
Fig. 3 is the entity structure schematic diagram of electronic equipment provided in an embodiment of the present invention, as shown in figure 3, the electronic equipment It may include: processor (processor) 310,320, memory communication interface (Communications Interface) (memory) 330 and communication bus 340, wherein processor 310, communication interface 320, memory 330 pass through communication bus 340 Complete mutual communication.Processor 310 can call the meter that is stored on memory 330 and can run on processor 310 Calculation machine program, to execute the update method of the public bus network crestal line of the various embodiments described above offer, for example, default according to history The driving trace of all public transit vehicles of the public bus network of time generates alternative crestal line, and the alternative crestal line is and public bus network Original highest crestal line of Ridge Comparability;Calculate the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line Similarity, according to original crestal line described in the length adjustment of crestal line section orderly in similarity-rough set result and the alternative crestal line, Obtain target crestal line;Calculate the driving traces of all public transit vehicles of the public bus network of the following preset time respectively with the target The registration of crestal line and original crestal line, if the registration result of the target crestal line is better than the registration knot of original crestal line Fruit, then using the target crestal line as the updated crestal line of the public bus network.
In addition, the logical order in above-mentioned memory 330 can be realized by way of SFU software functional unit and conduct Independent product when selling or using, can store in a computer readable storage medium.Based on this understanding, originally The technical solution of the inventive embodiments substantially part of the part that contributes to existing technology or the technical solution in other words It can be embodied in the form of software products, which is stored in a storage medium, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes the present invention respectively The all or part of the steps of a embodiment the method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic or disk Etc. the various media that can store program code.
The embodiment of the present invention also provides a kind of non-transient computer readable storage medium, is stored thereon with computer program, The computer program is implemented to carry out the update method of the public bus network crestal line of the various embodiments described above offer when being executed by processor, For example, alternative crestal line is generated according to the driving trace of all public transit vehicles of the public bus network of history preset time, it is described Alternative crestal line is the highest crestal line of original Ridge Comparability with public bus network;Calculate the orderly crestal line section of the alternative crestal line with The similarity of the orderly crestal line section of original crestal line, according to crestal line section orderly in similarity-rough set result and the alternative crestal line Original crestal line described in length adjustment obtains target crestal line;Calculate all public transit vehicles of the public bus network of the following preset time The driving trace registration with the target crestal line and original crestal line respectively, if the registration result of the target crestal line is better than institute The registration of original crestal line is stated as a result, then using the target crestal line as the updated crestal line of the public bus network.
The apparatus embodiments described above are merely exemplary, wherein described, unit can as illustrated by the separation member It is physically separated with being or may not be, component shown as a unit may or may not be physics list Member, it can it is in one place, or may be distributed over multiple network units.It can be selected according to the actual needs In some or all of the modules achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness Labour in the case where, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and Range.

Claims (10)

1. a kind of update method of public bus network crestal line characterized by comprising
Alternative crestal line, the alternative ridge are generated according to the driving trace of all public transit vehicles of the public bus network of history preset time Line is the highest crestal line of original Ridge Comparability with public bus network;
The similarity for calculating the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line, according to similarity-rough set As a result original crestal line described in the length adjustment of orderly crestal line section and in the alternative crestal line obtains target crestal line;
Calculate the driving traces of all public transit vehicles of the public bus network of the following preset time respectively with the target crestal line and original Have the registration of crestal line, if the target crestal line registration result better than original crestal line registration as a result, if by institute State updated crestal line of the target crestal line as the public bus network.
2. update method according to claim 1, which is characterized in that the public bus network according to history preset time The driving trace of all public transit vehicles generates alternative crestal line, specifically:
The public bus network is obtained in the location data of all public transit vehicles for meeting preset condition of history preset time;
The location data of the operation vehicle of each shift is mapped in road network map by road network mapping method, generates corresponding institute State the new crestal line of shift;
The orderly crestal line section of the orderly crestal line section of every new crestal line and original crestal line is carried out similarity to compare, by phase Like the highest new crestal line of degree as the alternative crestal line.
3. update method according to claim 2, which is characterized in that described to obtain the public bus network when history is preset Between all public transit vehicles for meeting preset condition location data, specifically:
According to the execution time of each shift of the public bus network, determining for the public transit vehicle being not belonging in the shift execution time is screened out Position data;
Location data by the cleaning of DBSCAN algorithm with original crestal line distance more than preset threshold;
Remaining location data is treated as according to shift to correspond to the driving trace of each shift, using road network as reference standard, The tracing point in driving trace at a distance from road more than preset threshold is mapped in road network map by road network mapping method.
4. update method according to claim 1, which is characterized in that described according to similarity-rough set result and described standby Original crestal line described in the length adjustment of orderly crestal line section in crestal line is selected, target crestal line is obtained, specifically:
Using similarity in the alternative crestal line less than the first preset threshold and length be greater than the crestal line section of the second preset threshold as Change crestal line section;
The corresponding crestal line section of variation crestal line section described in orderly crestal line Duan Zhongyu by original crestal line replaces with the variation ridge Line segment obtains the target crestal line.
5. update method according to claim 1, which is characterized in that the tool route according to the following preset time The driving trace of all public transit vehicles carries out registration test to the target crestal line and original crestal line respectively, specifically:
The public bus network is obtained in the location data of all public transit vehicles for meeting preset condition of the following preset time;
The ratio that the location data is fallen into the target crestal line, the coincidence factor result as the target crestal line;It will be described Location data falls into the ratio of original crestal line, the coincidence factor result as original crestal line.
6. update method according to claim 1, which is characterized in that the public bus network for calculating the following preset time The driving trace of all public transit vehicles registration with the target crestal line and original crestal line respectively, later further include:
If the target crestal line registration result be not better than original crestal line registration as a result, if do not update the public transport The crestal line of route.
7. update method according to claim 2, which is characterized in that the road network mapping method is specially hidden Markov Model viterbi algorithm.
8. a kind of updating device of public bus network crestal line characterized by comprising
Similarity calculation module, the driving trace for all public transit vehicles according to the public bus network of history preset time generate Alternative crestal line, the alternative crestal line are the highest crestal line of original Ridge Comparability with public bus network;
Module is adjusted, for calculating the similarity of the orderly crestal line section of the alternative crestal line and the orderly crestal line section of original crestal line, According to original crestal line described in the length adjustment of crestal line section orderly in similarity-rough set result and the alternative crestal line, target is obtained Crestal line;
Authentication module, the driving trace of all public transit vehicles of the public bus network for calculating the following preset time respectively with it is described The registration of target crestal line and original crestal line, if the registration result of the target crestal line is better than the registration of original crestal line As a result, then using the target crestal line as the updated crestal line of the public bus network.
9. a kind of electronic equipment including memory, processor and stores the calculating that can be run on a memory and on a processor Machine program, which is characterized in that the processor realizes the public transport line as described in any one of claim 1 to 7 when executing described program The step of update method of road crestal line.
10. a kind of non-transient computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer It is realized when program is executed by processor as described in any one of claim 1 to 7 the step of the update method of public bus network crestal line.
CN201910140157.7A 2019-02-26 2019-02-26 The update method and device of public bus network crestal line Pending CN109871423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910140157.7A CN109871423A (en) 2019-02-26 2019-02-26 The update method and device of public bus network crestal line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910140157.7A CN109871423A (en) 2019-02-26 2019-02-26 The update method and device of public bus network crestal line

Publications (1)

Publication Number Publication Date
CN109871423A true CN109871423A (en) 2019-06-11

Family

ID=66919307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910140157.7A Pending CN109871423A (en) 2019-02-26 2019-02-26 The update method and device of public bus network crestal line

Country Status (1)

Country Link
CN (1) CN109871423A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110675646A (en) * 2019-12-04 2020-01-10 武汉元光科技有限公司 Method and device for acquiring position of bus station
CN111862662A (en) * 2020-07-21 2020-10-30 上海晨擎信息科技有限公司 Bus route adjusting and monitoring method based on bus running data
CN112116805A (en) * 2019-06-21 2020-12-22 杭州海康威视系统技术有限公司 Method and device for determining specified driving route
CN115116258A (en) * 2022-06-24 2022-09-27 武汉元光科技有限公司 Bus operation state identification method and device and processing equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521963A (en) * 2011-10-12 2012-06-27 北京世纪高通科技有限公司 Method and device for updating bus line data
CN102637355A (en) * 2011-02-14 2012-08-15 北京四维图新科技股份有限公司 Method and device for updating real-time traffic network information
CN105989145A (en) * 2015-02-28 2016-10-05 中国移动通信集团辽宁有限公司 Bus line automatic updating method, device and system
CN108492564A (en) * 2018-04-18 2018-09-04 山东省交通规划设计院 The method and system of express-road vehicle running speed are measured based on road network
WO2018190428A1 (en) * 2017-04-14 2018-10-18 株式会社Nttドコモ Demand forecasting device
CN109215372A (en) * 2018-10-15 2019-01-15 百度在线网络技术(北京)有限公司 Road network information update method, device and equipment
CN109218960A (en) * 2017-07-07 2019-01-15 北京嘀嘀无限科技发展有限公司 Localization method and device
CN109284348A (en) * 2018-10-30 2019-01-29 百度在线网络技术(北京)有限公司 A kind of update method of electronic map, device, equipment and storage medium

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102637355A (en) * 2011-02-14 2012-08-15 北京四维图新科技股份有限公司 Method and device for updating real-time traffic network information
CN102521963A (en) * 2011-10-12 2012-06-27 北京世纪高通科技有限公司 Method and device for updating bus line data
CN105989145A (en) * 2015-02-28 2016-10-05 中国移动通信集团辽宁有限公司 Bus line automatic updating method, device and system
WO2018190428A1 (en) * 2017-04-14 2018-10-18 株式会社Nttドコモ Demand forecasting device
CN109218960A (en) * 2017-07-07 2019-01-15 北京嘀嘀无限科技发展有限公司 Localization method and device
CN108492564A (en) * 2018-04-18 2018-09-04 山东省交通规划设计院 The method and system of express-road vehicle running speed are measured based on road network
CN109215372A (en) * 2018-10-15 2019-01-15 百度在线网络技术(北京)有限公司 Road network information update method, device and equipment
CN109284348A (en) * 2018-10-30 2019-01-29 百度在线网络技术(北京)有限公司 A kind of update method of electronic map, device, equipment and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112116805A (en) * 2019-06-21 2020-12-22 杭州海康威视系统技术有限公司 Method and device for determining specified driving route
CN110675646A (en) * 2019-12-04 2020-01-10 武汉元光科技有限公司 Method and device for acquiring position of bus station
CN111862662A (en) * 2020-07-21 2020-10-30 上海晨擎信息科技有限公司 Bus route adjusting and monitoring method based on bus running data
CN111862662B (en) * 2020-07-21 2021-08-20 上海晨擎信息科技有限公司 Bus route adjusting and monitoring method based on bus running data
CN115116258A (en) * 2022-06-24 2022-09-27 武汉元光科技有限公司 Bus operation state identification method and device and processing equipment

Similar Documents

Publication Publication Date Title
CN109871423A (en) The update method and device of public bus network crestal line
Cortinovis et al. Is urban spatial development on the right track? Comparing strategies and trends in the European Union
CN104077308B (en) A kind of logistics service range determining method and device
CN107038478A (en) Road condition predicting method and device, computer equipment and computer-readable recording medium
Van der Hurk et al. Shuttle planning for link closures in urban public transport networks
CN107844848A (en) A kind of region flow of the people Forecasting Methodology and system
US20210286796A1 (en) Methods and systems for data structure optimization
Jia et al. A simulation optimization method for deep-sea vessel berth planning and feeder arrival scheduling at a container port
CN111044060B (en) Multi-vehicle path planning method and multi-vehicle path planning system
CN109405840A (en) Map data updating method, server and computer readable storage medium
CN108874801A (en) A kind of method and apparatus of dispensing station addressing
CN107633674A (en) A kind of emphasis commerial vehicle exception tracing point elimination method and system
US20160370333A1 (en) Generating fine resolution air pollution estimates
CN109447344A (en) Based on the repairing stationary point of Distribution Network Failure big data and method for optimizing route and system
CN107545318B (en) Bus line priority determination and bus transfer line sequencing method and device
CN108615190A (en) Air control model verification method, device, equipment and storage medium
CN111192090A (en) Seat allocation method and device for flight, storage medium and electronic equipment
CN110929945A (en) Prediction method and system for airline fulfillment and electronic equipment
CN111754147A (en) Road division method, system, device and computer readable storage medium
Ninikas et al. Reoptimization strategies for a dynamic vehicle routing problem with mixed backhauls
CN109991591A (en) Localization method, device, computer equipment and storage medium based on deep learning
US11237008B2 (en) System and method for controlling vehicular pollution concentration and providing maximum traffic flow throughput
Knaak et al. An agent-based simulation tool for modelling sustainable logistics systems
Xu et al. Applying finite mixture models to New York City travel times
CN111144429A (en) Object classification method and system, computer system and computer readable medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190611

RJ01 Rejection of invention patent application after publication