- CN109871242A CN109871242A CN201910102738.1A CN201910102738A CN109871242A CN 109871242 A CN109871242 A CN 109871242A CN 201910102738 A CN201910102738 A CN 201910102738A CN 109871242 A CN109871242 A CN 109871242A
- Authority
- CN
- China
- Prior art keywords
- task
- temporal information
- time
- definition
- rebuilding method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present disclosure proposes a kind of task rebuilding method and devices, wherein method includes: to obtain task definition to be identified;Natural language recognition is carried out to task definition, obtains the temporal information in task definition;The time parameter of task is set according to temporal information.Hereby it is achieved that making user, without voluntarily Extrapolation time and manual setting time, improve the convenience of task management in newly-built task using the time parameter of natural language setting task.
Description
Technical field
This disclosure relates to task management technical field more particularly to a kind of task rebuilding method and device.
Background technique
Currently, in TODO management or task management system, it usually needs set the deadline of task.
In the related technology, user is in newly-built task, by way of clicking expansion calendar control or being manually entered the time
Task time is set.However, operating on calendar, number of clicks is more inconvenient, needs when being manually entered according to specified lattice
Formula is inputted, and error is easy, therefore all very troublesome, the operation that selects the time to be still manually entered the time either on calendar
Cumbersome and inconvenient victory.
Summary of the invention
The disclosure provides a kind of task rebuilding method and device, grasps in the related technology when task time is arranged for solving
Make the technical problem of cumbersome and inconvenient victory.
For this purpose, on the one hand the disclosure proposes a kind of task rebuilding method, nature language is carried out by the content inputted to user
Speech identification is realized and is set using natural language with acquisition time information, and according to the time parameter of temporal information setting task
The time parameter of task makes user, without voluntarily Extrapolation time and manual setting time, improve task pipe in newly-built task
The convenience of reason.
On the other hand the disclosure proposes a kind of task new device.
On the other hand the disclosure proposes a kind of electronic equipment.
The another aspect of the disclosure proposes a kind of computer readable storage medium.
Disclosure first aspect embodiment proposes a kind of task rebuilding method, comprising:
Obtain task definition to be identified;
Natural language recognition is carried out to the task definition, obtains the temporal information in the task definition;
The time parameter of the task is set according to the temporal information.
The task rebuilding method of the embodiment of the present disclosure, by obtaining task definition to be identified, and then to task definition into
Row natural language recognition obtains the temporal information in task definition, and the time parameter of task is further arranged according to temporal information.
Natural language recognition is carried out with acquisition time information by the content inputted to user as a result, and is appointed according to temporal information setting
The time parameter of business realizes the time parameter using natural language setting task, makes user in newly-built task without voluntarily
Extrapolation time and manual setting time help user to avoid complicated operation in newly-built task, make the operation of newly-built task more
It is convenient and quick, to further promote the quality of task management.
In addition, the task rebuilding method according to disclosure above-described embodiment can also have following additional technical feature:
Optionally, the temporal information be relative time, then it is described according to the temporal information be arranged the task when
Between parameter include: that the relative time is scaled absolute time;When according to the absolute time, the cut-off of the task is set
Between.
Optionally, the temporal information be Fuzzy Time, then it is described according to the temporal information be arranged the task when
Between parameter include: acquisition current time, and absolute date is determined according to the current time and the Fuzzy Time;According to described
The deadline of the task is arranged in absolute date.
Optionally, after according to the temporal information, the time parameter of the task is set, further includes: by the time
Information is deleted from the task definition.
Optionally, after obtaining the temporal information in the task definition, further includes: generate and the temporal information pair
The markup information answered and displaying.
Optionally, after obtaining the temporal information in the task definition, further includes: receive and be directed to the temporal information
Cancel an order;Cancel the time parameter that the task is set according to the temporal information.
Disclosure second aspect embodiment proposes a kind of task new device, comprising:
Module is obtained, for obtaining task definition to be identified;
Identification module obtains the time in the task definition for carrying out natural language recognition to the task definition
Information;
Setup module, for the time parameter of the task to be arranged according to the temporal information.
The task new device of the embodiment of the present disclosure, by obtaining task definition to be identified, and then to task definition into
Row natural language recognition obtains the temporal information in task definition, and the time parameter of task is further arranged according to temporal information.
Natural language recognition is carried out with acquisition time information by the content inputted to user as a result, and is appointed according to temporal information setting
The time parameter of business realizes the time parameter using natural language setting task, makes user in newly-built task without voluntarily
Extrapolation time and manual setting time help user to avoid complicated operation in newly-built task, make the operation of newly-built task more
It is convenient and quick, to further promote the quality of task management.
In addition, the task new device according to disclosure above-described embodiment can also have following additional technical feature:
Optionally, the temporal information is relative time, and the setup module is specifically used for: the relative time is converted
For absolute time;The deadline of the task is set according to the absolute time.
Optionally, the temporal information is Fuzzy Time, and the setup module is specifically used for: obtaining current time, and root
Absolute date is determined according to the current time and the Fuzzy Time;When according to the absolute date, the cut-off of the task is set
Between.
Optionally, the device further include: removing module, for the temporal information to be deleted from the task definition
It removes.
Optionally, the device further include: display module, for generating markup information corresponding with the temporal information
And it shows.
Optionally, the device further include: revocation module, for receiving the cancel an order for being directed to the temporal information;
Cancel the time parameter that the task is set according to the temporal information.
Disclosure third aspect embodiment proposes a kind of electronic equipment, including processor and memory;Wherein, the place
Reason device is corresponding with the executable program code to run by reading the executable program code stored in the memory
Program, for realizing the task rebuilding method as described in first aspect embodiment.
Disclosure fourth aspect embodiment proposes a kind of computer readable storage medium, is stored thereon with computer journey
Sequence, which is characterized in that the task rebuilding method as described in first aspect embodiment is realized when the program is executed by processor.
The additional aspect of the disclosure and advantage will be set forth in part in the description, and will partially become from the following description
It obtains obviously, or recognized by the practice of the disclosure.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of task rebuilding method provided by the embodiment of the present disclosure;
Fig. 2 is the flow diagram of another kind task rebuilding method provided by the embodiment of the present disclosure;
Fig. 3 is a kind of markup information displaying schematic diagram provided by the embodiment of the present disclosure;
Fig. 4 is a kind of structural schematic diagram of task new device provided by the embodiment of the present disclosure;
Fig. 5 is the structural schematic diagram of another kind task new device provided by the embodiment of the present disclosure;
Fig. 6 shows the structural schematic diagram for being suitable for the electronic equipment for being used to realize the embodiment of the present disclosure;
Fig. 7 is the schematic diagram for illustrating computer readable storage medium according to an embodiment of the present disclosure.
Specific embodiment
Embodiment of the disclosure is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end
Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to for explaining the disclosure, and should not be understood as the limitation to the disclosure.
Below with reference to the accompanying drawings the task rebuilding method and device of the embodiment of the present disclosure are described.
Fig. 1 is a kind of flow diagram of task rebuilding method provided by the embodiment of the present disclosure, as shown in Figure 1, the party
Method includes:
Step 101, task definition to be identified is obtained.
In the present embodiment, in task management system create task when, user would generally incoming task title, description etc.
Content.Therefore, the task definition of user's input can be first obtained, and using the task definition of user's input as task to be identified
Content, in order to further determine task time according to task definition.
As a kind of possible implementation, the task title text that available user inputs in newly-built task, and
Using task title text as task definition to be identified.
For example, user inputs " tomorrow completes patent application " text as task mark by input frame in newly-built task
Topic, in turn, available " tomorrow completes patent application " text is as task definition to be identified.For another example user can be with language
Sound input " tomorrow completes patent application " obtains " tomorrow completes patent application " voice signal, and know by related voice in turn
Other technology obtains " tomorrow completes patent application " text, as task definition to be identified.
Step 102, natural language recognition is carried out to task definition, obtains the temporal information in task definition.
In one embodiment of the present disclosure, can be appointed by natural language recognition technology identification mission content with obtaining
Temporal information in content of being engaged in, wherein temporal information may include the vocabulary with time correlation, such as " today ", " tomorrow ", "
Tomorrow ", " day after tomorrow ", " day after tomorrow " etc..As a kind of possible implementation, available task definition and corresponding time vocabulary
Corpus information, and according to corpus information training machine learning model, to obtain the time in an available task definition
The Natural Language Processing Models of vocabulary identify task definition by Natural Language Processing Models, in acquisition task in turn
Temporal information in appearance.
As an example, temporal information may include relative time, such as " after 8 hours ", " within three days " etc..
As another example, temporal information may include Fuzzy Time, such as " this week ", " next week ", " next month " etc..
As another example, temporal information may include date, such as " No. 13 ", " 13 days " etc..
As another example, temporal information may include the period, for example, " today starts ", " before No. 13 ", " this week arrives
The description of the periods such as next week ".
It should be noted that temporal information includes but is not limited to relative time, Fuzzy Time, date, period etc., herein
With no restriction.
Step 103, the time parameter of task is set according to temporal information.
In the present embodiment, after obtaining the temporal information in task definition, temporal information can be converted, obtain phase
The absolute time answered or absolute date, such as 8:00am on the 2nd in January etc., and then task is arranged according to absolute time or absolute date
Time parameter.Wherein, the time parameter of task can be deadline, be also possible to initial time, when may include starting
Between and deadline, herein with no restriction.
In one embodiment of the present disclosure, when temporal information is relative time, relative time can be scaled absolutely
Time, and set absolute time to the deadline of task.
For example, task definition is " submitting task in 8 hours ", it is " 8 hours by natural language recognition acquisition time information
It is interior ", judge temporal information for relative time, and obtain current time be 12 when, in turn, by related algorithm by relative time turn
When being changed to absolute time 20, and when setting 20 for the deadline of task.
In one embodiment of the present disclosure, temporal information be Fuzzy Time when, obtain current time, and according to it is current when
Between and Fuzzy Time determine absolute date, and set absolute date to deadline of task.
For example, task definition is " next week completes task ", it is " next week " by natural language recognition acquisition time information, sentences
Disconnected temporal information is Fuzzy Time, and obtaining current time is Tuesday January 1 to obtain the last day of the Fuzzy Time in turn
That is Sunday January 13, and the deadline of task is set by January 13 (or 24:00 on January 13).
It is appreciated that in practical applications, user needs to be arranged task time in newly-built task, such as by clicking exhibition
It opens calendar control or is manually entered the time, however, either selecting the time on calendar, it is all unusual to be still manually entered the time
Trouble, cumbersome and inconvenient victory.
The task rebuilding method of the embodiment of the present disclosure, by obtaining task definition to be identified, and then to task definition into
Row natural language recognition obtains the temporal information in task definition, and the time parameter of task is further arranged according to temporal information.
Natural language recognition is carried out with acquisition time information by the content inputted to user as a result, and is appointed according to temporal information setting
The time parameter of business realizes the time parameter using natural language setting task, makes user in newly-built task without voluntarily
Extrapolation time and manual setting time help user to avoid complicated operation in newly-built task, make the operation of newly-built task more
It is convenient and quick, to further promote the quality of task management.
Based on the above embodiment, further, mark and the revocation of temporal information can also be realized, when guaranteeing setting task
Between parameter accuracy.
Fig. 2 is the flow diagram of another kind task rebuilding method provided by the embodiment of the present disclosure, as shown in Fig. 2, should
Method includes:
Step 201, task definition to be identified is obtained.
Step 202, natural language recognition is carried out to task definition, obtains the temporal information in task definition.
In previous embodiment to step 101, the equally applicable step 201 in this present embodiment of explanation of step 102,
Step 202, details are not described herein again.
Step 203, it generates markup information corresponding with temporal information and shows.
In one embodiment of the present disclosure, after obtaining the temporal information in task definition, the time can also be shown
Information.For example, Show board can be generated and believe with the time when including temporal information into task definition by natural language recognition
Cease corresponding markup information, wherein markup information content can according to need self-setting.In turn, mark is shown in Show board
Infuse information.
In one embodiment of the present disclosure, when the temporal information that user inputs in task definition may not indicate that
Between, for example, task names be " film review for writing one " world's tomorrow " ", " tomorrow " therein be not the time is specified, and
It is a part of task definition.And hence it is also possible to receive the cancel an order for temporal information, and then cancelled according to cancel an order
The time parameter of task is set according to temporal information, to avoid faulty operation.Wherein, the way of realization of cancel an order include but
Be not limited to click commands, touch slip instruction, phonetic order etc., it can specifically be configured, not make herein according to actual needs
Limitation.
For example, referring to Fig. 3, user passes through in turn in the input area input " completing patent application before tomorrow " of newly-built task
The mode acquisition time information " tomorrow " of natural language recognition, and show that markup information " detects a time, I can be automatic
" tomorrow " is set as the end time of task ", to realize the prompt to user.Further, revocation key can also be provided,
Such as key is not needed in figure, user can select to ignore the automatic of system by the key that do not need in clicking trigger figure
Setting, after user's selection is ignored, which will be no longer detected.Otherwise, system can be according to the time in newly-built task
The time parameter of task is arranged in information automatically.Hereby it is achieved that mark and the revocation of temporal information, ensure that setting task time
The accuracy of parameter.
Step 204, the time parameter of task is set according to temporal information.
As an example, when temporal information is the dates such as " No. 13 ", " 13 days ", available current month and date,
Absolute time corresponding with temporal information is obtained by related algorithm, and the absolute time after conversion is set as to the cut-off of task
Time.
It can for the relative times such as " today ", " tomorrow ", " tomorrow ", " day after tomorrow ", " day after tomorrow " as another example
To obtain current time, corresponding with temporal information absolute time is obtained by related algorithm, and by the absolute time after conversion
It is set as the deadline of task.
As another example, temporal information includes the periods such as " today starts ", " before No. 13 ", " this week to next week "
Description, available current time, and according to the initial time of current time and temporal information setting task, or task is set
Initial time and deadline.
It should be noted that temporal information is not limited only to Chinese form in the embodiment of the present disclosure, it also may include other languages
Kind, such as can not be limited herein according to the time parameter of the English temporal information setting task such as " Today ", " Tomorrow "
System.
Optionally, due to setting deadline scene it is more common, according to temporal information can not determine whether for
When deadline, the deadline that task is set according to temporal information can be defaulted.
Step 205, temporal information is deleted from task definition.
It, can also be by task definition after according to temporal information, the time parameter of task is set in the embodiment of the present disclosure
In temporal information delete.For example, task title content is that " tomorrow completes patent application, since relative times such as " tomorrows " go out
It may lead the puzzlement of user in present task title, therefore, title can have been deleted after task time parameter is provided with
" tomorrow " in content so that temporal information is no longer present in the title of task, and then saves task.
The task rebuilding method of the embodiment of the present disclosure can support relative time, Fuzzy Time and multilingual nature
Task time parameter is arranged in language, also, realizes mark and the revocation of temporal information, ensure that setting task time parameter
Accuracy.
In order to realize above-described embodiment, the disclosure also proposes a kind of task new device.
Fig. 4 is a kind of structural schematic diagram of task new device provided by the embodiment of the present disclosure, as shown in figure 4, this
Business new device includes: to obtain module 10, identification module 20, setup module 30.
Wherein, module 10 is obtained, for obtaining task definition to be identified.
Identification module 20 obtains the temporal information in task definition for carrying out natural language recognition to task definition.
Setup module 30, for the time parameter of task to be arranged according to temporal information.
On the basis of fig. 4, task new device shown in fig. 5 further include: removing module 40, display module 50, revocation
Module 60.
Wherein, removing module 40, for deleting temporal information from the task definition.
Display module 50, for generating markup information corresponding with temporal information and showing.
Module 60 is cancelled, for receiving the cancel an order for being directed to temporal information;Cancel and task is arranged according to temporal information
Time parameter.
In one embodiment of the present disclosure, temporal information is relative time, and setup module 30 is specifically used for: when will be opposite
Between be scaled absolute time;The deadline of task is set according to absolute time.
In one embodiment of the present disclosure, temporal information is Fuzzy Time, and setup module 30 is specifically used for: being obtained current
Time, and absolute date is determined according to current time and Fuzzy Time;The deadline of task is set according to absolute date.
It should be noted that previous embodiment is equally applicable to appointing for the present embodiment to the explanation of task rebuilding method
Business new device, details are not described herein again.
The task new device of the embodiment of the present disclosure, by obtaining task definition to be identified, and then to task definition into
Row natural language recognition obtains the temporal information in task definition, and the time parameter of task is further arranged according to temporal information.
Natural language recognition is carried out with acquisition time information by the content inputted to user as a result, and is appointed according to temporal information setting
The time parameter of business realizes the time parameter using natural language setting task, makes user in newly-built task without voluntarily
Extrapolation time and manual setting time help user to avoid complicated operation in newly-built task, make the operation of newly-built task more
It is convenient and quick, to further promote the quality of task management.
In order to realize above-described embodiment, the disclosure also proposes a kind of electronic equipment.
Below with reference to Fig. 6, it illustrates the structural representations for the electronic equipment 800 for being suitable for being used to realize the embodiment of the present disclosure
Figure.Terminal device in the embodiment of the present disclosure can include but is not limited to such as mobile phone, laptop, digital broadcasting and connect
Receive device, PDA (personal digital assistant), PAD (tablet computer), PMP (portable media player), car-mounted terminal (such as vehicle
Carry navigation terminal) etc. mobile terminal and such as number TV, desktop computer etc. fixed terminal.Electricity shown in Fig. 6
Sub- equipment is only an example, should not function to the embodiment of the present disclosure and use scope bring any restrictions.
As shown in fig. 6, electronic equipment 800 may include processing unit (such as central processing unit, graphics processor etc.)
801, random access can be loaded into according to the program being stored in read-only memory (ROM) 802 or from storage device 808
Program in memory (RAM) 803 and execute various movements appropriate and processing.In RAM 803, it is also stored with electronic equipment
Various programs and data needed for 800 operations.Processing unit 801, ROM 802 and RAM 803 pass through the phase each other of bus 804
Even.Input/output (I/O) interface 805 is also connected to bus 804.
In general, following device can connect to I/O interface 805: including such as touch screen, touch tablet, keyboard, mouse, taking the photograph
As the input unit 806 of head, microphone, accelerometer, gyroscope etc.;Including such as liquid crystal display (LCD), loudspeaker, vibration
The output device 807 of dynamic device etc.;Storage device 808 including such as tape, hard disk etc.;And communication device 809.Communication device
809, which can permit electronic equipment 800, is wirelessly or non-wirelessly communicated with other equipment to exchange data.Although Fig. 5 shows tool
There is the electronic equipment 800 of various devices, it should be understood that being not required for implementing or having all devices shown.It can be with
Alternatively implement or have more or fewer devices.
Particularly, in accordance with an embodiment of the present disclosure, it may be implemented as computer above with reference to the process of flow chart description
Software program.For example, embodiment of the disclosure includes a kind of computer program product comprising be carried on computer-readable medium
On computer program, which includes the program code for method shown in execution flow chart.In such reality
It applies in example, which can be downloaded and installed from network by communication device 809, or from storage device 808
It is mounted, or is mounted from ROM 802.When the computer program is executed by processing unit 801, the embodiment of the present disclosure is executed
Method in the above-mentioned function that limits.
It should be noted that the above-mentioned computer-readable medium of the disclosure can be computer-readable signal media or meter
Calculation machine readable storage medium storing program for executing either the two any combination.Computer readable storage medium for example can be --- but not
Be limited to --- electricity, magnetic, optical, electromagnetic, infrared ray or semiconductor system, device or device, or any above combination.Meter
The more specific example of calculation machine readable storage medium storing program for executing can include but is not limited to: have the electrical connection, just of one or more conducting wires
Taking formula computer disk, hard disk, random access storage device (RAM), read-only memory (ROM), erasable type may be programmed read-only storage
Device (EPROM or flash memory), optical fiber, portable compact disc read-only memory (CD-ROM), light storage device, magnetic memory device,
Or above-mentioned any appropriate combination.In the disclosure, computer readable storage medium can be it is any include or storage journey
The tangible medium of sequence, the program can be commanded execution system, device or device use or in connection.And at this
In open, computer-readable signal media may include in a base band or as the data-signal that carrier wave a part is propagated,
In carry computer-readable program code.The data-signal of this propagation can take various forms, including but not limited to
Electromagnetic signal, optical signal or above-mentioned any appropriate combination.Computer-readable signal media can also be computer-readable and deposit
Any computer-readable medium other than storage media, the computer-readable signal media can send, propagate or transmit and be used for
By the use of instruction execution system, device or device or program in connection.Include on computer-readable medium
Program code can transmit with any suitable medium, including but not limited to: electric wire, optical cable, RF (radio frequency) etc. are above-mentioned
Any appropriate combination.
Above-mentioned computer-readable medium can be included in above-mentioned electronic equipment;It is also possible to individualism, and not
It is fitted into the electronic equipment.
Above-mentioned computer-readable medium carries one or more program, when said one or multiple programs are by the electricity
When sub- equipment executes, so that the electronic equipment: obtaining at least two internet protocol addresses;Send to Node evaluation equipment includes institute
State the Node evaluation request of at least two internet protocol addresses, wherein the Node evaluation equipment is internet from described at least two
In protocol address, chooses internet protocol address and return;Receive the internet protocol address that the Node evaluation equipment returns;Its
In, the fringe node in acquired internet protocol address instruction content distributing network.
Alternatively, above-mentioned computer-readable medium carries one or more program, when said one or multiple programs
When being executed by the electronic equipment, so that the electronic equipment: receiving the Node evaluation including at least two internet protocol addresses and request;
From at least two internet protocol address, internet protocol address is chosen;Return to the internet protocol address selected;Wherein,
The fringe node in internet protocol address instruction content distributing network received.
The calculating of the operation for executing the disclosure can be write with one or more programming languages or combinations thereof
Machine program code, above procedure design language include object oriented program language-such as Java, Smalltalk, C+
+, it further include conventional procedural programming language-such as " C " language or similar programming language.Program code can
Fully to execute, partly execute on the user computer on the user computer, be executed as an independent software package,
Part executes on the remote computer or executes on a remote computer or server completely on the user computer for part.
In situations involving remote computers, remote computer can pass through the network of any kind --- including local area network (LAN)
Or wide area network (WAN)-is connected to subscriber computer, or, it may be connected to outer computer (such as utilize Internet service
Provider is connected by internet).
Flow chart and block diagram in attached drawing are illustrated according to the system of the various embodiments of the disclosure, method and computer journey
The architecture, function and operation in the cards of sequence product.In this regard, each box in flowchart or block diagram can generation
A part of one module, program segment or code of table, a part of the module, program segment or code include one or more use
The executable instruction of the logic function as defined in realizing.It should also be noted that in some implementations as replacements, being marked in box
The function of note can also occur in a different order than that indicated in the drawings.For example, two boxes succeedingly indicated are actually
It can be basically executed in parallel, they can also be executed in the opposite order sometimes, and this depends on the function involved.Also it to infuse
Meaning, the combination of each box in block diagram and or flow chart and the box in block diagram and or flow chart can be with holding
The dedicated hardware based system of functions or operations as defined in row is realized, or can use specialized hardware and computer instruction
Combination realize.
Being described in unit involved in the embodiment of the present disclosure can be realized by way of software, can also be by hard
The mode of part is realized.Wherein, the title of unit does not constitute the restriction to the unit itself under certain conditions, for example, the
One acquiring unit is also described as " obtaining the unit of at least two internet protocol addresses ".
In order to realize above-described embodiment, the disclosure also proposes a kind of computer readable storage medium, is stored thereon with calculating
Machine program, the program realize task rebuilding method as in the foregoing embodiment when being executed by processor.
Fig. 7 is the schematic diagram for illustrating computer readable storage medium according to an embodiment of the present disclosure.As shown in fig. 7, root
According to the computer readable storage medium 300 of the embodiment of the present disclosure, it is stored thereon with non-transient computer readable instruction 310.When this
When non-transient computer readable instruction 310 is run by processor, the task rebuilding method of each embodiment of the disclosure above-mentioned is executed
All or part of the steps.
In order to realize above-described embodiment, the disclosure also proposes a kind of computer program product, when the computer program product
In instruction when being executed by processor, realize task rebuilding method as in the foregoing embodiment.
Although embodiment of the disclosure has been shown and described above, it is to be understood that above-described embodiment is example
Property, it should not be understood as the limitation to the disclosure, those skilled in the art within the scope of this disclosure can be to above-mentioned
Embodiment is changed, modifies, replacement and variant.
Claims (10)
1. a kind of task rebuilding method characterized by comprising
Obtain task definition to be identified;
Natural language recognition is carried out to the task definition, obtains the temporal information in the task definition;
The time parameter of the task is set according to the temporal information.
2. task rebuilding method as described in claim 1, which is characterized in that the temporal information is relative time, then described
Include: according to the time parameter that the task is arranged in the temporal information
The relative time is scaled absolute time;
The deadline of the task is set according to the absolute time.
3. task rebuilding method as described in claim 1, which is characterized in that the temporal information is Fuzzy Time, then described
Include: according to the time parameter that the task is arranged in the temporal information
Current time is obtained, and absolute date is determined according to the current time and the Fuzzy Time;
The deadline of the task is set according to the absolute date.
4. task rebuilding method as described in claim 1, which is characterized in that the task is being arranged according to the temporal information
Time parameter after, further includes:
The temporal information is deleted from the task definition.
5. task rebuilding method as described in claim 1, which is characterized in that obtaining the temporal information in the task definition
Later, further includes:
It generates markup information corresponding with the temporal information and shows.
6. task rebuilding method as described in claim 1, which is characterized in that obtaining the temporal information in the task definition
Later, further includes:
Receive the cancel an order for being directed to the temporal information;
Cancel the time parameter that the task is set according to the temporal information.
7. a kind of task new device characterized by comprising
Module is obtained, for obtaining task definition to be identified;
Identification module obtains the temporal information in the task definition for carrying out natural language recognition to the task definition;
Setup module, for the time parameter of the task to be arranged according to the temporal information.
8. task new device as claimed in claim 7, which is characterized in that the temporal information is relative time, described to set
Module is set to be specifically used for:
The relative time is scaled absolute time;
The deadline of the task is set according to the absolute time.
9. a kind of electronic equipment, which is characterized in that including processor and memory;
Wherein, the processor is run by reading the executable program code stored in the memory can be performed with described
The corresponding program of program code, for realizing task rebuilding method such as of any of claims 1-6.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is by processor
Such as task rebuilding method of any of claims 1-6 is realized when execution.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910102738.1A CN109871242A (en) | 2019-02-01 | 2019-02-01 | Task rebuilding method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910102738.1A CN109871242A (en) | 2019-02-01 | 2019-02-01 | Task rebuilding method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109871242A true CN109871242A (en) | 2019-06-11 |
Family
ID=66918512
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910102738.1A Pending CN109871242A (en) | 2019-02-01 | 2019-02-01 | Task rebuilding method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109871242A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104376451A (en) * | 2013-08-13 | 2015-02-25 | 中兴通讯股份有限公司 | Reminding method for event of which user is to be reminded and terminal |
CN104917900A (en) * | 2015-06-24 | 2015-09-16 | 上海海漾软件技术有限公司 | Method and device for generating reminding item based on mobile terminal and terminal equipment |
CN104951508A (en) * | 2015-05-21 | 2015-09-30 | 腾讯科技(深圳)有限公司 | Time information identification method and device |
US20150338912A1 (en) * | 2014-05-23 | 2015-11-26 | Seoul National University R&Db Foundation | Memory aid method using audio/video data |
CN106020953A (en) * | 2016-05-12 | 2016-10-12 | 青岛海信移动通信技术股份有限公司 | Method and device for establishing schedule in electronic calendar |
-
2019
- 2019-02-01 CN CN201910102738.1A patent/CN109871242A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104376451A (en) * | 2013-08-13 | 2015-02-25 | 中兴通讯股份有限公司 | Reminding method for event of which user is to be reminded and terminal |
US20150338912A1 (en) * | 2014-05-23 | 2015-11-26 | Seoul National University R&Db Foundation | Memory aid method using audio/video data |
CN104951508A (en) * | 2015-05-21 | 2015-09-30 | 腾讯科技(深圳)有限公司 | Time information identification method and device |
CN104917900A (en) * | 2015-06-24 | 2015-09-16 | 上海海漾软件技术有限公司 | Method and device for generating reminding item based on mobile terminal and terminal equipment |
CN106020953A (en) * | 2016-05-12 | 2016-10-12 | 青岛海信移动通信技术股份有限公司 | Method and device for establishing schedule in electronic calendar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108022586B (en) | Method and apparatus for controlling the page | |
US10217462B2 (en) | Automating natural language task/dialog authoring by leveraging existing content | |
EP2987164B1 (en) | Virtual assistant focused user interfaces | |
CN110019279A (en) | Collaboration update method, device, equipment and the storage medium of online document | |
CN110489101A (en) | Interface analogy method, system, medium and electronic equipment | |
CN109992338B (en) | Method and system for exposing virtual assistant services across multiple platforms | |
CN110287473A (en) | Electrical form edit methods and device | |
JP5616390B2 (en) | Response generation apparatus, response generation method, and response generation program | |
CN110020231A (en) | Webpage capture method and device thereof | |
CN107506224A (en) | Reminding method, device, server and the storage medium of application program updating | |
JP6596373B2 (en) | Display processing apparatus and display processing program | |
CN110489106A (en) | A kind of generation method, device, medium and the electronic equipment of project initial code | |
CN110399065A (en) | Message treatment method, device and electronic equipment | |
CN109902726A (en) | Biographic information processing method and processing device | |
CN110134477B (en) | Method, device, medium and electronic equipment for dynamically laying out user pages | |
CN108989726B (en) | Method and apparatus for recorded video | |
CN108984260B (en) | Method and apparatus for handling information | |
CN109871242A (en) | Task rebuilding method and device | |
CN109816455A (en) | Method and apparatus for handling information | |
CN109491687A (en) | A kind of hot update method, device, terminal and the readable medium of application software | |
CN110489412B (en) | Data processing method, device, medium and electronic equipment | |
WO2020134506A1 (en) | Information replay method and apparatus, electronic device, and computer readable storage medium | |
CN110377654A (en) | Processing method, device, electronic equipment and the computer readable storage medium of request of data | |
CN110109942A (en) | Method and apparatus for handling information | |
CN109587066A (en) | For generating the method and device of information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190611 |
|
RJ01 | Rejection of invention patent application after publication |