CN109868881B - 一种雨污水管道内衬修复机构的修复方法 - Google Patents

一种雨污水管道内衬修复机构的修复方法 Download PDF

Info

Publication number
CN109868881B
CN109868881B CN201910137379.3A CN201910137379A CN109868881B CN 109868881 B CN109868881 B CN 109868881B CN 201910137379 A CN201910137379 A CN 201910137379A CN 109868881 B CN109868881 B CN 109868881B
Authority
CN
China
Prior art keywords
drill bit
pipeline
pipe
lining
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910137379.3A
Other languages
English (en)
Other versions
CN109868881A (zh
Inventor
刘敏达
陈园
姚志鹏
洪征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin Design Group Co ltd
Original Assignee
Huaxin Design Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxin Design Group Co ltd filed Critical Huaxin Design Group Co ltd
Priority to CN201910137379.3A priority Critical patent/CN109868881B/zh
Publication of CN109868881A publication Critical patent/CN109868881A/zh
Application granted granted Critical
Publication of CN109868881B publication Critical patent/CN109868881B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明提供一种雨污水管道内衬修复机构的修复方法,所述雨污水管道内衬修复机构包括钻头,所述钻头的末端通过套筒连接件与连杆卡接,所述连杆的另一端连接钻机;还包括注浆管、钢管以及内衬管,所述钢管连接所述内衬管与所述钻头,原管道与所述内衬管之间通过注浆管注浆。本发明设计简单合理,在不开挖、不影响其他管线布局的前提下,以较少的时间以及较低的成本有效的解决了一些管道位置较深、地下管线分布复杂而无法直接挖掘施工以及能够开挖施工但是施工效率低、经济成本高的问题。

Description

一种雨污水管道内衬修复机构的修复方法
技术领域
本发明涉及排水管道的修复技术,具体涉及一种雨污水管道内衬修复机构的修复方法。
背景技术
雨、污水管道在以下情况会造成塌陷损坏:①由于使用时间过长造成原管道使用管材老化,环刚度降低造成管道内的塌陷;②由于路面沉降挤压将已施工完成的管道而引起压塌;③交叉施工成品保护不到位也会造成管道的内部塌陷。目前管道损坏只能在道路边侧绿化带重新铺设,不仅施工周期长而且耗费成本很大,还极易造成交通的拥堵和绿化资源的破坏;而一些道路由于所处位置较深、地下管线分布错综复杂等原因还不能够直接开挖施工。因此急需一种新的修复方法来解决此类问题。
发明内容
本发明提供一种雨污水管道内衬修复机构的修复方法,以解决由于一些管道位置较深、地下管线分布复杂而无法直接挖掘施工以及能够开挖施工但是施工效率低、经济成本高的问题。
本发明提供一种雨污水管道内衬修复机构,包括钻头,所述钻头的末端通过套筒连接件与连杆卡接,所述连杆的另一端连接钻机;还包括注浆管、钢管以及内衬管,所述钢管连接所述内衬管与所述钻头,原管道与所述内衬管之间通过注浆管注浆。
优选的,所述套筒连接件是一根圆杆,其两端的端面上分别开有凹槽,所述钻头的末端和所述连杆的一端均设有与所述凹槽相配合卡接的凸起部位。
优选的,所述凹槽为四边形或者是六边形。
优选的,所述套筒连接件的长度为1~2cm。
优选的,所述内衬管直径小于钻头的外径。
优选的,一种雨污水管道内衬修复机构的修复方法,包括以下步骤:
1)确定堵塞管道深度和工作井的大小,测量管道标高和堵塞位置,根据现场实际情况安置钻机(4);
2)将钻头(1)的末端通过套筒连接件(2)与连杆(3)的一端卡接,连杆(3)的另一端连接所述钻机(4),将所述钻头(1)放置在原管道(8)内;
3)开启所述钻机(4),将所述原管道(8)内的堵塞物清理,再将所述钻头(1)抽回;
4)内衬管(7)和钢管(6)焊接后与所述连杆(3)连接,所述钢管(6)与所述钻头(1)连接,开通所述钻机(4),所述钻头(1)将所述内衬管(7)拉入所述原管道(8),并通过所述原管道(8);
5)在所述内衬管(7)通过所述原管道(8)后,将所述内衬管(7)延所述原管道(8)截断,并用膨胀混凝土对管道口进行封堵;
6)待膨胀混凝土硬化后在路面钻孔,用注浆管(5)对原管道(8)和内衬管(7)之间进行注水泥浆填充。
本发明的有益效果为:本发明设计简单合理,在不开挖、不影响其他管线布局的前提下,以较少的时间以及较低的成本有效的解决了一些管道位置较深、地下管线分布复杂而无法直接挖掘施工以及能够开挖施工但是施工效率低、经济成本高的问题。
附图说明
图1是本发明实施例的结构示意图。
图2是本发明实施例的工作状态示意图。
图3为本发明实施例工作结束状态的结构示意图。
其中,1-钻头,2-套筒连接件,3-连杆,4-钻机,5-注浆管,6-钢管,7-内衬管,8-原管道。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,以下结合具体实施例,对本发明作进一步地详细说明。
根据图1~图3,本发明提供一种雨污水管道内衬修复机构,包括钻头1,所述钻头1的末端通过套筒连接件2与连杆3卡接,所述连杆3的另一端连接钻机4;还包括注浆管5、钢管6以及内衬管7,所述钢管6连接所述内衬管7与所述钻头1,原管道8与所述内衬管7之间通过注浆管5注浆。
优选的,所述套筒连接件2是一根圆杆,其两端的端面上分别开有凹槽,所述钻头1的末端和所述连杆3的一端均设有与所述凹槽相配合卡接的凸起部位。所述凹槽为四边形或者是六边形。所述套筒连接件2的长度为1~2cm。所述内衬管7直径小于钻头1的外径。
本发明的工作步骤是:1)确定堵塞管道深度和工作井的大小,测量管道标高和堵塞位置,根据现场实际情况安置钻机4;
2)将钻头1的末端通过套筒连接件2与连杆3的一端卡接,连杆3的另一端连接所述钻机4,将所述钻头1放置在原管道8内;
3)开启所述钻机4,将所述原管道8内的堵塞物清理,再将所述钻头1抽回;
4)内衬管7和钢管6焊接后与所述连杆3连接,所述钢管6与所述钻头1连接,开通所述钻机4,所述钻头1将所述内衬管7拉入所述原管道8,并通过所述原管道8;
5)在所述内衬管7通过所述原管道8后,将所述内衬管7延所述原管道8截断,并用膨胀混凝土对管道口进行封堵;
6)待膨胀混凝土硬化后在路面钻孔,用注浆管5对原管道8和内衬管7之间进行注水泥浆填充。
本发明能以最短的时间以及最少的投资,在不开挖、不影响其他管线布局的情况下,达到应有的效果,而且可以杜绝开挖造成的扬尘,更加环保。
以上所述仅为本发明的实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的权利要求范围。

Claims (1)

1.一种雨污水管道内衬修复机构的修复方法,其特征在于,所述雨污水管道内衬修复机构包括钻头(1),所述钻头(1)的末端通过套筒连接件(2)与连杆(3)卡接,所述连杆(3)的另一端连接钻机(4);
还包括注浆管(5)、钢管(6)以及内衬管(7),所述钢管(6)连接所述内衬管(7)与所述钻头(1),原管道(8)与所述内衬管(7)之间通过注浆管(5)注浆;
所述套筒连接件(2)是一根圆杆,其两端的端面上分别开有凹槽,所述钻头(1)的末端和所述连杆(3)的一端均设有与所述凹槽相配合卡接的凸起部位;
所述凹槽为四边形或者是六边形;
所述套筒连接件(2)的长度为1~2cm;
所述内衬管(7)直径小于钻头(1)的外径;
所述雨污水管道内衬修复机构的修复方法,包括以下步骤:
1)确定堵塞管道深度和工作井的大小,测量管道标高和堵塞位置,根据现场实际情况安置钻机(4);
2)将钻头(1)的末端通过套筒连接件(2)与连杆(3)的一端卡接,连杆(3)的另一端连接所述钻机(4),将所述钻头(1)放置在原管道(8)内;
3)开启所述钻机(4),将所述原管道(8)内的堵塞物清理,再将所述钻头(1)抽回;
4)内衬管(7)和钢管(6)焊接后与所述连杆(3)连接,所述钢管(6)与所述钻头(1)连接,开通所述钻机(4),所述钻头(1)将所述内衬管(7)拉入所述原管道(8),并通过所述原管道(8);
5)在所述内衬管(7)通过所述原管道(8)后,将所述内衬管(7)延所述原管道(8)截断,并用膨胀混凝土对管道口进行封堵;
6)待膨胀混凝土硬化后在路面钻孔,用注浆管(5)对原管道(8)和内衬管(7)之间进行注水泥浆填充。
CN201910137379.3A 2019-02-25 2019-02-25 一种雨污水管道内衬修复机构的修复方法 Active CN109868881B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910137379.3A CN109868881B (zh) 2019-02-25 2019-02-25 一种雨污水管道内衬修复机构的修复方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910137379.3A CN109868881B (zh) 2019-02-25 2019-02-25 一种雨污水管道内衬修复机构的修复方法

Publications (2)

Publication Number Publication Date
CN109868881A CN109868881A (zh) 2019-06-11
CN109868881B true CN109868881B (zh) 2024-03-01

Family

ID=66919156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910137379.3A Active CN109868881B (zh) 2019-02-25 2019-02-25 一种雨污水管道内衬修复机构的修复方法

Country Status (1)

Country Link
CN (1) CN109868881B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630847A (zh) * 2019-09-25 2019-12-31 南方工程检测修复技术研究院 一种含多种病害混凝土排水管道的非开挖整体修复方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008064251A (ja) * 2006-09-08 2008-03-21 Nippon Steel Corp 管路の補修又は補強構造
CN102979461A (zh) * 2012-12-19 2013-03-20 广汉市井管厂 一种同心跟管钻具
CN203591296U (zh) * 2013-11-13 2014-05-14 王兵 一种开颅钻头
CN104895174A (zh) * 2015-06-02 2015-09-09 杭州江润科技有限公司 大口径雨污水管道装配式组件结构的施工方法
CN106595429A (zh) * 2017-01-23 2017-04-26 广西玉柴机器股份有限公司 带接杆钻头的长度测量装置
CN108590092A (zh) * 2018-06-28 2018-09-28 武汉乐享居商贸有限公司 一种地板连接结构
CN109183957A (zh) * 2018-09-17 2019-01-11 张桂华 一种地下排水管路修复系统及修复方法
CN210151883U (zh) * 2019-02-25 2020-03-17 无锡市政设计研究院有限公司 一种雨污水管道内衬修复机构

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008064251A (ja) * 2006-09-08 2008-03-21 Nippon Steel Corp 管路の補修又は補強構造
CN102979461A (zh) * 2012-12-19 2013-03-20 广汉市井管厂 一种同心跟管钻具
CN203591296U (zh) * 2013-11-13 2014-05-14 王兵 一种开颅钻头
CN104895174A (zh) * 2015-06-02 2015-09-09 杭州江润科技有限公司 大口径雨污水管道装配式组件结构的施工方法
CN106595429A (zh) * 2017-01-23 2017-04-26 广西玉柴机器股份有限公司 带接杆钻头的长度测量装置
CN108590092A (zh) * 2018-06-28 2018-09-28 武汉乐享居商贸有限公司 一种地板连接结构
CN109183957A (zh) * 2018-09-17 2019-01-11 张桂华 一种地下排水管路修复系统及修复方法
CN210151883U (zh) * 2019-02-25 2020-03-17 无锡市政设计研究院有限公司 一种雨污水管道内衬修复机构

Also Published As

Publication number Publication date
CN109868881A (zh) 2019-06-11

Similar Documents

Publication Publication Date Title
US9777881B2 (en) Polymer composite grouting method for blocking leaking and sand inrush of underground pipelines
CN205261132U (zh) 一种胀插法非开挖修复系统
CN105673935B (zh) 裂插法地下管线更换方法
CN101838988B (zh) 一种抽拔锚索的综合施工方法
CN103398215A (zh) 一种微创非开挖顶拉管工艺
CN111810715B (zh) 非开挖管道更新方法及施工系统
CN102121268A (zh) 一种更换污水管道的方法
CN108591614A (zh) 燃气旧管道内多管穿越施工方法
CN109868881B (zh) 一种雨污水管道内衬修复机构的修复方法
CN210151883U (zh) 一种雨污水管道内衬修复机构
CN103353019A (zh) 一种柔性接头钢结构中继间装置
CN202627165U (zh) 一种不开挖整管修复完全坍塌和大变形管道的装置
CN102864833A (zh) 成品塑料检查井在室外排水系统中的应用
CN203161238U (zh) 一种电缆隧道中长距离曲线顶管用注浆装置
CN203757176U (zh) 非开挖式管道更换装置
CN109058583B (zh) 一种手掘式顶管施工用工具管
CN112393027A (zh) 顶管进洞封口环梁结构
CN113108123B (zh) 一种人工顶管多用途工具管
CN109027419A (zh) 一种手掘式顶管施工方法
CN109119943A (zh) 电缆在顶管两端的敷设方式优化方法
CN211475164U (zh) 一种用于混凝土顶管的变径装置
CN1095807A (zh) 不破坏路面路下管道施工方法
CN208364988U (zh) 用于小管径顶管施工的塑料排水管
CN1247285A (zh) 不开挖地表的地下管线安装工程施工方法
CN209839370U (zh) 一种钢纤维混凝土管

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Country or region after: China

Address after: 407, West Building, Lianchuang Building, No. 901-2 Yinxiu Road, Wuxi City, Jiangsu Province, 214072

Applicant after: Huaxin Design Group Co.,Ltd.

Address before: 214072 5F, West building, Lianchuang building, 901 yinxiu Road, Binhu District, Wuxi City, Jiangsu Province

Applicant before: WUXI MUNICIPAL DESIGN INSTITUTE Co.,Ltd.

Country or region before: China

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant